Material conveying device and conveying method for construction site

By using the clamping structure of L-shaped support plates and guide components in the material transport device, the problems of unstable transportation and high labor intensity of steel pipes in the prior art are solved, and the stable arrangement and labor-saving laying of steel pipes are achieved.

CN118850158BActive Publication Date: 2024-11-22LONGZHAN CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411359452.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-11-22
Estimated Expiration
2044-09-27

AI Technical Summary

Technical Problem

When transporting steel pipes, existing material transport devices require staff to lift and place them one by one, and the unplanar structure of the steel pipes leads to lift and placement when laying the upper steel pipes, which increases labor intensity and transportation instability.

Method used

A material transport device including an L-shaped support plate, storage frame and guide assembly is designed. Through the clamping structure of the guide block and the connecting block, the steel pipes are ensured to be stable in the support plate and plane rolling, avoid relative movement, and pass through the guide. The combination of strips and convex strips achieves stable locking and labor-saving laying of steel pipes.

Benefits of technology

The stable arrangement and planar laying of steel pipes during transportation is achieved, which reduces labor intensity, avoids shaking of steel pipes, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118850158B_ABST
    Figure CN118850158B_ABST
Patent Text Reader

Abstract

The present invention discloses a material conveying device and a conveying method for a construction site, belonging to the technical field of material conveying devices, wherein the material conveying device for a construction site comprises an L-shaped support plate, the L-shaped support plate having a horizontal portion and a vertical portion, a storage frame is arranged above the horizontal portion, a plurality of guide components are arranged in the storage frame along the vertical direction, the guide components comprise a guide block and a connecting block matched with the guide block, the bottom end surfaces of the guide block and the connecting block are both arranged as arc surfaces; by means of the provided guide block and the connecting block, when a steel pipe rolls on the support plate, the connecting block and the guide block can be placed above the steel pipe and clamped with each other, in addition, when two adjacent steel pipes are abutted against each other, the two steel pipes can be limited by the cooperation of the guide block and the connecting block between the two adjacent steel pipes to avoid relative movement of the two steel pipes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of material conveying devices, and in particular to a material conveying device and a conveying method for a construction site. Background Art

[0002] During the construction of steel structure buildings and stage trusses, building components are usually placed in fixed storage points, which are some distance away from the construction site. At this time, a transport vehicle is needed to transport the building components.

[0003] Chinese patent CN220924231U discloses a transport device for steel structures in construction. Step grooves are arranged on the surface of the pallet. The cross-sections of the step grooves can match the I-beams, round steel columns, and steel pipes respectively. Two step grooves can carry trusses. The pallets can be stacked. Users can stack different layers of pallets according to their actual needs. Each layer of pallets can be loaded with different steel structure parts.

[0004] The above-mentioned device transports steel pipes by arranging a variety of troughs on a pallet. However, in actual use, workers are required to lift the steel pipes onto the pallet one by one. In addition, when the steel pipes are placed on the troughs, there is not a planar structure between two adjacent steel pipes. Therefore, when laying the upper steel pipes, workers are still required to lift the steel pipes to a higher position for stacking. In summary, the above-mentioned device still has room for improvement.

[0005] Therefore, it is necessary to provide a material transport device and a material transport method for use at a construction site to solve the above technical problems. Summary of the invention

[0006] The object of the present invention is to provide a material conveying device and a conveying method for a construction site, so as to solve the problem that the existing device proposed in the above-mentioned background technology transports steel pipes by arranging a variety of troughs on a pallet, but in actual use, workers are required to lift the steel pipes onto the pallet one by one. In addition, when the steel pipes are placed on the troughs, there is not a planar structure between two adjacent steel pipes. Therefore, when laying the upper steel pipes, workers are still required to lift the steel pipes to a higher position for stacking.

[0007] Based on the above ideas, the present invention provides the following technical solutions: a material conveying device for a construction site, comprising an L-shaped support plate, the L-shaped support plate having a horizontal portion and a vertical portion, a storage frame being arranged above the horizontal portion, a plurality of guide assemblies being arranged in the storage frame along a vertical direction, the guide assemblies comprising a guide block and a connecting block matched with the guide block, the bottom end surfaces of the guide block and the connecting block being both arranged as arc surfaces;

[0008] When the steel pipe rolls to the side of the guide block at the bottom of the storage frame, the rolling steel pipe can drive the guide block to slide in the horizontal direction and staggered with the connecting block above the guide block, so that the connecting block moves downward and falls to the top of the steel pipe. During this process, the connecting block and the guide block are engaged, and the connecting block is flush with the top end surface of the guide block. When two adjacent steel pipes are close to each other, the guide block and the connecting block between the two adjacent steel pipes will be engaged with each other.

