Rapid consolidation and compaction methods for remediation of various layers of soil and intermediate geological materials in soil piles.
RCCM addresses the inefficiencies of existing soil improvement methods by using porous earth piles to rapidly consolidate and densify clayey soils, enhancing density and consistency for structural support.
Patent Information
- Application Number
- JP2022580361
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-11-05
- Filing Date
- 2020-11-20
- Publication Date
- 2024-09-20
- Estimated Expiration
- 2040-11-20
AI Technical Summary
Existing geotechnical methods for soil improvement, such as sand drains and stone columns, fail to effectively increase the density and consistency of clayey soils, leading to prolonged consolidation times and high costs, while methods like vibroflotation and jet grouting are expensive and disruptive.
The Rapid Consolidation and Compaction Method (RCCM) involves driving a hollow pipe section into the soil, filling it with compacted sandy material, and using removable end plates to form porous earth piles that dissipate excess pore water pressure rapidly, enhancing soil density and consistency.
RCCM accelerates soil consolidation, reduces settlement, and increases density to support structural loads efficiently and economically, without the need for embankments or prolonged consolidation periods.
Smart Images

Figure 0007554501000016 
Figure 0007554501000022 
Figure 0007554501000011
Abstract
Description
[Technical field]
[0001] This application is for a utility patent in the arts including civil engineering and geological engineering for soil densification of layers of intermediate geological material within soils and soil piles. This specification / description stands on its own. This invention was not funded or supported by Federally Sponsored Research and Development or any other organization. This invention was independently conceived, developed and perfected by the inventor, Dr. Ramesh Chandra Gupta, Ph.D., PE, President and sole owner of SAR6 INC. The inventor, Dr. Ramesh Chandra Gupta, is a United States citizen. [Background technology]
[0002] Sand-draining (Kennedy and Woods, 1954) to strengthen weak soils has been widely used for a long time. Bowels, 1988 summarized the sand-draining method to strengthen and consolidate clay soil layers that cannot support the load of an embankment or foundation structure. A circular casing or mandrel is driven vertically into the soft clay layer to the required depth. The soil within the casing or mandrel is removed and the hole is backfilled with clean sand under gravity to form a coarse layer of sand column in the surrounding soft clay soil. The mandrel or casing is then removed by being pulled out of the ground. The embankment is then laid on the ground surface in stages to its full height. If the total height of the embankment is 5 metres, the embankment will generate excess pore water pressures up to about 49 kPa (7.1 psi). After allowing sufficient time for consolidation to dissipate any excess pore water pressures that have developed, typically up to 90% consolidation, the fill is left in place, in the case of a highway, or otherwise excavated, and the required structure, such as a building or airport, oil storage tank, etc., is constructed on or at some depth below the original grade. Depending on the horizontal spacing of the sand drains and the degree of consolidation of the in-situ clay, the time required for consolidation may range from six months to a year or more. In recent years, PVC drains or wick drains have commonly replaced sand drains.
[0003] Mars (1978) introduced another method in which a probe pipe with a partially openable valve at the end in the form of two halves of a cone is driven by a vibrating probe and assisted by a liquid jet to erode the in situ soil around and below the probe to facilitate penetration to the design depth. As the vibrating probe is very light and has very little centrifugal force, a pre-drilling or liquid jet to erode the soil is required. The liquid jet pipe is an integral part of the probe pipe that passes through the end of the probe pipe into the in situ soil. The probe has vertically spaced bands around it. As the probe pipe is being penetrated into the ground, the end valve remains in the closed position and pebbles, stones etc. are filled by gravity through the chute into the probe pipe resulting in a very coarse density. When the probe pipe is pulled out of the ground, the partially releasable valve is opened, allowing the pebbles, stones, or sand to fall through a narrow opening that is believed to be less than 25% of the inner area of the probe pipe, forming a column of pebbles, stones, etc., but the cross-sectional area of the column formed is less than 25% of the inner area of the probe pipe, because the in-situ soil, consisting of either clay or sand, quickly flows and collapses before additional pebbles, etc. can fall into the remaining outer area of the probe pipe and band. Thus, the pebbles, etc. that fall under gravity can only form a column in a very coarse state, the cross-sectional area of which is much smaller than the inner or outer area of the probe pipe. No fill is described in this method to fill and compact the area (Mars, 1978). The Mars (1978) method is used to fill in soils that are too rough, such as alluvial or sandy areas or hydraulically filled areas. The original support strength is low It was developed to compact soil areas. Many organizations do not allow vibratory probes to be driven into clay soils. In the sand drain method, fill is placed on the field area and compacted to densify the area, which also results in densification of the sand drain, which is made of loosely packed sand, whereas the Mars (1978) method does not use fill placed over an area where loosely packed gravel or other material is filled into a vertical hole. Therefore, the Mars method may loosen the area instead of densifying it.
[0004] The invention of the present application consists of a rapid consolidation and compaction method (RCCM) for producing rapid consolidation of clayey soil layers resulting in increased density and consistency.RCCM involves (i) first driving a hollow pipe section to a depth that minimizes heave above the ground surface or the layer of soil requiring improvement; (ii) filling the pipe section closed with a removable end plate with sandy material, compacting it, and then driving a soil-removing pile consisting of a pipe section with a removable or detachable end plate through the inside of the already driven hollow pipe section to the required depth into the layer of clayey soil; and (iii) allowing the pipe section with the detachable end plate to function as a soil-removing pile to displace the in-situ clayey soil. (iv) a heavy weight is placed on the compacted material within the pipe section prior to pulling the pipe section out of the ground; and (v) the pipe section is removed or pulled out of the ground and the heavy weight continues to push down on the column of compacted sandy material, causing a necking in the column of compacted material. (vi) the detachable or removable end plate opens 100 percent of the inner area, thereby forming a column of compacted sandy material equal to the inner area of the inner area, and the weight exerts a downward force to further displace it laterally, occupying a space equal to the outer area of the pipe section; and (vii) the column of compacted sandy material thus behaves as a porous soil dump embedded in the clay soil, first allowing the generation of excess pore water pressure and then quickly dissipating the excess pore water pressure to cause the excess pore water pressure to build up and then to collapse. (v) when the porous piles adjacent to the first pile are laid in a grid pattern, the length of the drainage channel is further reduced to half the spacing between the adjacent piles to allow rapid consolidation of the clayey soil layer, resulting in increased density and consistency sufficient to support the load of a required structure such as a pavement, civil engineering structure, airport, or oil storage tank. Laying the porous piles in a grid pattern in a coarse to medium dense sand layer results in an immediate increase in density.Therefore, the rapid consolidation and compaction method (i.e., RCCM) presented as an invention in this application improves and enhances the density of all kinds of soil and intermediate geological materials to support the load of the structure of the project. The sandy material is compacted to more than 70% or even 100% relative density in the pipe section, depending on the requirement of supporting the load of the structure and also the subsurface condition. The maximum value of the excess pore water pressure is on the cone penetrometer, and the excess pore water pressure decreases rapidly as it moves away from the cone penetrometer in the radial direction. The same trend of the distribution of excess pore water around the porous soil pile is expected to occur during the penetration of the porous soil pile. The maximum excess pore water pressure near the surface of the porous soil pile shall dissipate rapidly through the porous soil pile when the flow path length is zero or a very short distance from the area of high excess pore water pressure. As adjacent porous piles are installed, the length of the flow path shall be reduced to half the spacing between adjacent porous piles. For example, if the center-to-center spacing of the porous piles is, say, four times the radius of the porous piles, the distance between the faces of the porous piles is only three times the radius, but from the midpoint between the porous piles is only 1.5 times the radius, facilitating very rapid dissipation of excess pore water pressure. 290 kNm for a 30 metre high earth dam. 2 Since excess pore water pressures of up to 100% are generated in the clay zone, the sandy material needs to meet the filter criteria to prevent the migration of fine particles of the clayey soil and to allow the free flow of excess pore water pressure. In view of this, the particle size distribution of the compacted sandy material in the porous soil pile is also designed to meet the filter criteria (Prakash and Gupta, 1972).
