A pipe laying device for oil well repair

By introducing the oil pipe lifting buffer chamber, length measuring mechanism and transfer mechanism into the oil well repair and drainage pipe device, the problem of low coordination efficiency of oil pipe lift and drainage pipe device in the prior art is solved, the working efficiency is improved, and the Measuring accuracy and pollution prevention, and automate oil pipe transfer.

CN113153185BActive Publication Date: 2024-11-22JINAN EVERSHINING CNC MACHINE
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202110591584.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-28
Publication Date
2024-11-22
Estimated Expiration
2041-05-28

Smart Images

  • Figure CN113153185B_ABST
    Figure CN113153185B_ABST
Patent Text Reader

Abstract

The invention discloses a pipe arrangement device for oil well repair, which comprises main supports on two sides, wherein the upper part of the main supports is provided with guide rails, the guide rails on the two sides are provided with cross beams movable along the guide rails, the main supports are fixed with first racks for moving the cross beams, the cross beams are provided with first oil pipe grabbing mechanisms movable up and down, and an oil pipe warehouse is provided between the main supports on the two sides, wherein the oil pipe lifting and lowering buffer warehouse is provided in front of the oil pipe warehouse between the main supports on the two sides, the oil pipe lifting and lowering buffer warehouse comprises a buffer warehouse support, a V-shaped oil pipe support frame is provided on the upper part of the buffer warehouse support, an oil pipe stopper is fixed on the lower end of the two side support arms of the oil pipe support frame, and a single oil pipe taking-out mechanism is provided on the two side support arms of the oil pipe support frame, and the single oil pipe taking-out mechanism comprises a first oil cylinder connected to the buffer warehouse support and a rotatable lifting arm connected to the first oil cylinder.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a petroleum well repair pipe arrangement device, belonging to the technical field of petroleum well repair engineering. Background Art

[0002] At present, in the process of oil well repair, the use of oil well repair pipe laying equipment to replace manual pipe laying not only has a high degree of mechanization, can save a lot of manpower and material resources, improve work efficiency, but also can greatly reduce the footprint of the oil pipeline.

[0003] A Chinese patent document with publication number CN105672913 A and titled "A Pipe Arranging Device for Oil Well Repair" discloses a pipe arranging device for oil well repair, which includes a main support, a guide rail and a slide bar that can move along the guide rail are provided above the main support, a moving rod parallel to the slide bar is provided below the slide bar, a lifting mechanism that can move horizontally along the slide bar is provided on the slide bar, the moving rod is connected to the lifting mechanism and can be lifted and lowered accordingly, an electro-permanent magnet is provided at the bottom of the moving rod, and the main support is a pipe discharge space. The pipe arranging device for oil well repair can grab the oil pipe through the electro-permanent magnet and then move it to arrange the oil pipe in the oil pipe discharge space in the main support in an orderly manner, or grab the oil pipe in the oil pipe discharge space through the electro-permanent magnet and then move it to the front side of the main support, so that other oil pipe lifting equipment can lower the oil pipe into the oil well. When the oil pipe transported to the front side of the main support is transported to the wellhead by the oil pipe lifter, the action rhythm between the oil pipe lifter and the pipe arranging device needs to be coordinated, and they need to wait for each other, which greatly reduces the work efficiency. Summary of the invention

[0004] In view of the above-mentioned defects existing in the prior art, the present invention provides a petroleum well repair pipe arrangement device which can improve the working efficiency.

[0005] The present invention is realized through the following technical scheme: an oil well repair pipe laying device comprises main supports on two sides, the upper part of the main supports is provided with guide rails, the guide rails on both sides are provided with cross beams that can move along the guide rails, the main supports are fixedly provided with a first rack for moving the cross beam, the cross beam is provided with a first oil pipe grabbing mechanism that can move up and down, and an oil pipe bin is arranged between the main supports on both sides, and the characteristic is that an oil pipe lifting and lowering cache bin is arranged in front of the oil pipe bin between the main supports on both sides, the oil pipe lifting and lowering cache bin comprises a cache bin bracket, a V-shaped oil pipe support frame is arranged on the upper part of the cache bin bracket, an oil pipe stopper is respectively fixed to the lower end of the two side support arms of the oil pipe support frame, and a single oil pipe removal mechanism is respectively arranged on the two side support arms of the oil pipe support frame, and the single oil pipe removal mechanism comprises a first oil cylinder connected to the cache bin bracket and a rotatable lifting arm connected to the first oil cylinder.

