Temporary pier construction method
The method of constructing temporary piers by extending overhanging girders with bolt or tension joints addresses the limitations of conventional techniques, reducing costs and enhancing resistance to horizontal forces, allowing for flexible pile spacing and efficient use of smaller machinery.
Patent Information
- Application Number
- JP2023075788
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-01
- Publication Date
- 2024-11-14
AI Technical Summary
Conventional temporary pier construction techniques face issues such as the need for special measures when obstacles are encountered, high costs due to large-sized heavy equipment, low resistance to horizontal forces, and complex cantilevered structures that restrict the use of heavy machinery.
The method involves constructing a temporary pier by erecting support piles at predetermined intervals and extending overhanging main girders using heavy equipment mounted on the existing superstructure, connecting these girders with bolt joints or tension joining means, and forming a continuous beam structure to enhance resistance to horizontal forces.
This approach allows for reduced construction costs and time, increased flexibility in pile spacing, improved resistance to external forces, and the use of smaller, less costly heavy machinery, while maintaining structural integrity even in challenging conditions.
Smart Images

Figure 2024160603000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for constructing a temporary pier in which a superstructure is constructed while extending the main girder. [Background technology]
[0002] Referring to Figure 9, in a conventional temporary pier, support piles 60 are constructed at a predetermined interval in the direction of the bridge axis, and then main girders 61 are hung between the heads of adjacent support piles 60, and a covering plate 62 is laid on the main girders 61 erected in parallel to construct the superstructure (Patent Document 1). The main girders 61 extending between the heads of the support piles 60 are structurally separated into spans, and the main girders 61 function as simple beams. When constructing the superstructure, the erection of the support piles 60 and the construction of the main girders 61 are carried out using heavy machinery 63 such as a crane truck mounted on the existing superstructure.
[0003] On the other hand, the cantilever method has been proposed as another method for constructing temporary piers. Patent Document 2 discloses that a cantilever-type overhanging scaffolding is attached to the front end of the existing superstructure, and the overhanging scaffolding that obtains a reaction force from the existing superstructure is used to erect support piles and lay the main girders in the unfinished parts of the pier. Patent Document 3 discloses that the main girder is extended in a cantilever manner from the front end of the existing superstructure toward the unfinished portion of the pier, wire is stretched between the existing superstructure and the extended main girder, and support piles are erected in the unfinished portion of the pier while supporting the main girder via the wire. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2010-59743 A [Patent Document 2] JP 2012-162862 A [Patent Document 3] JP 2000-96582 A Summary of the Invention [Problem to be solved by the invention]
[0005] Conventional temporary pier construction techniques have the following problems: <1> Since both ends of the main girder 61 are supported by the support piles 60, the overall length of the main girder 61 and the erection interval (pile pitch) of the support piles 60 in the bridge axis direction are equal in size. Therefore, if an obstacle is present at the planned installation location of the support pile 60, the installation location of the support pile must be changed, and special measures such as shortening the overall length of the main girder 61 to accommodate the change in the installation location of the support pile 60 are required. <2> Since the conventional main girder 61 functions as a simple beam, the superstructure including the main girder 61 has little resistance to horizontal forces. <3> In order to make maximum use of the working radius of a heavy work machine 63 such as a crane truck, the heavy work machine 63 is driven forward to the very front end (foremost position) of the existing superstructure and parked there. In order to expand the pile pitch of the support piles 60, a large heavy work machine 63 with a large working radius must be used. <4> If a large heavy work machine 63 with a large working radius is used, the load on the superstructure increases, the steel material used becomes larger, and the cost of the heavy work machine and the material become higher. <5> In the cantilever construction method, in which construction is carried out by obtaining reaction force from the existing superstructure, the structure in which the cantilever support of the cantilever members such as the cantilever scaffolding and main girders is complex and costly, and construction cannot be carried out by placing heavy machinery on the cantilever members extending from the existing superstructure.
