Combined pipe jacking system and construction method
Through the positioning splicing and drag-reducing steel plate technology of the combined pipe hoist system, the complexity and pollution problems of traditional pipe hoist construction are solved, efficient and accurate rectangular tunnel construction is achieved, and construction difficulty and environmental impact are reduced.
Patent Information
- Application Number
- CN202010151470.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-06
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-03-06
AI Technical Summary
The construction of traditional large-section rectangular top pipe tunnels has problems such as complex construction technology, difficulty in controlling ground settlement, difficulty in making and transporting tool pipe sections, needing large reaction wall facilities and drag reduction mud pollution.
A combined pipe top system is adopted, including standard tool pipes, foot tool pipes and corner tool pipes. The tool pipes are spliced and positioned through positioning guides and grooves, and a drag-reducing steel plate is installed between the tool pipes and the geotechnical soil to reduce the The friction resistance is used to excavate the soil one by one by one by one using block and sectional construction methods and concealed excavation methods.
It reduces construction difficulty, improves construction accuracy and pass rate, reduces formation settlement deformation, avoids pollution from the use of large reaction walls and thixotropic mud, and achieves small section construction and efficient tunnel penetration.
Smart Images

Figure CN111173520B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel construction, and in particular to a combined pipe jacking system and a construction method. Background Art
[0002] Pipe jacking technology is a construction technology used in underground pipeline construction when crossing various obstacles such as railways, roads, rivers or buildings. In recent years, it has been widely used in urban traffic pedestrian tunnels and underground common trench construction. Traditional large-section rectangular pipe jacking tunnel construction requires the manufacture of tool pipe sections with the same shape as the tunnel section for jacking, and the use of large-scale pipe jacking machines with the same size as the excavation section for jacking construction. During jacking construction, thixotropic mud is required to reduce the friction between the tool pipe section and the rock and soil. Therefore, pipe jacking construction faces many difficulties such as complex construction technology, difficult to control ground settlement, difficult to manufacture and transport tool pipe sections, large reaction wall facilities and drag reduction mud pollution.
[0003] In summary, there is an urgent need for a combined pipe jacking system and a construction method to solve the problems existing in the prior art. Summary of the invention
[0004] The present invention aims to provide a combined pipe jacking system and a construction method to solve the difficulty of pipe jacking construction in large-section rectangular tunnels.
[0005] To achieve the above-mentioned objectives, the present invention provides a combined jacking system, comprising a standard tool tube, a base tool tube and a corner tool tube; at least one standard tool tube is spliced between the base tool tube and the corner tool tube in the vertical direction; at least one standard tool tube is spliced between two corner tool tubes in the horizontal direction; the standard tool tube, the base tool tube and the corner tool tube are all provided with positioning guide devices, and the standard tool tube and the corner tool tube are all provided with grooves matching the positioning guide devices, so as to realize the splicing and positioning of the standard tool tube, the base tool tube and the corner tool tube along the boundary contour line of the tunnel structure surface.
[0006] Preferably, the cross-section of the standard tool tube, base tool tube and corner tool tube along their length direction is rectangular, and the standard tool tube, base tool tube and corner tool tube are provided with positioning guide devices or grooves with the same side length to achieve splicing of jacking tool tube sections along the boundary contour line of the tunnel structure surface.
[0007] Preferably, the positioning guide device is at least one equal-section protrusion provided on the side wall of the standard tool tube and the corner tool tube along the length direction thereof at the first splicing side with the adjacent tool tube.
[0008] Preferably, the positioning guide device and groove of the standard tool tube are respectively arranged on the opposite side walls of the standard tool tube; the positioning guide device and groove of the corner tool tube are respectively arranged on the adjacent side walls of the corner tool tube to achieve positioning splicing between adjacent tool tubes.
[0009] Preferably, the footing tool tube comprises a detachably connected footing tube and a footing block; a positioning guide device is provided on the side wall of the splicing side of the footing tube and the standard tool tube along the length direction of the footing tool tube; a track mounting seat is provided on the top of the footing block to realize the jacking track installation of the prefabricated tunnel pipe section.
[0010] Preferably, a combined jacking system also includes a symmetrical tool tube; the cross-section of the symmetrical tool tube along its length direction is the same as the cross-section of the corner tool tube along its length direction; the side walls of the splicing side of the symmetrical tool tube and the adjacent standard tool tube are provided with grooves along the length direction of the symmetrical tool tube to realize the splicing of the jacking tool tube sections along the boundary contour line of the porous tunnel structure surface.
