Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

31results about How to "No empty drum" patented technology

Wind resistance and heat preservation EPS board outer wall structure and construction method thereof

The invention discloses a wind resistance and heat preservation EPS board outer wall structure which comprises a wall body, a galvanized steel wire netting, a bonding layer, an EPS heat preservation plate layer, a gridding cloth, an elastic coating and anchor bolts. The wind resistance and heat preservation EPS board outer wall structure is characterized in that composite mortar is laid on the inner side of a wall body, a plastering layer is arranged on the outer side of the wall body, the galvanized steel wire netting is laid inside the plastering layer, the EPS heat preservation plate layer is stuck to the outer side of the plastering layer, the thickness of an adhesive layer stuck to the surface of the heat preservation plate is controlled to be 4-5 mm, the anchor bolts penetrate through EPS heat preservation plates, the galvanized steel wire netting is fixed to the outer side of the wall body, each EPS heat preservation plate is provided with two anchor bolts and installed on a middle line, the anchor bolts press the bottom layer gridding cloth to form a fire barrier, and the gridding cloth and elastic coating are stuck to the outer sides of the EPS heat preservation plates. The construction method comprises the steps of base layer wall treatment, sticking of the heat preservation plates and the base layer, fixing of the fire barrier, auxiliary fixing of the heat preservation plates, sticking of the gridding cloth and a facing layer, and field testing and inspection.
Owner:克拉玛依市建设工程质量监督站

Construction method of insulating and waterproof integrated system for foam concrete roof

The invention provides a construction method of an insulating and waterproof integrated system for a foam concrete roof. The method comprises the following steps: 1, pouring foam concrete according to gradient, average thickness and energy-saving technical indexes required by design to finish construction of a slope finding and insulating layer of the cast-in-situ foam concrete; 2, dividing the slope finding and insulating layer of the cast-in-situ foam concrete into a plurality of paved regions, pre-paving one of the paved regions, pouring polymer cement glue onto the paved region, coiling a bearing waterproof roll on a sleeve, and pushing the sleeve to enable the bearing waterproof roll to be tightly attached to the polymer cement glue, the overlap joint of the bearing waterproof roll between two adjacent paved regions to be tightly adhered through the polymer cement glue, and construction of a polymer cement glue bonding layer and the bearing waterproof roll layer to be finished; and 3, pouring anti-crack mortar on the bearing waterproof roll layer to finish construction of an anti-crack mortar protecting layer. The construction method provided by the invention is short in construction work period, small in roof load and good in waterproof and insulating effect.
Owner:FUJIAN MINHUA WATERPROOF MATERIAL ENG

Bridge component collision damage restoration method

The invention discloses a bridge component collision damage restoration method, and belongs to the technical field of bridge restoration. The method comprises the following steps that a collision damage position is carefully inspected; if the collision only occurs on the surface, a damage party can perform repair operation; then, broken and loose concrete in the collision damage position can be chiseled away; deformation or fracture steel bars and steel twisted lines are connected and are subjected to anti-rust treatment; then, epoxy resin glue liquid used for glue bonding is brushed and coated on the surfaces of the steel bars and steel twisted lines; after bubbles of the epoxy resin glue liquid to be brushed and coated are eliminated, a mixture of epoxy mortar and high-intensity concrete can be gradually and compactly loaded into the repair region in a small amount and multilayer mode; leveling is performed; then, after the initial set of the mixture, a steel plate in the proper shape is cut according to the fold line length of the damaged edge and corners of the collision position; the collision damage position is subjected to corner covering treatment; then, the steel plate surface is subjected to paint brushing anti-rust treatment; warning paint is brushed and coated. The method is used for performing fast, effective and practical restoration on a bridge.
Owner:河北省高速公路青银管理处

Method for controlling thermal insulation layer construction by using step-type equal height thermal insulation batten

InactiveCN101168992AImprove integrityConsistent thermal performanceCovering/liningsThermal insulationFloor slab
The invention relates to walls, roof surfaces, and stilt floor slabs of industrial and civil buildings, in particular to a construction method for control insulation layers of step type equal height insulation laths. The invention is characterized in that the step type equal height insulation laths are connected on a base course wall through bonding agent to form reference control, then a polyurethane hard foam insulation layer is spray coated and a slurry material insulation layer is applied between two step type equal height insulation laths, so as to realize the effective control of the layer thickness and the overall thickness of the insulation layers. The polyurethane hard foam insulation layer is spray coated according to the height of a first step H1 of the step type equal height insulation laths, and the slurry material insulation layer is applied according to the height of a second step H2 of the step type equal height insulation laths. The width of the step type equal height insulation laths is 70 to 120 mm. The invention has the advantages that the application of the step type equal height insulation laths realizes the effective control to the thickness of the two insulation materials in the construction process; after the polyurethane hard foam insulation layer is spray coated, the surface is not required to be finished, thereby the labor intensity is reduced, the working time is saved and the environment pollution caused by construction waste generated by finishing the surface is reduced; the insulation layers have good insulation integrity and consistent thermal performance, edge joints and a hot bridge effect of large thickness insulation layers of EPS, etc. can be avoided, and the high efficiency and the energy conservation can be realized.
Owner:康玉范