[0006] The present invention aims to provide a method for constructing a temporary pier that can solve the above problems. [Means for solving the problem]
[0007] The present invention is a method for constructing a temporary pier, in which a step of erecting support piles at a predetermined interval and a step of constructing a superstructure of a temporary pier including a plurality of overhanging main girders on the top of the plurality of support piles are performed on a span-by-span basis, and the work of erecting the support piles in front of the existing superstructure and the work of erecting the extension overhanging main girders in front of the existing superstructure are performed using a heavy work machine placed on the existing superstructure, in which a part of the overhanging main girders is overhanged in the extension direction of the temporary pier from the support positions of the support piles to form an overhanging portion, The extension main girder is suspended and supported by the end of the extension part of the existing extension main girder and support piles installed in the extension direction of the existing superstructure, and floor plates are laid on the extension main girder to form the superstructure by extending it in the extension direction of the temporary pier. With the joint positions between the extension main girders and the support positions of the extension main girder by the support piles shifted in the bridge axis direction, the end of the existing extension main girder and the end of the extension main girder are joined together to provide continuity between the multiple extension main girders. In another embodiment of the present invention, the end of the existing main girder and the end of the extension main girder may be joined together by a bolt joint means combining a plurality of splice plates and a plurality of connecting bolts. In another form of the present invention, a lower jaw and an upper jaw that can come into contact with each other can be formed at both ends of the overhanging main girder, and an end plate provided at the tip and base end of the lower jaw with a position shifted in the height direction can be brought into contact with an end plate provided at the tip and base end of the upper jaw with a position shifted in the height direction, and the pair of end plates can be fastened with a plurality of bolts so that a large compressive force can be generated between the pair of end plates arranged with their joint surfaces abutting. In another embodiment of the present invention, the end of the existing main girder and the end of the extension main girder may be integrally joined by a tensile joint means. In another form of the present invention, an end plate having bolt holes may be fixed to the end face of the protruding main girder, and the pair of end plates may be fastened with multiple bolts or multiple high-strength bolts so that a large compressive force can be generated between the pair of end plates arranged with their joint surfaces abutting. In another embodiment of the present invention, the overhanging main girder is made of H-shaped steel. Effect of the Invention
[0008] The present invention has at least one of the following advantages. <1> Since the superstructure is formed by projecting in the extension direction of the temporary pier, the heavy work equipment can be advanced to the tip of the superstructure, so that the pile pitch can be made wider than before even if heavy work equipment with the same working radius as before is used. <2> If the pile pitch could be increased for construction, the number of support piles required for the construction of the temporary pier could be reduced, resulting in improvements in both construction costs and construction time. <3> Because the superstructure of the temporary pier is an overhanging structure, even when construction is carried out at a site where the temporary pier has a longitudinal slope, it is possible to work on the overhanging superstructure using heavy machinery, thereby ensuring the necessary working radius. <4> In the present invention, the ends of multiple overhanging main girders are joined together to form a continuous beam structure, which significantly improves the resistance to horizontal forces from the superstructure of the temporary pier. In particular, even if subjected to large external forces such as earthquakes or storms, the risk of the temporary pier collapsing can be significantly reduced. <5> By applying a tension joint means to the initial joint at the end of the overhanging main girder, the work time and labor on site can be significantly reduced, resulting in significant labor savings, shorter construction time, and reduced construction costs. <6> Since the overhanging main girder can be erected without being affected by the head spacing of the support piles, even if an obstacle is present at the planned location of the support pile, there is no need to take special measures such as changing the overall length of the main girder to match the change in the location of the support pile. <7> Since the heavy machinery can be advanced to the tip of the superstructure, construction can be carried out using heavy machinery with a small working radius when the pile spacing is not changed. This allows the use of small heavy machinery, reducing the load placed on the superstructure by the heavy machinery, and reducing the costs of the machinery and materials. [Brief description of the drawings]
[0009] [Figure 1] An explanatory diagram of a method for constructing a temporary pier according to Example 1 of the present invention using a protruding main girder. [Diagram 2] Model of the completed temporary pier [Diagram 3] A perspective view of a joint using bolts as a means of connecting the main girder [Figure 4A] A perspective view of the lower jaw that forms the joint of the overhanging main girder [Figure 4B] A perspective view of the upper jaw that constitutes the joint of the overhanging main girder [Diagram 5] Side view of the joint of the overhanging girder (tension joint) [Figure 6] Enlarged cross-sectional view of the joint (tension joint) of the overhanging main girder [Figure 7A] An explanatory diagram of the construction method of the temporary pier, including the erection of support piles [Figure 7B] An explanatory diagram of the construction method of the temporary pier, and the erection work of the second main girder [Figure 8] FIG. 11 is an explanatory diagram of a method for constructing a temporary pier according to a second embodiment of the present invention, and is a side view of a joint of a protruding main girder to which another tension joint is applied. [Figure 9] Illustration of a conventional method for constructing a temporary pier DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] The present invention will be described in detail below with reference to the drawings. In the description, the bridge axis direction is defined as X, and the bridge axis transverse direction is defined as Y. EXAMPLES
[0011] <1> Overview of the temporary pier The temporary pier 10 will be described with reference to FIGS. The temporary pier 10 comprises a plurality of support piles 20 erected at intervals, support girders 21 horizontally disposed between the heads of the plurality of support piles 20 in the direction transverse to the bridge axis Y, a protruding main girder 30 disposed between adjacent support girders 21 in the bridge axis direction X, and a floor plate 40 such as a covering plate laid on the upper surface of the protruding main girder 30. The "temporary pier 10" in this invention is not limited to a temporary pier used as a walkway or a work platform for construction work to transport workers, construction machinery, materials, etc. from the shore for on-water or underwater construction, but also includes various other structures such as piers, construction roads, work platforms, and emergency bridges for disaster recovery.