[0011] Preferably, a combined jacking system also includes a drag reducing steel plate; the drag reducing steel plate is detachably connected to the contact side of the standard tool tube, the footing tool tube, the corner tool tube and the symmetrical tool tube with the rock and soil along the outer boundary contour line of the tunnel structure surface, so as to reduce the resistance of the tool tube during jacking.
[0012] The present invention also provides a combined pipe jacking system construction method, which adopts the above-mentioned combined pipe jacking system to realize the construction of a rectangular tunnel, comprising the following steps:
[0013] Step 1: According to the tunnel structure to be excavated and the size of the tool tube, determine the boundary contour line of the tunnel structure surface and the number and splicing combination of the four tool tubes;
[0014] Step 2: Carry out pipe jacking construction in blocks and sections at the boundary of the tunnel, and jack the tool pipe section by section until the tunnel is through;
[0015] Step 3: Separate the footing tubes and footing blocks of all footing tool tubes, install the full-length track on the track mounting seat of the footing block, and push the prefabricated tunnel pipe section along the track in the starting well to replace the tool tube on the top of the footing block until all tool tubes are pushed to the receiving well;
[0016] Step 4: Under the protection of the prefabricated tunnel pipe segment, the soil in the tunnel is excavated section by section by using the dark excavation method, the invert or bottom plate steel cage is tied, and then the bottom of the tunnel is poured until the tunnel is through.
[0017] Preferably, the order of the pipe jacking construction in step 2 is from bottom to top along the boundary contour line of the tunnel structure surface, first the two sides and then the middle.
[0018] Preferably, in step 4, a steel bar connecting sleeve is embedded in the bottom of the prefabricated tunnel pipe segment for connecting with the invert or bottom plate steel bar cage.
[0019] The application of the technical solution of the present invention has the following beneficial effects:
[0020] (1) In the present invention, by providing a standard tool tube, a footing tool tube and a corner tool tube with positioning guide devices and grooves, after the jacking units are divided along the tunnel structure surface, the jacking construction of a single-hole tunnel can be carried out in blocks through positioning and splicing between the tool tubes, without the need to use a large jacking reaction wall, thereby reducing the difficulty of jacking construction of a large-section rectangular tunnel.
[0021] (2) In the present invention, by dividing the jacking tool tubes for large-section rectangular tunnel construction into standard tool tubes, footing tool tubes, corner tool tubes and symmetrical tool tubes, the manufacturing difficulty of the jacking tool tube sections is reduced, and standardized and modular splicing is achieved between the tool tubes, which is conducive to completing the jacking construction of single-hole and multi-hole tunnels.
[0022] (3) In the present invention, by providing a positioning guide device and a groove, the positioning error during the splicing of tool pipe sections is reduced, thereby improving the qualified rate of tunnel construction.
[0023] (4) In the present invention, by forming a footing tool tube with a footing tube and a footing block, it can not only meet the splicing positioning between the jacking tool pipe sections, but also provide a jacking tunnel track mounting seat for the prefabricated tunnel pipe section, thereby reducing the construction error when the prefabricated tunnel pipe section replaces the tool pipe section.
[0024] (5) In the present invention, by providing a drag-reducing steel plate between the tool pipe section and the rock and soil outside the tunnel, the friction resistance between the tool pipe section and the rock and soil during jacking construction can be reduced, and land pollution caused by the use of thixotropic mud can be avoided.
[0025] (6) In the present invention, the jacking units are divided on the tunnel structure surface according to the tunnel structure and the size of the tool pipe segment, and then the combined tool pipe segment is used to carry out block and segment jacking construction. The small-section tool pipe is used for construction, the equipment is simple, the reuse rate is high, the single excavation section is small, and the jacking is only carried out at the boundary, which has little disturbance to the surrounding environment and can well control the settlement and deformation of the stratum.
[0026] (7) In the present invention, under the protection of the prefabricated tunnel pipe segment, the soil inside the pipe segment is excavated section by section by using the dark excavation method, the invert or bottom plate steel cage is tied, and the steel cage is connected to the steel connecting sleeve pre-buried in the prefabricated tunnel pipe segment, and then the bottom of the tunnel is poured until the tunnel is through, which can improve the accuracy of tunnel construction, further compensate for the poor integrity of the assembled prefabricated pipe segment, and improve the longitudinal resistance of the structure to uneven deformation.