Method for constructing thermal insulation layer controlled by equal height insulation batten of step type

The invention relates to walls, roof surfaces, and stilt floor slabs of industrial and civil buildings, in particular to a construction method for control insulation layers of step type equal height insulation laths. The invention is characterized in that the step type equal height insulation laths are connected on a base course wall through bonding agent to form reference control, then a polyurethane hard foam insulation layer is spray coated and a slurry material insulation layer is applied between two step type equal height insulation laths, so as to realize the effective control of the layer thickness and the overall thickness of the insulation layers. The polyurethane hard foam insulation layer is spray coated according to the height of a first step H1 of the step type equal height insulation laths, and the slurry material insulation layer is applied according to the height of a second step H2 of the step type equal height insulation laths. The width of the step type equal height insulation laths is 70 to 120 mm. The invention has the advantages that the application of the step type equal height insulation laths realizes the effective control to the thickness of the two insulation materials in the construction process; after the polyurethane hard foam insulation layer is spray coated, the surface is not required to be finished, thereby the labor intensity is reduced, the working time is saved and the environment pollution caused by construction waste generated by finishing the surface is reduced; the insulation layers have good insulation integrity and consistent thermal performance, edge joints and a hot bridge effect of large thickness insulation layers of EPS, etc. can be avoided, and the high efficiency and the energy conservation can be realized.
Owner:康玉范

Solar phase change heat storage fireproof and waterproof building insulation material

The invention relates to a fireproof and waterproof heat insulation construction material of solar energy phase transition heat accumulation, which has the following technical essentials: sequentiallyadding a certain amount of phase transition heat accumulation and heat insulation material, fly ash, light expanded vermiculite powder or light calcium powder, cement reinforcing agent and calcium oxide into a mixing trough; evenly mixing the materials by stirring at normal temperature; then, keeping stirring and sequentially adding common portland cement, an impervious waterproof agent, fatty acid zinc or fatty acid calcium as a hydrophobing agent, dihydrocalcite and ferrous sulfate or ammonia chloride as a thickening agent; fully mixing the materials evenly by cyclone separation; and packing the mixture to obtain a finished product. The heat insulation construction material of the invention has good effects of heat insulation, heat accumulation and energy saving, light volume weight (350-550 kilograms / cubic meter), large density, high strength and small heat transfer coefficient; and after freezing and thawing tests for 60 times and circulation from 20 DEG C to -40 DEG C, the heat insulation construction material has no abnormality and can meet the energy saving index of 65%. The fly ash which is a serious public nuisance is fully utilized as a renewable resource to produce theenvironment-friendly heat insulation construction material.
Owner:蔡建军

A carbon fiber reinforcement process for corrosion and protection of petrochemical equipment

The invention discloses a carbon fiber reinforcement technology for corrosion and protection of a petrochemical device. The carbon fiber reinforcement technology comprises the following steps of step one, pretreating the inner surface of a pipe wall defect, and polishing the surface of a substrate until no attachment exists; secondly, performing filling and leveling treatment on the defect part by using a repairing agent; thirdly, fully filling a part where the repairing agent is fully filled and the surface of periphery pipe body with epoxy resin glue; fourthly, winding carbon fiber composite material cloth at a part where the epoxy resin glue is fully filled. The carbon fiber reinforcement technology disclosed by the invention has the characteristics of good sticking property, no layering and no hollowing and cracking in the process that a repairing material is repeatedly used for a long time; in addition, the galvanic corrosion resistance between the repairing material and the pipeline can be guaranteed by the reinforcement technology disclosed by the invention; meanwhile, the carbon fiber reinforcement technology also has the characteristics that technical steps are simple, the repairing material is good in curing effect and the like.
Owner:北京天诚宇新材料技术有限公司

