Electric wire intake amount calculation device, electric wire intake amount calculation program, and electric wire intake amount calculation method
By converting three-dimensional wire coordinates to two-dimensional coordinates and applying an approximate curve equation, the method efficiently calculates the wire intake amount to achieve target slackness, addressing inefficiencies in existing methods.
Patent Information
- Application Number
- JP2023086365
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-25
- Publication Date
- 2024-12-05
AI Technical Summary
Existing methods for evaluating and adjusting the slackness of electric wires using catenary curves are inefficient and require significant computational effort, making it difficult to determine the exact amount of wire intake needed to achieve a target slackness.
A method and device that convert three-dimensional coordinates of an electric wire into two-dimensional coordinates, use an approximate curve equation to represent the wire, and calculate the intake amount based on the slackness difference between actual and target slackness using a quadratic function.
Enables efficient calculation of the wire intake amount required to achieve a target slackness with reduced computational effort, allowing accurate adjustment of wire slackness using an approximate curve formula.
Smart Images

Figure 2024169145000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an electric wire intake amount calculation device, an electric wire intake amount calculation program, and an electric wire intake amount calculation method. [Background technology]
[0002] In a facility in which an electric wire is supported by a plurality of electric wire supports spaced apart from each other, when installing new equipment or replacing an electric wire, the electric wire is stretched across the plurality of electric wire supports, and then the electric wire is taken in by a winch or the like so that the sag of the electric wire becomes a target sag. In order to perform such a task, as shown in Patent Document 1, for example, it is conceivable to obtain a catenary curve corresponding to the electric wire using a three-dimensional point cloud representing the electric wire, and to evaluate the sag of the electric wire using the catenary curve.
[0003] In Patent Document 1, a catenary curve corresponding to the electric wire is obtained as follows. That is, a least-squares plane of a three-dimensional point group representing the electric wire is obtained, and the coordinates of the feet of perpendicular lines dropped from each point of the three-dimensional point group onto the least-squares plane are obtained. Furthermore, the coordinates of the feet of the perpendicular lines are converted into two-dimensional orthogonal coordinates, and a catenary curve that fits the coordinate group converted into the two-dimensional orthogonal coordinates is obtained. By obtaining a catenary curve corresponding to the electric wire in this manner, the sag of the electric wire can be evaluated using the catenary curve. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-144153 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, even if the sag of the electric wire is evaluated using the catenary curve, it is not clear how much of the electric wire should be taken in by a winch or the like to bring the sag to the target sag. Therefore, it becomes impossible to efficiently adjust the sag of the electric wire to the target sag by taking in the electric wire. In addition, when determining the catenary curve, it is necessary to determine a least-squares plane and to determine the coordinates of the feet of perpendicular lines dropped from each point of the three-dimensional point cloud onto the least-squares plane, which increases the amount of calculation required to determine the catenary curve. [Means for solving the problem]
[0006] The means for solving the above problems and their effects will be described below. The electric wire take-in amount calculation device for solving the above problem calculates the take-in amount of an electric wire to set the sag of an electric wire supported by a first electric wire support and a second electric wire support that are spaced apart from each other to a target sag. The device includes a coordinate acquisition unit, a coordinate conversion unit, an electric wire sag calculation unit, and an take-in amount calculation unit. The coordinate acquisition unit acquires three-dimensional coordinates of each point when the electric wire is represented by a three-dimensional point cloud. The coordinate conversion unit converts the acquired three-dimensional coordinates of each point into two-dimensional coordinates in a two-dimensional coordinate system. The electric wire sag calculation unit obtains an approximate curve equation representing the electric wire based on the two-dimensional coordinates of each point in the two-dimensional coordinate system, and obtains a straight line passing through a support point A of the electric wire on the first electric wire support and a support point B of the electric wire on the second electric wire support. The electric wire sag calculation unit calculates a sag d of the electric wire based on the approximate curve equation and the straight line. The take-in amount calculation unit calculates the actual length L between support points A and B of the electric wire when the sag of the electric wire is sag d, and the actual length L0 between support points A and B of the electric wire when the sag of the electric wire is target sag d0. The take-in amount calculation unit calculates the take-in amount of the electric wire based on the actual length L and the actual length L0.