[0006] In the present invention, the area between the high end of the two side arms of the oil pipe support frame of the oil pipe lifting and lowering cache bin and the corresponding oil pipe block is an oil pipe buffer area, which are respectively an oil pipe lowering buffer area and an oil pipe lifting buffer area, and the oil pipes can be arranged and temporarily stored in the oil pipe buffer area. When the present invention is working, when the oil pipe is lowered into the oil well, the first oil pipe grabbing mechanism can grab the oil pipe and move it to the lower oil pipe position of the oil pipe lifting and lowering cache bin through the crossbeam along the guide rail on the main support, and lower the oil pipe to the lower oil pipe buffer area of ​​the oil pipe support frame. The lower oil pipe buffer area can store multiple oil pipes. When the oil pipe lifter in the front needs to take the oil pipe, the first oil cylinder of the single oil pipe removal mechanism on the lower oil pipe side drives the lifting arm to rotate upward, lifts the single oil pipe to make it pass over the oil pipe block, and then the oil pipe can be grabbed by the oil pipe lifter or other oil pipe grabbing mechanisms, reducing the waiting time. When the oil pipe is lifted from the oil well, the oil pipe lifting machine in the front can send the oil pipe lifted from the wellhead into the oil pipe lifting buffer area of ​​the oil pipe lifting buffer bin for arrangement and temporary storage. The first oil cylinder of the single oil pipe taking out mechanism on the oil pipe lifting side of the oil pipe lifting buffer bin is actuated, driving the lifting arm to rotate upward, lifting the single oil pipe so that it passes over the oil pipe block. After the first oil pipe grabbing mechanism of the pipe discharge device moves into position, grabs the oil pipe and then moves to the oil pipe bin position along the guide rail on the main bracket through the cross beam to lower the oil pipe and place it in order. Then the first oil pipe grabbing mechanism returns and continues to grab the oil pipe for discharge.

[0007] Furthermore, the oil pipe lifting and lowering buffer bin is provided with an oil pipe length measuring mechanism, through which the length of the lifted and lowered oil pipe can be measured.

[0008] Furthermore, the oil pipe length measuring mechanism includes a moving rod, a driving mechanism for driving the moving rod to move, and a displacement measuring encoder connected to the driving mechanism. The moving rod is arranged between the two arms of the oil pipe support frame, and a positioning block is arranged at one end of the moving rod. When lifting or lowering the oil pipe, the oil pipe is lifted by the single oil pipe taking-out mechanism, and then falls onto the oil pipe length measuring mechanism to measure the length of the oil pipe, and then the oil pipe grabbing mechanism grabs the measured oil pipe for pipe laying, or the oil pipe lifting machine or other oil pipe grabbing mechanisms grab the measured oil pipe for lowering the oil pipe. While measuring the length of the oil pipe, the oil pipe can be pushed to one end along the length direction for positioning.

[0009] Furthermore, the driving mechanism for driving the moving rod to move is a reducer, a gear is provided at the output end of the reducer, and a second rack is provided on the moving rod to mesh with the gear; or the driving mechanism for driving the moving rod to move is an oil cylinder or an air cylinder connected to the moving rod.

[0010] Furthermore, in order to facilitate reliable support of the oil pipe, the oil pipe lifting and lowering buffer bins are divided into two groups arranged at intervals.

[0011] Furthermore, to facilitate the transportation of the pipe arrangement device, the main support and the first rack are both foldable structures. After the main support and the first rack are folded, the pipe arrangement device can be placed in a transport vehicle for transportation.

[0012] Furthermore, in order to prevent the oil on the oil pipe from contaminating the arrangement area, at least a first ship-shaped cofferdam connected to the main brackets on both sides is provided at the lower part of the oil pipe lifting and lowering buffering bin, and the oil pipe lifting and lowering buffering bin is provided on the first ship-shaped cofferdam. The ship-shaped cofferdam can collect the oil on the oil pipe, and the oil pipe lifting and lowering buffering bin is provided on the first ship-shaped cofferdam to facilitate the positioning of the oil pipe lifting and lowering buffering bin and the installation of the equipment.