[0009] As a further solution of the present invention: guide strips are provided on both sides of the bottom of the storage frame, and convex strips matching the guide strips are elastically installed on both sides of the guide block. When the guide block falls to the bottom of the storage frame, the convex strips can pop out and be placed above the guide strips.

[0010] As a further solution of the present invention: a plug-in block is fixedly arranged on one side surface of the connecting block close to the vertical portion, and a slot matching with the plug-in block is opened on one side surface of the guide block away from the vertical portion, and the cross-sections of the plug-in block and the slot are both set to be T-shaped, and the top end of the slot extends to the top end surface of the guide block.

[0011] As a further solution of the present invention: an L-shaped limit groove is provided on the side of the connecting block away from the vertical part, a limit block is fixedly arranged on a side of the guide block close to the vertical part, a clamping block is elastically installed on one side of the limit block, and an inclined surface is provided at one end of the clamping block away from the limit block. When the two steel pipes gradually approach each other on the support plate, the guide block on one of the steel pipes will fit with the connecting block on the other steel pipe. During this process, the limit block and the clamping block will be inserted into the limit groove.

[0012] As a further solution of the present invention: a slot is provided on the inner side surface of the vertical portion, and the cross section of the slot is set to be L-shaped.

[0013] As a further solution of the present invention: a plug hole connected to the card slot is provided on the side surface of the vertical portion of the support plate.

[0014] As a further solution of the present invention: a side panel is fixedly provided on the inner side surface of the vertical portion, and the side panel is located on the outer side of the storage frame. A slide plate is fixedly provided on a side of the storage frame close to the side panel, and a sliding groove is provided on the outer side surface of the slide plate. A sliding bar that slides in cooperation with the sliding groove is fixedly provided on the side panel, and the cross-sections of the sliding bar and the sliding groove are both set to be T-shaped.

[0015] As a further solution of the present invention: the limit block is provided with a groove which is slidably matched with the clamping block, and a first spring is fixedly arranged between the inner end surface of the groove and the clamping block.

[0016] As a further solution of the present invention: the arc surface on the guide block is located on a side of the guide block away from the vertical portion, and the arc surface on the connecting block is located on a side of the connecting block close to the vertical portion.

[0017] A method for transporting materials using the material transport device for construction sites, comprising the following steps: placing a steel pipe on a support plate, pushing the steel pipe to the bottom of a storage frame so that the steel pipe contacts the arc surface on a guide block; when the guide block is offset from the upper connecting block, the connecting block can fall onto the steel pipe and connect with the guide block on one side; when the two steel pipes are close to each other, the guide block and the connecting block between the two steel pipes are engaged with each other; when the steel pipe at the head end is pushed to move to the vertical portion, the guide block on one side of the steel pipe at the head end will be engaged with the vertical portion.

[0018] Compared with the prior art, the beneficial effects of the present invention are as follows: this device, through the provision of guide blocks and connecting blocks, when the steel pipe rolls on the support plate, the connecting blocks and guide blocks can be placed above the steel pipe and clamped with each other, and in addition, when two adjacent steel pipes are abutted against each other, the cooperation of the guide blocks and the connecting blocks between the two adjacent steel pipes can limit the two steel pipes to avoid relative movement of the two steel pipes, and the cooperation of the guide blocks and the vertical part allows the steel pipe at the head end to be locked on one side of the vertical part, so that multiple steel pipes can be stably arranged on the support plate, avoiding the shaking of the steel pipes during transportation, and in addition, when laying the upper steel pipe, the steel pipe can roll on the plane formed by multiple guide blocks and connecting blocks, so that the overall laying process is more labor-saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments:

[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0021] Figure 2 It is a three-dimensional structural schematic diagram of the present invention;

[0022] Figure 3 It is a schematic diagram of the support plate structure of the present invention;