[0007] According to the above configuration, the three-dimensional coordinates of each point in the three-dimensional point cloud representing the electric wire are converted into two-dimensional coordinates in a two-dimensional coordinate system, and an approximation curve equation representing the electric wire is obtained based on the two-dimensional coordinates of each point in the two-dimensional coordinate system. Therefore, the approximation curve equation representing the electric wire supported by the support point A and the support point B can be obtained with a small amount of calculation. The sag d of the electric wire is calculated based on a straight line passing through the support point A and the support point B and the approximation curve equation. Then, the take-in amount of the electric wire is calculated based on the actual length L of the electric wire when the sag of the electric wire is set to sag d and the actual length L0 of the electric wire when the sag of the electric wire is set to the target sag d0. Therefore, the take-in amount of the electric wire for making the sag of the electric wire the target sag d0 can be calculated using the approximation curve equation obtained with a small amount of calculation.
[0008] The electric wire sag calculation unit may express the approximation curve equation as a quadratic function and determine the coefficients of the quadratic function by the least squares method. The electric wire take-in amount calculation program for solving the above problem is for causing a computer that calculates the take-in amount of an electric wire to set the sag of the electric wire supported by a first electric wire supporter and a second electric wire supporter that are spaced apart from each other to a target sag to execute a coordinate acquisition process, a coordinate conversion process, an electric wire sag calculation process, and an take-in amount calculation process. The coordinate acquisition process is for acquiring three-dimensional coordinates of each point when the electric wire is represented by a three-dimensional point cloud. The coordinate conversion process is for converting the acquired three-dimensional coordinates of each point into two-dimensional coordinates in a two-dimensional coordinate system. The electric wire sag calculation process is for finding an approximate curve equation that represents the electric wire based on the two-dimensional coordinates of each point in the two-dimensional coordinate system, and for finding a straight line that passes through a support point A of the electric wire on the first electric wire supporter and a support point B of the electric wire on the second electric wire supporter. The electric wire sag calculation process is for calculating the sag d of the electric wire based on the approximate curve equation and the straight line. The take-in amount calculation process is to obtain the actual length L between support points A and B of the wire when the sag of the wire is d, and the actual length L0 between support points A and B of the wire when the sag of the wire is target sag d0. The take-in amount calculation process is to calculate the take-in amount of the wire based on the actual length L and the actual length L0.
[0009] According to the program, the three-dimensional coordinates of each point in the three-dimensional point cloud representing the electric wire are converted into two-dimensional coordinates in a two-dimensional coordinate system, and an approximation curve equation representing the electric wire is obtained based on the two-dimensional coordinates of each point in the two-dimensional coordinate system. Therefore, the approximation curve equation representing the electric wire supported by the support point A and the support point B can be obtained with a small amount of calculation. The sag d of the electric wire is calculated based on a straight line passing through the support point A and the support point B and the approximation curve equation. Then, the take-in amount of the electric wire is calculated based on the actual length L of the electric wire when the sag of the electric wire is set to the sag d and the actual length L0 of the electric wire when the sag of the electric wire is set to the target sag d0. Therefore, the take-in amount of the electric wire for making the sag of the electric wire the target sag d0 can be calculated using the approximation curve equation obtained with a small amount of calculation.
