Method for evaluating concrete structure

The method of polishing and image-based bubble analysis in concrete structures addresses weather dependence and lack of objective quantification, enabling quick and quantitative evaluation for effective quality control.

JP2024158475APending Publication Date: 2024-11-08FUJITA CO LTD +1

Patent Information

Application Number
JP2023073706
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-27
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing methods for evaluating concrete structures are weather-dependent, require prolonged drying times, and lack objective quantification, making it difficult to integrate evaluation results into the PDCA cycle for timely quality feedback.

Method used

A method involving surface polishing to expose air bubbles, image analysis to measure bubble diameter and count, and setting quality standards based on the ratio of small bubbles to total bubbles, allowing for quick, weather-independent, and quantitative evaluation.

Benefits of technology

Enables rapid, non-destructive evaluation of concrete quality post-formwork removal, facilitating integration into the PDCA cycle for improved construction quality control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024158475000001_ABST
    Figure 2024158475000001_ABST
Patent Text Reader

Abstract

To provide a method for evaluating a concrete structure which can perform a quantitative evaluation without being affected by a weather condition and can perform a measurement immediately after form removal.SOLUTION: The method for measuring a concrete structure includes the steps of: removing the surface layer of a concrete structure; taking an image of the surface of the concrete structure with its surface layer removed; specifying a plurality of air bubbles from the taken image; measuring the diameter of each air bubble; counting the total number of air bubbles and the number of air bubbles of which diameter is 0.25 mm at largest; and calculating the ratio of the air bubbles of which diameter is 0.25 mm at largest of the total number of air bubbles.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for evaluating a concrete structure. [Background technology]

[0002] Surface air permeability tests and surface water absorption tests are known as methods for evaluating the condition of the surface layer of a concrete structure. In addition, a method for evaluating the construction quality of a concrete structure from the relationship between the electrical resistivity and the surface layer permeability coefficient in the surface layer has been disclosed (see Patent Document 1). Furthermore, an evaluation system has been disclosed that uses image information of the concrete surface after removing the formwork and uses artificial intelligence to evaluate the construction quality of the concrete (see Patent Document 2). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 10-123126 [Patent Document 2] JP 2016-142601 A Summary of the Invention [Problem to be solved by the invention]

[0004] To conduct surface air permeability tests and surface water absorption tests, it is necessary to wait several months for the surface to dry to a certain extent after pouring and hardening the concrete. In addition, these tests are easily affected by the weather, and there are issues with the moisture content of the concrete affecting the test results. Methods for evaluating the construction quality of concrete structures using artificial intelligence require a huge amount of learning data, and there is an issue in that using learning data based on the tacit knowledge of a specific concrete engineer does not necessarily result in an objective evaluation.

[0005] As a result, when carrying out work to pour concrete, it is not possible to quickly provide feedback on objective evaluation results from the previous work, and there is an issue in that the evaluation results cannot be utilized in the PDCA (Plan, Do, Check, Action) cycle during construction.

[0006] The present invention has been made in consideration of such problems, and has an object to provide a method for evaluating a concrete structure which is not affected by weather conditions, allows for quantitative evaluation, and enables measurements to be performed immediately after demolding. [Means for solving the problem]

[0007] A method for evaluating a concrete structure according to one embodiment of the present invention includes removing a surface layer of a concrete structure, photographing the surface of the concrete structure from which the surface layer has been removed, identifying a plurality of bubbles from the photographed image, measuring the diameter of each of the plurality of bubbles, counting the total number of the plurality of bubbles and the number of bubbles having a diameter of 0.25 mm or less, and calculating the proportion of bubbles having a diameter of 0.25 mm or less to the total number of the plurality of bubbles.

[0008] In one embodiment of the present invention, the construction of a concrete structure can be judged to be good when the ratio of bubbles with a diameter of 0.25 mm or less to the total number of bubbles is equal to or greater than a certain value. In this case, the construction of a concrete structure can be judged to be good when the ratio is 35% or more.

[0009] In one embodiment of the present invention, the removal of the surface layer of the concrete structure may be performed by grinding with a grinding machine.

