Multi-drill door type digging, anchoring and probing all-in-one machine

By designing a multi-drill door-type anchor digging and drilling all-in-one machine that integrates anchor rods, anchor cable support and long-distance drilling capabilities, it solves the problem of low mechanization level of existing equipment and achieves fast and efficient tunneling production and geological conditions. Adaptability.

CN118855461APending Publication Date: 2024-10-29ZOUCHENG TIANHE SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411238701.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

The mechanization level of existing coal mine excavation equipment is low, the excavation speed and efficiency are insufficient, and it is impossible to detect the unexcavated areas ahead and adjust the geological conditions in advance, resulting in incompatibility in the excavation direction and speed.

Method used

Design an all-in-one multi-portal drilling and anchor digging machine that integrates anchor rods, anchor cable support and long-distance drilling capabilities, including crawler traveling mechanism, tunneling mechanism, portal multi-arm support system and forward drilling rig system. Multi-angle anchoring support and long-distance drilling detection are achieved through the elastic lifting mechanism.

Benefits of technology

It improves the efficiency of excavation and support, meets the needs of operations in coal mines and tunnels, realizes fast and efficient excavation production, and adapts to different geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118855461A_ABST
    Figure CN118855461A_ABST
Patent Text Reader

Abstract

A multi-drill-door type digging, anchoring and probing all-in-one machine is characterized in that a crawler walking mechanism, a tunneling mechanism, a shovel plate mechanism and a door type multi-drill-arm supporting system are installed on a machine frame, the tunneling mechanism comprises a cutting head and a material conveying belt, and the door type multi-drill-arm supporting system is installed on the machine frame through an elastic lifting mechanism; the portal multi-drill-arm supporting system is arranged on the machine frame and can vertically ascend and descend, transversely stretch out and draw back and adjust the deflection angle relative to the machine frame, a plurality of anchor drilling machines are installed on the portal multi-drill-arm supporting system and can anchor and support a roadway at multi-angle positions, and the front end of the machine frame is provided with a front exploring drilling machine system capable of conducting long-distance drilling detection on non-excavated positions. Wherein the crawler walking mechanism can drive the whole machine to walk in a roadway, a cutting head in the tunneling mechanism can excavate the roadway, the shovel plate mechanism can shovel, convey and collect materials falling in the excavation process, and the materials are conveyed and transferred through a material conveying belt. Under the telescopic control of the elastic lifting mechanism, the door type multi-drill-arm supporting system can adaptively anchor and support the inner peripheral wall of a roadway.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining equipment, in particular to a multi-drilling door type integrated digging, anchoring and exploration machine. Background Art

[0002] At present, the mechanization level of coal mine excavation working faces in my country is relatively low. Excavation working faces still mostly use tunnel boring machines and pneumatic anchor drills for excavation and support operations respectively. This process has high labor intensity, poor safety and low efficiency. In order to improve the mechanization level of excavation working faces, in recent years, longitudinal-axis excavator anchor machines and transverse-axis excavator anchor machines have been developed in China. Among them, the longitudinal-axis excavator anchor machine is equipped with an airborne anchor drill for support operations, but there are problems such as insufficient number of drill arms and slow positioning speed, which cannot significantly improve the excavation speed and efficiency. In addition, as the geological conditions of coal mines in my country become more and more complex, there is a new demand for long-distance exploration holes. The existing excavation equipment usually only has the ability of excavation and anchor support, and cannot realize the advance detection of the unexcavated area in front during the excavation process, and cannot adjust the excavation direction and excavation speed according to the actual geological conditions, which brings different degrees of trouble to the excavation work. Summary of the invention

[0003] The purpose of the present invention is to provide a multi-drilling portal drilling, anchoring and exploration machine with anchor and cable support capabilities and long-distance hole exploration capabilities, integrating excavation, transportation, anchor and cable support, and forward exploration, thereby solving the problems in the prior art.

