A steep slope pipeline installation device and a steep slope pipeline installation method
By designing a steep slope section pipeline installation device, and using self-weight and gravity acceleration to achieve pipeline installation, the problems of low installation efficiency, high cost and high construction difficulty in the existing technology are solved, and rapid and safe pipeline installation is achieved.
Patent Information
- Application Number
- CN202110086652.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-22
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2041-01-22
AI Technical Summary
The prior art is inefficient and labor-intensive when installing fiberglass sandwiched pipes and ball-grinding cast iron pipes, especially in steep slope environments, and construction is difficult.
A steep slope section pipeline installation device is designed, including steep slope and pipeline installation vehicle. The self-weight of the pipeline and pipeline installation vehicle and the gravity acceleration on the steep slope are used to realize the installation of the socket insertion bearing, reducing or eliminating the dependence on external forces.
It realizes rapid installation of pipelines in steep slope environments, reduces construction costs, improves construction efficiency, and has a simple structure and high safety.
Smart Images

Figure CN112721962B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pipeline installation, and in particular to a steep slope section pipeline installation device and a steep slope section pipeline installation method. Background Art
[0002] In current technology, a pipe includes a socket and a spigot. When installing two sections of pipe, the spigot of one section is installed into the socket of the other section, so as to complete the installation between the two sections of pipe. For the installation between pipes, especially for the installation of glass fiber reinforced plastic sand-filled pipes and ductile iron pipes, hand chain hoists and various simple gantries are generally used for installation. The docking between the socket and the spigot requires a lot of external force to complete the docking, which leads to low efficiency and high labor costs. In addition, in the environment of steep mountains, due to environmental restrictions, there is a problem of high construction difficulty. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a steep slope section pipeline installation device and a steep slope section pipeline installation method. The present invention is suitable for the installation of pipelines on steep slope sections. When the socket and the spigot are connected, no external force is required or only a small amount of external force is required. The spigot can be inserted into the socket by utilizing the dead weight of the pipeline and the pipeline installation device and the gravity acceleration on the steep slope to complete the installation between the pipelines. The present invention has the characteristics of low cost and high construction efficiency.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is:
[0005] A pipeline installation device for a steep slope section is provided, comprising a steep slope and a pipeline installation vehicle, wherein a track is arranged on the steep slope along the slope direction thereof, a wheel bracket is installed at the bottom of the pipeline installation vehicle, a wheel bracket is installed on the wheel bracket, the pipeline installation vehicle is movably installed on the track via the wheels, a pipeline bracket for placing pipelines is provided on the pipeline installation vehicle, a winch is provided on the steep slope at a position obliquely above the pipeline installation vehicle, the winch comprises a first rope, the first rope of the winch is connected to the pipeline installation vehicle, and the winch controls the pipeline installation vehicle to move up and down along the steep slope on the track.
[0006] As a further improvement of the present invention, the winch adopts a fixed single-drum slow winch, the load force of the winch is three times the load weight, and the bottom of the winch is fixed on the steep slope with expansion screws and anchor bars.
[0007] As a further improvement of the present invention, the steep slope is also provided with an emergency locking device at an obliquely upper position of the pipeline installation vehicle. The emergency locking device includes a second rope, which is connected to the pipeline installation vehicle. When the second rope suddenly accelerates, the emergency locking device can lock the second rope.
[0008] As a further improvement of the present invention, the emergency locking device further includes a belt reel, a ratchet mechanism, a control mechanism, an inertia disk and a sensitive mechanism.
[0009] As a further improvement of the present invention, it also includes a jack, and the pipe installation vehicle and the wheel bracket are connected together through the jack. One end of the jack is connected to the bottom of the pipe installation vehicle, and the other end is connected to the wheel bracket. The height adjustment of the pipe installation vehicle is achieved through the jack.
[0010] As a further improvement of the present invention, the jack and wheel bracket are installed on the front and rear sides of the pipe installation vehicle, the jack is movably connected to the bottom of the pipe installation vehicle, a fixed beam is installed between the front and rear wheel brackets, a spur rack is fixed to the front bottom of the pipe installation vehicle along its width direction, a gear bracket is fixed to the fixed beam at the position of the spur rack, a connected operating turntable and a gear group are installed on the gear bracket, the gear group is meshed with the spur rack, the operating turntable is used to rotate the gear group, and when the gear group rotates, the pipe installation vehicle is displaced left and right.
