Project progress visual management method and system
A visual management and progress technology, applied in the field of project management, can solve the problems of economic loss, real-time progress detection lag, project progress loss, etc., to improve the accuracy, predict the completion period and the number of remaining construction projects accurately, and reduce the difficulty of convergence. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] This embodiment provides a method for project progress visual management, specifically:
[0026] 1) Obtain the engineering data of each construction area at the current moment, and the engineering data includes the number of construction personnel, the expected completion period, and the number of remaining construction items; project.
[0027] 2) Predict the engineering data of each construction area in the future; among them, predict the future according to the key point map of the construction personnel at the current time, the key point map of the construction personnel in the future, and the expected completion period and the number of remaining construction projects of each construction area at the current time The estimated completion period and the number of remaining construction projects of each construction area at the moment; specifically, the key point map input map encoder of the construction personnel at the current moment, the estimated completion period...
Embodiment 2
[0046] Based on the same inventive concept as the above-mentioned method embodiment, this embodiment provides a project progress visual management system, the system includes a project data prediction module and a progress abnormal supervision module, specifically:
[0047] The engineering data prediction module is used to predict the engineering data of each construction area in the future. The engineering data includes the number of construction personnel, the expected completion period, and the number of remaining construction projects; wherein, according to the key point map of the construction personnel at the current moment, the construction personnel at the future time The key point map of , as well as the expected completion period of each construction area at the current moment, and the number of remaining construction items predict the expected completion period and number of remaining construction items of each construction area at the future time;
[0048] Specifica...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com