[0013] Furthermore, an oil pipe transfer mechanism is provided in front of the oil pipe lifting and lowering buffer bin, and the oil pipe transfer mechanism includes a transfer mechanism bracket, a rotating arm rotatably connected to the transfer mechanism bracket, and the rotating arm is a retractable structure. A second oil pipe grabbing mechanism is provided at the front end of the rotating arm. By providing the oil pipe transfer mechanism, the oil pipe lifting and lowering buffer bin can be connected to the oil pipe lifting machine, so as to realize the automation of oil pipe transfer. The second oil pipe grabbing mechanism can grab the oil pipe from the oil pipe lifting machine or from the oil pipe lifting and lowering buffer bin. After the second oil pipe grabbing mechanism grabs the oil pipe, the rotating arm can drive the oil pipe to rotate, and the oil pipe is transported to the oil pipe lifting machine or to the oil pipe lifting and lowering buffer bin.

[0014] Furthermore, the second oil pipe grabbing mechanism includes an oil pipe grabbing cylinder and two claws, the two claws are connected to the front end of the rotating arm through a rotating shaft, one end of the oil pipe grabbing cylinder is connected to the rotating arm, and the other end is connected to one of the claws, and meshing gears are installed on the rotating shafts of the two claws. When grabbing the oil pipe, the oil pipe grabbing cylinder is actuated to drive the claw connected to it to rotate, and the other claw is driven to rotate through the meshing transmission of the gears, so that the two claws clamp the oil pipe to achieve the grabbing of the oil pipe.

[0015] Furthermore, in order to facilitate the installation and positioning of the equipment and avoid oil pollution on the ground, a second ship-shaped cofferdam for installing the oil pipe lift is also provided in front of the oil pipe transfer mechanism, and the oil pipe transfer mechanism is provided at the rear end of the second ship-shaped cofferdam, and the second ship-shaped cofferdam and the first ship-shaped cofferdam are connected through a chassis. The oil pipe lift is installed on the second ship-shaped cofferdam, which can not only avoid oil pollution of the oil pipe on the ground, but also facilitate the installation and positioning of the oil pipe lift, and facilitate the rapid installation of the equipment.

[0016] The beneficial effects of the present invention are as follows: by providing an oil pipe lifting and lowering buffer bin, the present invention can temporarily store the oil pipe in the oil pipe lifting and lowering buffer bin, and the oil well repair pipe laying device and the oil pipe lifter can work independently without waiting for each other, which greatly improves the work efficiency. By providing an oil pipe length measuring mechanism on the oil pipe lifting and lowering buffer bin, the length of the oil pipe can be measured, and the measurement result is accurate, ensuring the accuracy of the oil pipe lifting and lowering operation. By providing a ship-shaped cofferdam, the pollution of the environment by oil pollution can be effectively prevented, and it is also convenient for the installation and positioning of the equipment. By providing an oil pipe transfer mechanism, the oil pipe lifting and lowering buffer bin can be connected to the oil pipe lifter, which is convenient for realizing the automation of the oil pipe transfer. By providing the main bracket and the first rack as a foldable structure, it can be convenient for transfer and transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the present invention in a specific implementation manner;

[0018] Figure 2 yes Figure 1 A top view schematic diagram of

[0019] Figure 3 yes Figure 1 A side view schematic diagram of

[0020] Figure 4 yes Figure 3 An enlarged schematic diagram of part E in FIG.

[0021] Figure 5 yes Figure 3 An enlarged schematic diagram of part F in FIG.

[0022] Figure 6 yes Figure 1 BB schematic diagram in;

[0023] Figure 7 yes Figure 2 AA schematic diagram in;

[0024] Figure 8 It is a front view of the tubing tripping buffer bin in the present invention in a specific implementation manner;

[0025] Fig. 9 yes Figure 8 A top view of

[0026] Fig.10 yes Figure 8 Side view of

[0027] Fig.11 2 is a schematic diagram of the structure of a single oil pipe removal mechanism in the present invention in a specific implementation manner;

[0028] Fig.12 yes Fig.11 A cross-sectional view of

[0029] Fig.13 yes Fig.11 A top view of

[0030] Fig.14 It is a schematic diagram of the action of a single oil pipe removal mechanism;

[0031] Fig.15 and Fig.16 is a schematic structural diagram of a first ship-shaped cofferdam in the present invention in a specific implementation manner;

[0032] Fig.17 is a structural schematic diagram of the oil pipe length measuring mechanism of the present invention in a specific implementation manner;

