Efficient hot filling device and method for flange root in clarification section of platinum channel

By designing a hot-state high-efficiency filling device for the flange root of the platinum channel clarification section, and adopting a material conveying structure and stainless steel material conveying troughs, pipes, nozzles and support frames, the problem of long sealing and filling time at the flange root of the platinum channel is solved, achieving fast, dead-angle-free high-efficiency filling and improving the service life of the platinum channel.

WO2024260143A1PCT designated stage expired Publication Date: 2024-12-26IRICO DISPLAY DEVICES CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/092916
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-06-19
Filing Date
2024-05-13
Publication Date
2024-12-26

AI Technical Summary

Technical Problem

The existing platinum channel clarification flange root sealing and filling operation takes a long time and has poor tightness, which affects the life of the platinum channel.

Method used

A hot-state high-efficiency filling device for the flange root of the platinum channel clarification section is designed. The device uses a material conveying structure that passes through the filling observation port and utilizes a stainless steel material conveying trough, pipe and nozzle, combined with a support frame, to achieve rapid and dead-angle-free filling.

Benefits of technology

It significantly shortens the operation time, improves the density of hot filling at the flange root, reduces platinum exposure time and temperature difference, and enhances filling efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024092916_26122024_PF_FP_ABST
    Figure CN2024092916_26122024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of manufacturing of glass substrates. Disclosed are an efficient hot filling device and method for a flange root in a clarification section of a platinum channel. The device comprises a material-conveying structure, wherein a refractory brick channel is provided outside a clarification section of a platinum channel; the clarification section of the platinum channel comprises a platinum body and a flange, and a cavity area is provided between the flange and the refractory brick channel and configured for normal expansion of the flange in a heating process; a filling observation opening is provided in the refractory brick channel corresponding to the cavity area; a conveying end of the flange runs through the filling observation opening; the material-conveying structure runs through the filling observation opening; an output end of the material-conveying structure is arranged in the cavity area, and an input end of the material-conveying structure is arranged outside the refractory brick channel; and a reserved distance is set between the output end of the material-conveying structure and the platinum body. By using the material-conveying structure, the present invention can effectively improve the hot filling compactness of a flange root, shorten the operation time, save on time and economic costs, and has a very strong use value.
Need to check novelty before this filing date? Find Prior Art

Description

A hot and efficient filling device and method for the flange root of a platinum channel clarification section Technical Field

[0001] The invention belongs to the technical field of substrate glass manufacturing, and in particular relates to a device and method for hot-state efficient filling of a flange root of a platinum channel clarification section. Background Art

[0002] As core equipment in the production and manufacturing of substrate glass, the platinum channel requires phased maintenance operations, combining different operational scenarios and the final equipment operation requirements, from design and manufacturing to masonry installation and management of temperature expansion. The clarification section is the component with the highest operating temperature and the highest risk of damage in the entire platinum channel structure. Because the platinum channel is primarily made of platinum-rhodium alloy, although it has excellent resistance to high temperatures and corrosion, long-term operation above 1400°C and continuous erosion and corrosion by the internal glass liquid still pose a significant challenge to the platinum substrate itself.

[0003] During the initial installation of the platinum channel, most areas of the clarification section can be sealed at room temperature. The sealing method is mainly to seal and fill the space between the outside of the platinum and the refractory bricks with high-temperature resistant zirconium powder. As for the flange area of ​​the platinum channel, since there is still relative expansion displacement between the platinum and the refractory material during the actual heating process, and the flange itself is larger than the refractory brick, it is necessary to reserve space in the flange area of ​​the clarification section in advance. After the heating and expansion are completed, rapid filling at high temperature is carried out to ensure the final sealing effect of the flange root.

[0004] From the line analysis over the years, it can be seen that the main problem restricting the life of the platinum channel is the flange root area of ​​the clarification section. Although this area was eventually filled in the hot state, the harsh operating environment, narrow space and strict technical requirements for operators in the hot state make this area still different from the filling of the clarification main section at room temperature. After comprehensive analysis, the density of the hot filling of the flange root can only reach about 70% of the platinum filling of the main section. Therefore, in actual production, as the channel has been running for more than 2 years, local cracks will first appear in the flange root area. This is mainly due to oxidation under high temperature, which leads to excessive volatilization of the base material in this area, and ultimately the wall thickness of the tube body is severely thinned. With further deterioration, the platinum tube body will eventually break in this area. This fracture not only depends on the thinning of the wall thickness, but also the local Joule heat caused by the running current will further accelerate the fracture.

