Prefabricated pier body and prefabricated pier body installation method

By connecting the prefabricated pier body with a steel frame to connect the prefabricated segments, the problem of inconvenience in installation of the bridge pier body is solved, efficient and stable pier body installation is achieved, and the installation accuracy and earthquake resistance are improved.

CN111379218BActive Publication Date: 2024-11-19ZHEJIANG INST OF COMM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010306781.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-17
Publication Date
2024-11-19
Estimated Expiration
2040-04-17

AI Technical Summary

Technical Problem

In the prior art, higher or larger span bridge piers have problems with inconvenience during installation, especially due to the limitations of casting, transportation and installation capabilities, it is impossible to manufacture and install them in one go. Segment prefabrication and On-site assembly, and existing connection methods such as grouting sleeves and prestressed steel strands have problems such as high accuracy, difficult to penetrate and poor seismic performance.

Method used

The prefabricated pier body includes prefabricated segments and steel frames. The segment pier body is connected by a steel frame. The steel frame is used as a bending member and an auxiliary installation frame. The segment is connected by a reserved through holes and concrete, and the epoxy adhesive layer is used to achieve the segment. Stable installation.

Benefits of technology

It improves the installation accuracy and convenience of the prefabricated pier body, ensures the stable connection of the pier body, reduces installation difficulty and cost, and enhances earthquake resistance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111379218B_ABST
    Figure CN111379218B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of civil engineering construction, and in particular to a prefabricated pier body and a method for installing the prefabricated pier body. The prefabricated pier body includes prefabricated segments and a steel frame, and the prefabricated pier body includes a bottom section pier body, multiple segment pier bodies and a top section pier body; one end of the steel frame is used to connect to the pedestal, and the other end of the steel frame extends along a first direction; the bottom section pier body, multiple segment pier bodies and the top section pier body are stacked on the pedestal in sequence and connected to the steel frame. The steel frame serves as a bending-resistant member of the prefabricated pier body, and at the same time, the steel frame also serves as a rigid frame to assist in completing the installation and connection of the bottom section pier body, the segment pier body and the top section pier body, thereby improving the installation accuracy of the prefabricated pier body. Therefore, when installing the prefabricated pier body, multiple prefabricated segments can be hoisted to a predetermined installation position section by section, and stacked together in sequence from bottom to top, making the installation of the prefabricated pier body more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering construction, and in particular to a prefabricated pier body and a prefabricated pier body installation method. Background Art

[0002] For the piers of higher or larger span bridges, pile group foundations and solid rectangular piers are generally used according to the force requirements, and the piers are connected by a cap. For piers with large cross-sectional areas and high heights, due to the limitations of casting, transportation and installation capabilities, they cannot be manufactured as a whole and installed at one time, and can only be prefabricated in segments and assembled on site. At present, there are two methods for on-site connection of prefabricated segments: one is to use grouting sleeves for connection, but it has high requirements for installation accuracy and high cost; the other method is to use prestressed steel strands for connection, but it is difficult to thread the prestressed steel strands and has poor seismic performance. Summary of the invention

[0003] The purpose of the present application is to provide a prefabricated pier body and a method for installing the prefabricated pier body, so as to solve the technical problem of inconvenient installation of the prefabricated pier body in the prior art to a certain extent.

[0004] In the first aspect, an embodiment of the present invention provides a prefabricated pier body, comprising a prefabricated segment and a steel frame; the prefabricated segment comprises a top section pier body, a bottom section pier body and a segment pier body; one end of the steel frame is used to connect to a pedestal, and the other end of the steel frame extends along a first direction; the number of the segment pier bodies is multiple, the bottom section pier body, the multiple segment pier bodies and the top section pier body are stacked sequentially on the pedestal along the first direction and connected to the steel frame.

[0005] In an optional embodiment, the prefabricated segment is formed with a reserved through hole extending along the first direction, and the steel frame passes through the prefabricated segment through the reserved through hole.

[0006] In an optional embodiment, there are multiple reserved through holes on each prefabricated segment, and the multiple reserved through holes are distributed at intervals along the circumference of the prefabricated segment; there are multiple steel frame sections, and the multiple steel frame sections correspond one-to-one to the multiple reserved through holes.