[0012] <2> Overhanging main girder Explaining with reference to FIG. 2, the overhanging main girder 30 is made of a high-rigidity steel material, and has a main girder body 31 which is the main body of the girder material. In this example, a configuration is described in which the total length L1 of the protruding main girder 30 has a dimensional relationship equal to the span length L2 of the support pile 20 in the bridge axis direction, but the total length L1 of the protruding main girder 30 and the span length L2 of the support pile 20 may have a different dimensional relationship.
[0013] <2.1> Main girder body The main girder body 31 will be described in detail with reference to FIG. The main girder body 31 is an H-shaped steel and has a web 31a and a pair of flanges 31b, 31b formed on both ends of the web 31a. The main girder body 31 can be made of existing main girder materials such as I-girders, box girders, truss girders, etc. in addition to the H-shaped steel shown in this example.
[0014] <3> Joint method for overhanging girder The projecting main girder 30 is joined by connecting both ends thereof that are butted against each other with a plurality of bolts.
[0015] As a joining means for the overhanging main girder 30, for example, a "bolt joint means" in which a plurality of splice plates 60 and a plurality of connecting bolts 61 as shown in FIG.
[0016] <4> Tension Joint Furthermore, as a joining means for the overhanging main girder 30, it is also possible to apply a "tension joining means" which will be described later. In this example, a form in which a "tension joint" is applied to a notched structure in which both ends of the overhanging main girder 30 are formed so that they can be connected to each other will be described.
[0017] The term "half cut" refers to a structure in which approximately half the thickness of the ends of the joining parts is cut away and the remaining parts are overlapped and joined together.
[0018] <4.1> Lower and upper jaws The lower jaw 33 and the upper jaw 34 will be described in detail with reference to FIGS. The overhanging main girder 30 has a lower jaw 33 in the lower half of one end (left tip) of the main girder body 31, and an upper jaw 34 in the upper half of the other end (right base end) of the main girder body 31. The opposing surfaces of the lower jaw 33 and the upper jaw 34 are crank-shaped (step-shaped), and when the two jaws 33, 34 are butted together, they can be fitted together and joined.
[0019] <4.2> End plate The lower jaw 33 is provided with a pair of end plates 33a, 33b at its tip and base. The upper jaw 34 is also provided with a pair of end plates 34a, 34b at its tip and base ends. These end plates 33a, 33b, 34a, 34b are high-strength plates, and a plurality of bolt holes 35 are formed in the plate surfaces. Since the end plates 33a, 33b, 34a, and 34b are made of the same material and have the same structure, only the end plate 33a will be described below as a representative, and descriptions of the other end plates 33b, 34a, and 34b will be omitted.
[0020] The end plate 33a is fixed by full circumference welding. The reason why full circumference welding is adopted as a fixing means for the end plate 33a is to resist bending forces (tension and compression) and shear forces acting on the joints of the overhanging main girder 30.
