A repair structure and repair method for river bank slope
The river bank slope repair structure is constructed with living plant materials to form an ecological self-circulation system, which solves the ecological degradation and erosion problems caused by traditional river bank slope repair, realizes the self-repair of the river and beautifies the landscape, and is economically applicable.
Patent Information
- Application Number
- CN201910841676.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-06
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2039-09-06
AI Technical Summary
Traditional river bank slope repair methods have led to river ecological degradation, increased erosion, increased pollution, and destroyed the natural ecological environment. There is a lack of natural bank protection methods without destroying the original ecological environment.
Use living plant materials to build a river bank slope repair structure, including a slope foot support area, a covering measure area, a plant planting area and a bank top plant configuration area. Woody plant branches are used to cover and plant planting to form an ecological self-circulation system to prevent soil erosion. and promote self-repair of rivers.
It effectively prevents soil erosion, restores the natural ecological functions of the riverbank, enhances the aesthetic value of the landscape, is economical and applicable, reduces subsequent maintenance costs, and forms a sustainable ecological cycle system.
Smart Images

Figure CN110468781B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of river bank slope restoration and greening, and in particular to a structure and method for restoring river bank slopes by using living plant materials. Background Art
[0002] Rivers are not only natural resources that can be developed, but also carriers of the earth's life system. Therefore, we should pay attention not only to the resource functions of rivers, but also to their ecological functions. The bank slope of a river is the interlaced zone between terrestrial and aquatic ecosystems, and is also an important source of coarse wood, nutrients and energy in the river, while providing a habitat for the survival and reproduction of organisms. Due to the long-term development and utilization of rivers by humans, a new river ecosystem has been formed, which is different from the original natural ecosystem. In the past, due to the limitations of human cognition and the influence of traditional water conservancy engineering design ideas, human projects often used mortar masonry, dry masonry or concrete structures to protect the banks. This riverbank protection measure has achieved immediate results to a certain extent, but it has also produced many negative effects. After the river channel was treated by engineering, the runoff speed increased, resulting in a large amount of sediment deposition in the downstream area; the hardened river channel destroyed the living environment of animals and plants on both sides of the river channel, and the habitat corridor was cut off; at the same time, because of the loss of filtration and buffering of the natural riverbank zone, non-point source pollutants entered the water body in large quantities, aggravating river pollution; due to the degradation of aquatic ecology, the self-purification function of the river declined, and the water quality was difficult to improve.
[0003] In summary, there is an urgent need for a natural bank protection method that relies on the vitality of the ecosystem itself without destroying the original ecological environment of the river. Summary of the invention
[0004] The purpose of the present invention is to provide a river bank slope repair structure and repair method to address the problem of ecological functional degradation in traditional river bank slope repair. That is, through the interaction mechanism between plants and river bank slopes, while preventing slope erosion, it can also play a role in river ecological restoration and gradually promote the self-repair and renewal of the river. It is a key technology for solving river ecological degradation.
[0005] The repair structure of the river bank slope of the present invention comprises a foot support area, a covering measure area, a plant planting area and a bank top plant configuration area which are arranged in sequence from the foot of the river bank slope upward; the foot support area is provided with a fence arranged along the river channel, and the fence is made of logs; the covering measure area is provided with woody plant branches covering the slope surface in a parallel, overlapping or cross manner, one end of the woody plant branch extends into the water, and the other end faces the top of the river bank slope; the plant planting area is further divided into a cutting area and a branch planting area from bottom to top; the bank top plant configuration area is located at the top of the river bank slope, and is configured with one or more of trees, shrubs, and / or perennial flowers and ornamental grass species.
[0006] Wherein, the foot support area is located at the foot of the river bank slope, and the fence is fixed by longitudinally arranged fixed piles; the fence uses round wood piles, square wood piles or wooden boards with a diameter of about 25 cm, or fences or metal piles made of dead branches of trees, and the fixed piles are thin wood piles, at least 2 / 3 of the length of the thin wood piles are buried underground; further, when the angle of the foot of the river bank slope is 0°~10°, 1 to 2 round wood piles are arranged longitudinally to form a fence, which are arranged along the direction of the river channel and finally fixed by thin wood piles; when the angle of the foot of the river bank slope is 10°~20°, 2 to 3 round wood piles are arranged longitudinally to form a fence, which are arranged along the direction of the river channel and finally fixed by thin wood piles; when the angle of the foot of the river bank slope is greater than 20°, more than 3 round wood piles are arranged longitudinally to form a fence, which are arranged along the direction of the river channel and finally fixed by thin wood piles.