[0005] In summary, for the sealing and filling of the root of the clarification pipe flange, a more convenient auxiliary method needs to be considered. The current filling method is mainly through multiple groups of people synchronously filling from different angles with simple tools such as shovels. The efficiency is extremely low and the filling effect is poor. In addition, because the filling process requires the temporary insulation cotton in the area to be removed, this will cause the platinum to be exposed. The longer the time, the greater the temperature difference, which will also have an adverse effect on the subsequent heating trial production. Therefore, improving the filling efficiency has become the main goal of this area.

[0006] Therefore, it is currently necessary to solve the problem of long operation time for sealing and filling the root of the existing platinum channel clarification flange. Technical issues

[0007] The existing platinum channel clarifies the problem of long operation time for flange root sealing and filling. Technical Solutions

[0008] The purpose of the present invention is to solve the problem of long operation time for sealing and filling the root of the existing platinum channel clarification flange, and provide a hot and efficient filling device and method for the root of the flange of the platinum channel clarification section, which effectively improves the density of the hot filling of the flange root.

[0009] In order to achieve the above object, the present invention adopts the following technical solutions:

[0010] A hot and efficient filling device for the root of the flange of a platinum channel clarification section includes a material feeding structure. A refractory brick channel is provided on the outside of the platinum channel clarification section. The platinum channel clarification section includes a platinum body and a flange. A cavity area is provided between the flange and the refractory brick channel for normal expansion of the flange during heating. A filling observation port is provided on the refractory brick channel corresponding to the cavity area. The transmission end of the flange passes through the filling observation port, and the material feeding structure passes through the filling observation port. The output end of the material feeding structure is provided in the cavity area, and the input end of the material feeding structure is provided outside the refractory brick channel. A reserved distance is provided between the output end of the material feeding structure and the platinum body.

[0011] Furthermore, the material feeding structure includes a side material feeding structure, and two side material feeding structures are provided. The two side material feeding structures are symmetrically arranged on both sides of the platinum channel.

[0012] Furthermore, the side material feeding structure includes a side material feeding trough, a side material feeding pipe, a side material feeding nozzle and a side material feeding support frame; the side material feeding trough adopts a hopper structure with a larger upper part and a smaller lower part, and the slope angle of the hopper structure is set to 75° to 80°. The outside of the side material feeding trough and the side material feeding pipe are welded with connecting ears, and the side material feeding support frame includes a side long leg part and a side short leg part, the side short leg part is arranged at the outer proximal end of the refractory brick channel, and the side long leg part is arranged at the outer distal end of the refractory brick channel. The upper part of the side material feeding support frame is connected to the connecting ear by bolts, and the bottom of the side material feeding support frame is welded with a side support foot.

[0013] Furthermore, the side support legs are circular, the side feed pipe and the side feed nozzle are both configured as oblique multi-angle spliced ​​tubes or oblique multi-curvature arc multi-segment spliced ​​tubes, the cross-sections of the side feed pipe and the side feed nozzle are both rounded rectangles or ellipses, the cross-sections are perpendicular to the flow direction of the filler, and the outlet end of the side feed nozzle is configured as an oblique cut shape or a rectangle.

[0014] Furthermore, the feeding structure also includes a top feeding structure, the filling observation port includes a side port and a top port, the side feeding structure passes through the side port, the top feeding device passes through the top port, and the transmission end of the flange passes through the top port.

[0015] Furthermore, the top material delivery structure includes a top material delivery trough, a top material delivery pipe, a top material delivery nozzle and a top support frame. The top material delivery trough adopts a hopper structure with a larger top and a smaller bottom. The top material delivery trough and the top material delivery pipe are welded with connecting ears. The top material delivery support frame includes a top long leg part and a top short leg part. The top short leg part is arranged at the outer proximal end of the refractory brick channel, and the top long leg part is arranged at the outer distal end of the refractory brick channel. The upper part of the top material delivery support frame is connected to the connecting ear by bolts, and the bottom of the top material delivery support frame is welded with a top support foot.

[0016] Furthermore, the top supporting foot is circular, the top feed pipe and the top feed nozzle are straight sections or segmented multi-angle spliced ​​tubes, the cross-sections of the top feed pipe and the top feed nozzle are both rounded rectangles or ellipses, the cross-sections are perpendicular to the flow direction of the filler, and the outlet end of the top feed nozzle is set to be an oblique cut or a rectangle.

[0017] Furthermore, the cross-sectional width of the top feed pipe = the cross-sectional width of the side feed pipe, the cross-sectional length of the top feed pipe > the cross-sectional length of the side feed pipe, the bevel angle of the top feed pipe > the bevel angle of the side feed pipe, and the volume of the top feed trough > the volume of the side feed trough.

[0018] Furthermore, a filling layer is provided between the platinum body and the refractory brick channel, and the material feeding structure is made of stainless steel, and the carbon content of the stainless steel is less than 0.08%.