[0021] The lower jaw 33 has an upwardly facing step surface 33c, and the upper jaw 34 has a downwardly facing step surface 34c. The step surface 33c of the lower jaw 33 is located between the lower end plate 33a and the upper end plate 33b. The step surface 34c of the upper jaw 34 is located between the lower end plate 34a and the upper end plate 34b. When the lower jaw 33 and the upper jaw 34 are butted together on the same axis, the lower end plates 33a, 34a and the upper end plates 33b, 34b and the step surfaces 33c, 34c can be joined together without any gaps.
[0022] <4.3> Thickness of end plate Explaining with reference to FIG. 6, the plate thickness t1 of the end plate 33a is greater than the plate thickness t2 of the flange 31b of the main girder body 31. The reason for making the plate thickness of the end plate 33a and the flange 31b different is to reduce stress concentration at the installation point of the high-strength bolt 36 on the end plate 33a when an external force such as a bending force acts on the joint of the overhanging main girders 30, 30.
[0023] <4.4> Ribs 4A to 5, ribs 37 parallel to the flanges 31b are provided between the left and right side surfaces of the web 31a and the end plates 33a. The rib 37 may be a single one, but a plurality of ribs 37 may be provided in multiple stages at intervals in the height direction of the web 31b. The ribs 37 are not essential, and may be omitted if sufficient strength can be ensured with the end plates 33a alone.
[0024] <4.5> Materials of main girder body and end plate The base material of the main girder body 31 is SM material (rolled steel for welded structure) or SS material (rolled steel for general structure). For the base material of the end plate 33a, one of SS material, SM material (rolled steel for welded structures) or SN material (rolled steel for architectural structures) is used, taking into consideration the cross-sectional dimensions of the main girder body 31 and the plate thickness of the end plate 33a. The base materials of the main girder body 31 and end plate 33a described above are merely examples, and known materials can be used.
[0025] Considering economy, workability, and weldability, a combination of using SS material for the main girder body 31 and SM material for the end plate 33a is preferable.
[0026] <4.6> High strength bolts The high-strength bolt 36 is a high-tension bolt for strongly pressing the two overlapping end plates 33a, 34a (33b, 34b) together to form a "tensile joint", and is used in combination with a washer 36a and a nut 36b. The high strength bolt 36 includes known high strength bolts such as a torsion type high strength bolt. The number of high strength bolts 36 used and their installation intervals are appropriately selected taking into consideration the joint area, etc.
[0027] <4.7> What is a tensile joint? The tension joint will be described with reference to FIG. 5 in which a plurality of high-strength bolts 36 are used to fasten the lower jaw 33 of the first overhanging main girder 30A and the upper jaw 34 of the second overhanging main girder 30B to each other at their abutting portions. When the lower jaw 33 and the upper jaw 34 are butted together on the same axis, the pair of lower end plates 33a, 34a and the pair of upper end plates 33b, 34b come into contact with each other without any gaps. After inserting high-strength bolts 35 between the abutting lower pair of end plates 33a, 34a and between the upper pair of end plates 33b, 34b, the nuts 35b are screwed on and tightened until a predetermined torque is reached, thereby joining the tip end of the existing first protruding main girder 30A and the rear end of the second protruding main girder 30B.
[0028] A "tension joint" is a joint method in which a large tightening force is applied to the high-strength bolts 36 to generate a large compressive force between the end plates 33a, 34a (33b, 34b), and stress is transmitted by canceling out the external tensile force acting in the bolt axial direction.The bending strength of the end plate 33a and the axial force introduced into the high-strength bolts 36 are utilized to counter the bending forces (tension and compression) and shear forces acting on the joint of the overhanging main girder 30 (between the end plates 33a, 34a (33b, 34b)). The "tensile joining means" is described in detail, for example, in the publication of Japanese Patent No. 6924999 previously proposed by the applicant.
[0029] By using a "tension joint" as the joint means between the first overhanging main girder 30A and the second overhanging main girder 30B, there is no need for multiple splice plates or numerous connecting bolts as in conventional friction joints, and on site, it is only necessary to fasten a pair of butted end plates 33a, 34a (33b, 34b) together using multiple high-strength bolts 36.
[0030] This allows for a significant reduction in on-site work time and labor, resulting in significant labor savings, shorter construction periods, and reduced construction costs.
[0031] Furthermore, it is possible to reduce the amount of steel used for connecting bolts, splice plates, etc., which are conventionally used in friction joints and bearing joints, thereby contributing to reducing the burden on the environment.