[0007] Among them, in the covering measure area, the woody plant branches are selected from woody plant branches with a length of generally not less than 1.5m, which have high germination ability and are forked. The part of the plant branches close to the river channel passes through the bottom of the fence of the slope foot support area and is compacted, or / simultaneously, compacting objects are arranged above the plant branches close to the slope foot support area for compaction; wooden stakes of about 1m in length are evenly distributed longitudinally in the covering measure area, or / simultaneously, long iron wires or wooden poles are used to stick the plant branches to the slope surface for compaction, and the surface of the plant branches is covered with soil; further, the woody plant branches are plants that like moisture and have strong reproductive ability. Specifically, the woody plants are golden willow, big-leaf willow, red-skinned willow, steamed bun willow, purple-spiked locust, vitex, and Canadian poplar.
[0008] Among them, in the plant planting area, the cutting area is located at the river bank slope that is not completely covered, and is provided with perennial sprouting woody plant cuttings, which are 30-50 cm long, 1-5 cm in diameter, and sharpened at the bottom. The cutting branches are 5 cm exposed above the ground and inserted vertically into the slope, with a cutting interval of 50 cm; the branch planting area is located at the edge of the river bank that is not completely covered, and is provided with straight branches of moisture-loving plants with germination ability, which are 1-3 m long, 4-15 cm in diameter, and one-third to half of their length is buried underground; further, the cuttings and / or planted plants in the plant planting area are selected from moisture-loving plants in the local or neighboring areas.
[0009] Among them, the bank top plant configuration area has planted plants, among which the trees are selected from one or more of weeping willow, Canadian poplar, metasequoia, matsudanax, elm, fraxinus, amorpha, purple-leaf plum, purple-leaf dwarf cherry, sea buckthorn, crabapple, privet, silk cotton tree, hawthorn, mulberry, velvety ash, and paper mulberry; the shrubs are selected from one or more of hibiscus, forsythia, lilac, crape myrtle, Hokkaido boxwood, large-leaf boxwood, deutzi, pearl bush, purple-leaf barberry, wintersweet, weigela, and red yew; perennial flowers and ornamental grasses are selected from one or more of creeping pot grass, violet yedoensis, creeper, large-flowered daylily, February orchid, evergreen dianthus, coreopsis, evening primrose, perennial cosmos, beach chrysanthemum, cut autumn iris, snake whip daisy, purple coneflower, large coreopsis, hosta, reed, reed, fine-leaved silvergrass, variegated silvergrass, pennisetum, variegated silvergrass, iris, ophiopogon, carex, and sage.
[0010] A method for repairing a river bank slope includes the process of sequentially forming the above-mentioned slope foot support area, covering measure area, plant planting area and bank top plant configuration area from the slope foot of the river bank slope upward.
[0011] Furthermore, it also includes the process of river bank slope landform preparation before forming the slope foot support area, and management and maintenance after forming the bank top plant configuration area.
[0012] The river bank slope terrain adjustment includes: removing the trees and dead tree trunks and branches that are tilted on the upper edge of the river bank slope, and clearing an area with a radius of at least 5 meters; leveling the unstable or steep slope surface, and leveling is required when the slope exceeds 50°, and the leveling angle does not exceed 35°.
[0013] Among them, the covering project in the covering measures area is implemented during the winter dormancy period of the plants; the cutting and / or planting project in the plant planting area is implemented during the winter dormancy period of the plants, but not during the frost period.
[0014] Among them, in the bank top plant configuration area, the planted plants are top-dressed 2 months after planting. The fertilizer used is urea, superphosphate, potassium sulfate, and cake fertilizer uniformly mixed in a mass ratio of 1:3:2:2, and the fertilizer application amount per square meter is 200-300g.
[0015] Among them, the management and maintenance include preliminary measures to promote the growth of vegetation cover and later maintenance measures; the preliminary measures include: hoeing, fertilizing, and irrigation; the later includes mowing, weeding, and pruning; hoeing is done after the rainy season, 2-3 times a month during the vegetation growth period; mowing is done regularly in the dry season, and one-third of the material height is left.
[0016] The advantages and beneficial effects of the present invention are:
[0017] (1) Effectively prevent soil erosion. The present invention can effectively protect the surface of the river bank slope from erosion by wind, rain, frost and running water by using living plant materials to support and reinforce the river bank, cover the slope and plant plants; the configured plant community can form soil with basic structures such as a dead leaf layer, a humus layer and a weathering layer, and the formation of soil aggregates through plant root secretions can effectively improve soil adhesion and improve soil structure; at the same time, the plant root system can reinforce and support the soil itself and stabilize the surface and deep soil.