[0033] Fig.18 yes Fig.17 Side view of

[0034] Fig.19 yes Fig.17 Rear view of

[0035] Fig. 20 is a structural schematic diagram of the oil pipe transfer mechanism of the present invention in a specific implementation manner;

[0036] Fig.21 yes Fig. 20 A partial cross-sectional view of

[0037] Fig. 22 yes Fig. 20 A top view of

[0038] Fig.23 yes Fig. 20 Side view of

[0039] Fig.24 is a schematic diagram of the assembly of the tubing lift and the second ship-shaped cofferdam in a specific implementation manner;

[0040] Fig.25 is a schematic structural diagram of a foldable main support on one side of the present invention in a specific implementation manner;

[0041] Fig.26 yes Fig.25 Side view of

[0042] Fig. 27 yes Fig.25 A top view of

[0043] Fig.28 This is a schematic diagram of the main support when it is folded;

[0044] Fig.29 is a schematic diagram of the present invention in a folded transport state;

[0045] In the figure, 1, main support, 2, first oil pipe grabbing mechanism, 2-1, electropermanent magnet, 2-2, gear, 2-3, rack shaft, 2-4, connecting shaft, 3, oil pipe bin, 4, guide rail, 5, first ship-shaped cofferdam, 5-1, bottom cross arm of oil pipe, 6, oil pipe lowering cache bin, 6-1, cache bin support, 6-2, oil pipe support frame, 6-3, oil pipe block, 6-4, single oil pipe taking out mechanism, 6-4-1, first oil cylinder, 6-4-2, lifting arm, 6-5, oil pipe lifting cache area, 6-6, lower oil pipe cache area, 7, bottom frame, 8, second ship-shaped cofferdam, 9, oil pipe lifter, 10, oil pipe transfer mechanism, 10-1, transfer mechanism support Frame, 10-2, swivel arm, 10-3, swivel arm telescopic cylinder, 10-4, oil pipe grabbing cylinder, 10-5, claw, 10-6, gear A, 10-7, gear B, 10-8, rotating cylinder, 11, beam, 12, transmission shaft, 13, transmission gear, 14, first rack, 15, oil pipe length measuring mechanism, 15-1, moving rod, 15-2, positioning block, 15-3, second rack, 15-4, gear, 15-5, reducer, 15-6, displacement measuring encoder, 15-7, mounting frame, 15-8, gear, 16, oil pipe length measuring position, 17, oil pipe transfer mechanism mounting bracket, 18, folding mechanism. DETAILED DESCRIPTION

[0046] The present invention will be further described below by way of non-limiting embodiments and in conjunction with the accompanying drawings:

[0047] As shown in the attached drawings, a pipe arrangement device for oil well repair comprises main supports 1 on both sides, wherein the upper part of the main supports 1 is provided with guide rails 4, and the guide rails 4 on both sides are provided with crossbeams 11 movable along the guide rails 4, and the inner sides of the main supports 1 on both sides are fixed with first racks 14 arranged along the guide rails, and a rotatable transmission shaft 12 is arranged on the crossbeam 11, and the transmission shaft 12 is driven to rotate by a servo motor, and transmission gears 13 are respectively arranged at both ends of the transmission shaft 12 to mesh with the first rack 14 for transmission, and the crossbeam 11 moves along the guide rails 4 through the meshing transmission of the transmission gear 13 and the first rack 14. The crossbeam 11 is provided with a first oil pipe grabbing mechanism 2 movable up and down. The first oil pipe grabbing mechanism 2 can be moved up and down by the lifting mechanism arranged on the crossbeam 11. The lifting mechanism includes two vertically arranged rack shafts 2-3 with rack structures, two gears 2-2 respectively meshing with the rack shafts 2-3, and the gear shafts of the two gears 2-2 are respectively connected to the connecting shaft 2-4 through couplings. A servo motor is arranged at one of the gears 2-2 and connected to its gear shaft. The first oil pipe grabbing mechanism 2 is connected to the lower ends of the two rack shafts 2-3. The lower part of the first oil pipe grabbing mechanism 2 is connected to an electro-permanent magnet 2-1, and the electro-permanent magnet 2-1 is used to grab the oil pipe. The gear 2-2 is driven to rotate by the servo motor, thereby driving the two rack shafts 2-3 to drive the first oil pipe grabbing mechanism 2 to move up and down. An oil pipe bin 3 for discharging the oil pipe is arranged between the main brackets 1 on both sides. The above description part in this embodiment is the prior art. The improvement made by the present invention is that an oil pipe lifting and lowering buffer bin 6 is arranged in front of the oil pipe bin 3 between the main supports 1 on both sides, and the oil pipe lifting and lowering buffer bin 6 includes a buffer bin support 6-1, and a V-shaped oil pipe support frame 6-2 is arranged on the upper part of the buffer bin support 6-1, and an oil pipe stopper 6-3 is fixed on the lower end of the two side support arms of the oil pipe support frame 6-2, and a single oil pipe removal mechanism 6-4 is arranged on the two side support arms of the oil pipe support frame 6-2. Each single oil pipe removal mechanism 6-4 includes a first oil cylinder 6-4-1 and a lifting arm 6-4-2 connected to the first oil cylinder 6-4-1. The first oil cylinder 6-4-1 is connected to the buffer bin support 6-1 through a mounting frame, and the lifting arm 6-4-2 is connected to the mounting frame through a rotating shaft. When the first oil cylinder 6-4-1 is in motion, it can drive the lifting arm 6-4-2 to rotate.

