Distillation tower for bromine production and use method thereof

By designing annular spray pipes and a distillation tower with multi-layer filter structures in bromine production, the problems of insufficient reaction between chlorine and mother liquor and bromine gas impurities are solved, and efficient bromine production is achieved.

CN118903849AActive Publication Date: 2024-11-08TANGSHAN SANYOU NEW MATERIALS CO LTD

Patent Information

Application Number
CN202411117428.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-08
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

In the existing bromine production technology, the reaction between chlorine and mother liquor is insufficient, resulting in the waste of chlorine and the impact of purity of bromine impurities.

Method used

A distillation tower consisting of an annular spray pipe, a conical partition, a condensing cylinder, a precipitation tank and a stirring structure was designed. Through the rotation spraying and multi-layer filtering structure of the annular spray pipe, the chlorine gas is fully in contact with the mother liquor and the bromine is improved. The purity of gas.

Benefits of technology

The utilization rate of chlorine and the production efficiency of bromine are improved, and the high purity production of bromine is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118903849A_ABST
    Figure CN118903849A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of bromine production, particularly relates to a distillation tower for bromine production and a use method thereof, and provides the following scheme aiming at the problems that the existing chlorine cannot fully react with mother liquor, the chlorine is wasted, the mother liquor is not uniformly preheated, the bromine gas possibly contains a small amount of impurities, and the purity of bromine collected in the later period is influenced. The device comprises a tower body and a filler layer fixed in the tower body, an annular spraying pipe located above the filler layer is rotationally connected in the tower body, and the annular spraying pipe is used for spraying mother liquor to the filler layer; a filler layer is arranged in the tower body, a conical partition plate located below the filler layer is fixed in the tower body and used for collecting reacted liquid, and a waste liquid pipe fixedly penetrates through the bottom of the conical partition plate. Under the action of a booster pump, a spray head and an arc-shaped plate, an annular spray pipe can be driven to rotate, so that mother liquor is uniformly sprayed on a filler layer, and chlorine fully reacts with the mother liquor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bromine production, and in particular to a distillation tower for bromine production and a use method thereof. Background Art

[0002] Bromine is a brown-red, volatile liquid with a strong pungent odor. Its vapor is brown-red and its solid is yellow-green with a metallic luster. It is an important chemical raw material. The utility model with patent number CN211004549U discloses a distillation tower for bromine production. However, this technical solution still faces some challenges in practical application: 1. In this technical solution, the mother liquor is contacted with chlorine gas by spraying, and the mother liquor undergoes an exchange reaction with the bromide ions in the mother liquor to generate bromine gas. However, during the spraying process, the mother liquor will continue to accumulate at a fixed position of the packing, resulting in the inability of the steam and chlorine gas to fully contact the mother liquor when they rise, thereby affecting the full reaction of chlorine gas and mother liquor, resulting in a waste of chlorine gas and affecting the purity of bromine gas; 2. During the bromine gas collection process, the bromine gas may still contain a small amount of impurities, which affects the purity of the collected bromine. To address the above problem, the present invention document proposes a distillation tower for bromine production and a method for using the same. Summary of the invention