[0018] (2) Restore the natural ecological function of the river bank. Compared with traditional engineering revetments, the river bank slope using the method of the present invention can form an ecological self-circulating system, which improves the water body by improving the soil interception and storage capacity and the water consumption of plants; the presence of slope plants also provides a favorable environment for the survival and reproduction of various small animals and microorganisms, gradually forming a complete food chain, and the damaged environment can slowly be restored to the original natural environment, purifying the air, regulating the local climate, and finally forming a self-sustaining dynamic self-regulating ecological circulation system, reflecting the concept of natural governance.
[0019] (3) Improve the aesthetic function of the landscape. Compared with the uniform, hard, straight and flat image of traditional engineering revetments, the revetment method of the present invention can enrich the landscape effect after the plant cultivation period, and improve the landscape diversity by adding new features, structures, shapes and colors of vegetation.
[0020] (4) Economical and applicable. Compared with traditional large-scale civil engineering, the present invention mostly uses local living plant materials, which has low cost and construction cost. As the plants grow, they form a vital system, which reduces maintenance costs. They can maintain their own development and balance through natural succession. The effect of bank reinforcement and slope protection is getting better and better. The subsequent maintenance and repair costs are low, economically feasible, and sustainable development is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0023] Figure 2 It is a schematic diagram of the local structure of one side of the river bank slope.
[0024] Figure 3 It is a partial schematic diagram of the slope foot support area and covering measures area. DETAILED DESCRIPTION
[0025] In order to better understand the present invention, the present invention is described in detail below with reference to the specific drawings.
[0026] The repair structure of the river bank slope of the present invention is as follows Figure 1-3 The specific construction process is as follows:
[0027] 1) Riverbank slope landform preparation: Remove the trees and dead tree trunks and branches on the upper edge of the riverbank slope, and clear a radius of at least 5 meters. This can promote the stability of the riverbank slope foot and prepare for vegetation restoration or construction. Unstable or steep slopes need to be leveled. Generally, leveling is required when the slope exceeds 50°. The leveling angle should not exceed 35°. This can prevent stones and rough slopes from being eroded locally, and plants are easy to survive.
[0028] 2) Forming the foot support area: At the foot of the river bank slope, a fence should be laid along the river direction, and the fence is fixed with longitudinally arranged fixed piles; the fence is made of logs, square logs or wooden boards with a diameter of about 25 cm, or fences made of dead branches of trees, metal piles and other materials, and the logs are arranged horizontally to form a fence to prevent the loss of loose topsoil. The fixed piles can be thin wood piles, and at least 2 / 3 of the length of the thin wood piles is buried underground. When the angle of the foot of the river bank slope is 0°~10°, 1 to 2 logs are arranged longitudinally to form a fence, which is laid along the river direction and finally fixed by thin wood piles; when the angle of the foot of the river bank slope is 10°~20°, 2 to 3 logs are arranged longitudinally to form a fence, which is laid along the river direction and finally fixed by thin wood piles; when the angle of the foot of the river bank slope is greater than 20°, more than 3 logs are arranged longitudinally to form a fence, which is laid along the river direction and finally fixed by thin wood piles.
[0029] 3) Form a covering measure area above the foot support area: select woody plant branches with high germination ability and forks that are generally not less than 1.5m in length, extend the thick end of the plant branches into the water, and the part of the plant branches close to the river channel passes through the bottom of the fence of the foot support area and is compacted, or / at the same time, arrange stones and other compacting objects above the plant branches close to the foot support area for compaction; the thin end of the plant branches faces the top of the river bank slope, and the branches are covered on the slope surface in a parallel, overlapping or cross manner, and at the same time, wooden stakes of about 1m in length are evenly distributed longitudinally, or / at the same time, long iron wires or wooden poles are used to stick the plant branches to the slope surface for compaction. After compaction, the surface of the plant branches can be covered with local native soil or other suitable soil to promote rooting and germination. The woody plant branches are plants that like moisture and have strong reproductive ability. Specifically, the woody plants are golden willow, big-leaf willow, red-skinned willow, steamed willow, purple-spiked locust, vitex, and Canadian poplar. The covering project in the covering measures area is generally implemented during the winter dormancy period of the plants.