[0010] In one embodiment of the present invention, a test specimen is prepared by pouring concrete into a formwork and compacting it with an internal vibrator, and the proportion of bubbles with a diameter of 0.25 mm or less to the total number of bubbles is calculated for a first position close to the internal vibrator and a second position far from the internal vibrator, and the proportions of bubbles at the first position and the second position are compared to determine a fixed value that will be used as a criterion for determining the proportion of bubbles with a diameter of 0.25 mm or less. Effect of the Invention

[0011] According to the method for evaluating a concrete structure of one embodiment of the present invention, evaluation can be performed based on images of the surface layer of the concrete structure, so that quality evaluation of the concrete structure can be performed quickly and non-destructively after the concrete has been poured and the formwork has been removed, regardless of weather conditions. [Brief description of the drawings]

[0012] [Figure 1] 1 shows a flowchart illustrating the steps of a method for evaluating a concrete structure according to one embodiment of the present invention. [Diagram 2] Photographs showing the condition of a concrete surface treated in a method for evaluating a concrete structure according to one embodiment of the present invention, in which (A) shows an image of the condition of the concrete surface after polishing, and (B) shows an enlarged image of the polished area. [Diagram 3] 1 shows the shape and measurement positions of a test specimen prepared in an example, where (A) is a side view and (B) is a plan view. [Figure 4] 1 is a graph showing the proportion of air bubbles having a size of 0.25 mm or less at each measurement point (distance from the internal vibrator) of a test specimen produced in an example. [Diagram 5] 1 is a graph showing the proportion of air bubbles of 0.25 mm or less at each measurement point (distance from the internal vibrator) of the footing measured in the examples. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, the embodiments of the present invention will be described with reference to the drawings. However, the present invention can be implemented in many different aspects, and should not be interpreted as being limited to the description of the embodiments exemplified below. In order to make the explanation clearer, the drawings may be schematic in terms of the width, thickness, shape, etc. of each part compared to the actual aspect, but they are merely examples and do not limit the interpretation of the present invention. In this specification and each figure, elements similar to those described above with respect to the previous figures may be given the same reference numerals, and detailed explanations may be omitted as appropriate. Furthermore, the letters "first" and "second" attached to each element are convenient labels used to distinguish each element, and have no further meaning unless otherwise specified.

[0014] The method for evaluating a concrete structure according to one embodiment of the present invention is carried out by acquiring an image of the surface of the concrete structure and analyzing the image to determine the number and size of bubbles. If a large number of bubbles remain in the hardened concrete, this will cause a decrease in the durability of the concrete structure, so it is considered to be beneficial to control the construction quality of the concrete structure by controlling the number of bubbles based on bubbles of a predetermined size.

[0015] Usually, when constructing a concrete structure, a formwork is erected, rebar is laid inside it, fresh concrete is poured in, and compacted with a vibrator. Fresh concrete is made by mixing cement, water, and aggregate, and is viscous, so air inevitably gets mixed in when it is made and poured. It is preferable to fully degas the air mixed in the concrete, but if the air is not fully degassed, it will remain inside as air bubbles. In general, the greater the slump of the concrete being poured, the more likely it is that air bubbles will be generated. Also, when the temperature of the concrete is high, it sets faster, so the air bubbles tend to harden without being degassed, and they tend to remain.

[0016] Specifically, concrete is known to contain bubbles called entrained air, which are fine, independent, and uniformly dispersed, and are generated in concrete by the surface-activating action of an air-entraining agent or an air-entraining water-reducing agent, and bubbles called entrapped air, which are naturally incorporated during mixing of concrete and have a large bubble diameter and an irregular shape. Here, bubbles called entrapped air are considered undesirable because they reduce the quality of concrete structures. Therefore, the method for evaluating a concrete structure according to this embodiment focuses on the size of bubbles and sets new quality control standards, making it possible to evaluate the quality in a simple manner. The details are shown below.

[0017] 1 shows a flowchart for explaining the steps of a method for evaluating a concrete structure according to one embodiment of the present invention. The method for evaluating a concrete structure according to this embodiment includes polishing a concrete surface (S201), acquiring an image of the polished concrete surface (S202), identifying bubbles on the concrete surface (S203), measuring the diameter of each bubble (S204), and calculating the proportion of bubbles with diameters equal to or smaller than a predetermined value to the total number of bubbles (S205). and evaluating the quality of the concrete structure based on whether or not the ratio of bubbles having a diameter equal to or smaller than a predetermined value to the total number of bubbles satisfies a predetermined evaluation criterion (S206).

[0018] First, a process of polishing the concrete surface is performed (S201). A thin skin of concrete paste is formed on the hardened concrete surface, and air bubbles may be covered by the thin skin and not exposed. Therefore, in order to accurately evaluate the number and size of air bubbles on the concrete surface, it is preferable to polish only the very surface layer of the concrete in order to remove this thin skin. There is no limitation on the polishing method, and for example, a polishing machine can be used. There is also no limitation on the range of polishing, and it is sufficient to selectively polish the areas required for measurement.