[0023] Figure 4 It is a schematic diagram of the cooperation between the convex strip and the guide strip of the present invention;

[0024] Figure 5 It is a schematic diagram of the guide block and the connecting block structure of the present invention;

[0025] Figure 6 It is a schematic diagram of the card block structure of the present invention;

[0026] Figure 7 It is a usage scenario diagram of the present invention;

[0027] Figure 8 It is a schematic diagram of the positions of the guide block and the connecting block when two steel pipes are fitted together according to the present invention;

[0028] Fig. 9 It is a schematic diagram of the cooperation between a larger-sized steel pipe, a connecting block and a guide block of the present invention;

[0029] Fig.10 The present invention Figure 3 A schematic diagram of the enlarged structure at point A;

[0030] Fig.11 It is a schematic diagram of the cooperation between the convex strip and the guide block of the present invention;

[0031] Fig.12 is a distribution diagram of positioning holes of the present invention;

[0032] Fig.13 It is a schematic diagram of the support rod structure of the present invention;

[0033] Fig.14 The present invention Figure 3 Schematic diagram of the enlarged structure at B.

[0034] In the figure: 1, support plate; 101, socket; 102, card slot; 103, horizontal part; 104, vertical part; 2, steel pipe; 3, inclined plate; 4, cushion block; 5, storage frame; 6, side plate; 7, traction rope; 8, crossbeam; 9, slide plate; 10, guide strip; 11, guide block; 1101, convex strip; 1102, slot; 1103, limit block; 12, connecting block; 1201, plug-in block; 1202, limit slot; 13, card block; 1301, inclined plane; 14, slide bar; 15, reel; 1501, positioning hole; 16, rotating shaft; 17, support rod. DETAILED DESCRIPTION

[0035] like Figure 1-Figure 5 As shown, a material conveying device and a conveying method for a construction site include an L-shaped support plate 1, the L-shaped support plate 1 has a horizontal portion 103 and a vertical portion 104, a storage frame 5 is arranged above the horizontal portion 103, and a plurality of guide components are arranged in the storage frame 5 along the vertical direction, the guide component includes a guide block 11 and a connecting block 12 matched with the guide block 11, and the guide block 11 and the connecting block 12 can be made of aluminum alloy or other materials, refer to Figure 4As shown, the guide block 11 is located below the connecting block 12, and the bottom end surfaces of the guide block 11 and the connecting block 12 are both configured as arc surfaces. Specifically, the arc surface on the guide block 11 is located on the side of the guide block 11 away from the vertical portion 104, while the arc surface on the connecting block 12 is located on the side of the connecting block 12 close to the vertical portion 104. In the initial state, the guide block 11 at the bottom is placed outside the storage frame 5 and can slide in the horizontal direction relative to the storage frame 5. In actual use, the steel pipe 2 to be transported is pushed onto the support plate 1. When the tube 2 rolls to the side of the guide block 11 at the bottom of the storage frame 5, the rolling steel tube 2 can drive the guide block 11 to slide in the horizontal direction, so that the guide block 11 is staggered with the connecting block 12 above and adjacent to it. At this time, the connecting block 12 will move downward and gradually fall to the top of the steel tube 2. In this process, the connecting block 12 will be engaged with the guide block 11, so that the connecting block 12 and the guide block 11 are stably placed on the top of the steel tube 2. In this state, the top end surfaces of the connecting block 12 and the guide block 11 are flush. Figure 7-Figure 8 As shown, when another steel pipe 2 is pushed above the support plate 1, the second guide block 11 from bottom to top in the storage frame 5 will fall to the bottom of the storage frame 5, so that the steel pipe 2 can drive the guide block 11 to move in the horizontal direction during the rolling process on the top of the support plate 1, referring to Figure 8 As shown, the guide block 11 and the connecting block 12 between two adjacent steel pipes 2 in the horizontal direction will be mutually engaged. In addition, when the steel pipe 2 at the head end moves to the vertical portion 104 of the support plate 1, the guide block 11 on one side of the steel pipe 2 will be connected to the vertical portion 104 on the support plate 1. At this time, the neatly arranged multiple steel pipes 2 are stably placed on the support plate 1, which is conducive to the transportation of the steel pipes 2. Figure 8 As shown, since the top end surfaces of the guide block 11 and the connecting block 12 above the steel pipe 2 are flush with each other, during the process of laying the second layer of steel pipes 2, the steel pipes 2 can roll on the top surfaces of the connecting block 12 and the guide block 11, so that there is no need to lift the steel pipes 2 during the arrangement of the upper layer of steel pipes 2, making it easier to arrange the steel pipes 2.