[0010] The method for calculating the amount of electric wire take-in that solves the above problem calculates the amount of electric wire take-in to set the sag of an electric wire supported by a first electric wire support and a second electric wire support that are spaced apart from each other to a target sag. In the method, a coordinate acquisition step, a coordinate conversion step, an electric wire sag calculation step, and an amount of take-in calculation step are executed in this order. The coordinate acquisition step is for acquiring three-dimensional coordinates of each point when the electric wire is represented by a three-dimensional point cloud. The coordinate conversion step is for converting the acquired three-dimensional coordinates of each point into two-dimensional coordinates in a two-dimensional coordinate system. The electric wire sag calculation step is for finding an approximation curve equation that represents the electric wire based on the two-dimensional coordinates of each point in the two-dimensional coordinate system, and for finding a straight line that passes through a support point A of the electric wire on the first electric wire support and a support point B of the electric wire on the second electric wire support. The electric wire sag calculation step is for calculating the sag d of the electric wire based on the approximation curve equation and the straight line. The take-in amount calculation step is to obtain the actual length L between support points A and B of the wire when the sag of the wire is d, and the actual length L0 between support points A and B of the wire when the sag of the wire is a target sag d0. The take-in amount calculation step is to calculate the take-in amount of the wire based on the actual length L and the actual length L0.
[0011] According to the above method, the three-dimensional coordinates of each point in the three-dimensional point cloud representing the electric wire are converted into two-dimensional coordinates in a two-dimensional coordinate system, and an approximation curve equation representing the electric wire is obtained based on the two-dimensional coordinates of each point in the two-dimensional coordinate system. Therefore, the approximation curve equation representing the electric wire supported by the support point A and the support point B can be obtained with a small amount of calculation. The sag d of the electric wire is calculated based on a straight line passing through the support point A and the support point B and the approximation curve equation. Then, the take-in amount of the electric wire is calculated based on the actual length L of the electric wire when the sag of the electric wire is set to the sag d and the actual length L0 of the electric wire when the sag of the electric wire is set to the target sag d0. Therefore, the take-in amount of the electric wire for making the sag of the electric wire the target sag d0 can be calculated using the approximation curve equation obtained with a small amount of calculation.
[0012] The coordinate acquisition process can be carried out by surveying the power line by flying an aircraft equipped with a laser surveying device back and forth along the power line between support point A and support point B, thereby determining the three-dimensional coordinates of each point when the power line is represented as a three-dimensional point cloud, and importing the three-dimensional coordinates of each point thus determined.
[0013] This method allows for the capture of accurate 3D coordinates for each point in the 3D point cloud representing the electrical wire. [Brief description of the drawings]
[0014] [Figure 1] 1 is a schematic diagram showing a facility in which an electric wire intake amount calculation device, an electric wire intake amount calculation program, and an electric wire intake amount calculation method are used. [Diagram 2] 4 is a schematic diagram showing the structure of a computer that embodies the electric wire intake amount calculation device. [Diagram 3] 1 is a table showing the three-dimensional coordinates of each point in a three-dimensional point cloud representing an electric wire. [Figure 4] 4 is a table showing the x-coordinate, y-coordinate, and z-coordinate of each point when the three-dimensional coordinate of point P0 shown in the table of FIG. 3 is set as the origin. [Diagram 5] FIG. 5 is a diagram showing equation (1) for converting the x and y coordinates of each point shown in the table of FIG. 4 into s coordinates on the s axis. [Figure 6]4 is a table showing two-dimensional coordinates obtained by converting the three-dimensional coordinates of each point shown in the table of FIG. 3 into two-dimensional coordinates in a two-dimensional coordinate system. [Figure 7] FIG. 2 is a diagram showing an approximation curve equation representing an electric wire. [Figure 8] 1 is a diagram showing an equation representing a straight line passing through support points A and B. [Figure 9] FIG. 9 is a diagram showing an equation representing a coefficient b′ used in the equation of FIG. [Figure 10] 9 is a graph showing the curve based on the approximation equation of FIG. 7 and the straight line of FIG. 8. [Figure 11] FIG. 1 is a diagram showing an equation expressing the sag of an electric wire. [Figure 12] FIG. 12 is a diagram showing an equation obtained by modifying the equation in FIG. [Figure 13] FIG. 11 is a diagram showing an equation expressing the sag d of the electric wire at the lowest point of the curve relative to the straight line in FIG. [Figure 14] 14 is a diagram showing an equation expressing the actual length L of the electric wire between support points A and B when the sag of the electric wire is set to d in FIG. 13. [Figure 15] 1 is a diagram showing an equation expressing the actual length L0 of the electric wire between support points A and B when the sag of the electric wire is set to a target sag d0. [Figure 16] FIG. 13 is a diagram showing a formula for calculating the amount of electric wire intake Lt. [Figure 17] 10 is a flowchart showing an execution procedure of an electric wire intake amount calculation program. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, an embodiment of an electric wire take-up amount calculation device, an electric wire take-up amount calculation program, and an electric wire take-up amount calculation method will be described with reference to Figs. 1 to 17. As shown in Fig. 1, in a power transmission facility in which an electric wire 13 is supported by steel towers 11 and 12 spaced apart from each other, the steel tower 11 plays a role as a first electric wire support, and the steel tower 12 plays a role as a second electric wire support. The electric wire 13 is supported by support point A of the steel tower 11 and support point B of the steel tower 11. When installing new power transmission facility or replacing the electric wire 13, the electric wire 13 is stretched across support point A of the steel tower 11 and support point B of the steel tower 12, and then the electric wire 13 is taken in by a winch 14 so that the sag of the electric wire 13 becomes a target sag.