[0007] In an optional embodiment, a concrete layer is further included; the concrete layer is filled between the reserved through holes and the corresponding steel frame, so that the prefabricated segments are connected to the steel frame.

[0008] In an optional embodiment, the top section pier body and the segment pier body form a shear groove at one end facing the pedestal; the bottom section pier body and the segment pier body form a shear key compatible with the shear key at one end away from the pedestal.

[0009] In an optional embodiment, it further includes an epoxy adhesive layer; the epoxy adhesive layer is arranged between any two adjacent prefabricated segments.

[0010] In an optional embodiment, each of the steel skeletons includes a plurality of segmented steels; the plurality of segmented steels are sequentially connected along the first direction.

[0011] In an optional embodiment, the prefabricated segments are all hollow piers.

[0012] In an optional embodiment, the height of the bottom section pier body does not exceed 2 m, and the heights of the segment pier body and the top section pier body are 3.5-5 m.

[0013] In a second aspect, an embodiment of the present invention provides a method for installing a prefabricated pier body, comprising the following steps:

[0014] Step 100, hoisting the first prefabricated segment to a predetermined installation position, inserting a steel frame into a reserved through hole of the first prefabricated segment, and connecting the lower end of the steel frame to the cap; applying epoxy glue on the upper surface of the first prefabricated segment;

[0015] Step 200, hoisting the prefabricated segments to the predetermined positions one by one, and lowering the prefabricated segments along the steel hanger; and after completing the installation of one prefabricated segment, applying epoxy glue on the upper surface of the prefabricated segment;

[0016] Step 300: When the length of the steel skeleton cannot meet the installation requirements of the next prefabricated segment, a section of steel skeleton is connected above the steel skeleton, and concrete is poured into the reserved through holes of the installed segment pier body;

[0017] Step 400: repeat the above steps 200 and 300 until the installation of the last prefabricated segment is completed.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] The present application provides a prefabricated pier body, including prefabricated segments and a steel frame, wherein the prefabricated pier body includes a bottom pier body, multiple segment pier bodies and a top pier body; one end of the steel frame is used to connect to the pedestal of the prefabricated pier body, and the other end of the steel frame extends along the first direction (vertical direction); there are multiple segment pier bodies, and the bottom pier body, multiple segment pier bodies and the top pier body are sequentially stacked on the pedestal and connected to the steel frame. The steel frame serves as a bending-resistant member of the prefabricated pier body, and at the same time, the steel frame also serves as a rigid frame to assist in completing the installation and connection of the bottom pier body, the segment pier body and the top pier body, thereby improving the installation accuracy of the prefabricated pier body. Therefore, during installation, multiple prefabricated segments can be hoisted to a predetermined installation position section by section, stacked together from bottom to top, and connected into a whole through the steel frame and fixedly installed on the pedestal, so as to share the external force of the pedestal and make the installation of the prefabricated pier body more convenient.

[0020] The present application also provides a method for installing a prefabricated pier body, comprising the following steps: first, hoisting the first prefabricated segment to a predetermined installation position, inserting a steel frame into the reserved through hole of the first prefabricated segment, and connecting the lower end of the steel frame to the pedestal; applying epoxy glue on the upper surface of the first prefabricated segment; next, hoisting the prefabricated segments to the predetermined position section by section, and lowering the prefabricated segments along the steel frame hanger; and after completing the installation of one prefabricated segment, applying epoxy glue on the upper surface of the prefabricated segment; next, when the length of the steel frame cannot meet the installation requirements of the next prefabricated segment, a section of steel frame is connected above the steel frame, and concrete is poured into the reserved through hole of the installed segment pier body; next, repeating the above steps 200 and 300 until the installation of the last prefabricated segment is completed. The installation method of the prefabricated pier body of the present application can quickly and conveniently complete the installation of the prefabricated pier body. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 A schematic diagram of the structure of a prefabricated pier body provided in an embodiment of the present invention;

[0023] Figure 2 A schematic diagram of the structure of the bottom section pier provided by an embodiment of the present invention;

[0024] Figure 3 A schematic diagram of the structure of a segmented pier body provided in an embodiment of the present invention;

[0025] Figure 4 A schematic diagram of the structure of the top section pier provided by an embodiment of the present invention;

[0026] Figure 5 A schematic diagram of the structure of a prefabricated segment of a hollow structure provided by an embodiment of the present invention;

[0027] Figure 6 A schematic flow chart of a prefabricated pier body installation method provided in an embodiment of the present invention.

