Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Whole-process monitoring and early warning method for urban construction project

A whole-process, engineering technology, applied in the field of urban construction projects, can solve problems such as manual supervision omissions, potential safety hazards of construction personnel, equipment damage, etc., to achieve the effect of avoiding potential safety hazards and improving the effect of monitoring and early warning

Pending Publication Date: 2020-11-13
襄阳微时间网络科技有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Aiming at the deficiencies of the prior art, the present invention provides a method for monitoring and early warning of the whole process of urban construction projects, which solves the problem of potential safety hazards caused by construction personnel leaving their posts privately during the construction of existing urban construction projects. The equipment is damaged, and there may be negligence in manual supervision

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Whole-process monitoring and early warning method for urban construction project
  • Whole-process monitoring and early warning method for urban construction project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0028] see Figure 1-2 , the embodiment of the present invention provides a technical solution: a method for monitoring and early warning of the whole process of urban construction projects. The module used for monitoring and early warning of the whole process includes: a camera unit 1, a central processing unit 2, a human figure recognition unit 3, and a setting value unit 4. Contrast unit 5, red line marking unit 6, imaging unit 7, first warning unit 8, proc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a whole-process monitoring and early warning method for an urban construction project. The method comprises the steps that S1, firstly, a video image in the urban constructionengineering process is obtained through a camera shooting unit, then analysis and processing are conducted through a central processing unit, and at the moment, video image data obtained through the camera shooting unit is used for recognizing the human shape in the video image through a human shape recognition unit. The invention discloses a whole-process monitoring and early warning method for an urban construction project. A camera shooting unit is arranged to shoot an urban construction engineering process; the set value unit and the video image are superposed; the matching comparison unitis compared with a set value; and the red line marking unit marks different positions of the comparison value by using red lines, the imaging unit performs imaging, and the first early warning unit gives an early warning, so that the potential safety hazard formed by equipment due to private departure of construction personnel can be effectively avoided, a response can be made at the first time,and the monitoring and early warning effects of urban construction engineering are greatly improved.

Description

technical field [0001] The invention relates to the technical field of urban construction engineering, in particular to a method for monitoring and early warning of the entire process of urban construction engineering. Background technique [0002] Urban construction is based on planning, and through construction projects, the urban living environment is transformed, and various material facilities in the urban system are constructed. The basic and staged work of the conditions is a special economic work with obvious process and periodicity; the construction project is carried out for the completion of various projects of new construction, reconstruction and expansion approved according to the law, and has a start and end date. , A specific process composed of a group of interrelated controlled activities that meet the specified requirements, including planning, survey, design, procurement, construction, trial operation, completion acceptance and handover, etc. [0003] Dur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06K9/00G06K9/62
CPCG06V40/103G06V20/52G06F18/22
Inventor 许满
Owner 襄阳微时间网络科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products