[0030] 4) Form a plant planting area above the covered area: the plant planting area can be divided into a cutting area and a branch planting area from bottom to top; the cutting area is located on the slope of the river bank that is not completely covered. Perennial germinating woody plant cuttings are selected, usually willow, 30-50cm long, 1-5cm in diameter, with the bottom tip sharpened. It is best if the cutting branches are 5cm above the ground and inserted vertically into the slope. The cutting interval is about 50cm; the branch planting area is located on the edge of the river bank that is not completely covered. Straight branches of plants that love moisture and have the ability to germinate are selected, such as the main trunk branches of willow, 1-3m long, 4-15cm in diameter, and one-third to half of the length is buried underground to complete the planting. The cutting and / or planting plants in the plant planting area should be moisture-loving plants from the local or nearby areas. If natural plant materials are not available locally, naturally grown poplars or willows should be selected as construction plant materials. Cuttings and / or planting projects are generally carried out during the plant's winter dormancy period, but not during the frost period.
[0031] 5) Form a bank top plant configuration area above the plant planting area: At the top of the river bank slope, trees, shrubs, and / or perennial flowers and ornamental grasses can be configured as needed to form an ecological self-circulating plant staggered belt, which also has ornamental and isolation effects. The configuration method is generally planting. Two months after the plants are planted, the planted plants are top-dressed. The fertilizer used is urea, superphosphate, potassium sulfate, and cake fertilizer mixed in a mass ratio of 1:3:2:2, and the fertilizer application rate is 200-300g per square meter. Among them, the trees can be selected from weeping willow, Canadian poplar, metasequoia, matsudana, elm, ash, purple-leafed plum, purple-leafed dwarf cherry, sea buckthorn, crabapple, privet, silk cotton wood, mountain vitex, mulberry, velvety ash, paper mulberry, etc. Shrubs include hibiscus, forsythia, lilac, crape myrtle, Hokkaido boxwood, boxwood, deutzia, pearl bush, purple-leafed barberry, wintersweet, weigela, and red ramie. Perennial flowers and ornamental grasses include: creeping grass, violet gentian, creeper, daylily, February orchid, evergreen dianthus, coreopsis, evening primrose, perennial cosmos, daisy, rudbeckia, snake whip daisy, purple coneflower, coreopsis, hosta, reed, reed bamboo, fine-leaved silvergrass, variegated silvergrass, pennisetum, variegated silvergrass, iris, ophiopogon, sedge, sage, and the like.
[0032] 6) Management and maintenance: After the restoration of the above-mentioned riverbank slopes is completed, further management and maintenance mainly include preliminary measures to promote the growth of vegetation cover and post-maintenance measures. Preliminary measures include: hoeing, fertilization, and irrigation; post-measures include mowing, weeding, and pruning. Hoeing is done 2-3 times a month during the vegetation growth period after the rainy season; mowing is done regularly in the dry season, and one-third of the material height is left.
[0033] The repair structure of the present invention effectively consolidates the river bank slope and maintains the ecology through plant living materials through the reasonable configuration of the foot support area, the covering measure area, the plant planting area and the bank top plant configuration area, and promotes the self-repair and renewal of the river. The foot support area effectively improves the supporting and stabilizing effect of the slope bottom through the fence along the river direction. The ecological wood piles have the function of absorbing moisture and diverting water in the early stage, which can provide sufficient moisture for the plant branches with high density coverage in the upper covering measure area, promote the rooting and germination of the plant branches, and play a role in stabilizing and compacting the plant branches; the wood material of the fence can also produce appropriate natural corrosion in the later stage. After the plants in the covering measure area and the plant planting area grow stably, they can cross-provide more ecological original biological habitats for the ecological circle of the river bank slope, and promote the construction of the slope ecological environment. The covering measures area adopts high-density slope covering, which greatly improves the effect of early slope consolidation. In the state of being close to the water source, it can have a higher germination survival rate, and can form a bush-like densely covered slope belt with increased survival density in the later stage. Compared with the low-density area of cuttings or planting, it has a more stable later slope consolidation effect, and forms a staggered ecological zone with other areas, which is conducive to the ecological development and promotion of riverside slopes. The plant planting area further provides a reasonable transition and configuration of the ecosystem through the cutting area and the branch planting area, and the cooperation with other areas is conducive to maintaining the ecological balance of the slope. The bank top plant configuration area further makes up for the integrity of the ecological self-circulation, and has both ornamental and isolation functions.