[0019] A method for hot and efficient filling of the flange root of a platinum channel clarification section utilizes the hot and efficient filling device for the flange root of a platinum channel clarification section described above, comprising the following steps: temporarily sealing the cavity area between the flange and the refractory brick channel with high-temperature cotton during the heating process; when it is confirmed that the expansion of the platinum channel clarification section has reached the expected level, removing the insulation cotton in the cavity area, quickly inserting the feeding structure into the flange root of the platinum channel clarification section through the filling observation port, and setting a reserved distance between the output end of the feeding structure and the platinum body; pouring the filler into the input end of the feeding structure, and the filler flows into the flange root of the platinum channel clarification section through the feeding structure, while observing the filling status of the filler through the filling observation port, thereby completing the hot and efficient filling of the flange root of the platinum channel clarification section. Beneficial effects

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] The feeding structure of the present invention passes through the filling observation port, the output end of the feeding structure is arranged in the cavity area, and the input end of the feeding structure is arranged outside the refractory brick channel, which converts the internal filling into simplified external loading, and can achieve rapid filling. It provides an effective time advantage for the insulation of the flange root area of ​​the platinum channel clarification section, can effectively improve the density of the hot filling of the flange root and shorten the operation time, saving time and economic costs, and has strong use value.

[0022] The feeding structure of the present invention can quickly build a feeding trough for loading materials by designing a special-shaped stainless steel feeding pipe and a simple fixed structure feeding support frame, and the feeding nozzle can directly extend into the filling gap, thereby having the structural function of rapid filling.

[0023] The present invention adopts a single or three feeding structures equipped with a common material trough for synchronous filling, which effectively improves the filling efficiency and avoids local filling blind areas.

[0024] The feed trough of the present invention adopts a hopper structure with a larger upper part and a smaller lower part. The inclined angle of the side feed trough is set to 75° to 80° so that the powder can slide into the feed pipe, which can ensure the normal flow of the powder without generating piles. In addition, the inclined angle is less than 80°, which can avoid the dust problem of the powder.

[0025] The overall side material delivery pipe of the present invention adopts an oblique design, which ensures that the side material delivery trough does not contact the refractory brick channel of the channel body, and can also transfer material powder from the outside to the inner cavity of the flange root.

[0026] The cross-section of the feed pipe of the present invention is designed to be a rounded rectangle or an ellipse, which ensures the dimensional consistency of the feed pipe and the feed nozzle. The narrower width direction is distributed vertically. When inserted into the filling gap at the root of the flange, due to the narrow space, the feed pipe needs to be placed vertically, that is, the narrow side of the rounded rectangle of the cross-section matches the narrow side of the filling gap, which can ensure that the feed pipe can smoothly enter the narrow cavity of the root of the flange.

[0027] The end of the feeding nozzle of the present invention is designed to be an oblique cut shape or a rectangular shape, which is convenient for further penetration of a small amount of material powder.

[0028] The upper part of the support frame of the present invention is connected to the connecting ears welded on the feed trough and the feed pipe by bolts, and can be rotated around the connection point at a certain angle, that is, the span angle of the support frame can be adjusted, so that it has a certain rotation and adjustment ability.

[0029] The present invention has circular support feet welded to the bottom of the support frame, which ensures a certain anti-slip ability.

[0030] The angle of the top conveying pipe of the present invention is designed to be smaller than that of the side conveying pipe, thereby avoiding the problem of dust raised by the high drop at the top.

[0031] The material feeding structure of the present invention is made of stainless steel with a carbon content of less than 0.08%, which avoids the contamination of the internal platinum body by metal tools and avoids carbonization reaction at high temperature.

[0032] During the heating process, the present invention uses high-temperature cotton to temporarily seal the cavity area, ensuring a certain degree of insulation without affecting the expansion of the platinum, thereby minimizing the temperature difference within the cavity area within the platinum to less than 100°C. This invention allows an entire basin of filler to be poured into the feed structure at once, and the filler automatically enters the flange base, improving upon the existing method of gradually adding filler in small batches. In actual use, the present invention can fill the flange base in less than 10 minutes, which is approximately 70% faster than the traditional method of manually pouring filler from a handheld basin with a shovel. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The drawings in the specification are used to provide further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0034] FIG1 is a schematic diagram of the structure of the flange area of ​​the channel clarification section of the prior art;

[0035] FIG2 is an overall schematic diagram of the refractory bricks in the flange area of ​​the channel clarification section of the present invention;

[0036] FIG3 is a layout diagram of the filling structure of the flange area of ​​the channel clarification section of the present invention;

[0037] FIG4 is a schematic diagram of the structure of the side filling feed trough of the present invention;

[0038] FIG5 is a schematic diagram of the top filling feed trough structure of the present invention.