[0048] In order to facilitate reliable support of the oil pipe, in this embodiment, the oil pipe lifting and lowering buffer bins 6 are divided into two groups arranged at intervals.

[0049] In order to facilitate the measurement of the length of the oil pipe, in this embodiment, an oil pipe length measuring mechanism 15 is provided on the oil pipe lifting and lowering buffer bin 6. The oil pipe length measuring mechanism 15 can adopt any structure capable of length measurement in the prior art. In this embodiment, the oil pipe length measuring mechanism 15 includes a moving rod 15-1, a driving mechanism for driving the moving rod 15-1 to move, and a displacement measuring encoder 15-6 connected to the driving mechanism. The moving rod 15-1 is installed on the buffer bin bracket 6-1 through a mounting frame 15-7. The moving rod 15-1 is arranged between the two arms of the oil pipe support frame 6-2, and a positioning block 15-2 is arranged at one end of the moving rod 15-1. In this embodiment, the driving mechanism for driving the moving rod 15-1 to move is a reducer 15-5, and the reducer 15-5 is mounted on a mounting frame 15-7. A gear 15-4 is provided at the output end of the reducer 15-5, and a gear 15-8 is also provided on the mounting frame 15-7. A second rack 15-3 is provided on the moving rod 15-1, and the gear 15-4 and the gear 15-8 are both meshed with the second rack 15-3, and the pull rope of the displacement measurement encoder 15-6 is connected to the gear shaft of the gear 15-8. When the reducer drives the gear to rotate, it pushes the second rack 15-3 to retract and retract, and the displacement measurement encoder 15-6 is used for measurement. The driving mechanism for driving the moving rod 15-1 to move in the present invention can also be an oil cylinder or an air cylinder connected to the moving rod 15-1, and one end of the displacement measurement encoder 15-6 is connected to the piston rod of the oil cylinder or the air cylinder. In order to adapt to the direction of the oil pipe lifting machine, in this embodiment, an oil pipe length measuring mechanism 15 is provided on both sets of oil pipe lifting and lowering buffer bins 6, so that the length can be measured at both ends of the oil pipe.

[0050] In order to avoid the oil pollution on the oil pipe from polluting the environment and to facilitate the installation and positioning of the equipment, it is preferred that at least a first ship-shaped cofferdam 5 connected to the main brackets 1 on both sides is provided at the lower part of the oil pipe lifting and lowering buffer warehouse 6, and the oil pipe lifting and lowering buffer warehouse 6 is provided on the first ship-shaped cofferdam 5. The ship-shaped cofferdam 5 is a ship-shaped cofferdam structure made of steel, and its bottom is closed, which can hold the oil pollution on the oil pipe. The oil pipe lifting and lowering buffer warehouse 6 is arranged on the first ship-shaped cofferdam 5 to facilitate the positioning of the oil pipe lifting and lowering buffer warehouse 6 and facilitate the installation of the equipment. In the present invention, in addition to the first ship-shaped cofferdam 5 being provided at the lower part of the oil pipe lifting and lowering buffer warehouse 6, a ship-shaped cofferdam can also be provided at the lower part of the oil pipe warehouse 3 to hold the oil pollution. The ship-shaped cofferdam provided at the lower part of the oil pipe warehouse 3 is provided with a bottom cross arm 5-1 of the oil pipe. The ship-shaped cofferdam provided at the lower part of the oil pipe warehouse 3 can be connected to the main bracket 1, or it can be provided separately without being connected to the main bracket 1.