[0027] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0029] Figure 1 It is a schematic diagram of a splicing structure of a combined pipe jacking system of the present application;
[0030] Figure 2 It is a schematic diagram of the structure of a standard tool tube;
[0031] Figure 3 It is a schematic diagram of the structure of the footing tool tube;
[0032] Figure 4 is a front view of the corner tool tube;
[0033] Figure 5 is the front view of the symmetrical tool tube;
[0034] Figure 6 It is a schematic diagram of the jacking unit divided according to the contour line of the tunnel structure surface and the size of the tool tube;
[0035] Figure 7 It is a schematic diagram of the jacking sequence of each pipe jacking construction section;
[0036] Figure 8 It is a structural schematic diagram of a prefabricated tunnel pipe segment;
[0037] Fig. 9 is a schematic diagram of replacing the tool pipe with a prefabricated tunnel pipe segment;
[0038] Fig.10 It is the front view of the tunnel after the soil inside the hole is excavated;
[0039] Fig.11 This is the front view of the whole tunnel after the tunnel floor casting is completed;
[0040] Among them, 1. Standard tool tube, 2. Footing tool tube, 2.1. Footing tube, 2.2. Footing block, 2.2.1. Track mounting seat, 3. Corner tool tube, 4. Positioning guide device, 5. Groove, 6. Symmetrical tool tube, 7. Drag reduction steel plate, 8. Prefabricated tunnel pipe section, 8.1 Steel bar connecting sleeve. DETAILED DESCRIPTION
[0041] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0042] See also Figures 1 to 5 , a combined pipe jacking system, this embodiment is applied to tunnel pipe jacking construction.
[0043] A combined pipe jacking system comprises a standard tool tube 1, a footing tool tube 2 and a corner tool tube 3; at least one standard tool tube 1 is spliced between the footing tool tube 2 and the corner tool tube 3 in the vertical direction; at least one standard tool tube 1 is spliced between two corner tool tubes 3 in the horizontal direction; the standard tool tube 1, the footing tool tube 2 and the corner tool tube 3 are all provided with a positioning guide device 4, and the standard tool tube 1 and the corner tool tube 3 are all provided with a groove 5 matching the positioning guide device 4, so as to realize the splicing and positioning of the standard tool tube 1, the footing tool tube 2 and the corner tool tube 3 along the boundary contour line of the tunnel structure surface. When constructing a single-hole rectangular tunnel, only the standard tool tube 1, the footing tool tube 2 and the corner tool tube 3 are needed to perform tool tube splicing and pipe jacking construction according to the boundary contour line of the tunnel structure surface.
[0044] See also Figure 1 A combined jacking system also includes a symmetrical tool tube 6 for the construction of a porous rectangular tunnel. The symmetrical tool tube 6 is placed at the top jacking unit of the supporting wall in the middle of the tunnel. The two side walls of the symmetrical tool tube 6 in the horizontal direction are spliced with the standard tool tubes 1 on both sides, and the bottom of the symmetrical tool tube 6 is spliced with the standard tool tube 1 below; the side walls of the splicing side of the symmetrical tool tube 6 and the standard tool tube 1 are provided with grooves 5 along the length direction of the symmetrical tool tube 6, which are used to cooperate with the positioning guide device 4 on the standard tool tube 1 to realize the splicing of the jacking tool tube section along the boundary contour line of the porous tunnel structure surface.
[0045] See also Figure 1 The cross-sections of the standard tool tube 1, the footing tool tube 2 and the corner tool tube 3 along their length directions are rectangular, and the side lengths of the positioning guide devices 4 or the grooves 5 of the standard tool tube 1, the footing tool tube 2 and the corner tool tube 3 are the same. The cross-section of the symmetrical tool tube 6 along its length direction is the same as the cross-section of the corner tool tube 3 along its length direction, so as to realize the splicing of the jacking tool tube sections along the boundary contour line of the tunnel structure surface.
[0046] See also Figure 2 or Figure 4The positioning guide device 4 is at least one equal-section protrusion arranged on the side wall of the first splicing side of the standard tool tube 1 and the corner tool tube 3 along the length direction thereof with the adjacent tool tube. The cross-sectional shape of the positioning guide device 4 can be semicircular, triangular, rectangular or the like. In the present embodiment, the positioning guide device 4 is two equal-section protrusions with semicircular cross-sections along the length direction of the tool tube section.