[0004] The technical solution adopted by the present invention to solve the technical problem is: a multi-drilling portal type drilling and anchoring integrated machine, including a frame, a crawler walking mechanism and a tunneling mechanism are installed on the frame, the tunneling mechanism includes a rotatable cutting head and a material conveyor belt, one end of the material conveyor belt is located at the lower part of the cutting head, and the other end of the material conveyor belt is located at the rear part of the frame, a swingable shovel mechanism is installed at the front end of the frame, a portal type multi-drilling arm support system is installed on the upper side of the tunneling mechanism, the portal type multi-drilling arm support system is installed on the frame through an elastic lifting mechanism, and the portal type multi-drilling arm support system can be vertically moved relative to the frame The gantry multi-drill arm support system can be lifted and lowered horizontally, extended and retracted, and the deflection angle can be adjusted. Several anchor drills are installed on the gantry multi-drill arm support system, and a forward exploration drill system is also installed at the front end of the frame. The forward exploration drill system can perform long-distance drilling detection on unexcavated positions, wherein the crawler walking mechanism can drive the whole machine to walk in the tunnel, the cutting head in the excavation mechanism can excavate the tunnel, the shovel mechanism can shovel and collect the materials that fall during the excavation process, and transport and transfer them through the material conveyor belt. Under the telescopic control of the elastic lifting mechanism, the gantry multi-drill arm support system can perform adaptive anchor support on the inner wall of the tunnel. The gantry multi-drill arm support system includes two groups of telescopic outer beams arranged side by side, each telescopic outer beam is equipped with a telescopic inner beam, a telescopic cylinder is installed between the telescopic inner beam and the telescopic outer beam, cross beams are installed at the ends of the two groups of telescopic inner beams, and drilling rig fixing seats are provided at both ends in the length direction of the cross beams, wherein a top beam is installed between the two groups of telescopic outer beams, the top beam is installed on the frame through an elastic lifting mechanism, a number of anchor cable drills that can move and rotate horizontally are installed on the side of the top beam between the telescopic outer beams, a number of top anchor rod drills that can move and rotate horizontally are installed on the front side of the cross beam, and an auxiliary anchor rod drill that can be lifted and rotated vertically is installed on the drilling rig fixing seat, wherein the anchor cable drill can drill holes and anchor cables at various angles at the top of the tunnel, the top anchor rod drill can drill holes and anchor rods at various angles at the top of the tunnel, and the auxiliary anchor rod drill can drill holes and anchor rods at various angles on the side of the tunnel. The rear end of the telescopic outer beam is equipped with a rear support mechanism, which includes a U-shaped frame fixed to the telescopic outer beam, a flip plate is hingedly installed on the U-shaped frame, a rear support plate is arranged at the end of the flip plate, and a clamping plate arranged side by side is arranged at the end of the telescopic outer beam, and a rear support cylinder is installed between the clamping plate and the rear support plate, wherein the cylinder barrel of the rear support cylinder is hinged between the clamping plates, and the piston rod of the rear support cylinder is hinged on the rear support plate. The front support mechanism is installed on the crossbeam, and the front support mechanism includes a first front support plate fixed at both ends of the crossbeam in the length direction, an anti-collision pad is installed on the top of the first front support plate, and a plurality of front support cylinders are installed on the crossbeam between the two first front support plates, and a second front support plate is installed on the piston rod of each front support cylinder, and the second front support plate can be vertically lifted and lowered relative to the crossbeam, and the front ends of the first and second front support plates extending out of the crossbeam are both downwardly bent arc plates.The end of the crossbeam is equipped with a side support mechanism, which includes a side flap hinged on the crossbeam, a side support plate is provided at the end of the side flap, a side support cylinder is hingedly installed between the side support plate and the crossbeam, a vertically arranged lower support cylinder is installed on the outer side of the drilling rig fixed seat, and a positioning cone sleeve is installed on the piston rod of the lower support cylinder. An auxiliary top drilling platform is installed at the bottom of the crossbeam corresponding to the position of the top anchor drilling rig, and an auxiliary auxiliary drilling platform is installed at the bottom of the drilling rig fixed seat corresponding to the position of the auxiliary anchor drilling rig. The elastic lifting mechanism includes a top beam arranged on the gantry-type multi-drilling arm support system, and a base frame arranged side by side is installed on the frame corresponding to the two ends of the top beam in the length direction. Each base frame is provided with a fixed sleeve frame, and an outer guide sleeve is installed in the fixed sleeve frame through a pin shaft. The outer guide sleeve is made of elastic material. An inner guide column matched with the outer guide sleeve is hingedly installed at the bottom of the top beam. Lifting cylinders are installed on the base frames on both sides of the outer guide sleeve. The cylinder barrel of the lifting cylinder is hingedly connected to the base frame through a joint bearing, and the piston rod end of the lifting cylinder is hingedly connected to the top beam through a joint bearing. The four groups of lifting cylinders on the elastic lifting mechanism are independently controlled. By controlling the lifting of the four groups of lifting cylinders respectively, the vertical lifting, lateral extension and deflection angle adjustment of the gantry-type multi-drilling arm support system relative to the frame can be realized. A guide circular shaft is installed in the outer guide sleeve, and a guide groove matched with the guide circular shaft is provided on the inner guide column. The outer guide sleeve is made of spring steel plate. The forward drilling system includes a drilling machine, a first slewing bearing is installed on the frame, a connecting plate is installed on the inner ring of the first slewing bearing, a second slewing bearing is installed on the upper side of the connecting plate away from one end of the first slewing bearing, and a drilling machine is installed on the inner ring of the second slewing bearing. The first slewing bearing and the second slewing bearing are driven by rotation to drive the drilling machine to perform drilling detection at different angles on the tunnel excavation surface. The shovel mechanism includes a shovel body, a connecting ear seat and a cylinder ear seat are provided at the end of the shovel body, and two groups of star wheel claws are symmetrically installed on the shovel body. A guide groove matching the material conveyor belt is opened on the shovel body between the two groups of star wheel claws, and a wear-resistant plate is arranged in the guide groove. The two groups of star wheel claws rotate in opposite directions and both rotate toward the inner side of the shovel body. A plurality of shovel teeth are provided at the front end of the shovel body, and both sides of the shovel body are provided with retractable extension shovels through side extension cylinders. The material conveyor belt includes a transmission chain, and a scraper is installed on the corresponding transmission chain. A planing tooth is provided on the upper surface of each scraper, and an inclined surface is provided on the planing tooth. The position of the inclined surface on the planing tooth is consistent with the direction of material transportation. A baffle is installed on the frame on the upper side of the material conveyor belt. When the scraper moves to the baffle position, the planing tooth and the baffle can extrude and planer materials with large diameters.