[0011] As a further improvement of the present invention, it also includes a sliding wheel and a bearing. The front bottom of the pipeline installation vehicle and the jack are connected together so that they can be horizontally moved left and right through the sliding wheel, and the rear bottom of the pipeline installation vehicle and the jack are rotatably connected together through the bearing.
[0012] As a further improvement of the present invention, the width of the wheel is 15 to 25 cm smaller than the track width.
[0013] As a further improvement of the present invention, at least two pipe supports are arranged along the length direction of the pipe installation vehicle, and the pipe supports are semicircular in shape to match the pipe; the pipe supports are provided with anti-slip pads or sponge pads on the contact surface with the pipe.
[0014] The method for installing a pipeline on a steep slope section using the above device includes placing a pipeline on a pipeline installation vehicle, installing another pipeline on the steep slope and diagonally below the pipeline installation vehicle, controlling the pipeline installation vehicle to move diagonally downward along the steep slope toward the other pipeline by a winch, and inserting the spigot of the pipeline into the socket of the other pipeline by utilizing the deadweight of the pipeline and the pipeline installation vehicle and the acceleration of gravity on the steep slope, thereby achieving installation between the pipelines.
[0015] The beneficial effects of the present invention are as follows: the present invention is applicable to steep slope sections, and utilizes the environmental factors of the steep slope to realize rapid installation between pipelines. The present invention has a simple structure, transforms the unfavorable factors of the steep slope into favorable factors, utilizes the deadweight of the pipeline and the pipeline installation device and the gravity acceleration on the steep slope, and can realize rapid installation between pipelines without the aid of external force or with only a small amount of external force, and has the characteristics of low cost and high construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0017] Figure 2 This is a schematic diagram of the side structure of the pipeline installation vehicle of the present invention;
[0018] Figure 3 This is a schematic diagram of the facade structure of the pipeline installation vehicle of the present invention;
[0019] Figure 4 This is a schematic diagram of the structure of the emergency locking device of the present invention;
[0020] Marking description: 1-steep slope, 11-track, 2-pipe installation vehicle, 21-wheel bracket, 22-wheel, 23-pipe bracket, 24-jack, 25-fixed beam, 26-gear bracket, 27-operating turntable, 28-gear set, 29-spur rack, 3-winch, 31-first rope, 4-pipe, 5-emergency locking device, 51-second rope, 52-reel, 53-ratchet mechanism, 54-control mechanism, 55-inertia disk, 56-sensitive mechanism. DETAILED DESCRIPTION
[0021] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0022] like Figure 1-3As shown, a steep slope pipeline installation device includes a steep slope 1 and a pipeline installation vehicle 2. A track 11 is arranged on the steep slope 1 along the slope direction. The track 11 is fixed with expansion screws and is detachable. The track 11 can be recycled, which is energy-saving and environmentally friendly with low cost. Wheel brackets 21 are respectively installed on the four corners on the front and rear sides of the bottom of the pipeline installation vehicle 2. Wheels 22 are installed on the wheel brackets 21. The pipeline installation vehicle 2 is movably installed on the track 11 through the wheels 22. The width of the wheels 22 is less than the width of the track 11 by 20 cm. A pipeline bracket 23 for placing the pipeline 4 is provided on the pipeline installation vehicle 2. Four pipeline brackets 23 are evenly distributed along the length direction of the pipeline installation vehicle 2. The pipeline bracket 23 is semicircular and compatible with the pipeline 4. The pipeline bracket 23 is provided with an anti-skid pad or a sponge pad on the contact surface with the pipeline 4. In this embodiment, a sponge pad is preferably used. The sponge pad is used to prevent the pipeline 4 from being worn when placed on the pipeline bracket 23. A winch 3 is installed on the steep slope 1 at an oblique position above the pipeline installation vehicle 2. The winch 3 is a fixed single-drum slow winch. The load capacity of the winch 3 is three times the load weight. The bottom of the winch 3 is fixed to the steep slope 1 with expansion screws and anchor bars. The winch 3 includes a first rope 31, which is connected to the pipeline installation vehicle 2. The winch 3 controls the pipeline installation vehicle 2 to move up and down along the steep slope 1 on the track 11.
[0023] When the pipeline is installed by using this device, the pipeline 4 is placed on the pipeline installation vehicle 2, and the other pipeline 41 is installed on the steep slope 1 and is located diagonally below the pipeline installation vehicle 2. The winch 3 controls the pipeline installation vehicle 2 to move diagonally downward along the steep slope 1 toward the other pipeline 41. By utilizing the dead weight of the pipeline 4 and the pipeline installation vehicle 2 and the gravity acceleration on the steep slope 1, the socket of the pipeline 4 can be inserted into the socket of the other pipeline 41 to achieve installation between the pipelines.