[0039] Among them, 1 is the platinum body, 2 is the flange, 3 is the filling layer, 4 is the refractory brick channel, 5 is the side port, 6 is the top port, 7 is the side feeding structure, 8 is the top feeding structure, 7-1 is the side feeding trough, 7-2 is the side feeding pipe, 7-3 is the side feeding nozzle, 7-4 is the side feeding support frame, 8-1 is the top feeding trough, 8-2 is the top feeding pipe, 8-3 is the top feeding nozzle, and 8-4 is the top feeding support frame. Modes for Carrying Out the Invention

[0040] In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts should fall within the scope of protection of the present invention.

[0041] It should be noted that the terms "first", "second", etc. in the description and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0042] Example 1

[0043] A hot and efficient filling device for the root of the flange of a platinum channel clarification section includes a material feeding structure. A refractory brick channel 4 is provided on the outside of the platinum channel clarification section. The platinum channel clarification section includes a platinum body 1 and a flange 2. A cavity area is provided between the flange 2 and the refractory brick channel 4 for the normal expansion of the flange 2 during the heating process. A filling observation port is provided on the refractory brick channel 4 corresponding to the cavity area. The transmission end of the flange 2 passes through the filling observation port, and the material feeding structure passes through the filling observation port. The output end of the material feeding structure is provided in the cavity area, and the input end of the material feeding structure is provided outside the refractory brick channel 4. A reserved distance is provided between the output end of the material feeding structure and the platinum body 1.

[0044] The feeding structure of the present invention passes through the filling observation port, the output end of the feeding structure is arranged in the cavity area, and the input end of the feeding structure is arranged outside the refractory brick channel, which converts the internal filling into simplified external loading, and can achieve rapid filling. It provides an effective time advantage for the insulation of the flange root area of ​​the platinum channel clarification section, can effectively improve the density of the hot filling of the flange root and shorten the operation time, saving time and economic costs, and has strong use value.

[0045] The material feeding structure includes a side material feeding structure 7. Two side material feeding structures 7 are provided. The two side material feeding structures 7 are symmetrically arranged on both sides of the platinum channel.

[0046] The side feeding structure 7 includes a side feeding trough 7-1, a side feeding pipe 7-2, a side feeding nozzle 7-3 and a side feeding support frame 7-4; the side feeding trough 7-1 adopts a hopper structure with a larger upper part and a smaller lower part, and the slope angle of the hopper structure is set to 75° to 80°. The outside of the side feeding trough 7-1 and the side feeding pipe 7-2 are welded with connecting ears, and the side feeding support frame 7-4 includes a side long leg part and a side short leg part. The side short leg part is arranged at the outer proximal end of the refractory brick channel 4, and the side long leg part is arranged at the outer distal end of the refractory brick channel 4. The upper part of the side feeding support frame 7-4 is connected to the connecting ear by bolts, and the bottom of the side feeding support frame 7-4 is welded with a side support foot.

[0047] The side support legs are circular, and the side feed pipe 7-2 and the side feed nozzle 7-3 are both configured as oblique multi-angle spliced ​​tubes or oblique multi-curvature spliced ​​arc multi-segment spliced ​​tubes. The cross-sections of the side feed pipe 7-2 and the side feed nozzle 7-3 are both rounded rectangles or ellipses, and the cross-sections are perpendicular to the flow direction of the filling material. The outlet end of the side feed nozzle 7-3 is configured as an oblique cut or rectangle.

[0048] The feeding structure of the present invention can quickly build a feeding trough for loading materials by designing a special-shaped stainless steel feeding pipe and a simple fixed structure feeding support frame, and the feeding nozzle can directly extend into the filling gap, thereby having the structural function of rapid filling.

[0049] The present invention adopts a single or three feeding structures equipped with a common material trough for synchronous filling, which effectively improves the filling efficiency and avoids local filling blind areas.

[0050] The feed trough of the present invention adopts a hopper structure with a larger upper part and a smaller lower part. The inclined angle of the side feed trough is set to 75° to 80° so that the powder can slide into the feed pipe, which can ensure the normal flow of the powder without generating piles. In addition, the inclined angle is less than 80°, which can avoid the dust problem of the powder.

[0051] The overall side material delivery pipe of the present invention adopts an oblique design, which ensures that the side material delivery trough does not contact the refractory brick channel of the channel body, and can also transfer material powder from the outside to the inner cavity of the flange root.

[0052] The cross-section of the feed pipe of the present invention is designed to be a rounded rectangle or an ellipse, which ensures the dimensional consistency of the feed pipe and the feed nozzle. The narrower width direction is distributed vertically. When inserted into the filling gap at the root of the flange, due to the narrow space, the side feed pipe 7-2 needs to be placed vertically, that is, the narrow side of the rounded rectangle of the cross-section matches the narrow side of the filling gap, which can ensure that the feed pipe can smoothly enter the narrow cavity of the root of the flange.