[0051] In order to facilitate the automation of oil pipe transfer, the present invention is also provided with an oil pipe transfer mechanism 10 in front of the oil pipe lifting and lowering buffer bin 6, the oil pipe transfer mechanism 10 includes a transfer mechanism bracket 10-1, a swing arm 10-2, and a rotating cylinder 10-8, the rotating cylinder 10-8 is connected to one end of the swing arm 10-2, the rotating cylinder 10-8 is installed on the transfer mechanism bracket 10-1, and the rotating cylinder 10-8 can drive the swing arm 10-2 to rotate. The swing arm 10-2 adopts a sleeve structure and is a telescopic structure. The front end of the swing arm 10-2 is connected to the piston rod of the swing arm telescopic cylinder 10-3, and the rear end of the swing arm telescopic cylinder 10-3 is connected to the rear end of the swing arm 10-2. The swing arm 10-2 can be extended and retracted by the telescopic cylinder 10-3. The front end of the swing arm 10-2 is provided with a second oil pipe grabbing mechanism. The second oil pipe grabbing mechanism includes an oil pipe grabbing cylinder 10-4 and two claws 10-5. The two claws 10-5 are connected to the front end of the swing arm 10-2 through a rotating shaft. One end of the oil pipe grabbing cylinder 10-4 is connected to the swing arm 10-2, and the other end is connected to one of the claws 10-5. The rotating shafts of the two claws 10-5 are respectively installed with meshing gears 10-6 and 10-7. When the oil pipe grabbing cylinder 10-4 is in motion, it drives the claw connected to it to rotate, and through the meshing transmission of the gear 10-6 and the gear 10-7, it drives the other claw to rotate. When the two claws are close together, the oil pipe can be grabbed. After the second oil pipe grabbing mechanism grabs the oil pipe, the rotating arm is driven to rotate by the rotating cylinder, which can drive the oil pipe to rotate and transport the oil pipe to the oil pipe lift 9 or to the oil pipe lifting and lowering buffer 6.

[0052] In order to facilitate the installation and positioning of the equipment and avoid oil pollution on the ground, the present invention also provides a second ship-shaped cofferdam 8 for installing the oil pipe lift 9 in front of the oil pipe transfer mechanism 10. The second ship-shaped cofferdam 8 is also a ship-shaped cofferdam structure made of steel, and its bottom is closed to contain oil pollution. The second ship-shaped cofferdam 8 and the first ship-shaped cofferdam 5 can be connected through the base frame 7. The oil pipe transfer mechanism 10 is arranged at the rear end of the second ship-shaped cofferdam 8. In order to facilitate the installation of the equipment, an oil pipe transfer mechanism mounting bracket 17 is provided at the rear end of the second ship-shaped cofferdam 8. The oil pipe transfer mechanism 10 is installed on the oil pipe transfer mechanism mounting bracket 17. The oil pipe lift 9 is installed on the second ship-shaped cofferdam 8, which can not only prevent the oil pollution of the oil pipe from polluting the ground, but also facilitate the installation and positioning of the oil pipe lift 9, and facilitate the rapid installation of the equipment.

[0053] In order to facilitate the transfer and transportation of the equipment, the present invention can design the main support 1 and the first rack 14 as a foldable structure. The main support 1 is divided into a fixed part and a foldable part, and the fixed part and the foldable part are connected by a folding mechanism 18, and the foldable part can be rotated and folded by the folding mechanism 18.

[0054] In the present invention, the oil pipe buffer area is between the high end of the two side arms of the oil pipe support frame 6-2 of the oil pipe lifting and lowering buffer warehouse 6 and the corresponding oil pipe block 6-3, which are the lower oil pipe buffer area 6-6 and the lifting oil pipe buffer area 6-5 respectively. The oil pipes can be arranged and temporarily stored in the oil pipe buffer area.