[0016] <Electric wire intake amount calculation device> When adjusting the sag of the electric wire 13 to the target sag, an electric wire take-in amount calculation device is used which calculates the take-in amount Lt of the electric wire 13 by the winch 14 for adjusting the sag of the electric wire 13 to the target sag. The electric wire 13 is taken in by the winch 14 by the take-in amount Lt calculated by the electric wire take-in amount calculation device, so that the sag of the electric wire 13 becomes the target sag. The electric wire take-in amount calculation device is realized by a computer 16. As the computer 16, for example, a personal computer such as a desktop type, a notebook type, or a tablet type, or a portable computer such as a smartphone may be adopted.
[0017] As shown in Fig. 2, the computer 16 includes a storage unit 17, a display 18, a communication unit 21, and a central processing unit 22. The storage unit 17 is for storing various data such as the three-dimensional coordinates of each point when the electric wire 13 is represented by a three-dimensional point cloud. The display 18 is capable of displaying the intake amount Lt of the electric wire 13. The communication unit 21 is for communicating with an aircraft 20 such as a drone equipped with a laser surveying device or the like shown in Fig. 1. The central processing unit 22 is for controlling various devices such as the storage unit 17, the display 18, and the communication unit 21 in the computer 16, and for performing arithmetic processing and the like based on the various data stored in the storage unit 17.
[0018] The aircraft 20 surveys the electric wire 13 with a laser surveying device by traveling back and forth along the electric wire 13 as shown by the arrows in Fig. 1. By surveying the electric wire 13 with the laser surveying device, the three-dimensional coordinates of each point when the electric wire 13 is represented as a three-dimensional point cloud are obtained. The obtained three-dimensional coordinates of each point are then stored in the memory unit 17 of the computer 16. Note that the three-dimensional coordinates of each point stored in the memory unit 17 do not necessarily have to be obtained by surveying the electric wire 13 with the laser surveying device using the aircraft 20, and may be obtained by other methods.
[0019] The central processing unit 22 of the computer 16 retrieves the three-dimensional coordinates stored in the memory unit 17, i.e., the three-dimensional coordinates (x, y, z) of each of the points P0 to Pn in the three-dimensional point cloud representing the electric wire 13. At this time, the central processing unit 22 serves as a coordinate acquisition unit. An example of the above three-dimensional coordinates (x, y, z) is shown in FIG. 3. Point P0 in the table of FIG. 3 corresponds to the point on the electric wire 13 that is connected to support point A of the steel tower 11.
[0020] The central processing unit 22 converts the three-dimensional coordinates (x, y, z) of each point P0 to Pn into two-dimensional coordinates in a two-dimensional coordinate system. At this time, the central processing unit 22 serves as a coordinate conversion unit. In detail, the central processing unit 22 converts the three-dimensional coordinates (x, y, z) of each point P0 to Pn into coordinates (x-x0, y-y0, z-z0) with the point P0 as the origin.