[0028] Reference numerals:

[0029] 1-steel frame, 2-prefabricated segment, 21-bottom section pier, 22-segment pier, 23-top section pier, 3-shear key, 4-shear groove, 5-reserved through hole, 6-cap pedestal. DETAILED DESCRIPTION

[0030] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.

[0031] In the description of the embodiments of the present application, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or are the positions or positional relationships in which the invented product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0032] In addition, the terms "horizontal", "vertical" and the like do not mean that the components are required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0033] In the description of the embodiments of the present application, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "setting", "installation", "connection", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0034] As used herein, the term "and / or" includes any one of the associated listed items and any combination of any two or more items.

[0035] For ease of description, spatial relative terms such as "above", "upper", "below", and "lower" may be used herein to describe the relationship of one element to another element as shown in the drawings. Such spatial relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the drawings.

[0036] The terms used herein are only used to describe various examples and are not used to limit the present disclosure. Unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. The terms "include", "comprise" and "have" list the stated features, quantities, operations, components, elements and / or their combinations that exist, but do not exclude the existence or addition of one or more other features, quantities, operations, components, elements and / or their combinations.

[0037] Variations in the shapes shown in the drawings may occur due to manufacturing techniques and / or tolerances. Therefore, the examples described herein are not limited to the specific shapes shown in the drawings but include variations in shapes that occur during manufacturing.

[0038] The features of the examples described herein may be combined in various ways that will be apparent after understanding the disclosure of the present application. In addition, although the examples described herein have various configurations, other configurations are possible as will be apparent after understanding the disclosure of the present application. In addition, the technical solutions between the various embodiments may be combined with each other, but must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is mutually contradictory or cannot be implemented, it should be considered that the combination of such technical solutions does not exist and is not within the scope of protection required by the present application.

[0039] Refer to the following Figures 1 to 6 The prefabricated pier shaft and the prefabricated pier shaft installation method according to some embodiments of the present invention are described.

[0040] See also Figure 1As shown, the present application provides a prefabricated pier body, including a prefabricated segment 2 and a steel frame 1, the prefabricated segment 2 includes a bottom section pier body 21, a segment pier body 22, and a top section pier body 23; one end of the steel frame 1 is used to connect with the base 6 of the prefabricated pier body, and the other end of the steel frame 1 extends along a first direction (vertical direction); the number of segment pier bodies 22 is multiple, the bottom section pier body 21, multiple segment pier bodies 22 and the top section pier body 23 are stacked in sequence on the base 6 and connected to the steel frame 1.

[0041] Preferably, if Figures 1 to 4 As shown, reserved through holes 5 are respectively formed on the bottom section pier body 21, the segmental pier body 22 and the top section pier body 23, and when the bottom section pier body 21, the segmental pier body 22 and the top section pier body 23 are stacked together in the vertical direction, the reserved through holes 5 on the bottom section pier body 21, the segmental pier body 22 and the top section pier body 23 are interconnected; the steel frame 1 can pass through the reserved through holes 5 in sequence through the bottom section pier body 21, multiple segmental pier bodies 22 and the top section pier body 23.

[0042] During the specific construction process, before the bottom section pier body 21 and the pedestal 6 are installed, the concrete of the pedestal 6 may be uncast or partially cast; first, the bottom section pier body 21 is hoisted to the predetermined installation position, that is, above the foundation pit of the pedestal 6, and the bottom section pier body 21 is temporarily supported and fixed; then the steel frame 1 is inserted into the bottom section pier body 21 from the reserved through hole 5 of the bottom section pier body 21, and the lower end of the steel frame 1 extends out of the bottom section pier body 21 to a predetermined distance into the foundation pit of the pedestal 6; finally, concrete is poured into the foundation pit of the pedestal 6 to complete the casting of the pedestal 6, and at the same time, the lower end of the steel frame 1 is inserted into the concrete structure of the pedestal 6 and fixedly connected to the pedestal 6, thereby completing the installation of the bottom section pier body 21 conveniently and quickly, and making the bottom section pier body 21 stably and firmly fixed on the pedestal 6.