[0047] See also Figure 2 or Figure 4 The positioning guide device 4 and the groove 5 of the standard tool tube 1 are respectively arranged on the opposite side walls of the standard tool tube 1; the positioning guide device 4 and the groove 5 of the corner tool tube 3 are respectively arranged on the adjacent side walls of the corner tool tube 3 to realize the positioning splicing between adjacent tool tubes.
[0048] See also Figure 3 The footing tool tube 2 comprises a detachably connected footing tube 2.1 and a footing block 2.2; a positioning guide device 4 is provided on the side wall of the joint side of the footing tube 2.1 and the standard tool tube 1 along the length direction of the footing tool tube 2; a track mounting seat 2.2.1 is provided on the top of the footing block 2.2 to realize the jacking track installation of the prefabricated tunnel pipe segment 8, and a slide groove cooperating with the jacking track is provided at the bottom of the prefabricated tunnel pipe segment 8 to facilitate the replacement of the tool tube with the prefabricated tunnel pipe segment 8 during tunnel construction.
[0049] See also Figures 1 to 5 A combined jacking system also includes a drag reduction steel plate 7; the drag reduction steel plate 7 is detachably connected to the contact side of the standard tool pipe 1, the footing tool pipe 2, the corner tool pipe 3 and the symmetrical tool pipe 6 with the rock and soil along the outer boundary contour line of the tunnel structure surface, so as to reduce the resistance of the tool pipe during jacking. The front end of the drag reduction steel plate 7 is connected to the first tool pipe section of each jacking unit, and moves toward the tunnel receiving shaft with the jacking of the tool pipe section. After jacking for a certain distance, a subsequent drag reduction steel plate is welded to the end of the previous drag reduction steel plate 7 until the drag reduction steel plate 7 is arranged along the boundary contour line of the tunnel structure surface along the entire length of the tunnel. The full-length drag reduction steel plate 7 is arranged on the surrounding rock side of the tunnel boundary. On the one hand, it can reduce the friction between the prefabricated tunnel pipe section 8 and the soil during the subsequent jacking process to avoid the back-soil effect. On the other hand, it can avoid the use of thixotropic mud and reduce environmental pollution.
[0050] See also Figures 6 to 11 A combined pipe jacking system construction method adopts the above-mentioned combined pipe jacking system to realize the construction of a rectangular tunnel, which is characterized by comprising the following steps:
[0051] Step 1: According to the tunnel structure to be excavated and the tool tube size, determine the tunnel structure surface boundary contour line and the number and splicing combination of the four tool tubes, see Figure 6, which is a schematic diagram of the division of jacking units for double-hole tunnel construction;
[0052] Step 2: The space at the boundary of the tunnel is jacked up in blocks and sections, and the tool pipe is jacked up section by section. The front end of the drag-reducing steel plate 7 is connected to the first tool pipe section of each jacking unit, and moves toward the tunnel receiving well along with the jacking of the tool pipe section until the tunnel is penetrated;
[0053] Step 3: Separate the footing tubes 2.1 and footing blocks 2.2 of all footing tool tubes 2, install the full-length track on the track mounting seat 2.2.1 of the footing block 2.2, release the connection between the drag reduction steel plate 7 and the tool tube segment, fix the drag reduction steel plate 7 on the rock and soil wall in contact with the drag reduction steel plate 7, and push the prefabricated tunnel tube segment 8 along the track in the starting well to replace the tool tube on the footing block 2.2 until all tool tubes are pushed to the receiving well. Fig. 9 As shown;
[0054] Step 4: Under the protection of the prefabricated tunnel pipe segment 8, the soil in the tunnel is excavated section by section by using the dark excavation method, such as Fig.10 Then tie the invert or bottom plate steel cage and pour the tunnel bottom until the tunnel is through. Fig.11 shown.
[0055] The order of pipe jacking construction in step 2 is from bottom to top along the boundary contour line of the tunnel structure surface, first on both sides and then in the middle. Figure 7 shown.
[0056] In the step 4, a steel bar connecting sleeve 8.1 is pre-buried at the bottom of the prefabricated tunnel pipe segment 8 for connecting with the invert or bottom plate steel bar cage, thereby enhancing the stability of the tunnel structure.