[0021] That is, the central processing unit 22 sets the x-coordinate, y-coordinate, and z-coordinate of the point P0 to x0, y0, and z0, respectively, and subtracts these x0, y0, and z0 from the x-coordinate, y-coordinate, and z-coordinate of each of the points P0 to Pn. In this way, the above coordinates (x-x0, y-y0, z-z0) of each of the points P0 to Pn are obtained. An example of the x-coordinate (x-x0), y-coordinate (y-y0), and z-coordinate (z-z0) of the above coordinates (x-x0, y-y0, z-z0) of each of the points P0 to Pn is shown in FIG. 4.
[0022] The central processing unit 22 converts the x coordinate (x-x0) and y coordinate (y-y0) of the above coordinates (x-x0, y-y0, z-z0) of each point P0-Pn into s coordinates using equation (1) shown in Fig. 5. As a result, the three-dimensional coordinates (x, y, z) of each point P0-Pn are converted into two-dimensional coordinates (s, z-z0) in a two-dimensional coordinate system. An example of the two-dimensional coordinates (s, z-z0) of each point P0-Pn after conversion is shown in Fig. 6.
[0023] The central processing unit 22 obtains an approximation curve equation representing the electric wire 13 based on the two-dimensional coordinates (s, z-z0) of each point P0 to Pn, obtains a straight line passing through the support point A and the support point B, and calculates the sag d of the electric wire 13 based on the approximation curve equation and the straight line. At this time, the central processing unit 22 serves as an electric wire sag calculation unit.
[0024] In detail, the above approximation curve equation is expressed by equation (2) of a quadratic function shown in Fig. 7. The central processing unit 22 determines the coefficients a, b, and c of equation (2) by the least squares method based on the two-dimensional coordinates (s, z-z0) of each point P0 to Pn. Moreover, the above straight line is expressed by equation (3) in Fig. 8. The coefficient b' of equation (3) is expressed by equation (4) shown in Fig. 9 based on the span length S between the steel towers 11 and 12 and the height difference h between support points A and B.
[0025] Fig. 10 shows a curve based on the approximation curve formula expressed by formula (2) and a straight line expressed by formula (3). In the graph of Fig. 10, the horizontal axis is the s-axis and the vertical axis is the z-axis, and the curve and straight line connecting support point A and support point B in the graph are shown by solid lines L1 and L2, respectively. The sag of the electric wire 13 is expressed by the amount of sagging of the curve (solid line L2) relative to the straight line (solid line L2) in Fig. 10, "z-z'". Therefore, the formula expressing the sag of the electric wire 13 is formula (5) shown in Fig. 11.
[0026] By replacing "b-b'" in equation (5) with "E" and transforming equation (5), equation (6) shown in Fig. 12 is obtained. The sag d of the electric wire 13 is the amount of hanging down at the lowest point of the curve with respect to the straight line in Fig. 10. Therefore, the sag d of the electric wire 13 is "z-z'" when the value of s in equation (6) is set to "s = -(E / 2a)", and is expressed by equation (7) in Fig. 13.
[0027] The central processing unit 22 calculates the actual length L between support points A and B of the electric wire 13 when the sag of the electric wire 13 is set to the above-mentioned sag d, and the actual length L0 between support points A and B of the electric wire 13 when the sag of the electric wire 13 is set to the target sag d0. Based on the actual length L and the actual length L0, the central processing unit 22 calculates the take-in amount Lt of the electric wire 13 for bringing the sag of the electric wire 13 into the target sag d0. At this time, the central processing unit 22 serves as a take-in amount calculation unit.
[0028] In detail, the central processing unit 22 calculates the actual length L of the electric wire 13 using equation (8) in Fig. 14 based on the span length S, the sag d, and the elevation difference h, and calculates the actual length L0 of the electric wire 13 using equation (9) in Fig. 15. Furthermore, the central processing unit 22 calculates the take-in amount Lt of the electric wire 13 using equation (10) in Fig. 16. The central processing unit 22 causes the display 18 to display the calculated take-in amount Lt. Then, the winch 14 takes in the electric wire 13 by the take-in amount Lt displayed on the display 18, and the sag of the electric wire 13 is set to the target sag d0.