[0032] [How to build a temporary pier] Next, a method for constructing the temporary pier 10 will be described with reference to Figs. 7A and 7B.
[0033] <1> Support pile erection work FIG. 7A shows a process of erecting a support pile 20b in front of the existing superstructure using a heavy work machine 50 such as a crane truck that is installed on the existing superstructure. The existing superstructure of the temporary pier 10 has the front end of the first protruding main girder 30A protruding from the existing support pile 20a located at the forefront toward the extension direction of the bridge axis, forming a protruding portion 38 at the front end of the first protruding main girder 30A.
[0034] Using a heavy work machine 50 mounted on the existing superstructure, a separate support pile 20b is erected in front of the existing superstructure. In the present invention, the heavy work equipment 50 can be advanced beyond the support position of the foremost support pile 20a to the tip position of the projection portion 38 of the first protruding main girder 30A, so that the pile pitch can be increased compared to the conventional case even when a heavy work equipment with the same working radius as the conventional case is used.
[0035] After the erection of the support piles 20b is completed, the support girder 21 is laid horizontally between the heads of the support piles 20b adjacent to each other in the transverse direction Y of the bridge axis as shown in FIG. 7B.
[0036] <2> Erection of the main girder FIG. 7B shows a process of extending the second protruding main girder 30B forward of the existing first protruding main girder 30A. The second main girder 30B, which is to be extended separately, is hoisted using heavy work equipment 50 mounted on the existing superstructure, and the second main girder 30B is joined integrally to the front of the existing first main girder 30A to extend the main girder. The second protruding main girder 30B to be extended is supported near its tip by a support pile 20a, and the rear end of the second protruding main girder 30B is connected to the tip of the existing first protruding main girder 30A with a plurality of bolts. As already described, the first and second projecting main girders 30A, 30B are connected by tension joints.
[0037] As shown in Figure 5, when erecting the second protruding main girder 30B, there is a step between the upper jaw 34 of the second protruding main girder 30B and the lower jaw 33 of the first protruding main girder 30A. Therefore, by temporarily placing the upper jaw 34 of the second protruding main girder 30B on the lower jaw 33 of the first protruding main girder 30A, the joint heights of a pair of end plates 33a, 34a (33b, 34b) can be made to match. Therefore, even if the joint points of the two protruding main girders 30A, 30B are away from the support pile 20, there is no need to fine-tune the suspension height of the second protruding main girder 30B on-site, and the joining work of the two protruding main girders 30A, 30B can be performed easily and accurately.
[0038] When erecting the second overhanging main girder 30B, a protruding portion 38 is formed by protruding a portion near the tip of the second overhanging main girder 30B from the support pile 20a in the extension direction. FIG. 2 shows a state in which the first overhanging main girder 30A and the second overhanging main girder 30B are connected by a tension joint.
[0039] <3> Floorboard installation A floor plate 40 such as a covering plate is laid on the upper surface of the adjacent second projecting main girder 30B. That is, the floor plate 40 is laid on the upper surface of the second protruding main girder 30B, and the superstructure is formed by protruding in the extension direction of the temporary pier. The joint position between the overhanging main girders 30A, 30B and the support position of the first overhanging main girder 30A by the support pile 20a are shifted in the bridge axis direction.
[0040] <4> Repeating the process The series of steps described above are repeated on a span-by-span basis to construct a temporary pier 10 of a predetermined length.
[0041] [Characteristics of the temporary pier] Next, the characteristics of the temporary pier 10 will be described.
[0042] <1> Relationship between the position of the support pile and the joint position of the overhanging main girder In conventional temporary piers, the support positions at both ends of the main girder were limited to support piles. In contrast, in the present invention, a portion of the protruding main girder is extended from the support pile and joined at a position away from the support pile. Therefore, the overhanging main girder can be erected without being affected by the erection position of the support piles. For example, even if an obstacle is present at the planned location of the support pile, the location of the support pile can be changed without changing the overall length of the projecting main girder.
