Partition wall pipeline module and integration method thereof

A pipeline and first-line technology, applied in the field of partition wall pipeline module and its integration, can solve the problems of difficulty in ensuring the mutual position of the top line pipe and the inner line pipe of the partition wall, time-consuming and labor-intensive threading of the integrated pipeline, etc., so as to improve the construction efficiency. , Avoid simmering operation, fast installation effect

Inactive Publication Date: 2020-03-24
ZHEJIANG YASHA DECORATION
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The present invention aims to overcome the technical problems of the prior art, such as the difficulty in ensuring the mutual position of the transition between the top wire pipe and the inner wire pipe in the partition wall, and the time-consuming and labor-intensive threading of the integrated pipeline in the prior art, and provides a partition wall pipeline module and Its integration method realizes the high integration of the partition wall pipeline module, forms an independent functional module, and improves the construction efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Partition wall pipeline module and integration method thereof
  • Partition wall pipeline module and integration method thereof
  • Partition wall pipeline module and integration method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0045] Such as figure 1 The shown embodiment 1 is a partition wall pipeline module, which includes a modularized bottom box 7; The upper wire pipe 2 and the transfer pipe 4; the two ends of the first wire pipe 14 are respectively connected with the bottom box for passing through the wire;

[0046] A mounting hole is provided on the wire passing bottom box 7, and the wiring pipe is plugged into the mounting hole, which realizes the connection between the wiring pipe and the wire passing bottom box 7, wherein the first wire pipe 14 is installed in the wire passing bottom box 7, the first line pipe 14 is used to protect the connecting wire 5 between the bottom boxes 7 from being damaged; There is a certain height difference between the wire passing bottom box 7 and the top surface wire pipe 2, which makes it necessary to set an adapter between the wire passing bottom box 7 and the top surface wire pipe 2 arranged on the upper part of the partition wall. The adapter is the adapter...

Embodiment 2

[0048] The technical solution of embodiment 2 is basically the same as the technical solution of embodiment 1, the difference is that: a cover plate 6 is provided on the line passing bottom box 7, and the cover plate 6 is used for the sealing installation of the partition wall pipeline module, and the The cover plate 6 is arranged as a split structure, and the cover plate 6 includes a first perforated panel 601 and a second perforated panel 602, and a quick docking structure is arranged between the first perforated panel 601 and the second perforated panel 602. The docking structure includes an insert structure 603 arranged on the first panel with holes 601 and a slot structure 604 arranged on the second panel with holes 602. When the cover plate 6 is installed, the first panel with holes 601 The insert structure 603 is plugged into the slot structure 604 on the second panel with holes 602 to realize quick docking between the first panel with holes 601 and the second panel with...

Embodiment 3

[0052] The technical solution of embodiment 3 is basically the same as the technical solution of embodiment 2, and the difference is that: the quick connection between the first panel with holes 601 and the second panel with holes 602 is set as snap connection, and the first panel with holes The panel 601 is provided with a first fastener, and the second panel with holes 602 is provided with a second fastener. When installing, the first fastener on the first panel with holes 601 is aligned with the second fastener on the panel with holes 602. The second fastener is pressed inward, so that the first fastener is fastened to the second fastener, which completes the installation of the blank panel, and the installation is convenient and quick, which effectively improves the construction efficiency.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a partition wall pipeline module and an integration method thereof. The partition wall pipeline module comprises a wire passing bottom box arranged in a modular mode, and a wiring pipe. The wiring pipe comprises a first wire pipe for middle wiring, a top surface wire pipe for top surface wiring and an adapter pipe; two ends of the first wire pipe are respectively connectedwith the wire passing bottom box; and the top surface wire pipe is connected with the wire passing bottom box through an adapter pipe. According to the partition wall pipeline module and the integration method thereof, high integration of the partition wall pipeline module is achieved, on-site operation such as pipeline hot bending is simplified, and the construction efficiency is improved.

Description

technical field [0001] The invention relates to the field of decoration, in particular to a partition wall pipeline module and an integration method thereof. Background technique [0002] When laying home improvement lines, it is first necessary to integrate the line pipe and the bottom box in the cavity of the partition wall, and then carry out on-site construction. During the on-site construction, it is difficult to ensure the mutual position of the top line pipe and the transition in the partition wall. This leads to inconvenient connection, and it is labor-intensive and time-consuming when the integrated pipeline is threaded in the later stage. [0003] For example, a "wiring device and method" disclosed in Chinese patent documents includes a pipeline module integrated in the partition wall, and the pipeline module includes a first bottom box for installation in the first through hole of the partition wall , for installing the second bottom box in the second through hol...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & AuthorityApplications(China)
IPC IPC(8): H02G3/22H02G3/38E04B2/74
CPCE04B2/74H02G3/22H02G3/38
Inventor丁欣欣丁泽成王文广周东珊王金霞武鹏
OwnerZHEJIANG YASHA DECORATION