[0053] The feeding structure also includes a top feeding structure 8, the filling observation port includes a side port 5 and a top port 6, the side feeding structure 7 passes through the side port 5, the top feeding device 8 passes through the top port 6, and the transmission end of the flange 2 passes through the top port 6.

[0054] The top material delivery structure 8 includes a top material delivery trough 8-1, a top material delivery pipe 8-2, a top material delivery nozzle 8-3 and a top support frame 8-4. The top material delivery trough 8-1 adopts a hopper structure with a larger upper part and a smaller lower part. The top material delivery trough 8-1 and the top material delivery pipe 8-2 are welded with connecting ears. The top material delivery support frame 8-4 includes a top long leg part and a top short leg part. The top short leg part is arranged at the outer proximal end of the refractory brick channel 4, and the top long leg part is arranged at the outer distal end of the refractory brick channel 4. The upper part of the top material delivery support frame 8-4 is connected to the connecting ear by bolts, and the bottom of the top material delivery support frame 8-4 is welded with a top support foot.

[0055] The top support foot is circular, and the top feed pipe 8-2 and the top feed nozzle 8-3 are straight sections or segmented multi-angle spliced ​​tubes. The cross-sections of the top feed pipe 8-2 and the top feed nozzle 8-3 are both rounded rectangles or ellipses, and the outlet end of the top feed nozzle 8-3 is set to be an oblique cut or a rectangle.

[0056] The cross-section of the feed pipe of the present invention is designed to be a rounded rectangle or ellipse, which ensures the dimensional consistency of the feed pipe and the feed nozzle. The narrow width direction is used as a vertical distribution to ensure that the feed pipe can smoothly enter the narrow flange root cavity.

[0057] The end of the feeding nozzle of the present invention is designed to be an oblique cut shape or a rectangular shape, which is convenient for further penetration of a small amount of material powder.

[0058] The upper part of the support frame of the present invention is connected to the connecting ears welded on the feed trough and the feed pipe by bolts, and can be rotated around the connection point at a certain angle, that is, the span angle of the support frame can be adjusted, so that it has a certain rotation and adjustment ability.

[0059] The present invention has circular support feet welded to the bottom of the support frame, which ensures a certain anti-slip ability.

[0060] The cross-sectional width of the top delivery pipe 8-2 is equal to the cross-sectional width of the side delivery pipe 7-2; the cross-sectional length of the top delivery pipe 8-2 is greater than the cross-sectional length of the side delivery pipe 7-2; the bevel angle of the top delivery pipe 8-2 is greater than the bevel angle of the side delivery pipe 7-2; and the volume of the top delivery trough 8-1 is greater than the volume of the side delivery trough 7-1. The angle of the top delivery pipe is designed to be smaller than that of the side delivery pipe, thus avoiding the problem of dust caused by the high height at the top.

[0061] A filling layer 3 is provided between the platinum body 1 and the refractory brick channel 4. The feeding structure is made of stainless steel with a carbon content of less than 0.08%, thereby avoiding contamination of the internal platinum body by metal tools and preventing carbonization reaction at high temperature.

[0062] A method for hot and efficient filling of the flange root of a platinum channel clarification section is disclosed, utilizing a hot and efficient filling device for the flange root of a platinum channel clarification section, and comprising the following steps: temporarily sealing the cavity area between the flange 2 and the refractory brick channel 4 with high-temperature cotton during the heating process; when it is confirmed that the expansion of the platinum channel clarification section has reached the expected level, removing the insulation cotton in the cavity area, quickly inserting a feed structure into the flange root of the platinum channel clarification section through a filling observation port, and setting a reserved distance between the output end of the feed structure and the platinum body 1; pouring filler into the input end of the feed structure, and the filler flows into the flange root of the platinum channel clarification section through the feed structure; and simultaneously observing the filling status of the filler through the filling observation port, thereby completing the hot and efficient filling of the flange root of the platinum channel clarification section.

[0063] During the heating process, the present invention uses high-temperature cotton to temporarily seal the cavity area, ensuring a certain degree of insulation without affecting the expansion of the platinum, thereby minimizing the temperature difference within the cavity area within the platinum to less than 100°C. The present invention allows an entire basin of filler to be poured into the feed structure at once, and the filler automatically enters the flange root, improving the existing filling method of gradually adding filler in small batches.

[0064] Example 2

[0065] As shown in Figure 1, the clarification section is a mature structure currently used in platinum channels. The existing clarification section flange structure is the main structure of the platinum channel's high-temperature zone. It is primarily responsible for clarifying and removing bubbles from the high-temperature, initially melted glass from the tank furnace, thereby purifying the molten glass. The clarification section structure consists of two main components: the platinum body 1 and the flange 2. The flange 2 is primarily used to transmit current. The two flanges 2 form a circuit, converting the current into Joule heat within the platinum body 1 itself, thereby heating the internal glass liquid.