[0034] The following is an example of a river slope protection project in Huairou District, Beijing. The total length of the implementation area is 800m and the implementation area is 4000m 2 The construction started in March 2016, and the specific process is as follows:
[0035] Riverbank slope terrain preparation: Since the local riverbank slope is less than 15 degrees, there is no need to cut the slope and level it. The inclined trees, dead tree trunks and branches, and large pieces of gravel on the upper edge of the riverbank slope are cleared out of the construction scope. At the same time, the soil is loosened to form a slope with gaps for plant planting and an uneven surface to make it easier for plants to survive.
[0036] Slope foot support area: A fence made of round wooden stakes with a diameter of about 25cm and a length of 1.5-2m is laid at the foot of the river bank slope. The fence is fixed with thin wooden stakes with a radius of 8cm and a length of 0.8m. One end of the thin wooden stakes is sharpened and buried in the ground with a depth of 55cm to fix the log fence and prevent the loss of loose topsoil.
[0037] Covering measures area: Lay 1.5-2m long golden willow branches on the slope in a cross and overlapping manner, with the layout direction perpendicular to the water flow direction, and place about 18-25 branches per meter. The roots of the branches are buried vertically in the river bank and as deep in the water as possible. The tops of the branches are facing the top of the slope. The part close to the river bank is compacted with logs or gravel. After the branches are laid, fix them with wire and wooden wedges, and then cover them with soil. The thickness of the soil layer is about 8-10cm.
[0038] Plant planting area: On the slope that is not completely covered, soak the 3cm diameter and 30cm long big-leaf willow branches in ferric dioxide overnight and then vertically insert them into the river bank slope, with the branches exposed 5cm above the ground and 50cm between the branches; at the edge of the slope, use the main trunk branches of the willow tree with a length of 1-3m and a diameter of 4-15m, bury one-third or half of the length underground, and use the germination ability of the willow tree for cuttings.
[0039] Plant configuration area on the top of the bank: On the gentle part of the top of the slope, weeping willow, golden willow, purple locust, hibiscus, forsythia, lilac, evening primrose, perennial dianthus, and fine-leaved miscanthus are planted to form a complete plant community structure.
[0040] After the construction is completed, the plants need to be nurtured for a period of time after they germinate. The main measures include: watering and irrigation, fertilizing, pruning, etc.
[0041] One month after completion, the plants began to sprout. Six months later, the survival rate of the golden willow branches covering the slope reached 85%, and the survival rate of the willow branches grafted was 90%. The growth was good and the vegetation coverage rate was significantly improved. One year after the vegetation in the construction area matured, the total runoff could be reduced by 50%-72% compared with the exposed slope bank, and the soil erosion could be reduced by 68%, achieving the effect of stabilizing the slope surface, and the water surface was clear and the water quality was purified. At the same time, after the implementation of this measure, it had a beneficial effect on the regional temperature. Compared with the unimplemented area of the same section, the daily average temperature was 0.3℃ lower, and the maximum daily average temperature difference reached 1℃. The smooth revetment project is not conducive to the habitat of aquatic organisms. The measures composed of logs and branches can attract small animals to swim back to the waters. The project has been implemented since 2016. In the summer of 2017, it was observed that 5 species of fish inhabited and bred in the implementation area, and the number of dragonfly species increased from 6 to 8. The habitat environment has been improved, and it will provide a better living environment for various animals such as aquatic organisms in the future. In terms of plant landscaping, the configuration of trees, shrubs, grasses and flowers on the bank slopes enriches the river landscape and meets people's water-loving needs.
