Mining method for maximum reservoir contact well and maximum reservoir contact well structure
A production method and a technology for oil reservoir development, applied in the field of oil reservoir development, can solve the problems of low production degree of oil layers, rapid decline in production, and difficulty in solving massive oil reservoir development and the like
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Below in conjunction with the accompanying drawings, the maximum reservoir contact (MRC) well type production method and well type structure according to the present invention will be described in detail.
[0023] 1. Maximum Reservoir Contact (MRC) Well Type Production Method
[0024] The following technical solutions are adopted, which are based on the combination of various well types and the optimization of well types at different development stages, mainly including the following steps:
[0025] (1) In the early stage of reservoir development, in order to reduce the development risk, vertical well development is used to understand and control the oil layer; the well layout mainly considers the planar well pattern design that belongs to the two-dimensional well pattern structure design; the vertical well is also used for the early stage of water injection Test and later recovery of oil;
[0026] (2) The reservoir has entered the stage of natural energy development, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 