[0024] In order to ensure the safety of construction, an emergency locking device 5 is fixed on the steep slope 1 at a position obliquely above the pipeline installation vehicle 2 and adjacent to the winch 3. Figure 4 As shown, the emergency locking device 5 includes a second rope 51, a belt drum 52, a ratchet mechanism 53, a control mechanism 54, an inertia disk 55 and a sensitive mechanism 56. The load weight of the emergency locking device 5 is ten times the load weight. The second rope 51 of the emergency locking device 5 is connected to the pipeline installation vehicle 2. When the second rope 51 encounters an emergency situation such as the pipeline installation vehicle 2 derailing, the first rope 31 of the winch 3 breaking, etc., the inertia disk 55 will trigger the sensitive mechanism 56, and the ratchet mechanism 53 will lock the second rope 51. The second rope 51 is used to lock the pipeline installation vehicle 2 to prevent the pipeline installation vehicle 2 from colliding with the construction personnel, thereby ensuring construction safety.
[0025] During construction, there may be a situation where the positions of the sockets and sockets between the pipes 4 do not correspond. In order to ensure smooth docking between the pipes 4, it is necessary to adjust the positions of the sockets of the pipes 4 up and down and left and right. Therefore, the device is also provided with an adjustment mechanism, including height position adjustment and left and right position adjustment. The specific structure is as follows:
[0026] Height position adjustment: The pipe installation vehicle 2 and the wheel bracket 21 are connected together by a jack 24. One end of the jack 24 is connected to the bottom of the pipe installation vehicle 2, and the other end is connected to the wheel bracket 21. The height of the pipe installation vehicle 2 is adjusted by lifting the jack 24, thereby adjusting the height position of the socket of the pipe 4.
[0027] Left and right position adjustment: The front bottom of the pipe installation vehicle 2 is connected to the jack 24 so as to be movable horizontally left and right through a sliding wheel, and the rear bottom of the pipe installation vehicle 2 is connected to the jack 24 so as to be rotatable through a bearing. A fixed beam 25 is installed between the front and rear wheel brackets 21. A spur rack 29 is fixed to the front bottom of the pipe installation vehicle 2 along its width direction. A gear bracket 26 is fixed to the fixed beam 25 at the position of the spur rack 29. The gear bracket 26 is installed with a connected operating turntable 27 and a gear set 28. The gear set 28 is meshed with the spur rack 29. The operating turntable 27 has a locking structure. The operating turntable 27 can be rotated only when the operating turntable 27 is released. When the operating turntable 27 is rotated, the gear set 28 rotates accordingly. When the gear set 28 rotates, the front side of the pipe installation vehicle 2 is horizontally displaced left and right, and the rear side rotates, thereby adjusting the left and right position of the socket of the pipe 4.
[0028] The use of the above device for pipeline installation has the following advantages:
[0029] 1. Strong adaptability. It can adapt to the installation of pipelines 4 on various steep slopes 1, especially the installation of glass fiber reinforced plastic sand-filled pipes and ductile iron pipes. The width of the pipeline installation vehicle 2 can be changed to adapt to the installation of glass fiber reinforced plastic sand-filled pipes and ductile iron pipes of any diameter.
[0030] Second, the installation speed is fast. Except that manpower is required to fix the pipeline 4 to the pipeline installation vehicle 2 at the beginning, the rest of the process only requires adjusting the winch 3, the jack 24 and the operating turntable 27, and utilizing the deadweight of the pipeline 4 and the pipeline installation vehicle 2 and the gravity acceleration on the steep slope 1, without any external force or a small amount of external force, the spigot can be inserted into the socket to complete the installation of the pipeline 4.
[0031] 3. Less pipe wear. During the installation process, the pipe 4 will not collide or rub against other objects except when it is hung on the pipe installation vehicle 2 and fixed, thus avoiding pipe wear caused by multiple collisions and frictions. At the same time, a sponge pad is installed on the pipe bracket 23, which can effectively reduce pipe wear.
[0032] 4. High safety. Generally, the installation of large-volume glass fiber reinforced plastic sand-filled pipes and ductile iron pipes requires a lot of manpower, hand chain hoists, and various simple gantry frames for installation, which poses great safety hazards. However, this device can greatly reduce manual operations, and is equipped with an emergency locking device 5, which greatly guarantees the construction safety of construction workers.