[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for repairing a river bank slope, characterized in that: The restoration method adopts a restoration structure of the river bank slope, and the restoration structure includes a foot support area, a covering measure area, a plant planting area and a bank top plant configuration area which are arranged in sequence from the foot of the river bank slope upward; the foot support area is provided with a fence arranged along the river channel, and the fence is made of logs; the covering measure area is provided with woody plant branches covering the slope surface in a parallel, overlapping or cross manner, and one end of the woody plant branch extends into the water and the other end faces the top of the river bank slope; the plant planting area is further divided into a cutting area and a branch planting area from bottom to top; the bank top plant configuration area is located at the top of the river bank slope and is configured with trees, shrubs, perennial flowers and ornamental grasses; The foot support area is located at the foot of the river bank slope, and the fence is fixed by longitudinally arranged fixed piles; the fence uses round wood piles with a diameter of 25 cm, and the fixed piles are fine wood piles, at least 2 / 3 of the length of the fine wood piles is buried underground; when the foot angle of the river bank slope is greater than 0° and less than or equal to 10°, 1 to 2 round wood piles are arranged longitudinally to form a fence, which are arranged along the river direction and finally fixed by fine wood piles; when the foot angle of the river bank slope is greater than 10° and less than or equal to 20°, 2 to 3 round wood piles are arranged longitudinally to form a fence, which are arranged along the river direction and finally fixed by fine wood piles; when the foot angle of the river bank slope is greater than 20°, more than 3 round wood piles are arranged longitudinally to form a fence, which are arranged along the river direction and finally fixed by fine wood piles; In the covering measure area, the woody plant branches are selected from woody plant branches with a length of not less than 1.5m, high germination ability, and forked branches; the part of the woody plant branches close to the river channel passes through the bottom of the fence of the slope foot support area and is compacted, and at the same time, compactors are arranged above the woody plant branches close to the slope foot support area for compaction; 1m long wooden stakes are evenly distributed longitudinally in the covering measure area, and long iron wires or wooden poles are used to stick the woody plant branches to the slope surface for compaction, and the surface of the woody plant branches is covered with soil; the woody plant branches are plants that like moisture and have strong reproductive ability, and the woody plant branches are golden willow, big-leaf willow, red-skinned willow, steamed bun willow, purple locust, vitex, and Canadian poplar; In the plant planting area, the cutting area is located at the incompletely covered river bank slope, and is provided with perennial sprouting woody plant cuttings, 30-50 cm long, 1-5 cm in diameter, with the bottom tipped, the cutting branches exposed 5 cm above the ground, inserted vertically into the slope, and the cutting interval is 50 cm; the branch planting area is located at the edge of the incompletely covered river bank, and is provided with straight branches of moisture-loving plants with germination ability, 1-3 m long, 4-15 cm in diameter, and one-third to half of the length of the straight branches of the plants are buried underground; the cuttings and planted plants in the plant planting area are selected from moisture-loving plants in the local or neighboring areas; The bank top plant configuration area has planted plants, among which the arbor is selected from one or more of weeping willow, Canadian poplar, metasequoia, matsudanax, elm, ash, amorpha, purple-leaf plum, purple-leaf dwarf cherry, sea buckthorn, crabapple, privet, silk cotton wood, mountain vitex, mulberry, and paper mulberry; the shrub is selected from one or more of hibiscus, forsythia, lilac, crape myrtle, Hokkaido boxwood, large-leaf boxwood, deutzia, pearl bush, purple-leafed barberry, wintersweet, weigela, and red yew; the perennial flowers and ornamental grasses are selected from one or more of creeping pot grass, violet yedoensis, creeper, large-flowered daylily, February orchid, evergreen dianthus, coreopsis, evening primrose, perennial root cosmos, beach chrysanthemum, cut autumn radish, snake whip daisy, purple coneflower, large coreopsis, hosta, reed, reed bamboo, fine-leafed silvergrass, variegated silvergrass, pennisetum, variegated silvergrass, iris, ophiopogon, laoyu carex, and sage; The restoration method includes the process of sequentially forming a slope foot support area, a covering measure area, a plant planting area and a bank top plant configuration area from the slope foot of the river bank upward; It also includes the process of river bank slope landform preparation before the formation of the slope foot support area and the management and maintenance after the formation of the bank top vegetation configuration area; The river bank slope landform adjustment includes: removing the trees and dead tree trunks and branches on the upper edge of the river bank slope, clearing an area with a radius of at least 5 meters; leveling the unstable or steep slope surface, and leveling is required when the slope exceeds 50°, and the leveling angle does not exceed 35°; The covering works in the covering measures area shall be implemented during the winter dormancy period of the plants; the cutting and planting works in the plant planting area shall be implemented during the winter dormancy period of the plants, but not during the frost period; In the bank top plant configuration area, 2 months after the plants are planted, the plants are top-dressed. The fertilizer used is urea, superphosphate, potassium sulfate, and cake fertilizer uniformly mixed in a mass ratio of 1:3:2:2, and the fertilizer application rate per square meter is 200-300g; The management and maintenance include preliminary measures to promote the growth of vegetation cover and later maintenance measures; the preliminary measures include: hoeing, fertilizing, and irrigation; the later maintenance measures include mowing, weeding, and pruning; hoeing is done 2-3 times a month during the vegetation growth period after the rainy season; mowing is done regularly in the dry season, and one-third of the vegetation height is left.