[0003] The purpose of the present invention is to solve the shortcomings of the existing chlorine gas that cannot fully react with the mother liquor, the chlorine gas is wasted, the bromine gas may still contain a small amount of impurities, and the purity of the bromine collected later is affected, and a distillation tower for bromine production and a method of using the same are proposed.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions: A distillation tower for bromine production comprises a tower body and a packing layer fixed in the tower body, wherein an annular spray pipe located above the packing layer is rotatably connected to the tower body, and the annular spray pipe is used to spray mother liquor onto the packing layer; A conical partition is fixed in the tower body below the packing layer for collecting the liquid after the reaction, a waste liquid pipe is fixedly passed through the bottom of the conical partition, and one end of the waste liquid pipe is fixedly extended to one side of the tower body for discharging the collected liquid to the outside; It also includes a condensing cylinder, which is arranged on one side of the tower body, a connecting pipe is fixed on one side of the condensing cylinder, and one end of the connecting pipe extends into the tower body, a liquid injection pipe is fixed on the side of the condensing cylinder away from the connecting pipe, and a condensing pipe is arranged in the condensing cylinder for initially preheating the mother liquid entering the condensing cylinder; It also includes a sedimentation box, which is arranged below the condensation tube and is used to filter impurities contained in the liquid bromine after condensation in the condensation tube; The preheating structure is arranged in the tower body and is used for secondary preheating of the mother liquor after the initial preheating; A spray structure is arranged in the tower body and is used to spray the second preheated mother liquid evenly downward onto the packing layer; A filtering structure, arranged in the sedimentation tank, for filtering impurities in the liquid bromine; A plurality of stirring structures are arranged on the outer wall of the waste liquid pipe in sequence from top to bottom, and two adjacent stirring structures are arranged vertically. The waste liquid in the waste liquid pipe drives the stirring structure to stir the mother liquid in the tower body.

[0005] In a possible design, the spray structure includes a liquid storage ring fixed in the tower body, and the liquid storage ring is sealingly slidably arranged on the top of the annular spray pipe, a plurality of arc plates are fixed on the top of the annular spray pipe, and the arc plates are located in the liquid storage ring, a plurality of injection holes are arranged on the top of the annular spray pipe, and the injection holes cooperate with the arc plates to inject the mother liquid into the annular spray pipe, a plurality of guide pipes are fixed on the outer wall of the tower body, and the bottom ends of the guide pipes extend into the tower body and are located below the conical partition, the top ends of the guide pipes extend into the tower body and are located above the liquid storage ring, an L-shaped pipe is fixed on one side of the guide pipe, and the storage A plurality of liquid storage tubes are fixed in the liquid ring, the bottom end of the L-shaped tube extends into the liquid storage ring and is connected with the liquid storage tube, a plurality of nozzles are fixed on one side of the liquid storage tube, and the nozzles cooperate with the arc plate to drive the annular spray tube to rotate; the mother liquid after secondary heating is sprayed toward the arc plate through the nozzles under the action of the guide tube and the booster pump, which is used to drive the annular spray tube to rotate, and the annular spray tube rotates in the process of spraying liquid bromine, so that the liquid bromine can be evenly sprayed onto the packing layer, and the chlorine can fully react with the bromide ions in the mother liquid in the packing layer in the later stage, thereby improving the utilization rate of chlorine and the production efficiency of bromine.

[0006] In one possible design, the filtering structure includes a baffle plate that is detachably fixed in a sedimentation box, the bottom end of the condenser tube is fixedly extended into the sedimentation box, the bottom end of the condenser tube passes through the baffle plate, a plurality of filter holes are provided on the top of the sedimentation box away from the condenser tube, for filtering impurities in the liquid bromine, a plurality of blocking components are fixed on the bottom inner wall of the sedimentation box, the blocking components are used to hinder the flow of liquid bromine under the baffle plate, and a collecting pipe located above the baffle plate is fixed on one side of the sedimentation box; the liquid bromine flows into the bottom of the baffle plate, and the flow rate of the liquid bromine can be reduced under the action of the plurality of blocking components, so as to precipitate impurities carried in the liquid bromine, and as the liquid bromine gradually increases, the impurities are filtered through the filter holes, and then the injection pipe can collect relatively pure liquid bromine.

[0007] In a possible design, the blocking member is composed of a first partition and two second partitions, and the tops of the first partition and the second partition are in conflict with the bottom of the blocking plate, and the sides of the two second partitions that are away from each other are fixedly connected to the inner wall of one side of the sedimentation box. The two sides of the first partition and the two sides of the inner walls of the sedimentation box form a first gap, and the sides of the two second partitions that are close to each other form a second gap. The cooperation of the first gap and the second gap can effectively reduce the flow rate of liquid bromine, and impurities carried in the liquid bromine are precipitated.