[0005] The positive effects of the present invention are as follows: a multi-drilling portal type drilling, anchoring and exploration integrated machine described in the present invention has a crawler walking mechanism, a tunneling mechanism, a shovel mechanism and a portal type multi-drilling arm support system installed on the frame, the tunneling mechanism includes a cutting head and a material conveyor belt, the portal type multi-drilling arm support system is installed on the frame through an elastic lifting mechanism, and can be vertically lifted, horizontally extended and adjusted in deflection angle relative to the frame, a plurality of anchor drills are installed on the portal type multi-drilling arm support system, which can anchor and support the tunnel at multiple angles, and a front exploration drilling system capable of long-distance drilling and detection of unexcavated positions is installed at the front end of the frame. The crawler walking mechanism can drive the whole machine to walk in the tunnel, the cutting head in the tunneling mechanism can excavate the tunnel, the shovel mechanism can shovel and collect the materials falling during the excavation process, and transport and transfer them through the material conveyor belt, and the portal type multi-drilling arm support system can adaptively anchor and support the inner peripheral wall of the tunnel under the telescopic control of the elastic lifting mechanism. The unit studied in the present invention integrates excavation, transportation, anchor rod and cable support, and forward exploration, thereby improving support efficiency, meeting different operation and early warning requirements in coal mines and tunnels, and realizing fast and efficient excavation production. BRIEF DESCRIPTION OF THE DRAWINGS

[0006] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 is another isometric view of the present invention; Figure 3 is a side view of the present invention; Figure 4 It is a structural schematic diagram of a portal multi-drill arm support system and an elastic lifting mechanism; Figure 5 yes Figure 4 Another axonometric view of the structure in the middle; Figure 6 yes Figure 4 A partial view of the side view of the middle structure; Figure 7 It is a structural schematic diagram of the front end crossbeam position of the portal multi-drill arm support system; Figure 8 It is a structural schematic diagram of the rear support mechanism; Fig. 9 It is a structural schematic diagram of the elastic lifting mechanism; Fig.10 It is the front view of the elastic lifting mechanism; Fig.11 is a side view of the elastic lifting mechanism; Fig.12 It is a structural schematic diagram of the vertical lifting of the inner guide column relative to the outer guide sleeve; Fig.13 It is a structural diagram of the forward drilling rig system; Fig.14It is a structural schematic diagram of the shovel mechanism; Fig.15 It is another axonometric view of the scraper mechanism; Fig.16 It is a structural diagram of the material conveyor belt; Fig.17 It is a schematic diagram of the structure of the scraper and baffle for extruding and planing large diameter materials. DETAILED DESCRIPTION

[0007] The multi-drilling door type anchoring and exploration integrated machine of the present invention is as follows: Figure 1-3 As shown, it includes a frame 1, on which a crawler travel mechanism 10 and a tunneling mechanism 11 are installed. The crawler travel mechanism 10 is the travel mechanism of the whole machine, which can be an existing crawler vehicle or other travel device with crawlers and wheels. The tunneling mechanism 11 includes a rotatable cutting head 12 and a material conveyor belt 13. One end of the material conveyor belt 13 is located at the lower part of the cutting head 12, and the other end of the material conveyor belt 13 is located at the rear of the frame 1. The rotation of the cutting head 12 can realize the opening and excavation in the tunnel. The stones and other materials dropped during the excavation process can be transported to the outside of the tunnel by the material conveyor belt 13 to avoid interference with the tunneling, so as to facilitate the continuation of the tunneling. A swingable shovel mechanism 2 is installed at the front end of the frame 1, which can collect and transport the soil and rocks that fall to the ground, so as to facilitate the movement of the whole machine in the tunnel after tunneling.

[0008] In order to realize stable anchoring support of the multi-drilling gantry drilling and anchoring machine in the tunnel, a gantry multi-drill arm support system 3 is installed on the upper side of the tunneling mechanism 11. The gantry multi-drill arm support system 3 is installed on the frame 1 through an elastic lifting mechanism 4. The gantry multi-drill arm support system 3 can be vertically lifted and lowered, laterally extended and deflected relative to the frame 1 to adapt to tunnels with different cross-sectional shapes. Several anchor drilling rigs are installed on the gantry multi-drill arm support system 3, which can enable the whole machine to form a more stable anchoring support in the tunnel.

[0009] The portal multi-drill arm support system 3 may include a gantry frame or a portal frame structure, and corresponding support structures and anchor drills are installed on the gantry frame and the portal frame. The elastic lifting mechanism 4 may be a vertical movement mechanism with elastic deformation or a mobile mechanism with an elastic guide device. While realizing the installation function between the frame 1, the relative position between the portal multi-drill arm support system 3 and the frame 1 is not limited, so that the anchor drill on the portal multi-drill arm support system 3 can be adaptively drilled and anchored according to the actual cross-sectional shape of the tunnel, thereby improving the support stability of the whole machine in the tunnel.