[0043] After completing the installation of the bottom section pier body 21, the segmental pier body 22 of the first section is hoisted to the top of the steel frame 1, and the reserved through hole 5 of the segmental pier body 22 is opposite to the steel frame 1; then the segmental pier body 22 is lowered along the steel frame 1, and the steel frame 1 passes through the reserved through hole 5 of the segmental pier body 22; until the segmental pier body 22 is aligned and placed above the bottom section pier body 21, the installation of the segmental pier body 22 of the first section is completed; then repeat this step to complete the installation of the remaining segmental pier bodies 22 and the top section pier body 23 in turn; the steel frame 1 serves as the bending-resistant member of the prefabricated pier body, and at the same time, the steel frame 1 also serves as a rigid frame to assist in completing the installation and connection of the bottom section pier body 21, the segmental pier body 22 and the top section pier body 23, thereby improving the installation accuracy of the prefabricated pier body. Finally, self-compacting concrete is poured into the reserved through hole 5, so that the bottom pier body 21, the multiple segment pier bodies 22 and the top pier body 23 are connected into a whole through the steel frame 1 and fixedly installed on the base 6 to jointly bear the external force.

[0044] In this embodiment, preferably, Figure 1 As shown, the steel frame 1 can be set up in sections under the condition of satisfying the force, that is, the steel frame 1 includes a plurality of segmental steels; during construction, firstly, a segmental steel with a certain length is inserted into the reserved through hole 5 of the bottom section pier body 21, and the lower end of the segmental steel is firmly connected to the cap 6; then the segmental pier body 22 is installed. When the length of the segmental steel cannot meet the installation requirements of the next segmental pier body 22, a segmental steel is connected to the upper end of the segmental steel, and self-compacting concrete is poured into the reserved holes of the installed segmental pier body 22 and the bottom section pier body 21. Then repeat the above operation until the installation of all segmental pier bodies 22 and the top section pier body 23 is completed. By setting the steel frame 1 to a plurality of segmental steels with a shorter length, the installation of the segmental pier body 22 is made more convenient during the hoisting and installation of the segmental pier body 22.

[0045] Preferably, the connection between the two sections of steel can be made by welding or by fasteners when the force is sufficient.

[0046] Preferably, each prefabricated segment 2, i.e., the bottom segment pier body 21, the multiple segment pier bodies 22 and the top segment pier body 23, is provided with multiple reserved through holes 5, and the multiple reserved through holes 5 are distributed at intervals along the circumference of each prefabricated segment 2; the number of steel frame 1 is also multiple, and the multiple steel frame 1 corresponds one-to-one to the multiple reserved through holes 5, so that the bottom segment pier body 21, the multiple segment pier bodies 22 and the top segment pier body 23 are connected in series through the steel frame 1 to form a complete prefabricated pier body, which jointly bear the external force.

[0047] Preferably, if Figures 2 to 4 As shown, the end of the bottom section pier body 21 away from the pedestal 6, i.e., the upper end of the bottom section pier body 21, forms a shear key 3, the upper end of the segment pier body 22 forms a shear key 3, the lower end of the segment pier body 22 forms a shear groove 4 matched with the shear key 3, and the lower end of the top section pier body 23 forms a shear key 3; when the bottom section pier body 21, the segment pier body 22 and the top section pier body 23 are stacked together in sequence, the shear key 3 on the upper end surface of the lower section pier body can be inserted into the shear groove 4 on the lower end surface of the upper section pier body, so that in the process of stacking the pier bodies section by section, the two adjacent sections of the pier body can be kept aligned by plugging the shear key 3 and the shear groove 4, thereby preventing the prefabricated pier body from horizontally deviating during the stacking and splicing process and resisting the effect of horizontal shear force.

[0048] By arranging shear keys 3 and shear grooves 4 on the prefabricated segments 2, a bulge is formed around the reserved through hole 5 of each prefabricated segment 2, so that even if the prefabricated segments 2 between two adjacent sections crack due to extreme conditions, rainwater will not penetrate into the reserved through hole 5 and affect the strength and life of the steel frame 1.