Repair method of bridge component collision damage

The invention discloses a bridge component collision damage restoration method, and belongs to the technical field of bridge restoration. The method comprises the following steps that a collision damage position is carefully inspected; if the collision only occurs on the surface, a damage party can perform repair operation; then, broken and loose concrete in the collision damage position can be chiseled away; deformation or fracture steel bars and steel twisted lines are connected and are subjected to anti-rust treatment; then, epoxy resin glue liquid used for glue bonding is brushed and coated on the surfaces of the steel bars and steel twisted lines; after bubbles of the epoxy resin glue liquid to be brushed and coated are eliminated, a mixture of epoxy mortar and high-intensity concrete can be gradually and compactly loaded into the repair region in a small amount and multilayer mode; leveling is performed; then, after the initial set of the mixture, a steel plate in the proper shape is cut according to the fold line length of the damaged edge and corners of the collision position; the collision damage position is subjected to corner covering treatment; then, the steel plate surface is subjected to paint brushing anti-rust treatment; warning paint is brushed and coated. The method is used for performing fast, effective and practical restoration on a bridge.
Owner:河北省高速公路青银管理处

Integrated bathroom

The embodiment of the invention provides an integrated bathroom. The integrated bathroom comprises a chassis and a plurality of wall plates. The wall plates comprise chassis main bodies and chassis ceramic tiles, the chassis main bodies comprise ultra-high performance cement-based composite material layers, the chassis ceramic tiles and the chassis main bodies are integrally poured and formed, and the chassis main bodies are used for being arranged on the ground; each wall plate comprises a wall plate main body and a wall plate ceramic tile, the multiple wall plate main bodies of the multiple wall plates are sequentially connected, the wall plate main bodies comprise ultra-high performance cement-based composite material layers, and the wall plate ceramic tiles and the wall plate main bodies of each wall plate are integrally poured and formed; and the lower ends of the wall plate main bodies are detachably mounted on the edges of the chassis main bodies. According to the integrated bathroom, ultra-high performance cement-based composite materials are used as materials of the chassis main bodies and the wall plate main bodies, the cost is low, the chassis and the wall plates are integrally poured and formed correspondingly, the chassis ceramic tiles and the wall plate ceramic tiles are not prone to falling off, the chassis and the wall plates do not have the problems of hollowing and vibration, the strength of the chassis and the wall plates is high, the overall thickness of the chassis and the wall plates is small, and the occupied indoor space is small.
Owner:GUANGDONG BOZHILIN ROBOT CO LTD

Light composite thermal insulation board for fabricated building

The invention discloses a light composite thermal insulation board for fabricated building. The light composite thermal insulation board for fabricated building comprises fireproof layers and thermal insulation layers, surfaces of the fireproof layers are in glued connection with surfaces of the thermal insulation layers, a filling groove is formed in an inner cavity of the fireproof layers, and an inner cavity of the filling groove is filled with a fireproof filling material; and the inner cavity of the fireproof layers is fixedly connected with fixing plates, and one sides of the fixing plates are fixedly connected with inserting rods. The invention relates to the technical field of thermal insulation boards. In the light composite thermal insulation board for fabricated building, the fixing plates and the inserting rods are arranged in the thermal insulation layers, the fixing plates and the inserting rods are subjected to one-time machining forming with the thermal insulation layers, the fireproof layers are subjected to machining forming, after the filling groove is formed, the inserting rods are inserted into the fireproof layers, and adhesive glue is applied on the fireproof layers and the thermal insulation layers to be bonded together, inserting bolts are screwed into the inserting rods, such that assembly can be rapidly completed, fireproof and thermal-insulating effects can be achieved at the same time, the use range is wider, and strength of the thermal insulation board is effectively improved.
Owner:潍坊浩源建设工程检测有限公司

A construction method of foam concrete roof thermal insulation and waterproof integrated system

The invention provides a construction method of an insulating and waterproof integrated system for a foam concrete roof. The method comprises the following steps: 1, pouring foam concrete according to gradient, average thickness and energy-saving technical indexes required by design to finish construction of a slope finding and insulating layer of the cast-in-situ foam concrete; 2, dividing the slope finding and insulating layer of the cast-in-situ foam concrete into a plurality of paved regions, pre-paving one of the paved regions, pouring polymer cement glue onto the paved region, coiling a bearing waterproof roll on a sleeve, and pushing the sleeve to enable the bearing waterproof roll to be tightly attached to the polymer cement glue, the overlap joint of the bearing waterproof roll between two adjacent paved regions to be tightly adhered through the polymer cement glue, and construction of a polymer cement glue bonding layer and the bearing waterproof roll layer to be finished; and 3, pouring anti-crack mortar on the bearing waterproof roll layer to finish construction of an anti-crack mortar protecting layer. The construction method provided by the invention is short in construction work period, small in roof load and good in waterproof and insulating effect.
Owner:FUJIAN MINHUA WATERPROOF MATERIAL ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products