Power distribution network infrastructure project investment statistics and deviation correction method

A statistical method and distribution network technology, applied in computing, data processing applications, instruments, etc., can solve problems such as lack of pertinence in infrastructure projects, constraint applicability, and large influence of engineering weight coefficient calculations, etc., to improve lean management and control Level, good applicability, money-saving effect

Pending Publication Date: 2019-11-15
STATE GRID HEBEI ELECTRIC POWER CO LTD +1
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] The State Grid Development Department proposed measures to estimate the investment completion rate and entry cost based on the construction progress. In the process of "three rates", a whole set of three rate theoretical curve prediction models was proposed, which focused on improving the defects of the accuracy of the planned construction period. The predicted curve was updated and corrected according to the adjusted planned construction period, and the reasonable interval of the three rate deviations was subsequently carried out. However, due to the differences in various conditions (climate, manpower, construction costs, etc.) and the lack of pertinence for infrastructure projects in various places, the calculation of project weight coefficients has the greatest impact and is very large. limit its applicability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the embodiments of the present application. Apparently, the described embodiments are only some of the embodiments of the present application, not all of them. The following description of at least one exemplary embodiment is merely illustrative in nature and in no way serves as any limitation of the application, its application or uses. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of this application.

[0026] It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a power distribution network infrastructure project investment statistical method. The method comprises the following steps of estimating monthly investment amount i based onmonthly investment percentages of historical similar projects in a local area; and calculating the engineering weight coefficient of each subsection based on the historical similar projects of the local area. The invention also relates to a power distribution network infrastructure project investment statistics deviation correction method. The method provided by the invention has good universalityand suits the actual condition..

Description

technical field [0001] The invention relates to a distribution network infrastructure project investment statistics and deviation correction method. Background technique [0002] The State Grid Corporation of China has put forward the work goal of "actively adapting to reform requirements, accelerating the realization of precise investment, and effectively improving the quality and efficiency of power grid development". In the current distribution network infrastructure project management process, there is a phenomenon that the funds issued by the monthly plan do not match the actual monthly capital expenditure. If the planned funds are higher than the actual capital expenditures, it will cause capital precipitation and increase in interest and other costs, which is not conducive to cost reduction; if the planned funds are less than the actual capital needs, it will cause problems such as abnormal construction. [0003] If the funds issued by the plan match or have little d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06
CPCG06Q50/06
Inventor 梅晓辉安世华赵海州杨海跃杨俊广高冰李铁良吴永超董阳河杜宗伟
Owner STATE GRID HEBEI ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products