[0005] In many cases, it is not practical to pull the pipe section out of the ground. Therefore, porous reinforced concrete piles with or without prestressing, or porous pipe sections with end plates, or pipe sections with small holes and end plates, filled with compacted sandy material, shall be installed through non-soiling piles and shall be used as porous soil piles when (1) they can be driven into the soil by a pile hammer without exceeding the allowable driving stress, (2) they allow free drainage and flow of water and prevent the movement of fine soil particles or fine sand of clay and silt, and (3) the holes in the tube or pipe section need to be made sufficiently small to hold the sandy material in the pipe section during compaction. These porous soil piles do not require the pipe section to be pulled out of the ground, which speeds up installation and eliminates the noise that may be generated while the pipe section is being pulled out.
[0006] The invention presented in this application does not require the laying of fill to generate uniform excess pore water pressures in clay soils, as much higher excess pore water pressures are likely to be generated by the penetration of porous soil-removal piles. Summary of the Invention
[0007] (a) Technical challenges of existing geotechnical methods for soil remediation As mentioned above, the widely used methods for consolidation and densification of clay or silty soils are sand drains or wick (PVC) drains, which have been used for more than 50 years. Other methods such as seepage are rarely used. In recent years, several methods have emerged that do not increase the consistency or density of clay or silty soil layers but increase their load-bearing capacity by laying (a) Geopiers, or (b) stone columns, or (c) jet grout columns, or d) lime or cement composite columns with clay soils in holes opened by drilling or excavation (Shaefer et al., 2016). Even bottom-feed stone columns without drilling cannot successfully densify clay soil layers, probably due to the very strong vibrations of the vibrating probe, which disturb the clay soil matrix and allow the clay soil to flow in. When excavating holes using the above methods, a significant amount of excavated material spreads around the project site and must be properly disposed of to prevent environmental issues. Reinforced concrete piles or H-piles covered with small footings and several layers of geotextile separated by sandy material have been used to support the load of embankments on soft to very soft soils. All of these methods do not increase the density and / or consistency of the soft to very soft soils and directly support the weight of the road embankment without allowing loading on soft clay layers. These methods are very costly, at millions of dollars per mile. The relatively new technologies listed above do not have a history that can demonstrate good long-term behavior.
[0008] Several methods are currently used to compact layers of sandy material in soil piles, such as dynamic deep compaction by dropping weights from a selected height, vibro replacement and vibro flotation, Geopier using tamped gravel material, bottom-feed or top-feed stone columns, etc. The vibro flotation or stone column equipment has a frequency of 3000 rpm, a centrifugal force of 30000 kg, a weight of 9000 kg, a height of about 2.5 meters, and an inner diameter of about 38 cm. The vibro flotation and stone column vibro equipment has a central hole through which a water jet is injected to erode the soil when the subsurface soil conditions are such that the soil cannot be penetrated further by vibration alone or when the penetration rate becomes too slow. The rapid consolidation and compaction method using porous soil-removal piles is a novel method that can successfully densify sandy materials so that excess pore water pressure does not develop, or if excess pore water pressure does develop, it can be dissipated as quickly as it develops. RCCM generally requires readily available equipment and machinery, such as cranes, pile hammers, pullers, and surface or plate vibrators, which are available in most areas for rental or lease or sold by manufacturers.
[0009] (b) The solution to the problem and the advantageous effects of the invention As mentioned above, the rapid consolidation and compaction method is implemented to densify both the sandy and clayey materials. Since the sandy materials are much less expensive and very economical compared to jet grout pillars, cement or lime pillars or Geopiers mixed with clayey materials, the cost of using the rapid consolidation and compaction method is much lower, potentially saving millions of dollars in large projects. The rapid consolidation and compaction method shall densify (i) very soft to soft cohesive soil to firm or very firm cohesive soil, (ii) moderately firm cohesive soil to firm or very firm cohesive soil, (iii) firm cohesive soil to very firm cohesive soil, and (iv) very firm cohesive soil to firm or very firm cohesive soil, depending on the selected spacing between adjacent porous soil piles and the relative density of the compacted sandy soil within the porous soil piles. Similarly, the rapid consolidation and compaction method shall compact sandy soil from (i) very coarse (less than 15% relative density) to moderately dense (35-65% relative density), (ii) coarse (15-35% relative density) to moderately dense or dense (65-85% relative density) sand, (iii) moderately dense to dense sand, and (iv) dense to very dense (greater than 85% relative density) depending on the selected spacing between adjacent porous soil piles and the relative density of the compacted sandy soil in the porous soil pile. When densification of the in-situ soil to a higher density is required, a relative density of more than 70% or even up to 100% of the sandy material in the porous soil pile may be selected upon displacing the pipe section with the removable end plate against the compacted sandy material, which after installation is withdrawn from the ground to form the porous soil pile. Both in situ clayey silt soils and in situ sandy soils in the layer from the ground surface to the selected depth shall be capable of providing support for the foundation of the structure with sufficient bearing capacity and minimum settlement. If excess pore water pressure is generated during construction of the structure on compacted in situ soils, the pressure shall dissipate quickly and only minor settlement shall occur before the structure reaches its full height. Embankment as required with sand drains or PVC drains and waiting for consolidation to occur for six months or more are not required when RCCM is selected.Therefore, the construction progress is greatly accelerated, which is very important for highway projects for the widening or expansion of existing roads or highways, as well as for supporting the foundations of various structures. [Brief description of the drawings]
[0010] [Figure 1A] Representative detail showing an installed non-displacement pile (120) and a pipe section (123) filled with compacted sandy material with a detachable or removable end plate (124). [Figure 1B] Typical detail of a pipe section (123) with detachable or removable end plates (124) driven to design depth. [Figure 1C] Typical detail showing a hammer or weight (126) placed on the compacted sandy material (125) prior to pulling the pipe section (123) out of the ground. [Figure 2A] 1 is a typical detail of a column of compacted sandy material acting as a porous soil pile (125) with a hammer or weight (126) still on the porous soil pile (125) after the pipe section has been pulled out of the ground. [Figure 2B] End plates (124) are exemplary details for completing the installation of the underlying porous soil dump piles (125). [Figure 3A] This is a typical detail of the construction that provides lateral support to the pipe section (123) during compaction of the sandy material inside. [Figure 3B] Another exemplary detail of the construction provides lateral support to the pipe section (123) during compaction of the sandy material inside. [Figure 4A] Typical details of the hinge joint connecting the pipe section (123) to the detachable and removable end plate (124). [Figure 4B] Typical detail of the end plate that becomes vertical while the pipe section (123) is pulled out of the ground. [Figure 5A]A removable and detachable short pipe (132) is inserted into the pipe section (123), the short pipe (132) being attached to the end plate (124). [Figure 5B] Typical detail showing the removable and detachable short pipe (132) and end plate (124) that is left behind while the pipe section (123) is pulled out of the ground. [Figure 5C] Typical detail showing removable end plate (124) attached to a connecting rod (133), which is secured to the top of the pipe section (123) by a bolt (13%). [Figure 5D] Typical details showing the connecting rods (133) and removable end plates (124) which remain in place while the pipe section (123) is pulled out of the ground after removal of the bolts (135). [Figure 6A] Typical details of a removable end plate (124) connected to a pipe section (123) by hinges (130) at one end and by corner sections (137) bolted to the pipe section (123) for raising the pipe section (123) filled with compacted sandy material into a position to be driven into the ground. [Figure 6B] Typical detail of a pipe section (123) bolted to a short pipe section (132) attached to an end plate (124) to raise the pipe section filled with compacted sandy material to a position to be driven into the ground. [Figure 7A] A typical plan showing grid lines (151) and locations of porous soil dump piles (150) for soil improvement under a slab foundation. [Figure 7B] FIG. 1 is a cross-sectional elevation view showing a porous soil removal pile (125) installed under a slab foundation. [Figure 8A] Typical details of a porous soil-removal pile (125) installed under an embankment. [Figure 8B]Typical detail of a porous soil pile placed under an embankment, where the primary position porous soil pile is placed prior to the embankment and the embankment is extended over the placed porous soil pile (125). [Figure 9] A typical plan showing grid lines (151) and porous soil pile locations (150) for soil improvement beneath and to the sides of the base of the Tower of Pisa. [Figure 10] Typical details showing the base and subsurface layer of the Tower of Pisa, together with the inclined porous soil-removal piles (125). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] The primary motivation for the invention of the Rapid Consolidation and Compaction Method (RCCM) is to develop a method of soil improvement that can densify layers of intermediate geological materials (IGM) within soils or soil piles. Cohesionless soils are those that have a N density of less than 50 blows / 0.3m. 60 Non-adhesive Category 3 IGMs are defined as having a N greater than 50 blows / 0.3m. 60 (AASHTO, 2012). Cohesive soils are defined as having a viscosity of 0.25 MN / m 2 Cohesive IGM category 1 is defined as having an undrained shear strength of less than 0.25MN / m 2(AASHTO, 2012) The invention of this application consists of a rapid consolidation and compaction method (RCCM) that produces rapid consolidation of clayey soil layers resulting in increased density and consistency. RCCM involves (i) first driving a hollow pipe section to a depth that minimizes heave above the ground surface or the layer of soil requiring improvement; (ii) filling and compacting the pipe section closed with a removable end plate with sandy material, and then driving a soil dump consisting of a pipe section with a removable or detachable end plate through the already driven hollow pipe section to the required depth into the layer of clayey soil; and (iii) generating high excess pore water pressure, typically expected to be in the range of 100 kPa to 800 kPa, but which can rise to 2500 KPa, as the pipe section with the detachable end plate acts as a soil dump to displace the in situ clayey soil. (Note: The value of excess pore water pressure shall depend on the consistency and depth of the clay below the ground surface. Pore water pressures ranging from 260 psi (1793 kPa) to 400 psi (2758 kPa) have been recorded in Cooper Marl.(2010) recorded pore water pressures ranging from 50 kPa (7.25 psi) to 800 kPa (261 psi) during piezocone penetration into overconsolidated cohesive soils; (iv) a heavy weight is placed on top of the compacted material within the pipe section prior to pulling the pipe section out of the ground; (v) the heavy weight continues to press down on the column of compacted sandy material while the pipe section is being removed or pulled out of the ground, preventing the formation of a neck in the column of compacted material; and (vi) a detachable or removable end plate opens 100 percent of the inner area, thereby forming a column of compacted sandy material equal to the inner area of the inner area, and the weight exerts a downward force to further displace the compacted sandy soil laterally and to collapse the column of compacted sandy material into the outer area of the pipe section. (vii) The compacted sandy material pillars therefore behave as porous soil dumps embedded in the clay soil, first allowing excess pore water pressure to build up, then quickly dissipating the excess pore water pressure, causing the excess pore water to flow horizontally first to the porous soil dump, then vertically through the porous soil dump to the ground surface or to the sandy layer above or below the porous soil dump, and (v) when the porous soil dumps adjacent to the first soil dump in the grid pattern are laid, the length of the drainage channel is further reduced to half the spacing between the adjacent porous soil dumps, allowing rapid consolidation of the clay soil layer, resulting in increased density and consistency sufficient to support the load of a required structure such as a pavement, civil engineering structure, airport, or oil storage tank. Laying the porous soil dumps in a grid pattern in a coarse to dense sand layer results in an immediate increase in density. Thus, the rapid consolidation and compaction method (i.e., RCCM) presented as an invention in this application improves and increases the density of all kinds of soil and intermediate geological materials (whether loose or dense, soft or very hard) to support the load of the structure of the project. Sandy materials are compacted to more than 70% or even 100% relative density in the pipe section depending on the requirement to support the load of the structure and also the subsurface conditions.When the foundation of a structure is constructed on soils compacted by RCCM, the weight of the structure will cause further production of excess pore water which will rapidly strengthen the foundation and the foundation may continue to settle uniformly with negligible magnitude while the substructure and superstructure are being constructed, but after completion of the superstructure, little, if any, settlement will occur and it will be uniform. After completion of installation of the porous soil dump piles, the surface soil may be compacted by the general contractor through processes such as compaction rollers or sheepfoot rollers if required as per the project drawings.
[0012] For the above process, the hollow pipe section (120) is driven into the soil to a selected depth (121) to minimize the uplift of the ground surface. Since the hollow pipe section has a very small annular area compared to the outer or inner area, for geotechnical purposes, the hollow pipe pile is called a non-soiling pile. Similarly, a pile consisting of a HP section and a channel section, etc., is called a non-soiling pile. After the non-soiling pile (120) is driven into the ground, a soil-removing pile consisting of a pipe section (123) with a removable end plate (124) and filled with compacted sandy material (125) is driven into the layer to be densified, as shown in Figures 1A and 1B. Since the end plate is attached to the bottom of the pipe section, when driven into the ground, the pipe section with the closed end will eventually densify the soil by displacing the in-situ soil to reduce the void volume of the in-situ soil or by generating excess pore water pressure to occupy the space. After a weight or hammer (126) is placed on the sandy material as shown in FIG. 1C, the pipe section is withdrawn from the ground, leaving a detachable or removable end plate at the bottom of the compacted column of sand as shown in FIG. 2A. The weight or hammer (126) helps to continue to press down the column of sandy soil and also helps to force the sand laterally into the column to occupy the space left by the thickness of the pipe section. Optionally, while withdrawing the pipe section from the ground, the weight can be raised a few centimeters and then dropped several times to further help displace the sandy material within the void created by withdrawing the pipe section (123). The non-soiling pile (122) is then withdrawn as well, and the weight or hammer can be dropped several times to further help displace and compact the sandy material (125) within the void created by withdrawing the non-soiling pile (120). In this manner, a porous soil dump (125) made of compacted sandy material is driven deep into the ground where densification or soil improvement is required, as shown in FIG. 2B.
[0013] The hollow pipe or tube section may be round, square or rectangular, or any shape available or made in the industry. Sometimes, two corner sections or two channel sections welded together can also be used as hollow pipe sections. When such sections are fitted with detachable or removable end plates and used as soil-scavengers driven into the ground, they are geotechnically called soil-scavengers because they displace the soil by occupying their place. When these sections (i.e., hollow sections) that do not include an end plate at the bottom are driven into the ground, they are geotechnically called non-soil-scavengers. Sandy material can be compacted within the pipe section at the driven position, or in the ground other than the driven position, or within the pipe section after it has been driven into the ground if the ground below is dense enough to limit settlement and hold the end plate intact at the bottom of the soil-scavengers.
[0014] In order to minimize the uplift of the ground surface or the top layer to be densified, the non-soil-removing piles are driven into the ground first. Ideally, there should be no uplift on the ground surface during the driving of the soil-removing piles to achieve maximum lateral displacement of the soil by the porous soil-removing piles and thus maximum densification. That is why, in order to minimize the uplift, the non-soil-removing piles are first driven to a selected depth, and then the soil-removing piles are driven through the non-soil-removing piles. If the above step of driving the soil-removing piles into the non-soil-removing piles is omitted and the soil-removing piles are driven directly, or when the non-soil-removing piles are not driven to a depth sufficient to minimize or prevent uplift, complete densification of the in-situ soil may be considered satisfactory in certain circumstances, although it does not occur due to the uplift of the ground surface. In such cases, the amount of densification is less since the amount of in-situ soil displaced by the soil dump is the sum of the reduction in voids in the in-situ soil and the amount of soil heaved above the ground surface or layer being compacted. The overburden soil above the depth of the base of the non-soil dump (120) acts to limit or minimize ground surface heaving to a reasonable limit when the weight of the overburden soil above the base of the non-soil dump (120) is sufficient to prevent ground surface heaving. Currently available research indicates that depending on the soil conditions, a depth of overburden soil of 7 to 10 times or more may be sufficient to prevent ground surface heaving. However, sufficient or extensive research is not currently available to predict the reasonable depth (121) of various types of soils of various densities or consistencies to prevent or minimize ground surface heaving when the soil dump is being driven into the ground. While a project involving ground improvement using RCCM is being carried out, sufficient investigations shall be made to estimate the reasonable depths (121) of various types of soils of various densities or consistencies.
