Benefits of technology

This technology helps improve the accuracy and security of drilling operations by determining the distance between holes for setting up cement slurry or other materials used when constructing tunnels through guided methods like pilings. By measuring these distances beforehand with reference points on the surface being dug, it becomes easier than ever to determine how well they are going after each step. Additionally, this method improves the quality control over the construction process while also reducing costs associated therewith.

Problems solved by technology

This technical problem addressed in this patented text relates to improving the stabilization of a pilot channel used in drilling operations while preventing damage caused by slippage due to its own movement over time. Existing methods involve adding extra supports like guards and wedges to increase stability but they cannot effectively reduce friction forces generated throughout their lifetimes without causing instability issues.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fore support and excavating method of inclined tunnel
  • Fore support and excavating method of inclined tunnel
  • Fore support and excavating method of inclined tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be described in further detail below with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many of the details listed in the specification are only for readers to have a thorough understanding of one or more aspects of the present invention, and these aspects of the present invention can be implemented even without these specific details.

[0059] The inventors of the present invention have found that, for the face of the pilot tunnel to be excavated, taking the advance support of the face by grouting as an example, the stability of the face is related to the distance between the grouting holes: from Grouting holes are drilled along the extension direction of the inclined tunnel at the face of the tunnel, and the advance support of the face is formed after grouting; the smaller the distance between t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a fore support and an excavating method of an inclined tunnel. The excavating method includes: punching grouting holes in a tunnel face of a pilot tunnel of the inclined tunnel, which is to be excavated, according to a set grouting hole interval for the inclined tunnel to be excavated; forming the fore support of the tunnel face after grout liquid is injected into the grouting holes; excavating the pilot tunnel with set stride length from the tunnel face according to the height and the span of the pilot tunnel, which are designed, wherein the grouting hole interval is predetermined according to the height and the span of the pilot tunnel. The technical scheme includes that cohesion and internal friction angles of surrounding rock of the tunnel face of the inclined tunnel to be excavated, and the designed height and the designed span of the pilot tunnel of the inclined tunnel to be excavated can enable the stability coefficient of the tunnel face of the pilot tunnel to be excavated to exceed a stability threshold value, and accordingly stability of the tunnel face is guaranteed, and safety can be improved during the pilot tunnel excavating process.

Description

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Owner CHINA RAILWAY ENG CONSULTING GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products