[0029] <Program for calculating the amount of electric wire taken in> Next, the electric wire intake calculation program for calculating the intake amount Lt will be described. 17 is a flowchart showing the procedure for executing the electric wire take-in amount calculation program. This electric wire take-in amount calculation program is executed by the central processing unit 22 of the computer 16.
[0030] As the process of step 101 (S101) in the flowchart of Fig. 17, the central processing unit 22 retrieves the three-dimensional coordinates stored in the storage unit 17, i.e., the three-dimensional coordinates (x, y, z) of each point P0 to Pn in the three-dimensional point cloud representing the electric wire 13. This process of S101 corresponds to a coordinate acquisition process. As the process of S102, the central processing unit 22 converts the x coordinate (x), y coordinate (y), and z coordinate (z) of the coordinates (x, y, z) of each point P0 to Pn into two-dimensional coordinates (s, z-z0) in a two-dimensional coordinate system. This process of S102 corresponds to a coordinate conversion process.
[0031] In the process of S103, the central processing unit 22 obtains equation (2), which is an approximate curve equation representing the electric wire 13, by determining coefficients a, b, and c of equation (2) shown in Fig. 7 by the least squares method based on the two-dimensional coordinates (s, z-z0) of each point P0 to Pn. In the process of S104, the central processing unit 22 obtains a straight line passing through support point A and support point B, i.e., a straight line expressed by equation (3) in Fig. 8, based on the span length S and the elevation difference h. In the process of S105, the central processing unit 22 calculates an actual sag d of the current electric wire 13 based on the approximate curve equation and the straight line. The processes of S103 to S105 correspond to an electric wire sag calculation process.
[0032] In the process of S106, the central processing unit 22 calculates the actual length L of the electric wire 13 between the support points A and B when the sag of the electric wire 13 is set to sag d, i.e., when the sag of the electric wire 13 is set to the current sag of the electric wire 13, using the formula (8) in Fig. 14 based on the span length S, the sag d, and the elevation difference h. In the process of S107, the central processing unit 22 calculates the actual length L0 of the electric wire 13 between the support points A and B when the sag of the electric wire 13 is set to the target sag d0, using the formula (9) in Fig. 15 based on the span length S, the target sag d0, and the elevation difference h. In the process of S108, the central processing unit 22 calculates the take-in amount Lt of the electric wire 13 based on the actual length L and the actual length L0, using the formula (10) in Fig. 16. The processes of S106 to S108 correspond to the take-in amount calculation process.
[0033] <How to calculate the amount of electric wire taken in> Next, a method for calculating the electric wire intake amount Lt will be described. In this method for calculating the amount of intake, a coordinate acquisition step, a coordinate conversion step, a wire sag calculation step, and an intake amount calculation step are performed in this order.
[0034] In the coordinate acquisition step, the aircraft 20 is made to fly back and forth along the electric wire 13 as shown by the arrows in Fig. 1, and the electric wire 13 is surveyed by a laser surveying device of the aircraft 20. By surveying the electric wire 13 with the laser surveying device in this manner, the three-dimensional coordinates (x, y, z) of each of the points P0 to Pn when the electric wire 13 is represented as a three-dimensional point cloud are obtained. Then, the obtained three-dimensional coordinates (x, y, z) of each of the points P0 to Pn are stored in the memory unit 17 of the computer 16. The three-dimensional coordinates (x, y, z) of each of the points P0 to Pn thus stored in the memory unit 17 are taken into the central processing unit 22 of the computer 16.
[0035] In the coordinate conversion step, the three-dimensional coordinates (x, y, z) of each of the points P0 to Pn input to the central processing unit 22 are converted into two-dimensional coordinates (s, z-0) in a two-dimensional coordinate system. In the electric wire sag calculation process, an approximation curve equation representing the electric wire 13, i.e., equation (2) shown in Fig. 7, is obtained based on the two-dimensional coordinates (s, z-z0) of each point P0 to Pn. Furthermore, a straight line passing through support point A and support point B, i.e., a straight line represented by equation (3) in Fig. 8, is also obtained. Then, based on the approximation curve equation and the straight line, the actual sag d of the current electric wire 13 is calculated.