[0008] In a possible design, the preheating structure includes a spiral heating steam pipe arranged in the tower body, and the spiral heating steam pipe is located below the conical partition, a vent pipe is fixed to the bottom end of the spiral heating steam pipe, and the bottom end of the vent pipe is fixed and extends to the bottom of the tower body, a plurality of columns are fixed to the top of the conical partition, and the top of the plurality of columns is fixed with the same annular exhaust pipe, the top of the spiral heating steam pipe passes through the conical partition and is connected to the annular exhaust pipe, an annular chlorine gas discharge pipe is fixed in the tower body, an injection pipe is fixed on one side of the annular chlorine gas discharge pipe, and one end of the injection pipe extends to one side of the tower body for injecting chlorine into the annular chlorine gas discharge pipe, and the annular chlorine gas discharge pipe is located above the annular exhaust pipe; heat exchange is carried out through the condenser to complete the initial preheating of the mother liquor, and then the mother liquor enters the tower body through the connecting pipe, and steam is injected into the spiral heating steam pipe through the vent pipe, and the mother liquor is preheated for the second time through the steam and the spiral heating steam pipe to make full use of the heat energy in the steam.

[0009] In a possible design, the stirring structure includes a rotating box fixed to the outer wall of the waste liquid pipe, a rotating shaft is rotatably connected in the rotating box, a plurality of arc-shaped liquid collecting plates are fixed to the outer wall of the rotating shaft, and one side of the arc-shaped liquid collecting plates extends into the waste liquid pipe. The arc-shaped liquid collecting plates rotate under the action of the downstream liquid, and rotating rods are fixed at both ends of the rotating shaft, and one end of the rotating rod extends to one side of the rotating box, and a plurality of stirring blades are fixed to the outer wall of the rotating rod; the mother liquor after the reaction is discharged to the outside through the waste liquid pipe under the action of the conical partition plate, and when the liquid flows downward through the waste liquid pipe, the liquid drives the arc-shaped liquid collecting plates and the rotating shaft to rotate, and the rotating shaft drives the rotating rod and the stirring blades to rotate, which are used to stir the mother liquor in the tower body, so that the mother liquor can be evenly heated under the action of the spiral heating steam pipe, so as to facilitate the exchange reaction between the bromide ions and the chlorine gas in the mother liquor in the later stage.

[0010] In a possible design, a plurality of exhaust holes are fixed on the inner wall and the outer wall of the annular exhaust pipe, and the exhaust holes are placed obliquely downward to prevent liquid from entering the annular exhaust pipe through the exhaust holes. A booster pump is provided on the guide pipe, and the booster pump cooperates with the guide pipe to increase the flow rate of the mother liquid injected into the liquid storage ring by the guide pipe, so as to achieve the purpose of driving the annular spray pipe to rotate.

[0011] In a possible design, a gas collecting pipe and a liquid drain pipe are fixed to the top and bottom of the tower body respectively. The liquid drain pipe is used to discharge the mother liquor remaining in the tower body. One end of the gas collecting pipe extends into the condenser tube and is connected with the top of the condenser tube, so as to condense the collected bromine gas in the condenser tube and preheat the mother liquor in the condenser tube for the first time, thereby improving the utilization rate of thermal energy. A cross pipe is provided in the annular chlorine discharge pipe and the annular spray pipe, and the two cross pipes are connected with the corresponding annular chlorine discharge pipe and the annular spray pipe. A plurality of through holes are provided on the side close to each other of the two cross pipes, so as to increase the efficiency and area of ​​spraying and exhaust.