[0015] Sandy soil (125) is filled in layers in the pipe section (123) and each layer is compacted by a certain number of drops of the hammer or weight (118) to achieve a specified dry or relative density. A connecting pipe or rod (127) connects the weight or hammer to a crane boom or piling hammer system (not shown in FIG. 1C). Alternatively, the sandy soil can be filled in layers and then vibrated by mounting a surface vibrator on both sides of the pipe section (123) after the hammer or weight (118) is placed on each layer, or a vibrating probe / weight is placed on each layer to densify the sandy soil to a specified dry or relative density. The pipe section (123) with detachable or removable end plates is generally maintained vertically while filling and compacting the sandy material inside.
[0016] It is desirable that the density of the compacted sandy material inside the pipe section (123) should generally be based on a relative density of about 70%, which is a common requirement for subsequent compaction of fill. When densification from hard to very hard clay to firm clayey soil, or from medium to dense sand to very dense sand is required, the relative density of the compacted sandy material inside the pipe section may be more appropriate to about 70% or more than 70%, and even up to 100%. In earthquake zones and faults or under nuclear power plants, even harder clay or dense sand may be required for further densification, in which case the relative density of the compacted sandy soil column acting as a porous soil dump pile may be specified as more than 70% or even up to 100%. However, when very soft or soft clays are compacted to medium hard clays or coarse to very coarse sands are compacted to medium dense sands, the requirement of relative density can be relaxed if the structural support requirements of the site can be met by a lower relative density of the porous soil pile made of compacted sandy material. The relative density of medium dense sand varies in the range of 35-65%. If the site requires the subsurface layer to be compacted to a relative density corresponding to a medium dense sand condition to meet the support of the structural foundation or the support of the entire ground of the site, it may be sufficient to lay a porous soil pile made of a column of sandy material with the relative density required for the medium dense sand. Therefore, in such cases, the sandy soil in the pipe section (123) shall be compacted to achieve a medium dense condition. Therefore, the sandy soil in the pipe section (123) shall be compacted to achieve a medium dense, dense, or very dense condition according to the project site requirements. Selecting the appropriate spacing and diameter of the porous soil piles is important to determine how much the porous soil piles will displace, compress, and densify the in-situ soil. To densify the sandy soil in the pipe section (123) to a higher relative density, several additional drops of the hammer shall be required on each layer of the sandy soil in the pipe section (123), which is fairly simple, does not take much time, and will cost only a few extra dollars.Porous soil dumping piles, having a relative density higher than that of the in-situ soils consolidated by rapid consolidation and compaction methods, shall reduce the total settlement of the structure and embankment by acting as a load-sharing reinforcement for the embankment or foundation of the structure, which is greater than the in-situ soils consolidated. All these technical aspects should be considered in the design of the porous soil dumping piles for each project.
[0017] FIG. 3A shows a typical example of a support system that maintains the pipe section (123) in a vertical position during compaction of the sandy soil inside the pipe section, and therefore the pipe section is preferably supported laterally by horizontal braces (111). The horizontal braces are attached to both sides of a vertical column section (110). The column section is supported on a concrete pad or plate and secured there by nails or bolts (114). Alternatively, the pipe section (123) as shown in FIG. 3B is maintained vertical by sliding it into another pipe section (116) that has already been driven into the ground to a sufficient depth to maintain lateral stability. This pipe section (116) also protrudes out of the ground to keep the pipe section (123) vertically and laterally stable while compacting the sandy material inside. The lateral support system shall be specifically designed for each project depending on the length and size of the pipe section and the soil conditions, and these typical examples shall also be considered at this point. When soil layers below the surface of river or marine waters are compacted from a boat or floating platform or vessel, a lateral support system shall be specially designed in consultation with the owner.
[0018] To compact the sandy soil, various hammers / weights are available that fall on the sandy soil placed in the pipe section (123). Any of these hammers / weights and their mountings can be used as deemed appropriate according to the equipment manufacturer's specifications or brochures. Many types of vibrators are available in the industry that can be used around the pipe to compact the sand in the pipe section (123), and the vibrator can be placed on the plate or the weight can be vibrated to compact the sandy soil in the pipe when the weight or hammer is already placed on the sandy material to compact it. Any of the available systems can be used as appropriate according to the manufacturer's brochures or specifications. There are many types of pile driving hammers, including vibratory hammers, available in the industry for driving non-soiling or soil-scouring piles. Any of these pile driving hammers can be used as deemed appropriate. There are many types of pile pipe pullers, such as vibratory pullers and pullers with hydraulic jaws that grip the pile, available in the industry for pulling non-soiling or soil-scouring piles out of the ground. Any of these pullers can be used as deemed appropriate. Attachments such as U-bolts or hooks between the pipe section or rod (127) and the crane, or between the puller and the pipe section (123) or surface vibrator, to the pipe section (123) or plate vibrator, etc. shall be in accordance with the manufacturers specifications and pamphlets. All attachments of the pile driving hammer when the pipe section is being driven shall be in accordance with the pile driving specifications. Many organizations do not permit the driving of non-displacement or displacement piles with vibratory hammers into clayey silt soils because vibration is believed to regenerate and disturb the matrix and locked instresses of clayey silt soils.
[0019] Some typical examples of detachable or removable end plates are shown in Figures 4A, 4B, 5A, 5B, 5C, 5D, 6A, and 6B. Figure 4A shows a detachable end plate that is attached to a hinged connection (130) at one end and to the pipe section (123) by a bolt (131). During the driving of the pipe section (123), the detachable end plate (124) remains attached to the bottom, but when the pipe section (123) is pulled out of the ground, the detachable end plate (124) connected by the hinge (130) becomes vertical as shown in Figure 4B, helping to pull the pipe section (123) out of the ground but holding the compacted sandy material in place. Figure 5A shows a short piece of pipe section, or form-fitting corrugated pipe (132), placed within the pipe section (123), but attached to an end plate (124). During steady and careful driving, the short pipe section (132) and end plate will stay in place at the bottom of the pipe section (123), but when the pipe section (123) is pulled out of the ground, the short pipe or end plate (124) attached to the form-fitting corrugated pipe section (132) will be left on the ground as shown in Figure 5B. As an additional option, this section (132) can be attached to the pipe section (123) by thin aluminum rivets, but these rivets will break when the weight of the compacted sand material applies its weight and breaks the aluminum rivets. Figure 5C shows an end plate (124) attached to a number of tie rods (133) that are laid upwardly on opposite sides of the outside of the pipe section (123) and are held by bolts (135) near the top of the pipe section (123). The tie rods (133) are supported by a number of corners (140) and pass through a circular plate (136) that is secured by bolts (135) near the top of the pipe section (123). During driving of the pile, the end plate (124) remains attached, but prior to withdrawing the pipe section (123), the bolts (135) are removed and the detachable end plate (124) is left in the ground while the section (123) is withdrawn from the ground, as shown in Figure 5D.In this way, the compacted sandy material is left in place to form a porous soil dump pile. For each project, the removable or detachable end plates may be specifically designed according to the soil conditions and the length and size of the soil dump pile, taking into consideration the typical examples above.
[0020] The above details are applicable when a field operation of compacting sandy material is being carried out at the location where the pipe section (123) is to be driven. When the sandy material is compacted in the pipe section (123) at some other location and then transported to the selected location where it is to be driven into the ground, additional attachment to the end plate (124) is required. In such a case, the arrangement of removable plates in Figures 5A and 5B still works, but some improvements in Figures 4A, 4B, 5A, and 5B are required. As shown in Figure 6A, a number of corner pieces (137) are attached to the pipe section (123) and the hinged connection (130) diametrically opposite each other by bolts. Figure 6B shows a short pipe section (132) attached to the pipe section (123) diametrically opposite each other by bolts. When the pipe section (123) is transported to the selected location for driving, the bolts (138) need to be removed and the corner pieces (137) extracted. Similarly, when the end plate is in contact with the ground, the bolts (131) as shown in Figure 6B need to be removed and then the crane slings can be released to lower the pile to the ground.