[0010] In order to formulate subsequent excavation routes and directions according to the actual geological conditions at the excavation location, a forward drilling system 5 is also installed at the front end of the frame 1. The forward drilling system 5 can perform long-distance drilling detection on unexcavated locations. The staff can formulate subsequent more favorable excavation plans based on the actual geological conditions obtained by the detection.

[0011] The crawler walking mechanism 10 in the above-mentioned multi-drill portal drilling, anchoring and exploration machine can drive the whole machine to move in the tunnel, the cutting head 12 in the tunneling mechanism 11 can excavate the tunnel, the shovel mechanism 2 can shovel and collect the materials falling during the excavation process, and transport and transfer them through the material conveyor belt 13, and the portal multi-drill arm support system 3 under the telescopic control of the elastic lifting mechanism 4 can adaptively anchor and support the inner wall of the tunnel.

[0012] Furthermore, if Figure 4-7 As shown, the portal multi-drill arm support system 3 includes two sets of telescopic outer beams 30 arranged side by side, and the telescopic outer beams 30 are arranged along the length direction of the whole machine and are located at the upper positions on both sides of the whole machine. Each telescopic outer beam 30 is equipped with a telescopic inner beam 31, and a telescopic cylinder 32 is installed between the telescopic inner beam 31 and the telescopic outer beam 30. Through the drive of the telescopic cylinder 32, the telescopic inner beam 31 can be moved relative to the telescopic outer beam 30, completing the forward extension of the whole portal multi-drill arm support system 3 to cover and support the cutting head 12 at the front of the whole machine.

[0013] A crossbeam 33 is installed at the end of the two sets of telescopic inner beams 31, and a drilling rig fixing seat 34 is provided at both ends of the crossbeam 33 in the length direction. The crossbeam 33 and the drilling rig fixing seat 34 constitute a portal structure at the front end of the portal multi-drilling arm support system 3. A top beam 35 is installed between the two sets of telescopic outer beams 30, and the top beam 35 is installed on the frame 1 through an elastic lifting mechanism 4, so as to realize the multi-angle position movement of the portal multi-drilling arm support system 3 relative to the frame 1.

[0014] A number of anchor drills 36 capable of horizontal movement and rotation are installed on the side of the top beam 35 between the telescopic outer beams 30, a number of top anchor drills 37 capable of horizontal movement and rotation are installed on the front side of the cross beam 33, and a side anchor drill 38 capable of vertical lifting and rotation is installed on the drill fixing seat 34. The anchor drill 36 can drill holes for anchor fixing at various angles at the top of the tunnel, the top anchor drill 37 can drill holes for anchor fixing at various angles at the top of the tunnel, and the side anchor drill 38 can drill holes for anchor fixing at various angles on the side of the tunnel.

[0015] The horizontal movement or vertical lifting of the above-mentioned drilling rigs can be guided by a gear rack mechanism, a slide rail slider mechanism, and a gear or oil cylinder with a motor, an electric push rod, etc. as the driving force. The rotation of the drilling rig can be achieved by a slewing bearing or a hinged drive cylinder to achieve a corresponding angle of rotation.

[0016] In order to realize the adaptive support of the portal multi-drill arm support system 3 in different tunnels, such as Figure 8 As shown, the rear end of the telescopic outer beam 30 is installed with a rear support mechanism, which includes a U-shaped frame 39 fixed to the telescopic outer beam 30, and a flip plate 310 is hingedly installed on the U-shaped frame 39. The end of the flip plate 310 is provided with a rear support plate 311, and the rear support plate 311 can rotate relative to the U-shaped frame 39 along with the flip plate 310. The end of the telescopic outer beam 30 is provided with a clamping plate 312 arranged side by side, and a rear support cylinder 313 is installed between the clamping plate 312 and the rear support plate 311, wherein the cylinder barrel of the rear support cylinder 313 is hinged between the clamping plates 312, and the piston rod of the rear support cylinder 313 is hinged on the rear support plate 311. The extended length of the piston rod of the rear support cylinder 313 can adjust the rotation opening and closing angle of the rear support plate 311, and can press the rear support plate 311 against the inner peripheral wall of the tunnel, so that the rear end position of the portal multi-drilling arm support system 3 forms a stable support.

[0017] A front supporting mechanism is installed on the cross beam 33. When the telescopic inner beam 31 is located in the telescopic outer beam 30, the cross beam 33 and the front supporting mechanism are located in the middle position of the whole machine, which will not affect the normal movement of the whole machine in the tunnel. When excavation support is required, the telescopic inner beam 31 is extended forward, and the cross beam 33 and the front supporting mechanism can be extended forward to the top of the cutting head 12 for anchoring support, thereby improving the anchoring stability of the whole machine in the tunnel during the excavation operation.

[0018] The front support mechanism includes a first front support plate 314 fixed at both ends of the crossbeam 33 in the length direction, and an anti-collision pad 315 is installed on the top of the first front support plate 314. A plurality of front support cylinders 316 are installed on the crossbeam 33 between the two first front support plates 314, and a second front support plate 317 is installed on the piston rod of each front support cylinder 316, and the second front support plate 317 can be vertically raised and lowered relative to the crossbeam 33. The first front support plates 314 at both ends are fixedly arranged. When the portal multi-drill arm support system 3 performs multi-angle adaptive position adjustment, the end of the crossbeam 33 in the length direction is in contact with the inner peripheral wall of the tunnel first, and a corresponding anti-collision pad 315 is provided for this purpose. The second front support plates 317 at other positions can be adjusted in height according to actual conditions to achieve adaptive support for the inner peripheral wall of the tunnel.