[0036] In the take-in amount calculation step, the actual length L of the electric wire 13 between the support points A and B when the slack of the electric wire 13 is set to slack d is calculated using equation (8) in Fig. 14. Furthermore, the actual length L0 of the electric wire 13 between the support points A and B when the slack of the electric wire 13 is set to target slack d0 is calculated using equation (9) in Fig. 15. Then, based on the actual length L and the actual length L0, the take-in amount Lt of the electric wire 13 is calculated using equation (10) in Fig. 16.
[0037] According to the present embodiment described above in detail, the following advantageous effects can be obtained. (1) The three-dimensional coordinates (x, y, z) of each point P0 to Pn in the three-dimensional point group representing the electric wire 13 are converted into two-dimensional coordinates (s, z-z0) in a two-dimensional coordinate system, and an approximation curve equation representing the electric wire 13 is obtained based on the two-dimensional coordinates (s, z-z0) of each point P0 to Pn in the two-dimensional coordinate system. Therefore, the approximation curve equation representing the electric wire 13 supported by the support point A and the support point B can be obtained with a small amount of calculation. The sag d of the electric wire 13 is calculated based on a straight line passing through the support point A and the support point B and the approximation curve equation. Then, the take-in amount Lt of the electric wire 13 is calculated based on the actual length L of the electric wire 13 when the sag of the electric wire 13 is set to the sag d and the actual length L0 of the electric wire 13 when the sag of the electric wire 13 is set to the target sag d0. Therefore, the take-in amount Lt of the electric wire 13 for bringing the sag of the electric wire 13 to the target sag d0 can be calculated using an approximation curve equation that can be obtained with a small amount of calculation.
[0038] (2) In the coordinate acquisition step in the electric wire intake amount calculation method, the aircraft 20 is caused to reciprocate along the electric wire 13 between support point A and support point B, and the electric wire 13 is surveyed by a laser surveying device mounted on the aircraft 20. By such surveying of the electric wire 13 by the laser surveying device, the three-dimensional coordinates (x, y, z) of each point P0 to Pn when the electric wire 13 is represented by a three-dimensional point cloud are obtained. The above three-dimensional coordinates (x, y, z) are stored in the storage unit 17 of the computer 16. Then, when calculating the intake amount Lt, the above three-dimensional coordinates (x, y, z) are taken into the central processing unit 22 of the computer 16. As a result, the accurate three-dimensional coordinates (x, y, z) of each point P0 to Pn in the three-dimensional point cloud representing the electric wire 13 can be taken into the central processing unit 22.
[0039] The above embodiment can be modified, for example, as follows: The above embodiment and the following modified examples can be combined with each other to the extent that no technical contradiction occurs. When the three-dimensional coordinates (x, y, z) of each point P0 to Pn when the electric wire 13 is represented as a three-dimensional point cloud using the laser surveying device of the aircraft 20, the central processing unit 22 may import the three-dimensional point cloud (x, y, z) without storing it in the memory unit 17.
[0040] In the coordinate acquisition step in the electric wire intake amount calculation method, it is not necessary to obtain the three-dimensional coordinates (x, y, z) of each of the points P0 to Pn when the electric wire 13 is represented by a three-dimensional point cloud. For example, it is also possible to simply input into the central processing unit 22 the three-dimensional coordinates (x, y, z) of each of the points P0 to Pn that have been obtained in advance and stored in the storage unit 17.