[0055] When the present invention is working, action 1: lowering the oil pipe into the oil well

[0056] The oil pipe is stored in the oil pipe bin 3. The first oil pipe grabbing mechanism 2 moves downward under the drive of the lifting mechanism to grab the oil pipe. After grabbing the oil pipe, it moves upward to the set position. The servo motor on the crossbeam 11 drives the transmission shaft 12 and the transmission gear 13 to rotate, thereby driving the crossbeam 11, the first oil pipe grabbing mechanism 2, and the oil pipe to move along the guide rail 4 on the main bracket to the lower oil pipe position of the oil pipe lifting and lowering buffer bin 6, and lowering the oil pipe to the lower oil pipe buffer area 6-6 of the oil pipe support frame 6-2. The first oil pipe grabbing mechanism 2 returns to the oil pipe bin 3 to continue grabbing the oil pipe. The lower oil pipe buffer area 6-6 can store multiple oil pipes. When the oil pipe lift 9 in front needs to take out the oil pipe, the first cylinder 6-4-1 of the single oil pipe removal mechanism 6-4 on the lower oil pipe side drives the lifting arm 6-4-2 to rotate upward, lifts the single oil pipe, and passes over the oil pipe block 6-3 on this side. Under the action of gravity, the oil pipe moves downward along the slope of the oil pipe block to the oil pipe length measuring position 16, and the oil pipe length measuring mechanism 15 measures the length of the oil pipe. While measuring the length of the oil pipe, the oil pipe is pushed to one end along the length direction to position it to adapt to the oil pipe lift to transport the oil pipe to the wellhead.

[0057] After the tubing lift 9 has transported the tubing to the wellhead, it returns to the starting position, sends a signal and waits. The tubing transfer mechanism 10 grabs the tubing from the tubing length measuring position 16 through the second tubing grabbing mechanism, rotates the tubing to the tubing lift 9 through the rotating cylinder 10-8, returns to the tubing grabbing position and waits. The tubing lift 9 transports the tubing to the wellhead, and the single tubing removal mechanism 6-4 in the tubing lifting and lowering buffer bin 6 continues to take out the tubing to measure the length, waiting for the signal from the tubing lift 9.

[0058] Action 2: Pulling the oil pipe from the oil well

[0059] The tubing lift 9 retrieves the tubing from the wellhead workover rig, the tubing transfer mechanism 10 grabs the tubing from the tubing lift 9 through the second tubing grabbing mechanism, and rotates the tubing to the tubing lifting buffer area 6-5 of the tubing lifting and lowering buffer bin 6 through the rotating cylinder 10-8. Under the action of gravity, the tubing moves downward along the slope of the tubing support frame to be arranged in the tubing lifting buffer area, and a number of tubings can be stored in the tubing lifting buffer area 6-5.

[0060] The first oil cylinder 6-4-1 of the single oil pipe removal mechanism 6-4 on the oil pipe lifting side in the oil pipe lifting and lowering buffer bin 6 extends out to drive the lifting arm 6-4-2 to rotate upward, lift the single oil pipe, and pass over the oil pipe block 6-3 on this side. Under the action of gravity, the oil pipe moves downward along the slope of the oil pipe block to the oil pipe length measuring position 16. The oil pipe length measuring mechanism 15 measures the length of the oil pipe and aligns one end of the oil pipe as needed. The first oil pipe grabbing mechanism 2 moves above the oil pipe length measuring position 16, moves downward to grab the oil pipe, and moves upward to the set position after grabbing the oil pipe. The crossbeam 11, driven by its driving mechanism, drives the first oil pipe grabbing mechanism 2 and the oil pipe to move to the oil pipe bin 3. The first oil pipe grabbing mechanism 2 moves downward to put down the oil pipe, returns to the top of the oil pipe length measuring position 16, continues to grab the oil pipe whose length has been measured, and realizes automatic arrangement of the oil pipe in the oil pipe bin.

[0061] The other parts of this embodiment are all prior art and will not be described in detail here.