[0036] like Figure 2-Figure 9 As shown, guide bars 10 are provided on both sides of the bottom of the storage frame 5. The guide bars 10 can be made of steel. In actual use, a steel wire rope can be fixedly provided between the end of the guide bar 10 away from the storage frame 5 and the storage frame 5 to improve the structural strength of the guide bar 10. The guide bar 10 can move relative to the storage frame 5. Raised strips 1101 cooperating with the guide bar 10 are elastically installed on both sides of the guide block 11. When the guide block 11 falls to the bottom of the storage frame 5, the raised strip 1101 can pop out and be placed above the guide bar 10. At this time, the guide block 11 can be supported by the guide bar 10, and the guide block 11 can slide along the length direction of the guide bar 10.

[0037] In order to enable the connecting block 12 to cooperate with the guide block 11 on one side thereof when falling to the top of the steel pipe 2, in this scheme, a plug-in block 1201 is fixedly provided on one side surface of the connecting block 12 close to the vertical portion 104, and a slot 1102 cooperating with the plug-in block 1201 is provided on the side surface of the guide block 11 away from the vertical portion 104. The cross-sections of the plug-in block 1201 and the slot 1102 are both set to be T-shaped, and the top of the slot 1102 is in an open state, that is, the top of the slot 1102 extends to the top end surface of the guide block 11. Through this structure, when the steel pipe 2 drives the guide block 11 to be offset from the connecting block 12 above and adjacent to it, the connecting block 12 can move downward, and the plug-in block 1201 will be inserted into the slot 1102. At this point, the guide block 11 and the connecting block 12 can be stably placed above the steel pipe 2. Of course, in specific use, the size of the slot 1102 is larger than the size of the plug-in block 1201.

[0038] In order to connect the connecting block 12 and the guide block 11 between two adjacent steel pipes 2, the present solution provides a limiting groove 1202 on the side of the connecting block 12 away from the vertical portion 104, the cross section of the limiting groove 1202 is set to be L-shaped, and the two ends of the limiting groove 1202 can extend to the top and bottom end faces of the connecting block 12, and a limiting block 1103 is fixedly provided on one side of the guide block 11 close to the vertical portion 104, and a clamping block 13 is elastically installed on one side of the limiting block 1103, and the clamping block 13 is away from the limiting block 1103. A slope 1301 is provided at one end. In actual use, when the two steel pipes 2 gradually approach each other on the support plate 1, the guide block 11 on one of the steel pipes 2 will fit with the connecting block 12 on the other steel pipe 2. During this process, the limit block 1103 and the clamping block 13 will be inserted into the L-shaped limit groove 1202. The adjacent connecting blocks 12 and guide blocks 11 are mutually clamped through the cooperation between the clamping block 13 and the limit groove 1202, thereby avoiding relative movement between the two adjacent steel pipes 2, which is conducive to stably arranging the steel pipes 2 on the support plate 1.

[0039] Reference Figure 3 , Fig.14 As shown, a slot 102 is opened on the inner side surface of the vertical portion 104 of the support plate 1, and the cross-section of the slot 102 is set to be L-shaped. Through this structure, when the steel pipe 2 at the head end moves to the vertical portion 104, the guide block 11 on one side of the steel pipe 2 will fit with the vertical portion 104, so that the block 13 is inserted into the slot 102, so as to lock the steel pipe 2 at the head end to one side of the vertical portion 104.