[0019] In order to shield and support the top anchor drill 37, auxiliary anchor drill 38 and other mechanisms on the beam 33, and to form necessary contact limits for the forward movement of the beam 33, the front ends of the first front support plate 314 and the second front support plate 317 extending out of the beam 33 are both downwardly bent arc plates.

[0020] In order to allow the gantry multi-drill arm support system 3 to form more comprehensive support in the tunnel, a side support mechanism is installed at the end of the beam 33, and the side support mechanism includes a side flap 318 hinged on the beam 33, and a side support plate 319 is provided at the end of the side flap 318. A side support cylinder 320 is hingedly installed between the side support plate 319 and the beam 33. The extension and retraction of the piston rod of the side support cylinder 320 can drive the side support plate 319 to rotate and open and close, and press the side support plate 319 against the side of the tunnel for support and positioning.

[0021] In order to achieve support and positioning at the bottom of the tunnel, a vertically arranged lower support cylinder 321 is installed on the outer side of the drilling rig fixed seat 34, and a positioning cone sleeve 322 is installed on the piston rod of the lower support cylinder 321. When the piston rod of the lower support cylinder 321 is extended, it can drive the positioning cone sleeve 322 to move down to the ground of the tunnel and form a stable contact support.

[0022] In order to facilitate anchoring and support in the tunnel and allow the staff to assist in observation and correction, so that each anchor drill can perform anchoring and support at the set position, an auxiliary top drilling platform 323 is installed at the bottom of the beam 33 corresponding to the position of the top anchor drill 37, and an auxiliary auxiliary drilling platform 324 is installed at the bottom of the drilling rig fixed seat 34 corresponding to the position of the auxiliary anchor drill 38. The above-mentioned platform can provide a position for auxiliary observation for the staff.

[0023] Furthermore, if Figure 9-12 As shown, the elastic lifting mechanism 4 includes a top beam 35 arranged on the portal multi-drill arm support system 3, and the top beam 35 is fixedly installed on the telescopic outer beam 30 of the portal multi-drill arm support system 3. Base frames 40 arranged side by side are installed on the frame 1 corresponding to the two ends of the top beam 35 in the length direction, and each base frame 40 is provided with a fixed sleeve frame 41, and an outer guide sleeve 42 is installed in the fixed sleeve frame 41 through a pin shaft. The outer guide sleeve 42 is made of elastic material and can be elastically deformed within a limited range. An inner guide column 43 matching with the outer guide sleeve 42 is hingedly installed at the bottom of the top beam 35, and lifting cylinders 44 are installed on the base frames 40 on both sides of the outer guide sleeve 42. The cylinder barrel of the lifting cylinder 44 is hingedly connected to the base frame 40 through a joint bearing, and the piston rod end of the lifting cylinder 44 is hingedly connected to the top beam 35 through a joint bearing.

[0024] The four groups of lifting cylinders 44 on the elastic lifting mechanism 4 are all independently controlled. By controlling the lifting of the four groups of lifting cylinders 44 respectively, the inner guide column 43 is vertically lifted and moved along the outer guide sleeve 42, so that the vertical lifting, lateral extension and deflection angle adjustment of the portal multi-drill arm support system 3 relative to the frame 1 can be realized, so that the portal multi-drill arm support system 3 can be tilted at different angles and directions to adapt to tunnels with different sections and complete adaptive support and anchoring.

[0025] Furthermore, in order to guide the inner guide column 43 when it moves relative to the outer guide sleeve 42, a guide shaft 45 is installed in the outer guide sleeve 42, and a guide groove 46 matching the guide shaft 45 is provided on the inner guide column 43. In order to achieve the tilting deformation of the outer guide sleeve 42 at different angles, the outer guide sleeve 42 is made of spring steel plate.

[0026] Furthermore, if Fig.13 As shown, the forward drilling system 5 includes a drilling machine 50, a first slewing bearing 51 is installed on the frame 1, a connecting plate 52 is installed on the inner ring of the first slewing bearing 51, a second slewing bearing 53 is installed on the upper side of the connecting plate 52 away from one end of the first slewing bearing 51, and the drilling machine 50 is installed on the inner ring of the second slewing bearing 53. The first slewing bearing 51 and the second slewing bearing 53 are respectively located at the upper and lower positions of both ends of the connecting plate 52 in the length direction. The first slewing bearing 51 and the second slewing bearing 53 are driven by rotation to drive the drilling machine 50 to perform drilling detection at different angles on the tunnel excavation surface, and can also realize drilling detection at various different inclination angles at other positions such as the side of the tunnel.

[0027] Furthermore, if Fig.14 and Fig.15 As shown, the shovel mechanism 2 includes a shovel body 20, and the end of the shovel body 20 is provided with a connecting ear seat 21 and a cylinder ear seat 22. The connecting ear seat 21 is used for hinged installation on the frame 1, and the cylinder ear seat 22 and the frame 1 are used to install a swing cylinder, and the shovel mechanism 2 is rotated, lifted or lowered by the telescopic drive of the swing cylinder.