[0012] In a possible design, an annular inclined panel is fixed in the tower body, a plurality of ceramic columns are fixed at the bottom of the annular inclined panel, the bottom ends of the plurality of ceramic columns are fixedly extended into the liquid storage ring, and the annular inclined panel is made of ceramic material. Under the action of the ceramic columns, the annular inclined panel can introduce the heat energy of the mother liquid in the liquid storage ring into the annular inclined panel to avoid condensation of bromine gas at the bottom of the annular inclined panel. A reflux pipe is fixedly passed through the tower body, and one end of the reflux pipe extends to the outside of the tower body and is connected to the gas collecting pipe. A one-way valve is arranged in the reflux pipe, and the reflux pipe and the one-way valve are used to guide the liquid bromine condensed at the top of the tower body into the gas collecting pipe. When the bromine gas and steam move upward and enter the condensing pipe through the gas collecting pipe, the bromine gas condenses on the inner wall of the top of the tower body. At this time, the condensed liquid bromine falls on the annular inclined panel along the inner wall of the tower body, and the condensed liquid bromine can be poured into the gas collecting pipe through the reflux pipe to avoid the waste of liquid bromine caused by the reflux of liquid bromine into the tower body.

[0013] In the present application, a method for using a distillation tower for bromine production comprises the following steps: S1. The mother liquor is injected into the condenser through the injection pipe, first preheated by the condenser pipe, and then enters the tower body; in the tower, steam preheats the mother liquor for a second time through the spiral heating steam pipe, and is evenly sprayed by the annular spray pipe; at the same time, chlorine is injected through the annular chlorine discharge pipe, rises together with the steam into the packing layer, and reacts with the bromide ions in the mother liquor to generate bromine gas; S2, bromine gas and water vapor mix and rise, and flow back to the condenser through the gas collecting pipe, and condense into liquid bromine under the action of the mother liquid in the condenser tube; the liquid bromine passes under the baffle plate, and the flow rate is slowed down by multiple blocking components to promote the precipitation of impurities, and then filtered through the filter holes and collected by the injection pipe. Pure bromine liquid; S3, the preheated mother liquor is sprayed onto the arc plate through the nozzle, driving the annular spray pipe to rotate, so that the bromine liquid is evenly sprayed onto the packing layer, thereby enhancing the reaction efficiency of chlorine and bromide ions, and improving the utilization rate of chlorine and the output of bromine; S4. The mother liquor after the reaction is guided to the waste liquid pipe through the conical partition plate for discharge, and at the same time, the arc-shaped liquid collecting plate and the rotating shaft are driven to rotate, driving the stirring blade to rotate, ensuring that the mother liquor is evenly heated in the tower, and promoting the full reaction of bromide ions and chlorine gas; S5. After bromine gas and steam are condensed at the top of the tower, they slide down the annular inclined plate to the reflux pipe and then are introduced into the gas collecting pipe, which effectively prevents the condensed bromine liquid from flowing back into the tower and reduces waste. Beneficial Effects