[0040] In actual use, an inclined plate 3 can be arranged on one side of the support plate 1, and one end of the inclined plate 3 is aligned with the horizontal part 103 of the support plate 1, so that the steel pipe 2 can be pushed onto the support plate 1. When the steel pipe 2 reaches the bottom of the storage frame 5, the steel pipe 2 will contact a guide block 11 at the bottom, and as the steel pipe 2 rolls, the guide block 11 can be driven to move in the horizontal direction, so that the guide block 11 is staggered from the connecting block 12 above and adjacent to it. When the guide block 11 slides along the guide bar 10 and is completely staggered from the connecting block 12, the connecting block 12 will gradually move downward relative to the storage frame 5. Before the connecting block 12 is completely moved out of the storage frame 5, the plug-in block 1201 on the connecting block 12 can be inserted into the slot 1102 on the guide block 11. Figure 7 As shown, as the steel pipe 2 moves, the connection block 12 above it will completely fall onto the steel pipe 2. During this process, the plug-in block 1201 on the connection block 12 will be completely inserted into the slot 1102 of the guide block 11, so that the connection block 12 and the guide block 11 can be stably placed above the steel pipe 2. Afterwards, when the steel pipe 2 continues to move, the connection block 12 that falls onto the steel pipe 2 will be completely staggered with the adjacent guide block 11 above it, so that the guide block 11 can fall to the bottom end of the storage frame 5, and the cooperation between the convex strip 1101 and the guide strip 10 can keep the guide block 11 stable.

[0041] When another steel pipe 2 is pushed onto the support plate 1 through the inclined plate 3 and placed on the side of the guide block 11 at the bottom end of the storage frame 5, as the steel pipe 2 moves, the guide block 11 can slide along the guide strip 10, so that the connecting block 12 above and adjacent to the guide block 11 can fall onto the steel pipe 2. Figure 8 As shown, when the two steel pipes 2 are close to each other, the guide block 11 on one steel pipe 2 will fit with the connecting block 12 on the other steel pipe 2. During this process, the limit block 1103 and the clamping block 13 on the guide block 11 will be inserted into the limit groove 1202 on the connecting block 12, so that the guide block 11 and the connecting block 12 between the two adjacent steel pipes 2 are mutually clamped. When the steel pipe 2 at the head end moves to the vertical portion 104, the guide block 11 on one side of the steel pipe 2 will contact the vertical portion 104, so that the limit block 1103 and the clamping block 13 on the guide block 11 can be inserted into the clamping groove 102. At this point, the steel pipe 2 at the head end will be locked on one side of the vertical portion 104. Since the two adjacent steel pipes 2 are limited by the cooperation of the connecting block 12 and the guide block 11, a plurality of steel pipes 2 arranged in sequence can be stably placed on the support plate 1.

[0042] Since the top end surfaces of the guide block 11 and the connecting block 12 are flush with each other, when arranging the second layer of steel pipes 2, the angle of the inclined plate 3 can be adjusted so that the steel pipes 2 passing through the inclined plate 3 can be pushed to the top of the first layer of steel pipes 2. At the same time, the storage frame 5 and the guide bar 10 are driven to move upward, so that the steel pipes 2 are pushed to the support plate 1 and can contact with the guide block 11 at the bottom of the storage frame 5. The steel pipes 2 of the second layer are arranged with reference to the arrangement method of the first layer of steel pipes 2. During the arrangement process, the second layer of steel pipes 2 can roll on the top of the neatly arranged guide blocks 11 and connecting blocks 12, thereby avoiding the need to transport the steel pipes 2, making the arrangement process more labor-saving. With this structure, the steel pipes 2 can be arranged in multiple layers in the vertical direction, and the steel pipes 2 are always in a rolling state during the arrangement process.

[0043] Reference Fig. 9 As shown, for steel pipes 2 of different sizes, the position of the storage frame 5 in the vertical direction can be adjusted so that the connecting block 12 and the guide block 11 can fall onto the steel pipe 2 and engage with each other. At this time, the steel pipe 2 can also drive the matching connecting block 12 and guide block 11 to move horizontally along the guide strip 10 when rolling.

[0044] To summarize, this device is provided with guide blocks 11 and connecting blocks 12. When the steel pipe 2 rolls on the support plate 1, the connecting blocks 12 and the guide blocks 11 can be placed above the steel pipe 2 and engage with each other. In addition, when two adjacent steel pipes 2 are abutted against each other, the cooperation between the guide blocks 11 and the connecting blocks 12 between the two adjacent steel pipes 2 can limit the two steel pipes 2 to avoid relative movement of the two steel pipes 2. The cooperation between the guide blocks 11 and the vertical portion 104 allows the steel pipe 2 at the head end to be locked on one side of the vertical portion 104, so that multiple steel pipes 2 can be stably arranged on the support plate 1, avoiding the shaking of the steel pipes 2 during transportation. In addition, when laying the upper steel pipe 2, the steel pipe 2 can roll on the plane formed by the multiple guide blocks 11 and the connecting blocks 12, so that the overall laying process is more labor-saving.