[0049] Preferably, an epoxy glue layer is also provided between any two adjacent prefabricated segments 2; that is, after the installation of the bottom section pier body 21 and the pedestal 6 is completed, a layer of epoxy glue is applied to the upper end surface of the bottom section pier body 21 to form an epoxy glue layer with a certain thickness, and then a segment pier body 22 is placed on the bottom section pier body 21, and the bottom section pier body 21 and the adjacent segment pier body 22 are kept vertically aligned through the shear keys 3 and the shear grooves 4, and at the same time, the epoxy glue layer between the bottom section pier body 21 and the segment pier body 22 plays a certain bonding and fixing role for the two; in the subsequent installation process of other segment pier bodies 22 and the top section pier body 23, after each installation of a segment pier body 22 is completed, a layer of epoxy glue is applied to the upper end surface of the segment pier body 22, and then the next segment pier body 22 is installed, until the assembly between the last segment pier body 22 and the top section pier body 23 is completed.

[0050] In one embodiment of the present application, preferably, for a prefabricated pier with a smaller cross section, the bottom section pier 21, the segment pier 22 and the top section pier 23 may be solid piers; for a prefabricated pier of a higher or larger span bridge, or a prefabricated pier with a larger cross section, such as Figure 5 As shown, the bottom pier body 21, the segment pier body 22 and the top pier body 23 can be hollow pier bodies, which can reduce the amount of materials used and facilitate the installation of the pier body.

[0051] In one embodiment of the present application, preferably, the height of the bottom pier section 21 does not exceed 2m, so that the construction and installation of the bottom pier section 21 is more convenient. The height of the segment pier 22 and the top pier 23 can be determined according to the transportation requirements and installation capacity. Preferably, the height of the segment pier 22 and the top pier 23 is 3.5m-5m, so that it is more convenient to transport the prefabricated segment pier 22 and the top pier 23 to the installation site, and it is also more convenient to install and construct the segment pier 22 and the top pier 23.

[0052] The present application also provides a method for installing a prefabricated pier body, such as Figure 6 As shown, the following steps are included:

[0053] Step 100, hoisting the first prefabricated segment to a predetermined installation position, inserting a steel frame into a reserved through hole of the first prefabricated segment, and connecting the lower end of the steel frame to the cap; applying epoxy glue on the upper surface of the first prefabricated segment;

[0054] Step 200, hoisting the prefabricated segments to the predetermined positions one by one, and lowering the prefabricated segments along the steel hanger; and after completing the installation of one prefabricated segment, applying epoxy glue on the upper surface of the prefabricated segment;

[0055] Step 300: When the length of the steel skeleton cannot meet the installation requirements of the next prefabricated segment, a section of steel skeleton is connected above the steel skeleton, and concrete is poured into the reserved through holes of the installed segment pier body;

[0056] Step 400: repeat the above steps 200 and 300 until the installation of the last prefabricated segment is completed.

[0057] The following is an example of a prefabricated segment 2 including a bottom pier body 21, a segment pier body 22, and a top pier body 23 to specifically describe the installation method of the prefabricated pier body provided by the present application. The installation method includes the following steps:

[0058] First, the first prefabricated section, i.e., the bottom section pier body, is hoisted to the predetermined installation position, i.e., above the cap of the prefabricated pier body, and the bottom section pier body is temporarily supported and fixed; at this time, the cap is in a state where concrete has not been poured into the foundation pit of the cap or concrete has been partially poured; the steel frame is inserted into the bottom section pier body through the reserved through hole of the bottom section pier body, and the lower end of the steel frame extends a certain distance from the bottom section pier body to the foundation pit of the cap. Then, concrete is poured into the foundation pit of the cap to complete the construction of the cap, and at the same time, the lower end of the steel frame is inserted into the cap and fixedly connected to the cap, and the bottom section pier body is seated on the cap, thereby completing the installation of the bottom section pier body; after the installation of the bottom section pier body is completed, a layer of epoxy glue is applied to the upper surface of the bottom section pier body.