Claims

1. A pipe arrangement device for oil well repair, comprising main supports (1) on both sides, wherein the upper part of the main supports (1) is provided with a guide rail (4), and the guide rails (4) on both sides are provided with a crossbeam (11) that can move along the guide rail (4), and the main supports (1) are fixed with a first rack (14) for moving the crossbeam (11), and the crossbeam (11) is provided with a first oil pipe grabbing mechanism (2) that can move up and down, and an oil pipe warehouse (3) is provided between the main supports (1) on both sides, wherein the device is characterized in that: An oil pipe lifting and lowering buffer bin (6) is arranged in front of the oil pipe bin (3) between the main supports (1) on both sides, and the oil pipe lifting and lowering buffer bin (6) comprises a buffer bin support (6-1), and a V-shaped oil pipe support frame (6-2) is arranged on the upper part of the buffer bin support (6-1), and an oil pipe stopper (6-3) is fixed on the lower end of the two side support arms of the oil pipe support frame (6-2), and a single oil pipe removal mechanism (6-4) is arranged on the two side support arms of the oil pipe support frame (6-2), and the single oil pipe removal mechanism (6-4) comprises a first oil cylinder (6-4-1) connected to the buffer bin support (6-1) and a rotatable lifting arm (6-4-2) connected to the first oil cylinder (6-4-1).

2. The oil well repair pipe arrangement device according to claim 1 is characterized in that: The oil pipe lifting and lowering buffer bin (6) is provided with an oil pipe length measuring mechanism (15).

3. The oil well repair pipe arrangement device according to claim 2 is characterized in that: The oil pipe length measuring mechanism (15) comprises a moving rod (15-1), a driving mechanism for driving the moving rod (15-1) to move, and a displacement measuring encoder connected to the driving mechanism; the moving rod (15-1) is arranged between two arms of the oil pipe supporting frame (6-2); and a positioning block (15-2) is arranged at one end of the moving rod (15-1).

4. The oil well repair pipe arrangement device according to claim 3 is characterized in that: The driving mechanism for driving the moving rod (15-1) to move is a reducer, a gear is provided at the output end of the reducer, and a second rack (15-3) is provided on the moving rod (15-1) to mesh with the gear; or the driving mechanism for driving the moving rod (15-1) to move is an oil cylinder or an air cylinder connected to the moving rod (15-1).

5. The oil well repair pipe arrangement device according to claim 3 is characterized by: The oil pipe lifting and lowering buffer bins (6) are divided into two groups arranged at intervals.

6. The oil well repair pipe arrangement device according to claim 1 is characterized in that: The main support (1) and the first rack (14) are both foldable structures.

7. The oil well repair pipe arrangement device according to claim 1, 2, 3, 4, 5 or 6, characterized in that: A first ship-shaped cofferdam (5) connected to the main supports (1) on both sides is provided at least at the lower part of the oil pipe lifting and lowering buffer chamber (6), and the oil pipe lifting and lowering buffer chamber (6) is provided on the first ship-shaped cofferdam (5).

8. The oil well repair pipe arrangement device according to claim 7 is characterized in that: An oil pipe transfer mechanism (10) is arranged in front of the oil pipe lifting and lowering buffer bin (6), and the oil pipe transfer mechanism (10) comprises a transfer mechanism bracket (10-1), and a rotating arm (10-2) rotatably connected to the transfer mechanism bracket (10-1), the rotating arm (10-2) is a telescopic structure, and a second oil pipe grabbing mechanism is arranged at the front end of the rotating arm (10-2).

9. The oil well repair pipe arrangement device according to claim 8, characterized in that: The second oil pipe grabbing mechanism comprises an oil pipe grabbing cylinder (10-4) and two claws (10-5). The two claws (10-5) are connected to the front end of the rotating arm (10-2) via a rotating shaft. One end of the oil pipe grabbing cylinder (10-4) is connected to the rotating arm (10-2), and the other end is connected to one of the claws (10-5). Meshing gears are installed on the rotating shafts of the two claws (10-5).

10. The oil well repair pipe arrangement device according to claim 8, characterized in that: A second ship-shaped cofferdam (8) for installing an oil pipe lifting machine (9) is also arranged in front of the oil pipe transfer mechanism (10); the oil pipe transfer mechanism (10) is arranged at the rear end of the second ship-shaped cofferdam (8); and the second ship-shaped cofferdam (8) and the first ship-shaped cofferdam (5) are connected via a base frame (7).

Citation Information

Patent Citations

  • Petroleum workover pipe arranging device

    CN105672913A

  • Full-automatic intelligent hydraulic workover rig

    CN105672908A

  • Petroleum well repair pipe arrangement device

    CN214886922U

  • Automatic auxiliary workover rig

    US20170314346A1

  • Pipe racking and transfer assembly

    US3501027A