[0041] Instead of displaying the calculated intake amount Lt on the display 18, the amount may be notified by voice or the like. [Explanation of symbols]
[0042] 11,12…Steel tower 13...Electric wire 14…Winch 16. Computer 17...Storage section 18…Display 20...Flying object 21…Communications Department 22...Central processing unit
Claims
1. a take-in amount of the electric wire for setting the sag of the electric wire supported by the first electric wire support body and the second electric wire support body spaced apart from each other to a target sag; The apparatus includes a coordinate acquisition unit, a coordinate conversion unit, a wire sag calculation unit, and an intake amount calculation unit, The coordinate acquisition unit acquires three-dimensional coordinates of each point when the electric wire is represented by a three-dimensional point cloud, The coordinate conversion unit converts the three-dimensional coordinates of each of the captured points into two-dimensional coordinates in a two-dimensional coordinate system, the electric wire sag calculation unit obtains an approximation curve equation representing the electric wire based on two-dimensional coordinates of each of the points in the two-dimensional coordinate system, obtains a straight line passing through a support point A of the electric wire on the first electric wire support body and a support point B of the electric wire on the second electric wire support body, and calculates a sag d of the electric wire based on the approximation curve equation and the straight line, The take-in amount calculation unit calculates an actual length L between the support point A and the support point B of the electric wire when the slack of the electric wire is set to the slack d, and an actual length L0 between the support point A and the support point B of the electric wire when the slack of the electric wire is set to a target slack d0, and calculates the take-in amount of the electric wire based on the actual length L and the actual length L0.
2. 2. The electric wire take-in amount calculation device according to claim 1, wherein the electric wire sag calculation unit calculates the approximation curve equation as a quadratic function and calculates coefficients of the quadratic function by a least squares method.
3. An electric wire take-in amount calculation program for causing a computer to execute a coordinate acquisition process, a coordinate conversion process, an electric wire sag calculation process, and a take-in amount calculation process, the computer calculating an amount of take-in of an electric wire so that the sag of the electric wire supported by a first electric wire support body and a second electric wire support body spaced apart from each other becomes a target sag, the program comprising: The coordinate acquisition process acquires three-dimensional coordinates of each point when the electric wire is represented by a three-dimensional point cloud, The coordinate conversion process converts the three-dimensional coordinates of each of the captured points into two-dimensional coordinates in a two-dimensional coordinate system; The electric wire sag calculation process determines an approximation curve equation representing the electric wire based on two-dimensional coordinates of each point in the two-dimensional coordinate system, determines a straight line passing through a support point A of the electric wire on the first electric wire support body and a support point B of the electric wire on the second electric wire support body, and calculates a sag d of the electric wire based on the approximation curve equation and the straight line, The take-in amount calculation process calculates an actual length L between the support point A and the support point B of the electric wire when the slack of the electric wire is set to the slack d, and an actual length L0 between the support point A and the support point B of the electric wire when the slack of the electric wire is set to a target slack d0, and calculates the take-in amount of the electric wire based on the actual length L and the actual length L0.
4. The method calculates an amount of take-in of the electric wire to set the sag of the electric wire supported by the first electric wire support and the second electric wire support that are spaced apart from each other to a target sag. A coordinate acquisition process, a coordinate conversion process, a wire sag calculation process, and an intake amount calculation process are executed in this order; The coordinate acquisition step acquires three-dimensional coordinates of each point when the electric wire is represented by a three-dimensional point cloud, The coordinate conversion step converts the three-dimensional coordinates of each of the captured points into two-dimensional coordinates in a two-dimensional coordinate system, the electric wire sag calculation step includes determining an approximation curve equation representing the electric wire based on two-dimensional coordinates of each of the points in the two-dimensional coordinate system, determining a straight line passing through a support point A of the electric wire on the first electric wire support body and a support point B of the electric wire on the second electric wire support body, and calculating a sag d of the electric wire based on the approximation curve equation and the straight line, The take-in amount calculation step determines an actual length L between the support points A and B of the electric wire when the slack of the electric wire is set to the slack d, and an actual length L0 between the support points A and B of the electric wire when the slack of the electric wire is set to a target slack d0, and calculates the take-in amount of the electric wire based on the actual length L and the actual length L0.
5. The method for calculating the amount of electric wire intake according to claim 4, wherein the coordinate acquisition step involves surveying the electric wire by flying an aircraft equipped with a laser surveying device back and forth along the electric wire between support point A and support point B to determine the three-dimensional coordinates of each point when the electric wire is represented as a three-dimensional point cloud, and importing the determined three-dimensional coordinates of each point.