[0045] like Figure 1-Figure 6 , Figure 10-12 As shown, a roller is installed at the bottom of the support plate 1 to facilitate the movement of the entire device. A push rod is also installed on the support plate 1. Figure 1 As shown, in order to drive the storage frame 5 to move in the vertical direction, a crossbeam 8 is fixedly arranged between the two storage frames 5, a pulley is fixedly installed on the inner side of the vertical portion 104 of the support plate 1, and a traction rope 7 is arranged on the pulley. Specifically, one end of the traction rope 7 is fixedly connected to the crossbeam 8, and a reel 15 is arranged on the outer side of the vertical portion 104. Figure 2As shown, bosses are provided at both ends of the drum 15, and a circular shaft is fixedly provided on the end face of the drum 15, which passes through the boss and is rotatably connected thereto, and the end of the traction rope 7 away from the crossbeam 8 is fixedly connected to the drum 15. In actual use, a motor can be installed on the outer side of the vertical portion 104, and the output shaft of the motor is transmission-connected to the end of the circular shaft passing through the boss, so as to drive the drum 15 to rotate. Of course, a handle can also be fixedly installed on the end of the circular shaft passing through the boss, and the staff can manually rotate the drum 15. When the drum 15 is manually controlled, a plurality of positioning holes 1501 need to be evenly opened on the end face of one end of the drum 15, and a latch is slidably provided on the boss. When one end of the latch is inserted into the positioning hole 1501, the drum 15 stops rotating.

[0046] In actual use, a pad 4 can be set at the bottom of the inclined plate 3. The angle of the inclined plate 3 can be adjusted by adjusting the height of the pad 4. Of course, the inclined plate 3 is not connected to the support plate 1, and the inclined plate 3 can be made of steel plates at the construction site.

[0047] A socket 101 connected to the slot 102 is provided on the side of the vertical portion 104 of the support plate 1. In actual use, when it is necessary to move the limit block 1103 and the block 13 out of the slot 102, the staff can insert a rod-shaped component into the socket 101 to make the block 13 shrink into the limit block 1103, so that the limit block 1103 can be moved out of the slot 102. Of course, a thinner plastic sheet can also be inserted into the slot 102 to lead the limit block 1103 out of the slot 102.

[0048] A side panel 6 is fixedly provided on the inner side surface of the vertical portion 104, and the side panel 6 is located on the outer side of the storage frame 5. A slide plate 9 is fixedly provided on a side of the storage frame 5 close to the side panel 6, and a slide groove is provided on the outer side surface of the slide plate 9. A slide bar 14 that slides with the slide groove is fixedly provided on the side panel 6. The cross-sections of the slide bar 14 and the slide groove are both set to be T-shaped. Through this structure, the storage frame 5 can be stably moved in the vertical direction.

[0049] like Figure 6 , Fig.11 As shown, a groove is provided on the limit block 1103 for sliding cooperation with the clamping block 13, a first spring is fixedly arranged between the inner end surface of the groove and the clamping block 13, and a strip groove is provided on the guide block 11 for sliding cooperation with the convex strip 1101, a second spring is fixedly arranged between the inner end surface of the strip groove and the convex strip 1101.

[0050] like Fig.13As shown, a U-shaped support rod 17 is fixedly provided on the outer surface of the guide bar 10, and a groove that slides with the support rod 17 is opened on the side of the storage frame 5. Here, the support rod 17 cannot rotate relative to the storage frame 5. Specifically, a rotating shaft 16 is provided between the support rods 17 on both sides of the storage frame 5. The rotating shaft 16 is staggered with the guide block 11 and the connecting block 12 in the vertical direction, that is, the rotating shaft 16 does not interfere with the guide block 11 and the connecting block 12. The rotating shaft 16 passes through the storage frame 5 and is rotatably connected thereto, and the rotating shaft 16 passes through the support rod 17 and is threadedly engaged therewith. In actual use, the rotating shaft 16 External threads with opposite screw directions are provided at both ends of 16, so that the two support rods 17 can be driven to move closer to or away from each other during the rotation of the rotating shaft 16, thereby driving the two guide bars 10 to move closer to or away from each other. When laying the upper steel pipe 2, it is necessary to drive the storage frame 5 to move upward. At this time, the rotating shaft 16 can be rotated to drive the guide bar 10 to move outward so that it is staggered with the convex strip 1101, so that the guide bar 10 can move upward with the storage frame 5. Of course, the support rod 17 can also be fixed by screw connection. When adjusting the position of the support rod 17, it is only necessary to loosen the screw.