[0043] <2> Continuous beam structure of the overhanging main girder As shown in Figure 2, in the present invention, the vicinity of the tip of the second protruding main girder 30B to be extended is supported by a support pile 20a via a support girder 21, and the rear end of the second protruding main girder 30B is integrally joined to and supported by the tip of the existing first protruding main girder 30A. By joining the first protruding main girder 30A and the second protruding main girder 30B together on the same axis, the first protruding main girder 30A and the second protruding main girder 30B have continuity, forming a "continuous beam structure." Since the multiple overhanging girders erected along the bridge axis direction X form a "continuous beam structure," the resistance of the superstructure of the temporary pier 10 to horizontal forces increases.
[0044] <3> About the working range of heavy machinery In the present invention, the front end of the overhanging main girder 30 is extended forward from the support position by the existing support pile 20, and the superstructure is formed including the overhanging portion 38. Therefore, as shown in FIG. 7A, it is possible to move the heavy work machine 50 forward to the position of the foremost end of the projection 38 of the temporary pier 10 and stop it there. In other words, the stopping position of the heavy work machine 50 can be advanced in the extension direction of the temporary pier 10 compared to the conventional case, so that the working range of the heavy work machine 50 is expanded by the amount of advancement.
[0045] <4> Pitch of support piles By expanding the working range of the heavy work machine 50, the interval (pile pitch) between the support piles 20 can be increased. By increasing the spacing between the support piles 20, the number of support piles 20 required for the entire temporary pier can be reduced, resulting in significant reductions in construction costs and shortening of construction time.
[0046] <5> About heavy machinery Since the work range can be expanded by moving the parking position of the heavy work machine 50 forward, construction can also be carried out using a heavy work machine 50 with a small working radius. If the working radius is reduced, the heavy work equipment 50 used can be made smaller, and the cost of the heavy equipment can be reduced.
[0047] <6> Strength of joints in overhanging girders The following description will be given with reference to Fig. 5. The front and rear ends of the overhanging main girders 30, 30 installed on the same axis are closely joined, and the joints are joined with a plurality of bolts. The strength of the joints of the overhanging main girder 30 is designed to withstand bending forces and shear.
[0048] <6.1> Strength evaluation of joints in overhanging girders using tension joints The evaluation of the joint of the overhanging main girder 30 using tension joints against compression, shear and bending will be considered.
[0049] <6.2> Compressive force When a compressive force acts in the axial direction on the joints of the overhanging main girder 30, the compressive force is transmitted through the joint surfaces of the lower end plates 33a, 34a and the joint surfaces of the upper end plates 33b, 34b.
[0050] <6.3> Shear force When a shear force acts on the joint of the overhanging main girder 30, the axial force introduced into the high-strength bolt 36 (shear resistance of the bolt portion) resists the shear force, so that the high-strength bolt 36 does not suffer shear failure. Therefore, no sliding or separation occurs between the tension-jointed lower end plates 33a, 34a and between the upper end plates 33b, 34b.
[0051] <6.4> Bending force When a downward bending force is applied to the joint of the overhanging girder 30, the upper side of the overhanging girder 30 becomes a compression area, and the lower side of the overhanging girder 30 becomes a tension area.
[0052] In the case of a tension joint, when a bending force acts on the joint of the overhanging main girder 30, the axial force of the high-strength bolt 36 changes depending on its installation position. In this example, a compressive force acts on the upper high-strength bolt 36, and a tensile force acts on the lower high-strength bolt 36. In the upper high strength bolt 36 on which the compressive force acts, the axial force previously introduced into the high strength bolt 36 is somewhat reduced, but is not completely eliminated. In the lower high-strength bolt 36 on which the tensile force acts, a new tensile force is added to the axial force previously introduced in the high-strength bolt 36, but since the high-strength bolt 36 is set to have a high strength, there is no need to worry about the lower high-strength bolt 36 breaking.
[0053] <6.5>Effect on end plates Furthermore, since the plate thickness t1 of each end plate 33a, 33b, 34a, 34b is set to a dimension capable of alleviating stress concentration, no yield deformation occurs in the end of the overhanging main girder 30 and the end plates 33a, 33b, 34a, 34b. Furthermore, the joints between the main girder 30 and the end plates 33a, 33b, 34a, and 34b are also welded all around, so these welds will not separate.