[0021] To successfully pull the pipe section (123) out of the ground, the weight of the weight or hammer (126) held on the compacted sandy material is designed based on the side frictional resistance generated by the compacted sandy material inside the pipe section (123) and the side frictional resistance between the outside of the pipe section (123) and the in-situ soil around it, as well as the suction force applied to the in-situ soil on the end plate while pulling the pipe section. Similarly, the weight of the weight or hammer and the number and height of the drops are designed to achieve the specified density. The structural members described for the non-soil-scavenge piles and the soil-scavenge piles consist of circular sections as shown in the text and drawings, but non-common sections of hollow rectangular or elliptical sections or any other non-common sections can be used as per the client's requirements, either functional in RCCM. During the driving of the non-soil-scavenge piles or the soil-scavenge piles, sometimes it becomes important to limit noise and vibration, and in such cases it may be important to drop a heavy hammer from a very low height or to hydraulically drive the pile into the ground to minimize or limit damage or risk to adjacent structures. Settlement readings can be taken at both the structure and the ground surface, and at a depth in the ground, to monitor settlement of adjacent structures. It may also be desirable to perform a wave equation analysis to drive the pipe section (123) with a selected hammer (Pile Dynamics, Inc., 2005). Subsurface exploration with field test methods and laboratory testing of samples extracted from the field soil can be performed before and after installation of the porous soil dump to determine the amount of improvement and the density increase of the improved in-situ soil.
[0022] In addition to densifying and improving the surrounding soil, porous soil piles consisting of a column of compacted sandy material have another important function of preventing clay or silt particles from passing through or migrating through the compacted sandy material while allowing water to flow freely through the column of compacted sandy material to dissipate excess pore water pressure. The gradation of compacted sandy material to act as a filter restricting the movement of fine materials and allowing free flow of water shall be designed based on the design criteria for filters or chimney filters used in earth dams or earth and rockfill dams, using the Terzaghi criteria with or without modifications made by several organizations such as the United States Bureau of Reclamation (Prakash and Gupta, 1972). The sandy material may consist of a mixture of sand and a small amount of gravel, but should meet the requirements of allowing free water flow and preventing migration of fine particles of the in-situ soil into the column of compacted sandy material. The sandy material should not contain more than a specified amount of fine particles to maintain the free water flow characteristics. Generally, fine clean sand is used for sand drains. The same type of material can be used for the porous soil piles if it meets the filter criteria.
[0023] Briefly, the Terzaghi criterion is simply explained as follows: (1) Piping or moving particle standard: D 85(Base) represents the particle size that must be retained. D 15(Filter) represents the average pore size. 15(Filter) Filters that capture particles of up to 100mm in size D 15(filter) <4-5 D 85(Base) Permeability or free flow criteria: D 15(filter) >4~5 D 15(Base) Gradient Control D 50(filter) <25 D 50(Base)
[0024] The sandy material in the porous soil pile acts as a filter. The in situ clayey silt soil surrounding the compacted sandy material of the porous soil pile acts as a base for the above criteria. D 15 is the diameter at which 15% by weight of the material is relatively fine, and D 85 is a particle size in which 85% by weight of the material is relatively fine. In geotechnical engineering, the engineer's focus is generally to make the best use of the soil available in the vicinity of the site. If, for any reason, the sandy soil in the vicinity of the project site falls slightly outside the requirements of the traditional Terzaghi standard, laboratory tests such as those described in Prakash and Gupta, 1972, or in U.S. Bureau of Reclamation publications or other publications can be performed to determine whether the sandy soil on the site meets the filtration requirements of the chimney filter.
[0025] Cone penetration resistances (q ) of 0.1 to 1 MPa were measured during piezocone penetration measurements in highly stratified and overconsolidated soft to hard soils. c ) and penetration pore water pressures ranging from 50 to 1.8 MPa (7.25 to 261 psi), increasing with depth below the ground surface, have been recorded from the ground surface to a depth of about 22 meters (Peuchen, 2010). Penetration pore water pressures of this magnitude should be expected during the penetration of the soil-removal pile into the cohesive soil. A penetration pore water pressure of 1.8 MPa corresponds to 183.6 meters of impoundment from a 183 m (600 ft) high earth / concrete dam reservoir. Thus, the compacted sandy soil of the porous soil-removal pile can be subjected to such high pore water pressures and should therefore meet the chimney filter criteria as used for earth and rockfill dams. In such a case, if a pipe of about 1” (25 mm) with a porous disk at the bottom is driven into the porous soil-removal pile, clear water can be seen flowing from the top of the pipe.
[0026] A porous soil-rejecting pile consisting of a column of compacted sandy soil has been described above. There is another equally attractive way to install a porous soil-rejecting pile to perform the same kind of function, but it is more expensive than the method already described. Therefore, porous reinforced concrete piles with or without prestressing, or porous pipe sections with end plates, or pipe sections with small holes and end plates, filled with compacted sandy material, shall also be installed through the non-soiling pile, and (1) be driven into the soil by a pile hammer without exceeding the allowable driving stress, (2) allow free drainage and water flow, and prevent the migration of fine soil particles of clay and silt or fine sand into the porous soil-rejecting pile, and (3) be used as a porous soil-rejecting pile when the holes in the tube or pipe section need to be sufficiently small to hold the sandy material in the pipe section during compaction. These porous soil-rejecting piles do not require the pipe section to be pulled out of the ground, and installation is also easier and faster. In many cases where the soil layer consists of very cohesive clay or contains batter piles or where further vibration or noise cannot be tolerated, extracting the pipe section may be difficult or may not be permitted by the authorities.
[0027] In many areas, such as earthquake zones, local building codes may not permit construction unless the relative density exceeds a certain value. Table 1 shows the relationship of liquefaction potential between earthquake magnitude and relative density with respect to the water table 1.5 m below the ground surface.
[0028] Table 1: Earthquake magnitude and relative density (D r ), and a schematic relationship for liquefaction potential (Seed and Idriss, 1971). [Table 1]
[0029] In such cases, in areas with a 0.10g band, the next topsoil layer should be re-treated with RCCM to a D of more than 55% as necessary. rThe sandy soil in the pipe section may need to be compacted to a minimum relative density of 55% or more. In areas of the 0.15g zone, the subsurface soil layer shall be compacted to a D of more than 75% using RCCM. r The sandy soil in the pipe section may need to be compacted to a minimum relative density of 75% or more. In the 0.20g zone area, the subsurface soil layer shall be compacted to a D of more than 85% using RCCM. r In the 0.20g zone, the subsurface soil layer shall be densified to a Dr of more than 85% and the relative density of the sandy soil in the pipe section may need to be compacted to a minimum of 85% or more to provide low liquefaction probability in the above areas. In the 0.25g zone, the subsurface soil layer shall be densified to a Dr of more than 95% and the relative density of the sandy soil in the pipe section may need to be compacted to a minimum of 85% or more to provide low liquefaction probability in the above areas. ... r The sandy soil in the pipe section (123) shall be compacted to a specific relative density and the relative density of the sandy soil in the pipe section may need to be compacted to a minimum of 95% or more to provide a low liquefaction probability in the area. The spacing and diameter of the porous soil piles need to be designed to achieve a reduction in displacement and void volume of the in-situ soil and to achieve the required densification and density of the subsurface layer at the site. In the above discussion, it has been stated that the requirement to compact the sandy soil in the pipe section (123) to a specific relative density as well as the spacing and diameter of the porous soil piles depend on the subsurface conditions at the site and the requirements of the subsurface layer to be compacted at the site.
[0030] Typical examples of industrial applications of RCCM Ground improvement under slab foundation RCCM can provide an economical and very useful solution when a project requires soil layer improvement. For example, a slab foundation for a bridge foundation may rest on a soil consisting of a weak layer of soil (140) and requires soil improvement to support the load from the bridge superstructure. Figure 7A shows a typical layout plan of grid lines (151) and central locations of porous soil piles (150) consisting of columns (125) of compacted sandy material in a square or rectangular grid pattern. The locations marked by the number "1" at the grid intersections (150) are primary locations where the porous soil piles shall be initially placed using the method described in the paragraph above. The locations marked by the number "2" at the grid intersections are secondary locations where the porous soil piles shall be placed after the placement at the primary locations is completed. The secondary locations are usually selected at the center of the grid of four primary locations. The location marked by the number "3" at the grid intersection is the tertiary location where the porous soil dump pile shall be placed after completion of placement at the secondary location. The location marked by the number "4" at the grid intersection is the last and final location where the porous soil dump pile shall be placed after completion of placement at the tertiary location. Similar placement of the porous soil dump piles is possible, such as triangular or quadrilateral patterns as performed for vibro replacement columns, or any other grid pattern selected for the particular structure at the project site.