[0033] The above embodiments are only used to illustrate the present invention and are not intended to limit the present invention in any form. Any person with ordinary knowledge in the technical field may make equivalent embodiments that are partially changed or modified by the technical contents disclosed in the present invention without departing from the scope of the technical features of the present invention, and the equivalent embodiments that do not depart from the technical features of the present invention are still within the scope of the technical features of the present invention.
Claims
1. A steep slope pipeline installation device, characterized in that: The invention comprises a steep slope and a pipeline installation vehicle, wherein a track is arranged on the steep slope along the slope direction thereof, a wheel bracket is arranged at the bottom of the pipeline installation vehicle, a wheel is arranged on the wheel bracket, the pipeline installation vehicle is movably installed on the track through the wheel, a pipeline bracket for placing pipelines is arranged on the pipeline installation vehicle, a winch is arranged at an oblique upper position of the pipeline installation vehicle on the steep slope, the winch comprises a first rope, the first rope of the winch is connected to the pipeline installation vehicle, and the winch controls the pipeline installation vehicle to move up and down along the steep slope on the track; and further comprises a jack, the pipeline installation vehicle and the wheel bracket are connected together through the jack, one end of the jack is connected to the At the bottom of the pipeline installation vehicle, the other end is connected to the wheel bracket, and the height adjustment of the pipeline installation vehicle is achieved through the jack; the jack and the wheel bracket are installed on the front and rear sides of the pipeline installation vehicle, the jack is movably connected to the bottom of the pipeline installation vehicle, and a fixed beam is installed between the front and rear wheel brackets. A spur rack is fixed to the bottom of the front side of the pipeline installation vehicle along its width direction, and a gear bracket is fixed to the fixed beam at the position of the spur rack, and a connected operating turntable and a gear set are installed on the gear bracket, the gear set is meshed with the spur rack, and the operating turntable is used to rotate the gear set. When the gear set rotates, the pipeline installation vehicle moves left and right.
2. A steep slope pipeline installation device according to claim 1, characterized in that: The winch adopts a fixed single-drum slow winch, the load force of the winch is three times the load weight, and the bottom of the winch is fixed on the steep slope by expansion screws and anchor bars.
3. The steep slope pipeline installation device according to claim 1, characterized in that: The steep slope is also provided with an emergency locking device at an obliquely upper position of the pipeline installation vehicle. The emergency locking device includes a second rope, and the second rope is connected to the pipeline installation vehicle. When the second rope suddenly accelerates, the emergency locking device can lock the second rope.
4. A steep slope pipeline installation device according to claim 3, characterized in that: The emergency locking device also includes a belt reel, a ratchet mechanism, a control mechanism, an inertia disk and a sensitive mechanism.
5. The steep slope pipeline installation device according to claim 1, characterized in that: It also includes a sliding wheel and a bearing. The front bottom of the pipeline installation vehicle and the jack are connected together so that they can be horizontally moved left and right through the sliding wheel, and the rear bottom of the pipeline installation vehicle and the jack are rotatably connected together through the bearing.
6. The steep slope pipeline installation device according to claim 1, characterized in that: The width of the wheel is 15 to 25 cm smaller than the track width.
7. The steep slope pipeline installation device according to claim 1, characterized in that: At least two pipe supports are arranged along the length direction of the pipe installation vehicle, and the pipe supports are in a semicircular shape adapted to the pipe; and the pipe supports are provided with anti-skid pads or sponge pads on the contact surface with the pipe.
8. A method for installing a steep slope pipeline using the device according to any one of claims 1 to 7, characterized in that: The pipeline is placed on the pipeline installation vehicle, and the other pipeline is installed on the steep slope and is located diagonally below the pipeline installation vehicle. The pipeline installation vehicle is controlled by a winch to move diagonally downward along the steep slope toward the other pipeline. The socket of the pipeline is inserted into the socket of the other pipeline by utilizing the dead weight of the pipeline and the pipeline installation vehicle and the gravity acceleration on the steep slope to achieve installation between the pipelines.
Citation Information
Patent Citations
Device for installing large-scale pipelines on steep-wall slope
CN108443580A
Pipeline mounting device for abrupt slope section
CN214450933U
Cited By
Slope section pressure steel pipe mounting method
CN120946854A
Method for installing a pressure steel pipe with a slope section
CN120946854B