[0028] Two sets of symmetrically arranged star wheel claws 23 are also installed on the shovel board body 20. A guide groove matching the material conveyor belt 13 is opened on the shovel board body 20 between the two sets of star wheel claws 23. A wear-resistant plate 24 is arranged in the guide groove. The two sets of star wheel claws 23 rotate in opposite directions and both rotate toward the inside of the shovel board body 20, so that soil and rocks on the shovel board body 20 can be transferred to the material conveyor belt 13 between the star wheel claws 23. A plurality of shovel teeth 25 are arranged at the front end of the shovel board body 20. Both sides of the shovel board body 20 are equipped with retractable extension shovel boards 27 through side extension cylinders 26. By adjusting the extension position of the extension shovel board 27, the overall shovel board mechanism 2 can be adapted to the width distance in the tunnel. The soil and rocks excavated during the excavation process can all fall directly onto the shovel board body 20, realizing the full-section material collection operation, so as to facilitate collection and transportation, and avoid falling at the bottom of the tunnel to affect the subsequent passage of the overall equipment.

[0029] Furthermore, in order to perform preliminary crushing on the soil and rocks with larger diameters on the material conveyor belt 13 and avoid the phenomenon that the soil and rocks with larger diameters are stuck on the material conveyor belt 13, as shown in FIG. Fig.16 and Fig.17As shown, the material conveyor belt 13 includes a transmission chain 130, and a scraper 131 is installed on the corresponding transmission chain 130. A planing tooth 132 is provided on the upper surface of each scraper 131, and a slope 133 is provided on the planing tooth 132. The position of the slope 133 on the planing tooth 132 is consistent with the direction of material transportation.

[0030] A baffle 134 is installed on the frame 1 on the upper side of the material conveyor belt 13. When the scraper 131 drives the soil and rocks thereon to move to the position of the baffle 134, if they can directly pass through the space between the baffle 134 and the scraper 131, it indicates that the diameter of the soil and rocks meets the requirements and will not get stuck during transportation. If the diameter of the soil and rocks exceeds the limit range, they will be clamped between the baffle 134 and the planing teeth 132 of the scraper 131, and as the transmission chain 130 continues to rotate, the soil and rocks are squeezed by the baffle 134 and the scraper 131. The planing teeth 132 and the baffle 134 can squeeze and plan the large-diameter materials to break them. After the diameter of the soil and rocks after squeezing and crushing meets the requirements, they can pass smoothly. If they still do not meet the passing requirements, they can continue to squeeze and plan until they can pass, thereby realizing the preliminary crushing of the larger-diameter soil and rocks on the material conveyor belt 13 to avoid getting stuck during subsequent transportation.

[0031] The portal multi-drill arm support system 3 described in the present invention has the functions of lifting, telescoping, and angle adjustment. The airborne drilling rig arranged on the portal mechanism is moved to the working position through telescoping, lifting and other functions, and each drilling rig is equipped with a lifting, horizontal sliding, and rotary motion mechanism on the portal mechanism, and can perform anchoring operations after moving to the corresponding position. The forward drilling rig system 5 is located at the front side of the whole machine, and the drilling azimuth is adjusted through a multi-stage rotary mechanism, which can meet the long-distance drilling needs in the front and on both sides.

[0032] The upper and lower ends of the elastic lifting mechanism 4 are respectively hinged with the top beam 35 and the base frame 40, and the top beam 35 and the telescopic outer beam 30 are vertically lifted and lowered, and the lateral angle and longitudinal angle are adjusted through the action of the lifting cylinder 44. The working stability of the gantry mechanism is improved through the all-round support of the front support mechanism, the side support mechanism, the rear support mechanism and the lower support mechanism, and the working position and working state of multiple drilling rigs can be adjusted through the gantry mechanism, with high structural strength and good working stability. Multiple drilling rigs can realize rapid support operations, which can greatly increase the footage speed, and the drilling rigs only need to move horizontally, vertically and rotaryly, with fast drilling positioning speed and high work efficiency.

[0033] The gantry multi-drill arm support system 3 adopts a gantry longitudinal movement structure, has two long-distance telescopic beams, and the equipment is relatively wide, so it is necessary to adopt a lifting and angle adjustment mechanism with elastic deformation, that is, an elastic lifting mechanism 4, using a spring steel plate as an outer guide sleeve 42, and multiple groups of cylinders to control the lifting and angle adjustment of the inner guide column 43 to meet the structural design requirements of the gantry anchor mining machine and prevent structural damage due to asynchrony.

[0034] The outer guide sleeve 42 is made of a spring plate. By adjusting the stroke of the lifting cylinder 44 at the left and right positions, the top beam 35 can be tilted left and right. At this time, the outer guide sleeve 42 is deformed by the external force and tilts along with the top beam 35. The lifting cylinders 44 are arranged on the left and right sides, two on each side. By controlling the different telescopic strokes of the four oil cylinders, the top frame can be tilted horizontally and in the front and back directions. The four oil cylinders can be controlled independently, and different telescopic strokes can adjust the horizontal and front and back angles of the top beam 35, the outer guide sleeve 42 and the inner guide column 43.