[0031] FIG. 7B is a cross-sectional elevation of the grid pattern shown in FIG. 7A. In FIG. 7B, a reinforced concrete foundation (146) is laid on a mud mat (147). A porous soil-removing pile made of compacted sandy material is laid to a design depth in the layer, in this case located in the soil layer (141). Case 1: Assume that the upper layer (142) and the lower layer (141) are made of sandy material and the sandwich layer (140) is made of soft clay. In this case, the pipe section with the detachable end plate can be driven from the ground surface without driving the non-soil-removing pile first if the layer (142) is thick enough to reasonably minimize the uplift above the soft layer (140), otherwise it is desirable to drive the non-soil-removing pile first and then drive the pipe section (123) with the detachable end plate (124) through the inside of the non-soil-removing pile. Case 2: Assume that the top layer (142) is made of clay and the sandwich layer (140) is made of coarse sand and requires densification. In this case, it is desirable to first drive the non-soiling pile to the bottom of the top layer (142) or to some small depth in the coarse sand layer (140). It shall be desirable to excavate the clayey soil from inside the non-soiling pile and drive the pipe section (123) with the detachable end plate (124) to the design depth. This can avoid the clayey soil being pushed into the coarse sand layer and prevent the immediate densification of the coarse sand layer. Therefore, for each project, the subsurface soil profile shall be carefully considered and the laying method shall be carefully designed. In some cases, the design may not require the laying of the porous soil-bailing pile at the tertiary (3) or final grid position (4).
[0032] Ground improvement under embankment RCCM can be used under mechanically stabilized walls (such as reinforced earth walls) to reduce and limit settlement and generate the required stability. Slopes that are known not to have sufficient safety factor based on slope stability analysis, when densified with RCCM, can develop the required safety factor against slope failure. Road and highway embankments resting on very soft soil layers may sink and settle by several inches or feet or meters. The 2H:1V slopes typically provided on the opposite side of the embankment are found to be unstable and therefore require a very flat slope. In such cases, RCCM shall densify the weak or soft soils under the embankment, reduce settlement to a reasonable limit, and improve the slope stability of the embankment slope without the need for a flatter slope. One typical example is shown in Figures 8A and 8B. As shown in Figure 8A, a layer of sandy material (142) is first laid on the very soft clay soil to build a low fill onto which equipment can be brought to place porous soil piles made of compacted sandy material. After the porous soil piles are placed, the fill is further raised to full height with an additional layer (143). As shown in Figure 8B, since the clay soil is too soft to even support the low fill for the equipment, the porous soil piles can be placed in the primary location (or secondary location) prior to the low fill, and then the fill can be further expanded before the porous soil piles are placed in the secondary and tertiary locations.
[0033] Rapid Consolidation and Compaction Method (RCCM) can also be used in coastal areas where the subsoil consists of soft to very soft clay and coarse sand, where the embankment is extended further into the sea to create new land for airports, housing projects etc. Similarly, where subsoils consisting of coarse, soft and very soft soils lie underneath, new islands can be built as these subsoils can be densified by the Rapid Consolidation and Compaction Method. To reduce the resistance of the piles being driven into the clayey silt soil, sand drains or PVC (wick) drains are laid and the embankment is built on them for a period of consolidation, typically up to 90%, to consolidate the clayey silt layer, after which the embankment is sometimes removed and piles are driven. Instead of sand drains or wick drains, RCCM can be used by laying porous soil catchment piles, which will quickly consolidate the layer without the need to build fill and wait for up to 90% consolidation. RCCM can be used very economically for any layer of soil or intermediate geological material where consolidation soil improvement is required and wherever existing methods such as jet grout columns, columns of cement or lime mixed with clayey materials, or Geopier, or vibro replacement or vibro flotation using vibro probes, bottom-feed or top-feed stone columns are used.
[0034] Ground improvement under inclined or tilted structures such as the Leaning Tower of Pisa There are many structures around the world that are tilted either during construction or after completion of construction. Ground improvement using rapid consolidation and compaction methods for the installation of porous soil dumping piles can improve the underlying soil, resulting in a significant reduction in the angle of tilt, bringing the tilted structure closer to vertical. There are many other structures in the city of Pisa, Italy that are tilted, though to a lesser extent, like the Leaning Tower of Pisa. First, before considering installing porous soil dumping piles on the Leaning Tower of Pisa to reduce the tilt, porous soil dumping piles should be installed on a non-tower tilted structure in the city of Pisa to demonstrate the effectiveness of soil improvement in successfully reducing tilt in the underlying subsurface conditions. In order to reduce the tilt angle of the Tower of Pisa, (i) lead weights were placed on the north side of the prestressed concrete ring around the base of the Tower of Pisa, (ii) steel cables were used to fix the north side of the Tower and restrict its movement towards the south, (iii) boreholes were formed and soil was removed from the boreholes on the north side, and (iv) excavations were made in the east-west direction (Jamiokowsky et al., 1993). However, in order to avoid disturbing the Tower, no construction on the south side is allowed and even subsurface exploration including cone penetration sounding is allowed only 10-20 meters from the southern edge of the Tower, while such construction is allowed on the north side. Additional steel cables to fix the Tower before laying the porous soil removal piles can be considered to further fix the Tower in the north-east and north-west directions with steel cables. If permission is given by the concerned authorities, the cone penetration resistance q of only 1-1.5 MPa at altitudes of -7 m to -18 m is required. cIt is worth considering the scheme of laying porous soil-removal piles as shown in Figures 9 and 10, which will compact and densify the upper clay (locally called Pancone clay) (Jamiokowsky et al., 1993). In order to achieve the densification of the upper clay (163) and raise the foundation of the south side of the Tower of Pisa, it is proposed to lay porous soil-removal piles with a slope of about 1V:2H (or even between 1V:3H and 1V:1H, if considered necessary). As the upper clay (160) is densified, the bearing strength increases, and as a result the settlement of the south side is reduced. The reduction in the slope reduces the bearing pressure on the south side and increases the bearing pressure on the north side, which leads to more settlement on the north side and reduces the settlement of the south side of the tower foundation. Also, after the stabilization and densification of the upper clay (163), the tendency of the south side of the tower foundation to further tilt in the future is prevented. A demonstration of industrial application of ground improvement under tilted structures to reduce tilt is described below. For this purpose, the Leaning Tower of Pisa was selected. To implement the scheme, the following steps are recommended:
[0035] 1. Conduct a subsurface survey near the south side of the tower.
[0036] 2. Install equipment to monitor vibrations and settlements both at the surface, at selected depths below the surface, and around the tower above the surface.
[0037] 3. Before and during the implementation of the scheme, radar surveys are carried out at designated points around the tower above the surface.
[0038] 4. Figure 9 shows grid lines (151) and the locations of grid line intersections (150) where porous soil dumping piles can be placed.
[0039] 5. Figure 10 shows (a) the ground surface at an elevation of 3.0 m (170), (b) the bottom of the clayey and sandy yellow silt (162) at an elevation of -7 m (171), (c) the bottom of the upper clay (163) at an elevation of -18 m (172), (d) the bottom of the middle clay (164) at an elevation of -22.5 m (173), (e) the bottom of the middle sand (164) at an elevation of -24.5 (173), and (f) the lower clay (166) below the middle sand (165).
[0040] 6. The tower base (162) has an outer diameter of 19.58 m with a circular space of 4.5 m diameter in the middle. The lower part of the tower is designated as reference number 161 in Fig. 10. It is proposed that the non-soiling pile (120) is driven first to the lowest level of the tower base with a gradient of 1H:2V. Then the pile section (123) with the detachable end plate (124) filled with compacted sandy material shall be driven so that it penetrates a short distance through the non-soiling pile (120) into the intermediate clay (164). After that, the pipe section is pulled out of the ground and then the non-soiling pile is raised. The porous soil-removing piles (125) numbered 1 to 5 shall be driven first as shown in this drawing. The pipe section (123) and the detachable end plate (124) are not shown in this drawing.