[0054] <6.6> Summary of tensile joints In this way, by fastening the overlapping lower end plates 33a, 34a and the upper end plates 33b, 34b together with a plurality of high-strength bolts 36 to form a tensile connection, it is possible to withstand the compressive forces, shear forces and bending forces acting on the joints of the overhanging main girder 30 and maintain a good joint condition. Furthermore, the on-site work time and labor can be significantly reduced, workability can be greatly improved, and construction time can be greatly shortened. EXAMPLES
[0055] Other embodiments will be described below. In the description, the same parts as those in the first embodiment will be given the same reference numerals and detailed description thereof will be omitted.
[0056] <1> Example of tension joint without step FIG. 8 shows an embodiment in which another tension joint is applied as a joint means for the overhanging main girder 30. In this example, a configuration will be described in which a tension joint is applied without providing a step at the end of the protruding main girder 30 (the first protruding main girder 30A and the second protruding main girder 30B). In this example, end plates 33d, 34d measuring the entire cross section of the H-shaped steel are provided at the ends of the first protruding main girder 30A and the second protruding main girder 30B, and this pair of end plates 33d, 34d are tightened with a predetermined torque via a plurality of high-strength bolts 36. The requirements for the tensile joint in this example are the same as those in the first example described above, so a detailed explanation will be omitted.
[0057] <2> Effects of this Example This embodiment provides the same effects as those of the first embodiment described above. [Explanation of symbols]
[0058] 10. Temporary pier 20...Support pile 21....Passing beam 30... Overhanging main girder 31... Main girder body 31a··Web 31b···Flange 33... lower jaw 33a...end plate 33b...End plate 33c...Step surface 34...Upper jaw 34a...end plate 34b...End plate 34c...Step surface 35...Bolt hole 36 High strength bolt 36a···Washer 36b Nut 37 Rib 38...Protrusion 40...Floorboard 50 Heavy machinery
Claims
1. A method for constructing a temporary pier, comprising the steps of erecting support piles at a predetermined interval and constructing a superstructure of a temporary pier including a plurality of overhanging girders on the tops of the plurality of support piles, on a span-by-span basis, and using heavy machinery placed on the existing superstructure to erect the support piles in front of the existing superstructure and to erect the overhanging girders for extension in front of the existing superstructure, A part of the main girder is extended in the extension direction of the temporary pier relative to the support position of the support pile to form an extension portion; The extension main girder is supported by the end of the extension part of the existing extension main girder and a support pile provided in the extension direction of the existing superstructure, and the extension main girder is hung. A floor plate is laid on the extension main girder and a superstructure is extended in the extension direction of the temporary pier to form the superstructure; The joint positions of the protruding main girders and the support positions of the protruding main girders by the support piles are shifted in the bridge axis direction, and the ends of the existing protruding main girders and the ends of the extension protruding main girders are joined together to provide continuity between the multiple protruding main girders. How to build a temporary pier.
2. A method for constructing a temporary pier as described in claim 1, characterized in that the end of the existing main girder and the end of the extension main girder are joined together by a bolt joint means combining a plurality of splice plates and a plurality of connecting bolts.
3. A method for constructing a temporary pier as described in claim 1, characterized in that a lower jaw and an upper jaw that can come into contact with each other are formed at both ends of the overhanging main girder, end plates are provided at the tip and base end of the lower jaw with a position shifted in the height direction, and end plates are provided at the tip and base end of the upper jaw with a position shifted in the height direction, and the pair of end plates are fastened with a plurality of bolts so that a large compressive force can be generated between the pair of end plates arranged with their joint surfaces abutting.
4. 2. A method for constructing a temporary pier as claimed in claim 1, characterized in that the end of the existing main girder and the end of the extension main girder are integrally joined together by a tensile joint means.
5. A method for constructing a temporary pier as described in claim 4, characterized in that an end plate having a bolt hole is fixed to the end face of the protruding main girder, and the pair of end plates are fastened with a plurality of high-strength bolts so that a large compressive force can be generated between the pair of end plates arranged with their joint surfaces abutting.
6. 4. The method for constructing a temporary pier according to claim 3, wherein the bolts are high-strength bolts.
7. 7. The method for constructing a temporary pier according to claim 1, wherein the main girder is made of H-shaped steel.
Citation Information
Patent Citations
Pile pier execution method and pile pier structure
JP2000096582A
Construction method of pier-type road
JP2010059743A
Scaffold for pier construction and pier construction method
JP2012162862A
Cited By
Construction method for pier extension stages and piers
JP7885463B1