[0035] The four lifting cylinders 44 cooperate with each other to achieve the front and rear, left and right adjustment and vertical lifting of the top beam 35. The use of spring steel plates can produce beneficial deformation under external forces to prevent mechanical interference. The frame structure improves the strength of the lifting mechanism and ensures the normal operation of the equipment.

[0036] The extended shovel 27 in the shovel mechanism 2 can ensure that the side of the shovel is close to the side of the tunnel, ensuring that the anchor miner is always located in the middle of the tunnel. In conjunction with the telescopic large-stroke cutting part for hard rock, the full-section automatic positioning and cutting operation is realized, thereby increasing the excavation speed. The material collection is completed by rotating the star wheel claw 23, and the hard alloy shovel teeth 25 arranged at the front have the function of assisting the cleaning and leveling of the tunnel floor.

[0037] The above-mentioned shovel mechanism 2 is used to realize the centering of the anchor boring machine during construction, and the specially designed wide section realizes a one-time material collection operation, which greatly improves the adaptability of the equipment and can adapt to the material collection operations of tunnels of different widths. According to a predetermined program, it is formed in one time, and the tunnel forming speed is fast and the precision is high. The cutting and collecting action does not rely on manual operation, and gets rid of the dependence on the skills of the tunnel boring machine driver, avoiding the time of the equipment moving left and right during the excavation process. When cutting tunnels with large cross-sections, high rock hardness and poor conditions, continuous operation in one anchor protection operation cycle is realized, avoiding secondary repairs, greatly reducing operation time and improving production efficiency.

[0038] The technical solution of the present invention is not limited to the scope of the embodiments described in the present invention. The technical contents not described in detail in the present invention are all well-known technologies.

Claims

1. A multi-drilling door type anchoring and exploration integrated machine, characterized in that: The invention comprises a frame (1), on which a crawler walking mechanism (10) and a tunneling mechanism (11) are installed, the tunneling mechanism (11) comprises a rotatable cutting head (12) and a material conveying belt (13), one end of the material conveying belt (13) is located at the bottom of the cutting head (12), and the other end of the material conveying belt (13) is located at the rear of the frame (1), a swingable shovel mechanism (2) is installed at the front end of the frame (1), a portal multi-drilling arm support system (3) is installed on the upper side of the tunneling mechanism (11), the portal multi-drilling arm support system (3) is installed on the frame (1) through an elastic lifting mechanism (4), and the portal multi-drilling arm support system (3) can be vertically moved relative to the frame (1). The gantry-type multi-drill arm support system (3) is equipped with a plurality of anchor drills, and a front-exploring drill system (5) is also installed at the front end of the frame (1). The front-exploring drill system (5) can perform long-distance drilling detection at unexcavated locations, wherein the crawler walking mechanism (10) can drive the whole machine to walk in the tunnel, the cutting head (12) in the excavation mechanism (11) can excavate the tunnel, the shovel mechanism (2) can shovel and collect the materials that fall during the excavation process, and transport and transfer them through the material conveyor belt (13), and under the telescopic control of the elastic lifting mechanism (4), the gantry-type multi-drill arm support system (3) can perform adaptive anchoring support on the inner peripheral wall of the tunnel.

2. The multi-drilling-door type anchoring and exploration integrated machine according to claim 1, characterized in that: The portal multi-drilling boom support system (3) comprises two sets of telescopic outer beams (30) arranged side by side, each telescopic outer beam (30) is matched with a telescopic inner beam (31), a telescopic cylinder (32) is installed between the telescopic inner beam (31) and the telescopic outer beam (30), cross beams (33) are installed at the ends of the two sets of telescopic inner beams (31), and drilling rig fixing seats (34) are provided at both ends of the cross beams (33) in the length direction, wherein a top beam (35) is installed between the two sets of telescopic outer beams (30), and the top beam (35) is installed on the frame (1) through an elastic lifting mechanism (4), and the telescopic outer beam (31) is installed between the two sets of telescopic inner beams (31). A plurality of anchor cable drills (36) capable of horizontal movement and rotation are installed on the side of the top beam (35) between the top beam (30), a plurality of top anchor rod drills (37) capable of horizontal movement and rotation are installed on the front side of the cross beam (33), and a supporting anchor rod drill (38) capable of vertical lifting and rotation is installed on the drill rig fixing seat (34), wherein the anchor cable drill (36) can drill holes for anchor cable fixing at various angles at the top of the tunnel, the top anchor rod drill (37) can drill holes for anchor rod fixing at various angles at the top of the tunnel, and the supporting anchor rod drill (38) can drill holes for anchor rod fixing at various angles at the side of the tunnel.

3. The multi-drilling-door type anchoring and exploration integrated machine according to claim 2, characterized in that: A rear support mechanism is installed at the rear end of the telescopic outer beam (30), the rear support mechanism comprising a U-shaped frame (39) fixed to the telescopic outer beam (30), a flip plate (310) being hingedly installed on the U-shaped frame (39), a rear support plate (311) being provided at the end of the flip plate (310), a clamping plate (312) arranged side by side being provided at the end of the telescopic outer beam (30), a rear support cylinder (313) being installed between the clamping plate (312) and the rear support plate (311), wherein a cylinder barrel of the rear support cylinder (313) is hingedly connected between the clamping plates (312), and a piston rod of the rear support cylinder (313) is hingedly connected to the rear support plate (311).

4. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 2, characterized in that: A front support mechanism is installed on the cross beam (33), and the front support mechanism includes first front support plates (314) fixed at both ends of the cross beam (33) in the length direction, and an anti-collision pad (315) is installed on the top of the first front support plate (314). A plurality of front support cylinders (316) are installed on the cross beam (33) between the two first front support plates (314), and a second front support plate (317) is installed on the piston rod of each front support cylinder (316). The second front support plate (317) can be lifted vertically relative to the cross beam (33), and the front ends of the first front support plate (314) and the second front support plate (317) extending out of the cross beam (33) are both downwardly bent arc plates.

5. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 2, characterized in that: A side support mechanism is installed at the end of the cross beam (33), and the side support mechanism includes a side flap (318) hinged on the cross beam (33). A side support plate (319) is provided at the end of the side flap plate (318). A side support cylinder (320) is hingedly installed between the side support plate (319) and the cross beam (33). A vertically arranged lower support cylinder (321) is installed on the outer side surface of the drilling rig fixing seat (34), and a positioning cone sleeve (322) is installed on the piston rod of the lower support cylinder (321).

6. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 2, characterized in that: An auxiliary top drilling platform (323) is installed at the bottom of the crossbeam (33) corresponding to the position of the top anchor drilling machine (37), and an auxiliary auxiliary drilling platform (324) is installed at the bottom of the drilling machine fixing seat (34) corresponding to the position of the auxiliary anchor drilling machine (38).

7. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 1, characterized in that: The elastic lifting mechanism (4) comprises a top beam (35) arranged on the portal multi-drilling arm support system (3), and base frames (40) arranged side by side are installed on the frame (1) at the two ends of the top beam (35) in the length direction. Each base frame (40) is provided with a fixed sleeve frame (41), and an outer guide sleeve (42) is installed in the fixed sleeve frame (41) through a pin shaft. The outer guide sleeve (42) is made of elastic material. An inner guide column (43) matching with the outer guide sleeve (42) is hingedly installed at the bottom of the top beam (35). Lifting cylinders (44) are installed on the base frames (40) on both sides of the sleeve (42). The cylinder barrels of the lifting cylinders (44) are hingedly connected to the base frames (40) through joint bearings. The piston rod ends of the lifting cylinders (44) are hingedly connected to the top beam (35) through joint bearings. The four groups of lifting cylinders (44) on the elastic lifting mechanism (4) are independently controlled. By controlling the lifting and lowering of the four groups of lifting cylinders (44) respectively, the vertical lifting and lowering, lateral extension and deflection angle adjustment of the portal multi-drilling arm support system (3) relative to the frame (1) can be achieved.

8. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 7, characterized in that: A guide shaft (45) is installed in the outer guide sleeve (42), and a guide groove (46) matching with the guide shaft (45) is formed on the inner guide column (43).

9. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 7, characterized in that: The outer guide sleeve (42) is made of spring steel plate.

10. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 1, characterized in that: The forward drilling system (5) comprises a drilling machine (50), a first slewing bearing (51) is mounted on a frame (1), a connecting plate (52) is mounted on the inner ring of the first slewing bearing (51), a second slewing bearing (53) is mounted on the upper side of the connecting plate (52) away from one end of the first slewing bearing (51), and the drilling machine (50) is mounted on the inner ring of the second slewing bearing (53). The first slewing bearing (51) and the second slewing bearing (53) are driven by rotation to drive the drilling machine (50) to perform drilling detection at different angles on the tunnel excavation surface.

11. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 1, characterized in that: The shovel mechanism (2) comprises a shovel body (20), the end of which is provided with a connecting ear seat (21) and a cylinder ear seat (22), and two groups of symmetrically arranged star wheel rake claws (23) are also installed on the shovel body (20), a guide groove matching with the material conveyor belt (13) is opened on the shovel body (20) between the two groups of star wheel rake claws (23), and a wear-resistant plate (24) is arranged in the guide groove, the two groups of star wheel rake claws (23) rotate in opposite directions and both rotate toward the inside of the shovel body (20), a plurality of shovel teeth (25) are provided at the front end of the shovel body (20), and retractable extension shovel plates (27) are installed on both sides of the shovel body (20) through side extension cylinders (26).

12. The multi-drilling-door type integrated drilling, anchoring and exploration machine according to claim 1, characterized in that: The material conveyor belt (13) comprises a transmission chain (130), and a scraper (131) is installed on the corresponding transmission chain (130). A planing tooth (132) is provided on the upper surface of each scraper (131), and an inclined surface (133) is provided on the planing tooth (132). The position of the inclined surface (133) on the planing tooth (132) is consistent with the direction of material conveying. A baffle (134) is installed on the frame (1) on the upper side of the material conveyor belt (13). When the scraper (131) moves to the position of the baffle (134), the planing tooth (132) and the baffle (134) can extrude and plan large-diameter materials.