[0041] 7. Porous soil removal piles can be successively laid at grid intersection position 1 15 meters from the south edge of the leaning tower, then at grid intersection position 2 approximately 12 meters from the south edge, then at grid intersection position 3 9 meters from the south edge, at grid position 4 6 meters from the south edge, and at grid intersection position 5 3 meters from the south edge, and the settlement, vibration, movement, etc. can be continuously monitored and observed, and the effect of laying porous soil removal piles around the tower as these positions approach the tower foundation can be analyzed.
[0042] 8. The safety of the tower is determined by analyzing the recorded data and only when it is found to be sufficient after the installation of each porous soil pile may the installation of the remaining porous soil piles be considered.
[0043] 9. If permitted by the authorities, laying in primary locations 6 to 13, then 14 to 21 in that order may be considered.
[0044] 10. Once the data has been analyzed and deemed sufficient to proceed, tertiary locations may be considered for installation in the following order: locations 22-27, then 28-47. After evaluation of the reduction in tower tilt, tertiary locations may be considered.
[0045] 11. After completion of the construction of the porous soil dump piles, subsurface exploration will be carried out to evaluate the improvement in the properties of the overlying clay.
[0046] 12. Although only the installation of inclined porous soil piles is shown in Fig. 10, vertical porous soil piles can also be installed outside the tower foundation in addition to those shown in Fig. 9 and Fig. 10 to densify the upper clay outside the tower foundation. It is believed that a slope of about 60 degrees will result in distribution of the load of the tower or any foundation.
[0047] 13. Instead of laying porous soil piles consisting of columns of compacted sandy soil, porous soil piles consisting of porous pipe sections fitted with end plates or pipe sections with holes, containing compacted sandy material and equipped with end plates can be considered, but these sections do not need to be pulled out of the ground and therefore do not cause the disturbance and noise associated with the pulling of pipe sections out of the ground. These porous soil piles shall also be driven through non-soil piles.
[0048] Densification under structures subject to settlement When a structure such as a building or an oil or water tank continues to sink on all sides, oblique porous soil dumping piles penetrating under the structure on all sides can be laid to prevent or significantly reduce further settlement. The oblique soil dumping piles shall be laid in a specific sequence so that they are symmetrically and evenly distributed around the structure at any given moment. The porous soil dumping piles consist of columns of compacted sandy soil and may be laid as described above. To reduce vibration, noise and disturbance, one may also consider laying porous pipe sections or pipe sections with small holes and end plates filled with compacted sandy soil. All soil dumping piles shall be driven through the non-soil dumping piles. The choice shall be made for the specific site based on the soil conditions and the environment around the structure.
[0049] TEACHINGS OF THE PRESENT APPLICATION Various aspects of the subject matter described in the above sections can be used alone or in other combinations for other types of applications. The teachings of the present application are not limited to the industrial applications mentioned above and may have other applications. Thus, the teachings of the present application have numerous advantages and applications. Therefore, it should be noted that this is not an exhaustive list and may have other advantages and applications not described herein. Although the teachings of the present application have been described in detail for purposes of illustration, it is understood that such details are merely for illustrative purposes and that modifications may be made by those skilled in the art without departing from the scope of the teachings of the present application. Features described in the preceding description / specification may be used in combinations other than those expressly described. While the above specification / description has sought to draw attention to those features of the invention that are believed to be particularly important, it should be understood that the applicants and inventors claim protection for any patentable feature or combination of features referenced and / or shown in the drawings / figures, whether or not specifically emphasized. The term "comprising" when used in the claims does not exclude other elements or steps. The term "a" or "an" when used in the claims does not exclude a plurality. A unit or other means may fulfill the functions of several units or means recited in the claims. Although various possible embodiments may be made of the above-described invention and various modifications may be made to the above-described embodiments, it is to be understood that all matter set forth in this specification or shown in the accompanying drawings shall be interpreted in an illustrative and not a limiting sense.
[0050] References Bowels, E.B. "Foundation Analysis and Design", 4th ed., 1981, McGraw-Hill Book Company, New York, NY, USA Jamiolkowski, M., Lancellotta, R. and Pepe, C. (1993) "Leaning Tower of Pisa-Updated Information", Proceedings of the 3rd International Conference on Geotechnical Case Histories, 1-4 June 1993, SOA, St. Louis, Missouri, USA. Kennedy, GD and Woods, KB (1954) "Vertical Sand Drains", National Highway Research Board, Bulletin 90, Washington, DC, USA. Mars, BN, U.S. Patent No. 4,126,007, issued November 21, 1978, "Compaction of Soil," U.S. Patent and Trademark Office, Alexandria, Virginia, U.S.A. Peuchen, J., Berghes, JFV and Coulais, C (2010), "Estimation of u1 / u2 conversion factor for piezocone", 2nd International Symposium on Cone Penetrometer Testing, Alexandria, VA, USA. Pile Dynamics, Inc. (2005) "GRLWEAP, Wave Equation Analysis of Pile Driving", Cleveland, Ohio, USA. Prakash, D. and Gupta, R. C. (1972), "Laboratory Studies on Filter Materials Placed at Ramganga Main Dam", Indian Journal of Geotechnical Engineering, Vol. 2, No. 3, July 1972, pp. 203-219, New Delhi, India. Schaefer, V.R., Berg, R.R., Collin, J.G., Christofer, B.R., DiMaggio, J.A., Filz, G.M., Bruce, D.A., and Ayala, D. (2016) Ground Modification Methods-Reference Manual, Vol. 1, Bulletin of the Geotechnical Society No. 13, FHWA-NHI-16-027, U.S. Department of Transportation, Washington, DC, USA. Seed, H.B. and Idriss, I.M. (1971) "Simplified Procedure for Evaluating Soil Liquefaction Potential", JSMFD, ASCE, Vol. 97, SM9, September, pp. 1249-1273.
Claims
1. A rapid consolidation and compaction method for densifying a layer of clayey silt soil and / or a layer of sandy soil, the soil including intermediate geological material within a soil pile, comprising: The rapid consolidation and compaction method uses a porous soil dump, which is a column of compacted sandy soil; (i) a non-soil-displacement pile driving step of driving a non-soil-displacement pile having a pipe section into at least one layer of clayey silt soil and / or at least one layer of sandy soil; (ii) after the non-soil-removal pile driving step, a soil-removal pile driving step is performed in which the porous soil-removal pile, the porous soil-removal pile having a removable end plate attached to one end thereof and a soil-removal pipe portion filled with a compacted layer of sandy soil, is driven through the inside of the non-soil-removal pile into the at least one layer of clayey silt soil and / or the at least one layer of sandy soil; (iii) a weight or hammer placing step of placing a weight or hammer on the compacted sandy soil in the soil discharge pipe portion after the soil discharge pile driving step; (iv) after the step of placing the weight or hammer, the removable end plate is caused to open 100 percent of the inner area of the soil discharge pipe section, and the soil discharge pipe section is pulled out from the at least one layer of clayey silt soil and / or the at least one layer of sandy soil while continuing to press the compacted sandy soil vertically downward with the weight or hammer, leaving a column of the compacted sandy soil, thereby filling the space previously occupied by the soil discharge pipe section with the compacted sandy soil while preventing the formation of a constriction in the column of the compacted sandy soil; Equipped with The column of compacted sandy soil remaining after the soil discharge pipe section is pulled out has a cross-sectional area at least equal to the inner area of the soil discharge pipe section and behaves as a porous soil discharge pile up to the depth to which the soil discharge pipe section is driven, thereby displacing the clayey silt soil and / or sandy soil laterally away from the porous soil discharge pile, In the at least one layer of clayey silt soil, the porous soil removal pile occupies the space previously occupied by the clayey silt soil and pressurizes the pore water present in the pores of the saturated clayey silt soil, thereby generating excess pore water pressure in the saturated clayey silt soil and the excess pore water pressure in the partially saturated clayey silt soil, and then the excess pore water pressure generated in the clayey silt soil is rapidly dissipated by the pressurized pore water flowing through the porous soil removal pile to the ground surface or a sandy layer located in the ground, thereby densifying the clayey silt soil; in the at least one layer of sandy soil, the porous soil dump occupies space previously occupied by the sandy soil and instantly densifies the sandy soil by reducing the amount of voids in the soil matrix; Rapid consolidation and compaction methods.