[0066] As shown in Figures 2 and 3, a hot and efficient filling device for the root of the flange of the clarification section of a platinum channel is shown. The outside of the clarification section is wrapped with several layers of refractory material structures, collectively referred to as refractory bricks. A main section filling layer 3 is located between the platinum body 1 and the refractory brick channel 4. The filling layer 3 is for normal filling at room temperature. To protect the protruding flange 2, a certain length of cavity area is reserved inside this area of ​​the refractory brick channel 4 for the normal expansion of the flange 2. For the cavity area of ​​the flange 2, three filling observation ports are left on the outside, namely a side port 5 and a top port 6.

[0067] As shown in Figure 3, the feeding structure consists of two parts: a side feeding structure 7 and a top feeding structure 8. The side feeding structures 7 include two parts, symmetrically distributed on both sides of the channel, and only one is required on the top, for a total of three parts. The feeding structure is fixed to the two side ports 5 and the top port 6 by a bracket. The actual filling process is also carried out through these three ports, which can achieve filling of the internal cavity area without dead angles.

[0068] The feeding structure is entirely made of stainless steel, with a carbon content of less than 0.08%, which prevents metal tools from contaminating the internal platinum body and avoids carbonization reactions at high temperatures.

[0069] As shown in Figure 4, the side feeding structure 7 includes four parts: a side feeding trough 7-1, a side feeding pipe 7-2, a side feeding nozzle 7-3 and a side feeding support frame 7-4. First, the feeding trough 7-1 adopts a traditional hopper structure with a larger upper portion and a smaller lower portion, so that the powder can slide into the side feeding pipe 7-2. The slope angle of the side feeding trough 7-1 is 75° to 80°. Through repeated measurements of the root powder fluidity test, the slope angle of 75° to 80° can ensure the normal flow of the powder without generating piles. The slope angle of less than 80° can avoid the dust problem of the powder. Preferably, according to the single-person carrying capacity of the loading personnel and the compaction density of the powder, the capacity volume of the side feeding trough 7-1 is 0.3m³;

[0070] The side feed pipe 7-2 is designed to be oblique as a whole, which not only ensures that the side feed trough 7-1 does not contact the refractory brick channel 4, but also can transfer the powder from the outside to the inner cavity of the flange root. The angle and length of the side feed pipe 7-2 are designed according to the size of the feed trough 7-1 and the outer contour size of the channel refractory brick 4. In order to consider the smoothness of the flow of materials, the side feed pipe 7-2 can adopt an oblique multi-angle spliced ​​pipe or an oblique multi-curvature spliced ​​arc multi-segment spliced ​​pipe. The cross-section of the side delivery pipe 7-2 is a rounded rectangular structure to ensure the dimensional consistency of the side delivery pipe 7-2 and the side delivery nozzle 7-3. The narrower width direction is distributed vertically. When inserted into the filling gap at the root of the flange, due to the narrow space, the side delivery pipe 7-2 needs to be placed vertically, that is, the narrow side of the rounded rectangular cross-section matches the narrow side of the filling gap, which can ensure that the side delivery pipe 7-2 can smoothly enter the narrow flange root cavity. Preferably, the cross-sectional width of the side delivery pipe 7-2 is 25mm; preferably, the cross-sectional length and cross-sectional area are designed according to the flow rate and fluidity, and the cross-sectional length of the side delivery pipe 7-2 is 50mm to 70mm;

[0071] The side feeding nozzle 7-3 has the same structure as the side feeding pipe 7-2. The end of the side feeding nozzle 7-3 is an oblique cut or rectangular shape, which facilitates the further penetration of a small amount of powder.

[0072] The side material conveying support frame 7-4 includes a long side leg part and a short side leg part. The long side leg part is arranged on the outside and the short side leg part is arranged on the inside. The upper part of the side material conveying support frame 7-4 is connected to the connecting ears welded on the side material conveying trough 7-1 and the side material conveying pipe 7-2 by bolts. It can be rotated around the connection point at a certain angle, that is, the span angle of the support frame can be adjusted, so that it has the ability to rotate and adjust. Circular side support feet are welded at the bottom of the side material conveying support frame 7-4 to ensure a certain anti-slip ability.