[0059] Next, hoist the other prefabricated segments one by one to the predetermined position, that is, above the steel frame, so that the reserved through hole of the prefabricated segment being installed is facing the steel frame, and the steel frame can pass through the prefabricated segment through the reserved through hole; lower the prefabricated segment along the steel frame and align and connect it with the prefabricated segment below. At the same time, after each prefabricated segment is installed, apply a layer of epoxy glue on the upper end surface of the prefabricated segment.

[0060] Next, when the length of the steel frame cannot meet the installation requirements of the next prefabricated segment, a section of the steel frame is connected above the steel frame, and concrete is poured into the reserved through holes of the prefabricated segment that has been installed.

[0061] Next, repeat the second and third steps above until the installation of the last prefabricated segment, i.e., the top pier body, is completed, and after the concrete pouring is completed, the installation of the prefabricated pier body is completed.

[0062] Through the prefabricated pier body installation method of the present application, during the installation process of the prefabricated pier body, the prefabricated pier body is divided into multiple prefabricated segments, and then the prefabricated segments are hoisted and installed section by section, making the installation of the prefabricated pier body more convenient; at the same time, for the prefabricated pier body with a smaller cross-section, its prefabricated segments can adopt solid prefabricated segments, and for the prefabricated pier body of a higher or larger span bridge, or the prefabricated pier body with a larger cross-section, its prefabricated segments can adopt hollow prefabricated segments, which can not only reduce the amount of material used, but also make the installation of the prefabricated pier body more convenient.

[0063] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A prefabricated pier body, characterized in that: Includes prefabricated segments and steel skeleton; The prefabricated segments include a top pier body, a bottom pier body and a segment pier body; One end of the steel frame is used to connect to the cap, and the other end of the steel frame extends along the first direction; There are multiple segmented pier bodies, and the bottom pier body, multiple segmented pier bodies and the top pier body are sequentially stacked on the cap along the first direction and connected to the steel frame; The prefabricated segment is formed with a reserved through hole extending along the first direction, and the steel frame passes through the prefabricated segment through the reserved through hole; The top section pier body and the segment pier body form a shear groove at one end facing the cap; The ends of the bottom section pier body and the segment pier body away from the cap form a shear key adapted to the shear groove; By arranging the shear key and the shear groove on the prefabricated segment, a bulge is formed around the reserved through hole of each prefabricated segment; The number of the reserved through holes on each of the prefabricated segments is multiple, and the multiple reserved through holes are distributed at intervals along the circumference of the prefabricated segment; There are multiple section steel frames, and the multiple section steel frames correspond one to one with the multiple reserved through holes.

2. The prefabricated pier body according to claim 1, characterized in that: It also includes a concrete layer; The concrete layer is filled between the reserved through hole and the corresponding steel frame, so that the prefabricated segment is connected to the steel frame.

3. The prefabricated pier shaft according to claim 1, characterized in that: It also includes an epoxy glue layer; the epoxy glue layer is arranged between any two adjacent prefabricated segments.

4. The prefabricated pier shaft according to claim 1, characterized in that: Each of the steel skeletons includes a plurality of segmental steels; the plurality of segmental steels are connected in sequence along the first direction.

5. The prefabricated pier according to claim 1, characterized in that: The prefabricated segment is a hollow pier body or a solid pier body.

6. The prefabricated pier shaft according to claim 1, characterized in that: The height of the bottom section pier body does not exceed 2m, and the heights of the segment pier body and the top section pier body are 3.5-5m.

7. A method for installing a prefabricated pier body, used for installing the prefabricated pier body according to any one of claims 1 to 6, characterized in that: The following steps are involved: Step 100, hoisting the first prefabricated segment to a predetermined installation position, inserting a steel frame into a reserved through hole of the first prefabricated segment, and connecting the lower end of the steel frame to the cap; applying epoxy glue on the upper surface of the first prefabricated segment; Step 200, hoisting the prefabricated segments to the predetermined positions one by one, and lowering the prefabricated segments along the steel frame; After completing the installation of a prefabricated segment, apply epoxy glue on the upper surface of the prefabricated segment; Step 300: When the length of the steel skeleton cannot meet the installation requirements of the next prefabricated segment, a section of steel skeleton is connected above the steel skeleton, and concrete is poured into the reserved through holes of the installed prefabricated segment; Step 400: repeat the above steps 200 and 300 until the installation of the last prefabricated segment is completed.