2. A rapid consolidation and compaction method for densifying a layer of clayey silt soil and / or a layer of sandy soil, the soil including intermediate geological material within a soil deposit, comprising: The rapid consolidation and compaction method includes using a porous soil dump pile having a small hole, an end plate attached to one end, and a soil dump pipe section filled with compacted sandy soil; (i) a non-soil-displacement pile driving step of driving a non-soil-displacement pile having a pipe section into at least one layer of clayey silt soil and / or at least one layer of sandy soil; (ii) a soil-removal pile driving step, which follows the non-soil-removal pile driving step, includes driving the porous soil-removal pile through the inside of the non-soil-removal pile into the at least one layer of clayey silt soil and / or the at least one layer of sandy soil; Equipped with The porous soil pile displaces the clayey silt soil and / or sandy soil laterally away from the porous soil pile; In the at least one layer of clayey silt soil, the porous soil removal pile occupies the space previously occupied by the clayey silt soil and pressurizes the pore water present in the pores of the saturated clayey silt soil, thereby generating excess pore water pressure in the saturated clayey silt soil and the excess pore water pressure in the partially saturated clayey silt soil, and then the excess pore water pressure generated in the clayey silt soil is rapidly dissipated by the pressurized pore water flowing through the porous soil removal pile to the ground surface or a sandy layer located in the ground, thereby densifying the clayey silt soil; in the at least one layer of sandy soil, the porous soil dump occupies space previously occupied by the sandy soil and instantly densifies the sandy soil by reducing the amount of voids in the soil matrix; Rapid consolidation and compaction methods.
3. The rapid consolidation and compaction method comprises: (v) filling the soil discharge pipe section with the sandy soil in layers; (vi) a compaction step of compacting the sandy soil filled in the soil discharge pipe portion in the filling step so that the gradation of the particle size distribution of the compacted sandy soil allows the free flow of excess pore water to dissipate the excess pore water pressure and prevents the movement of fine particles of the on-site soil; 3. The method of claim 1 or claim 2, further comprising:
4. The rapid consolidation and compaction method comprises: In the filling step, the sandy soil of the layer filled in the soil discharge pipe section is compacted in one of the following three ways: (a) a first method in which the sandy soil in each layer is compacted and densified by the falling of a hammer or weight connected to a crane boom or piling hammer by a connecting rod; (b) A second method in which a hammer or weight is placed on the top of the sandy soil inside the soil discharge pipe section, and then a surface vibrator is attached to the side of the soil discharge pipe section to vibrate the soil discharge pipe section, thereby compacting and densifying each layer of the sandy soil; (c) A third method, in which a hammer or a weight is placed on the top of the sandy soil in the soil discharge pipe section, and then the hammer or the weight is vibrated to compact and densify each layer of the sandy soil; compacting each layer of said sandy soil to a relative density of either medium dense, dense or very dense sand; the porous soil dump pile compacted and densified using one of the three methods has a relative density greater than the density of the in-situ soil densified by the rapid consolidation and compaction method, and acts as a reinforcement for sharing the load of the foundation of the fill or structure, which is greater than the load of the densified in-situ soil, thereby reducing the total settlement of the structure or fill; 4. The method of claim 3 for rapid consolidation and compaction.
5. The rapid consolidation and compaction method comprises: There are three ways to attach the removable end plate to the soil dump pipe section: (A) a first manner in which the removable end plate is attached to the one end of the soil dump pipe section by a hinge connection; During the soil discharge pipe section extraction process, in the case of a vertical pile, the removable end plate is vertical at the side of the hinge connection at the bottom of the soil discharge pipe section to completely open the bottom of the soil discharge pipe section, and in the case of a diagonal pile, the removable end plate with the hinge connection is aligned in the vertical diagonal direction of the porous soil discharge pile to open the bottom of the soil discharge pipe section. A first mode; (B) A second manner in which a removable short pipe is connected to the removable end plate, and then both are inserted together into the one end of the soil discharge pipe section; the short pipe fits snugly inside the soil dump pipe section or the short pipe is attached to the soil dump pipe section by a thin aluminium rivet which breaks when the soil dump pipe section is extracted; A second mode in which during the soil dumping pipe section extraction step, the soil dumping pipe section is fully opened, and the short pipe attached to the removable end plate is left at the bottom of the column of compacted sandy soil. (C) A third manner in which a plurality of connecting rods are first fixed to the removable end plate located at the bottom of the soil dumping pipe section, and then the connecting rods are bolted to the top of the soil dumping pipe section; A third manner, during the soil discharge pipe section extraction process, the bolts at the top of the soil discharge pipe section are loosened, and the connecting rod and the removable end plate are detachable from the soil discharge pipe section and left behind in the at least one layer of clayey silt soil and / or the at least one layer of sandy soil; 2. The rapid consolidation and compaction method according to claim 1, further comprising one of the steps of:
6. The rapid consolidation and compaction method comprises: (I) In the first mode, when the sandy soil is filled and compacted in the soil discharge pipe section at a position other than the position where the porous soil discharge pile is driven, in addition to the hinge connection, one or more angle members are arranged at equally spaced positions from each other around the periphery of the one end of the soil discharge pipe section, each of which is bolted to the removable end plate and the soil discharge pipe section; With at least one of the angle members bolted to the removable end plate and to the one end of the soil dump pipe section, the soil dump pipe section filled with the compacted sandy soil is moved to a position where the porous soil dump pile is to be driven, and then the bolts of the angle member are loosened while the removable end plate is in contact with the ground, so that the removable end plate can be detached from the soil dump pipe section, or (II) In the second mode, when the sandy soil is filled and compacted in the soil discharge pipe section at a position other than the position where the porous soil discharge pile is driven, the short pipe connected to the removable end plate is bolted to the one end of the soil discharge pipe section to hold the compacted sandy soil in place in the soil discharge pipe section, and then the soil discharge pipe section filled with the compacted sandy soil is moved to the position where the porous soil discharge pile is driven, and the bolt of the short pipe is loosened while the removable end plate is in contact with the ground, so that the short pipe and the removable end plate can be detached from the soil discharge pipe section.
6. The method of claim 5 for rapid consolidation and compaction.
7. A rapid consolidation and compaction method for densifying a layer of clayey silt soil and / or a layer of sandy soil, the soil including intermediate geological material within a soil deposit, comprising: The rapid consolidation and compaction method uses a porous soil removal pile, which is a porous reinforced concrete pile; (i) a non-soil-displacement pile driving step of driving a non-soil-displacement pile having a pipe section into at least one layer of clayey silt soil and / or at least one layer of sandy soil; (ii) a concrete soil-removal pile driving step, in which the porous soil-removal pile is driven through the inside of the non-soil-removal pile into the at least one layer of clayey silt soil and / or the at least one layer of sandy soil after the non-soil-removal pile driving step; Equipped with The porous soil pile displaces the clayey silt soil and / or the sandy soil laterally away from the porous soil pile; In the at least one layer of clayey silt soil, the porous soil removal pile occupies the space previously occupied by the clayey silt soil and pressurizes the pore water present in the pores of the saturated clayey silt soil, thereby generating excess pore water pressure in the saturated clayey silt soil and the excess pore water pressure in the partially saturated clayey silt soil, and then the excess pore water pressure generated in the clayey silt soil is rapidly dissipated by the pressurized pore water flowing through the porous soil removal pile to the ground surface or a sandy layer located in the ground, thereby densifying the clayey silt soil; in the at least one layer of clayey silt soil, the porous soil dump occupies space previously occupied by the sandy soil, reducing the amount of voids in the soil matrix, thereby instantly densifying the sandy soil; Rapid consolidation and compaction methods.
8. A method of rapid consolidation and compaction as described in any one of claims 1 to 7, wherein a plurality of the porous soil removal piles are used, the plurality of the porous soil removal piles being laid vertically or diagonally, spaced apart from each other in a grid pattern over the entire area requiring densification.
Citation Information
Patent Citations
JP1972036685U
Method of improving poor subsoil
JP1977135511A
Driving method of sand pile and its apparatus
JP1980098519A
Sand drain and its formation
JP1982116824A
Concrete [topairu[topairu] -
JP1985036422U