Claims

1. A material transport device for a construction site, comprising an L-shaped support plate, the L-shaped support plate having a horizontal portion and a vertical portion, a storage frame being arranged above the horizontal portion, and a plurality of guide components being arranged in the storage frame along a vertical direction, characterized in that: The guide assembly comprises a guide block and a connecting block matched with the guide block, and the bottom end surfaces of the guide block and the connecting block are both configured as arc surfaces; When the steel pipe rolls to the side of the guide block at the bottom of the storage frame, the rolling steel pipe can drive the guide block to slide in the horizontal direction and stagger with the connecting block above the guide block, so that the connecting block moves downward and falls to the top of the steel pipe. In this process, the connecting block is engaged with the guide block, and the connecting block is flush with the top end surface of the guide block. When two adjacent steel pipes are close to each other, the guide block and the connecting block between the two adjacent steel pipes will be engaged with each other. Guide strips are arranged on both sides of the bottom of the storage frame, and convex strips cooperating with the guide strips are elastically installed on both sides of the guide block. When the guide block falls to the bottom of the storage frame, the convex strips can pop out and be placed above the guide strips.

2. A material transport device for a construction site according to claim 1, characterized in that: A plug-in block is fixedly arranged on one side surface of the connecting block close to the vertical portion, and a slot matching with the plug-in block is opened on one side surface of the guide block away from the vertical portion. The cross-sections of the plug-in block and the slot are both set to be T-shaped, and the top end of the slot extends to the top end surface of the guide block.

3. A material transport device for a construction site according to claim 2, characterized in that: An L-shaped limit groove is provided on the side of the connecting block away from the vertical part, a limit block is fixedly provided on a side of the guide block close to the vertical part, a clamping block is elastically installed on one side of the limit block, and an inclined surface is provided at one end of the clamping block away from the limit block. When the two steel pipes gradually approach each other on the support plate, the guide block on one of the steel pipes will fit with the connecting block on the other steel pipe. During this process, the limit block and the clamping block will be inserted into the limit groove.

4. A material transport device for a construction site according to claim 3, characterized in that: A slot is provided on the inner side surface of the vertical portion, and the cross section of the slot is L-shaped.

5. A material transport device for use at a construction site according to claim 4, characterized in that: A plug hole connected with the card slot is provided on the side surface of the vertical portion of the support plate.

6. A material transport device for a construction site according to claim 1, characterized in that: A side panel is fixedly provided on the inner side surface of the vertical portion, and the side panel is located on the outer side of the storage frame. A slide plate is fixedly provided on a side of the storage frame close to the side panel, and a sliding groove is provided on the outer side surface of the slide plate. A sliding bar that slides with the sliding groove is fixedly provided on the side panel, and the cross-sections of the sliding bar and the sliding groove are both set to be T-shaped.

7. A material transport device for use at a construction site according to claim 3, characterized in that: The limit block is provided with a groove which is slidably matched with the clamping block, and a first spring is fixedly arranged between the inner end surface of the groove and the clamping block.

8. The material transport device for use at a construction site according to claim 1, characterized in that: The arc surface on the guide block is located on a side of the guide block away from the vertical portion, and the arc surface on the connecting block is located on a side of the connecting block close to the vertical portion.

9. A method for transporting materials using the material transport device for a construction site as claimed in any one of claims 1 to 8, characterized in that: The method comprises the following steps: placing a steel pipe on a support plate, pushing the steel pipe to the bottom of a storage frame so that the steel pipe contacts the arc surface on a guide block; when the guide block is offset from the upper connecting block, the connecting block can fall onto the steel pipe and connect with the guide block on one side; when the two steel pipes are close to each other, the guide block and the connecting block between the two steel pipes are mutually engaged; when the steel pipe at the head end is pushed to move to the vertical part, the guide block on one side of the steel pipe at the head end will be engaged with the vertical part.