[0073] As shown in FIG5 , the top feeding structure 8 is similar to the side feeding structure 7. The top feeding structure 8 includes a top feeding trough 8-1, a top feeding pipe 8-2, a top feeding nozzle 8-3 and a top support frame 8-4. According to its structural principle, the shape of the structure is designed in accordance with the principle of the side feeding structure. Since the top is the main filling channel of the feeding structure, the volume of the top feeding trough 8-1 is larger than that of the side feeding trough 7-1. Preferably, the volume of the top feeding trough 8-1 is 0.6 m³, and the cross-sectional width of the top feeding pipe 8-2 is the same as that of the side feeding pipe 7-2. The cross-sectional width of the top delivery pipe 8-2 is preferably 25 mm; the cross-sectional length of the top delivery pipe 8-2 is slightly larger than the cross-sectional length of the side delivery pipe 7-2. Preferably, the cross-sectional length of the top delivery pipe 8-2 is 65 mm to 85 mm; the bevel angle of the top delivery pipe 8-2 is smaller than the bevel angle of the side delivery pipe 7-2, thereby avoiding the problem of dust raised by the high drop at the top. Preferably, the bevel angle of the top delivery pipe 8-2 is 75°. The top delivery pipe 8-2 can be designed as a straight section or a segmented multi-angle splicing pipe. Preferably, the connection angle is 75°.

[0074] A method for hot-state efficient filling of the flange root of a platinum channel clarification section, and a filling method matched with a hot-state efficient filling device for the flange root of a platinum channel clarification section, realize the pre-installation of the hot-state efficient filling device for the flange root of the platinum channel clarification section. During the process of heating to 1300°C, high-temperature cotton is used to temporarily block the cavity area, which can ensure a certain thermal insulation effect without affecting the expansion of the platinum, so as to minimize the cavity temperature difference within the platinum to less than 100°C. After the channel runs to 1300°C, it is confirmed by inspection that the platinum expansion is basically in place, and filling is started according to the following preferred method:

[0075] (1) The three feeding structures are debugged and assembled in advance. After removing the insulation cotton in the cavity at the root of the flange, the three feeding devices are quickly moved and inserted into the root of the flange, and the distance between the feeding nozzle of the feeding structure and the platinum body 1 is controlled within a preset range. Preferably, the preset range is 30 mm to 40 mm, to ensure the normal outflow of the powder at the end of the feeding nozzle of the feeding structure and the adequacy of filling the root of the flange of the clarification section;

[0076] (2) The operator locks the connecting bolts between the support frame and the three feeding structures to ensure the stability of the feeding structure;

[0077] (3) Arrange one person to stand above the main body of the channel, and arrange another person to transport the powder. After the skills are proficient, two people can be arranged to load the materials separately. The advantage of the present invention is that the loaders do not need to load the materials in small batches step by step, but can directly pour the whole basin of materials, and the powder will automatically enter the flange root;

[0078] (4) Arrange another person to observe the material-powder connection at the lower side port 5, and use a stainless steel chisel to poke the material to avoid blockage at the lower feed nozzle outlet.

[0079] The entire process requires 2 people to load the materials, 2 people to transport the materials, and 1 person to poke the materials from below. The root of a flange can be filled in less than 10 minutes. Compared with the traditional method of pouring materials multiple times with a shovel and holding the material basin, the speed is increased by 70%.

[0080] Through actual application, the hot and efficient filling method of the platinum channel clarification section flange root of the present invention was used to shorten the exposure time of the flange root by 70%, which means that the time that the platinum at the flange root was affected by the static impact of the outer ring was shortened by 70%. After the actual filling was completed, the temperature difference before and after filling according to the process feedback was reduced by 70°C, which was 20°C higher than the traditional 50°C. This fully demonstrates that the filling method of the present invention has a significant sealing and insulation effect on the clarification pipe flange root.

[0081] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit its scope of protection. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that after reading the present invention, those skilled in the art may still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the scope of protection of the pending claims of the invention.

Claims

1. A hot and efficient filling device for the flange root of a platinum channel clarification section, characterized in that: It comprises a material feeding structure, wherein a refractory brick channel (4) is arranged outside the platinum channel clarification section, and the platinum channel clarification section comprises a platinum body (1) and a flange (2). A cavity area is arranged between the flange (2) and the refractory brick channel (4) for normal expansion of the flange (2) during heating. A filling observation port is arranged on the refractory brick channel (4) corresponding to the cavity area. The transmission end of the flange (2) passes through the filling observation port, and the material feeding structure passes through the filling observation port. The output end of the material feeding structure is arranged in the cavity area, and the input end of the material feeding structure is arranged outside the refractory brick channel (4). A reserved distance is arranged between the output end of the material feeding structure and the platinum body (1).

2. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 1 is characterized in that: The material conveying structure comprises a side material conveying structure (7), two of which are provided, and the two side material conveying structures (7) are symmetrically arranged on both sides of the platinum channel.

3. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 2 is characterized in that: The side material conveying structure (7) comprises a side material conveying trough (7-1), a side material conveying pipe (7-2), a side material conveying nozzle (7-3) and a side material conveying support frame (7-4); the side material conveying trough (7-1) adopts a hopper structure with a larger upper part and a smaller lower part, and the inclined angle of the hopper structure is set to 75° to 80°. The outsides of the side material conveying trough (7-1) and the side material conveying pipe (7-2) are both welded with connecting ears. The side material conveying support frame (7-4) comprises a side long leg part and a side short leg part. The side short leg part is arranged at the outer proximal end of the refractory brick channel (4), and the side long leg part is arranged at the outer distal end of the refractory brick channel (4). The upper part of the side material conveying support frame (7-4) is connected to the connecting ear by bolts, and the bottom of the side material conveying support frame (7-4) is welded with a side supporting foot.

4. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 3 is characterized in that: The side support foot is circular, the side feed pipe (7-2) and the side feed nozzle (7-3) are both configured as oblique multi-angle spliced ​​pipes or oblique multi-curvature spliced ​​arc multi-segment spliced ​​pipes, the cross-sections of the side feed pipe (7-2) and the side feed nozzle (7-3) are both rounded rectangular or elliptical, the cross-sections are perpendicular to the flow direction of the filling material, and the outlet end of the side feed nozzle (7-3) is configured as an oblique cut shape or a rectangle.

5. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 2 is characterized in that: The material feeding structure also includes a top material feeding structure (8), the filling observation port includes a side port (5) and a top port (6), the side material feeding structure (7) passes through the side port (5), the top material feeding device (8) passes through the top port (6), and the transmission end of the flange (2) passes through the top port (6).

6. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 5 is characterized in that: The top material delivery structure (8) comprises a top material delivery trough (8-1), a top material delivery pipe (8-2), a top material delivery nozzle (8-3) and a top support frame (8-4); the top material delivery trough (8-1) adopts a hopper structure with a larger top and a smaller bottom; the top material delivery trough (8-1) and the top material delivery pipe (8-2) are welded with connecting ears; the top material delivery support frame (8-4) comprises a top long leg portion and a top short leg portion; the top short leg portion is arranged at the outer proximal end of the refractory brick channel (4); the top long leg portion is arranged at the outer distal end of the refractory brick channel (4); the upper portion of the top material delivery support frame (8-4) is connected to the connecting ears by bolts; and the bottom of the top material delivery support frame (8-4) is welded with a top support foot.

7. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 6 is characterized in that: The top support foot is circular, the top material delivery pipe (8-2) and the top material delivery nozzle (8-3) are straight sections or segmented multi-angle joint pipes, the cross-sections of the top material delivery pipe (8-2) and the top material delivery nozzle (8-3) are both rounded rectangular or elliptical, the cross-sections are perpendicular to the flow direction of the filling material, and the outlet end of the top material delivery nozzle (8-3) is arranged to be an oblique cut shape or a rectangle.

8. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 3 or 6, characterized in that: The cross-sectional width of the top feed pipe (8-2) is equal to the cross-sectional width of the side feed pipe (7-2); the cross-sectional length of the top feed pipe (8-2) is greater than the cross-sectional length of the side feed pipe (7-2); the slope angle of the top feed pipe (8-2) is greater than the slope angle of the side feed pipe (7-2); and the volume of the top feed trough (8-1) is greater than the volume of the side feed trough (7-1).

9. The hot and efficient filling device for the flange root of the platinum channel clarification section according to claim 1 is characterized in that: A filling layer (3) is provided between the platinum body (1) and the refractory brick channel (4), and the material conveying structure is made of stainless steel, wherein the carbon content of the stainless steel is less than 0.08%.

10. A method for hot and efficient filling of the flange root of a platinum channel clarification section, using the hot and efficient filling device for the flange root of a platinum channel clarification section as described in any one of claims 1 to 9, characterized in that: The following steps are involved: The cavity area between the flange (2) and the refractory brick channel (4) is temporarily sealed with high-temperature cotton during the heating process. When it is confirmed that the expansion of the platinum channel clarification section has reached the expected level, the insulation cotton in the cavity area is removed, and the feed structure is quickly inserted into the root of the flange of the platinum channel clarification section through the filling observation port, and a reserved distance is set between the output end of the feed structure and the platinum body (1); the filling material is poured into the input end of the feed structure, and the filling material flows into the root of the flange of the platinum channel clarification section through the feed structure. At the same time, the filling condition of the filling material is observed through the filling observation port, thereby completing the hot and efficient filling of the root of the flange of the platinum channel clarification section.

Citation Information

Patent Citations

  • Auxiliary device and method for sealing and filling platinum channel

    CN114516716A

  • Automatic mixing and heating grouter as well as use method and application thereof

    CN114917806A

  • Hot-state efficient filling device and method for platinum channel clarification section flange root

    CN116750954A

  • Automatic mixing and heating grouter for filling platinum channel

    CN217829767U

  • Method and apparatus for refining molten glass

    GB1416027A