[0057] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A combined pipe jacking system, characterized in that: The invention comprises a standard tool tube (1), a footing tool tube (2) and a corner tool tube (3); at least one standard tool tube (1) is spliced between the footing tool tube (2) and the corner tool tube (3) in the vertical direction; at least one standard tool tube (1) is spliced between two corner tool tubes (3) in the horizontal direction; the standard tool tube (1), the footing tool tube (2) and the corner tool tube (3) are all provided with a positioning guide device (4); the standard tool tube (1) and the corner tool tube (3) are all provided with a groove (5) matching the positioning guide device (4) so as to realize the splicing and positioning of the standard tool tube (1), the footing tool tube (2) and the corner tool tube (3) along the boundary contour line of the tunnel structure surface; The cross-sections of the standard tool tube (1), the footing tool tube (2) and the corner tool tube (3) along their length direction are rectangular, and the lengths of the sides of the positioning guide devices (4) or the grooves (5) provided on the standard tool tube (1), the footing tool tube (2) and the corner tool tube (3) are all the same, so as to realize the splicing of the jacking tool tube sections along the boundary contour line of the tunnel structure surface; The positioning guide device (4) is at least one protrusion of equal cross-section provided on the side wall of the standard tool tube (1) and the corner tool tube (3) along the length direction thereof at the first splicing side with the adjacent tool tube; The positioning guide device (4) and the groove (5) of the standard tool tube (1) are respectively arranged on two opposite side walls of the standard tool tube (1); the positioning guide device (4) and the groove (5) of the corner tool tube (3) are respectively arranged on two adjacent side walls of the corner tool tube (3) to achieve positioning splicing between adjacent tool tubes; The footing tool tube (2) comprises a detachably connected footing tube (2.1) and a footing block (2.2); a positioning guide device (4) is provided on the side wall of the splicing side of the footing tube (2.1) and the standard tool tube (1) along the length direction of the footing tool tube (2); and a track mounting seat (2.2.1) is provided on the top of the footing block (2.2) to realize the jacking track installation of the prefabricated tunnel pipe section; It also comprises a symmetrical tool tube (6); the cross section of the symmetrical tool tube (6) along its length direction is the same as the cross section of the corner tool tube (3) along its length direction; the side wall of the splicing side of the symmetrical tool tube (6) and the adjacent standard tool tube (1) is provided with a groove (5) along the length direction of the symmetrical tool tube (6) to achieve the splicing of the jacking tool tube section along the boundary contour line of the porous tunnel structure surface.
2. A combined pipe jacking system according to claim 1, characterized in that: It also includes a drag-reducing steel plate (7); the drag-reducing steel plate (7) is detachably connected to the contact side of the standard tool tube (1), the footing tool tube (2), the corner tool tube (3) and the symmetrical tool tube (6) with the rock and soil along the outer boundary contour line of the tunnel structure surface, so as to reduce the resistance when the tool tube is pushed forward.
3. A combined pipe jacking system construction method, using a combined pipe jacking system as claimed in any one of claims 1 to 2 to realize the construction of a rectangular tunnel, characterized in that: The following steps are involved: Step 1: According to the tunnel structure to be excavated and the size of the tool tube, determine the boundary contour line of the tunnel structure surface and the number and splicing combination of the four tool tubes; Step 2: Carry out pipe jacking construction in blocks and sections at the boundary of the tunnel, and jack the tool pipe section by section until the tunnel is through; Step 3: Separate the footing tubes (2.1) and footing blocks (2.2) of all footing tool tubes (2), install a full-length track on the track mounting seat (2.2.1) of the footing block (2.2), and push the prefabricated tunnel pipe section along the track in the starting well to replace the tool tube on the upper part of the footing block (2.2) until all tool tubes are pushed to the receiving well; Step 4: Under the protection of the prefabricated tunnel pipe segment, the soil in the tunnel is excavated section by section by using the dark excavation method, the invert or bottom plate steel cage is tied, and then the bottom of the tunnel is poured until the tunnel is through.
4. A combined pipe jacking system construction method according to claim 3, characterized in that: The order of the pipe jacking construction in step 2 is from bottom to top along the boundary contour line of the tunnel structure surface, first the two sides and then the middle.
5. A combined pipe jacking system construction method according to claim 3, characterized in that: In the step 4, a steel bar connecting sleeve is embedded in the bottom of the prefabricated tunnel pipe segment to connect with the invert or bottom plate steel bar cage.