[0019] Next, an image of the polished concrete surface is captured (S202). There is no limitation on the method of capturing the image, but for example, a digital camera can be used.

[0020] Figure 2(A) shows an image of the concrete surface after polishing. The image shown in Figure 2(A) shows that the polished area has a circular shape, with different contrast between the polished area and the surrounding area. There is no limit to the shape and range of the polished area, but Figure 2(A) shows a polished area with a diameter of 100 mm.

[0021] Figure 2(B) shows an enlarged image of a portion of the image shown in Figure 2(A), and shows an enlarged rectangular area with one side length of 5 mm. In the enlarged image of Figure 2(B), the difference in contrast confirms that air bubbles and aggregates are dispersed. Since air bubbles are usually circular, it is possible to identify the air bubbles by separating them from the aggregates based on their shape (S203).

[0022] Next, the number of bubbles is counted from the images shown in Figs. 2(A) and (B), and the diameter of each bubble is measured (S204). Then, the ratio of bubbles whose diameter is equal to or smaller than a predetermined reference value is calculated (S205). The reference value of the diameter can be set appropriately. For example, since the bubble diameter of entrained air is about 0.025 mm to 0.25 mm, the reference value of the diameter can be set to 0.25 mm or less. Then, the ratio of bubbles whose diameter is equal to or smaller than 0.25 mm to all bubbles observed on the concrete surface is calculated, and the calculated value is compared with a value set as a quality control standard to evaluate the quality of the concrete structure (S206).

[0023] Quality control standards can be determined based on the amount of surface bubbles in test specimens prepared at the same time as the actual concrete structure. For example, quality control standards can be determined by preparing test specimens of a specified size at the same time as the concrete structure is constructed, and investigating how the proportion of bubbles with a specified diameter changes with distance from the position where compaction was performed. It is empirically known that sufficient compaction is achieved at the position where the vibrator is inserted, and that the effect of the vibrator decreases at positions away from the vibrator, resulting in a decrease in the degree of compaction. Therefore, quality control standards can be set by investigating how the proportion of bubbles of a specified size changes relative to the total number of bubbles, based on the state of the concrete around the position where the vibrator is inserted.

[0024] Specifically, since the effective compaction range of a general internal vibrator (with a diameter of 50 mm) is about 500 mm, it can be determined that the concrete is sufficiently compacted if the compaction time is appropriate (generally about 5 to 15 seconds) and the distance from the internal vibrator is within 250 mm. In addition, it can be determined that the concrete is sufficiently compacted when a line of cement paste appears on the contact surface between the concrete and the sheathing, the concrete volume is not reduced, the surface becomes almost horizontal, and the surface becomes glossy. If the concrete is determined to be sufficiently compacted based on these criteria, the quality control standard value can be determined by calculating the proportion of bubbles of 0.25 mm or less in the concrete. Then, the quality of the concrete structure can be evaluated by checking whether the number of bubbles of a specified diameter or less is a specified proportion set by the quality control standard with respect to the total number of bubbles.

[0025] According to this embodiment, quality control standards can be set based on the number and diameter of air bubbles confirmed by observing the polished concrete surface, making it possible to evaluate the quality of concrete structures regardless of the test time or weather conditions. This can also be applied to the PDCA cycle as part of quality control during construction, contributing to reliable construction and further quality improvement. EXAMPLES

[0026] [Example 1] This embodiment shows an example of setting quality control standards. To set the quality control standards, a test specimen is prepared. Figures 3(A) and (B) show an outline of the test specimen. In Figure 3, (A) shows a side view of the test specimen, and (B) shows a plan view.

[0027] The test specimens were prepared by pouring concrete into the formwork. The mix proportions of the concrete used to prepare the test specimens are shown in Table 1. [Table 1]

[0028] In Table 1, Gmax is the maximum size of the coarse aggregate, the type of cement is ordinary cement, and s / a is the ratio of sand to aggregate. In addition, W is water, C is cement, S is sand, and G is the unit amount of gravel (kg / m 3 ) is shown.

[0029] As shown in Figures 3(A) and (B), the test specimen is a rectangular parallelepiped with a width (W) of 1500 mm, a height (H) of 500 mm, and a depth (D) of 325 mm. As shown in Figure 3(A), when the test specimen is viewed in cross section, concrete was poured from a position 250 mm away from the left end (L1) and 150 mm away from the bottom (L2), and the internal vibrator was inserted to compact it. After the concrete hardened, the position directly above the internal vibrator was set as the reference point, and measurement points (within a diameter of 100 mm) were set at a constant distance from the reference point (P1 = 200 mm), and the number of bubbles at each measurement position was evaluated. The evaluation method was performed according to the procedure shown in the flowchart of Figure 1.

