Power network power-cut scheme based major network N-1 risk assessment method and system
A technology of risk assessment system and blackout plan, applied in the field of electric power, can solve the problems of high cost and low efficiency, achieve accurate analysis results, save manpower, and improve approval efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] see figure 1 As shown, it is a schematic flowchart of an embodiment of the method for assessing the main network N-1 risk based on the power grid outage plan of the present invention. Such as figure 1 As shown, the main network N-1 risk assessment method based on the power grid outage plan in this embodiment includes the following steps:
[0025] Step S101: Obtain business data, power grid topology, and equipment ledger information. The business data includes power outage plan data, and enter step S102, where the power grid topology includes main network equipment topology information and distribution network equipment topology information, and equipment ledger information. It is divided into main network ledger information and distribution network ledger information. Outage plan data can be obtained from the main network production system, main network device topology information is generally obtained from the main network EMS system, and distribution network device t...
Embodiment 2
[0036] According to the method for assessing the main network N-1 risk based on the power grid outage plan of the present invention, the present invention also provides a main network N-1 risk assessment system based on the power grid outage plan. The specific embodiment of the main network N-1 risk assessment system based on the power grid outage plan will be described in detail below.
[0037] Such as figure 2 As shown, it is a schematic structural diagram of an embodiment of the main network N-1 risk assessment system based on the power grid outage plan of the present invention, which includes:
[0038] The acquisition module 201 is used to acquire business data, power grid topology, and equipment ledger information. The business data includes power outage plan data, and these data information can be obtained from corresponding business systems through data interfaces. The power grid topology includes main network equipment Topology information and distribution network equi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com