[0030] In this example, the top surface of the test specimen was visually observed, and the ratio of bubbles with a diameter of 0.25 mm or less to the total number of bubbles was examined, as explained above. Here, the visual evaluation was of the condition (smoothness) and color tone of the concrete surface, and was a subjective judgment based on the evaluator's experience, but the condition of the concrete directly above the test specimen, at least within 250 mm from the position of the internal vibrator, was judged to be sufficiently compacted.

[0031] Figure 4 shows the proportion of bubbles with a diameter of 0.25 mm or less at each measurement point (distance from the internal vibrator) of the test specimen produced in this example. In the graph shown in Figure 4, the horizontal axis is the distance from the internal vibrator, and the vertical axis shows the proportion of bubbles with a diameter of 0.25 mm or less as a percentage. As is clear from the graph in Figure 4, within 250 mm from the internal vibrator, where it is judged that sufficient compaction has been performed even by visual observation, the proportion of bubbles with a diameter of 0.25 mm or less is high, and it can be seen that the proportion decreases with increasing distance from the internal vibrator.

[0032] From the results shown in FIG. 4, the numerical value of the percentage of bubbles with a diameter of 0.25 mm or less at a location within 250 mm away from the internal vibrator means the numerical value when sufficient compaction has been achieved, and serves as a reference for quality control standard values. In this embodiment, "the percentage of bubbles with a diameter of 0.25 mm or less is 35% or more" can be used as the criterion for determining whether or not compaction has been achieved sufficiently.

[0033] According to this embodiment, the quality control standard for evaluating the surface quality of a concrete structure can be set as the ratio of bubbles with a diameter of 0.25 mm or less to the total number of bubbles. This quality control standard can be determined each time the concrete mix or construction conditions are changed, so that the quality control standard value can be determined more appropriately when constructing a concrete structure.

[0034] [Example 2] This example shows the result of applying the evaluation method for a concrete structure according to one embodiment of the present invention to the footing of a bridge abutment. The design standard strength of the footing is 24 N / mm 2The mix proportions of the concrete used were the same as those shown in Table 1. In this example, the quality control standard was set to "the proportion of air bubbles with a diameter of 0.25 mm or less is 35% or more."

[0035] Figure 5 is a graph showing the results of the measurements in this example, showing the percentage of bubbles with a diameter of 0.25 mm or less at each measurement point on the footing. Measurements were taken at seven points in total, and since the percentage of bubbles with a diameter of 0.25 mm or less was 35% or more at each measurement point, it can be determined that the compaction of the footing was good.

Claims

1. Remove the surface layer of the concrete structure, Photographing the surface of the concrete structure from which the surface layer has been removed; Identifying a plurality of bubbles from the captured image; measuring a diameter of each of the plurality of bubbles; Counting the total number of the plurality of bubbles and the number of bubbles having a diameter of 0.25 mm or less; Calculating the ratio of the bubbles having a diameter of 0.25 mm or less to the total number of the plurality of bubbles.

2. A method for evaluating a concrete structure comprising the steps of:

2. When the ratio of the bubbles having a diameter of 0.25 mm or less to the total number of the plurality of bubbles is equal to or greater than a certain value, the construction of the concrete structure is judged to be good. The method for evaluating a concrete structure according to claim 1 .

3. When the ratio is 35% or more, the construction of the concrete structure is judged to be good. The method for evaluating a concrete structure according to claim 2.

4. The surface of the concrete structure is removed by polishing with a polishing machine. The method for evaluating a concrete structure according to claim 1 .

5. Concrete was poured into the formwork and compacted with an internal vibrator to create a test specimen. calculating a ratio of bubbles having a diameter of 0.25 mm or less to a total number of the plurality of bubbles for each of a first position close to the internal vibrator and a second position distant from the internal vibrator; determining said constant value by comparing the rate at which the air bubble contracts at said first location and said second location; The method for evaluating a concrete structure according to claim 2.

Citation Information

Patent Citations

  • Device and method for testing amount of air of fresh concrete

    JP1998123126A

  • Construction quality evaluation program, construction quality evaluation method, and construction quality evaluation device

    JP2016142601A

Cited By

  • Concrete bubble real-time monitoring method and system applied to water conservancy project

    CN121830397A