[0014] In the present invention, the liquid storage ring is sealingly slidably arranged on the top of the annular spray pipe, a plurality of arc-shaped plates are fixed on the top of the annular spray pipe, a plurality of injection holes are arranged on the top of the annular spray pipe, a plurality of flow guide pipes are fixed on the outer wall of the tower body, the bottom end of the L-shaped pipe extends into the liquid storage ring and is connected to the liquid storage pipe, and a plurality of nozzles are fixed on one side of the liquid storage pipe; the mother liquid is sprayed toward the arc-shaped plate through the nozzle under the action of the flow guide pipe and the booster pump, which is used to drive the annular spray pipe to rotate, so that the liquid bromine can be evenly sprayed toward the packing layer, and the chlorine can fully react with the bromide ions in the mother liquid in the packing layer in the later stage, thereby improving the utilization rate of the chlorine and the production efficiency of the bromine; In the present invention, a condensing tube is provided in the condensing cylinder, the bottom end of the gas collecting pipe extends into the condensing cylinder and is connected to the condensing tube, and a spiral heating steam pipe is provided in the tower body; after the mother liquid enters the condensing cylinder, it is heat exchanged through the condensing tube to complete the primary preheating of the mother liquid, and then the mother liquid enters the tower body through the connecting pipe, and steam is injected into the spiral heating steam pipe through the ventilation pipe, and the mother liquid is preheated for a second time through the steam and the spiral heating steam pipe, so that the heat energy in the steam is fully utilized, which is used for the primary preheating of the mother liquid entering the condensing cylinder, and the heat energy carried by the steam is fully utilized; In the present invention, a rotating shaft is rotatably connected in the rotating box, a plurality of arc-shaped liquid collecting plates are fixed on the outer wall of the rotating shaft, a rotating rod is fixed on both ends of the rotating shaft, and a plurality of stirring blades are fixed on the outer wall of the rotating rod; the mother liquor after the reaction is discharged to the outside through the waste liquid pipe under the action of the conical partition plate, and when the liquid flows downward through the waste liquid pipe, the liquid drives the arc-shaped liquid collecting plate and the rotating shaft to rotate, and the rotating shaft drives the rotating rod and the stirring blades to rotate, which are used to stir the mother liquor in the tower body, so that the mother liquor can be evenly heated under the action of the spiral heating steam pipe, so as to facilitate the exchange reaction between the bromide ions and the chlorine gas in the mother liquor in the later stage; In the present invention, a baffle plate is fixed in the sedimentation box, the bottom end of the condenser tube passes through the baffle plate, a plurality of filter holes are provided on the top side of the sedimentation box away from the condenser tube, and a plurality of blocking components are fixed on the bottom inner wall of the sedimentation box; liquid bromine flows into the bottom of the baffle plate, and the flow rate of the liquid bromine can be reduced under the action of the plurality of blocking components, so that impurities carried in the liquid bromine can be precipitated, and as the liquid bromine gradually increases, the impurities are filtered through the filter holes, and then the injection tube can collect relatively pure liquid bromine.

[0015] In the present invention, the mother liquor can be heated for a second time, and the heat energy carried in the steam can be fully utilized. When the mother liquor is sprayed, the booster pump, the nozzle and the arc plate can drive the annular spray pipe to rotate, so that the mother liquor is evenly sprayed on the packing layer, so that the chlorine and the mother liquor can fully react, thereby improving the utilization rate of the chlorine and the production efficiency of the bromine. In addition, the condensed bromine liquid can also be filtered to prevent the impurities contained therein from affecting the purity of the bromine liquid. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of the three-dimensional structure of a distillation tower for bromine production provided in Example 1 of the present invention; Figure 2 This is a schematic diagram of the main cross-sectional structure of a distillation tower for bromine production provided in Example 1 of the present invention; Figure 3 for Figure 2 The enlarged structural diagram at A in the middle; Figure 4 A schematic three-dimensional cross-sectional structure diagram of a condenser cylinder and a precipitation tank of a distillation tower for bromine production provided in Example 1 of the present invention; Figure 5 A schematic diagram of a three-dimensional cross-sectional structure of a liquid storage ring and annular spray pipe of a distillation tower for bromine production provided in Example 1 of the present invention; Figure 6 for Figure 5 The enlarged structural diagram at B in the middle; Figure 7 A schematic diagram of a three-dimensional cross-sectional structure of a waste liquid pipe of a distillation tower for bromine production provided in Example 1 of the present invention; Figure 8 A schematic diagram of a three-dimensional explosion structure of a baffle plate, a first baffle plate, and a second baffle plate of a distillation tower for bromine production provided in Example 1 of the present invention; Fig. 9 This is a schematic diagram of a partial front cross-sectional structure of a tower body of a distillation tower for bromine production provided in Example 1 of the present invention.

[0017] In the figure: 1, tower body; 2, conical partition; 3, spiral heating steam pipe; 4, guide pipe; 5, booster pump; 6, annular spray pipe; 7, packing layer; 8, annular chlorine gas discharge pipe; 9, gas injection pipe; 10, annular exhaust pipe; 11, liquid storage ring; 12, L-shaped pipe; 13, liquid storage pipe; 14, nozzle; 15, curved plate; 16, liquid injection hole; 17, condenser cylinder; 18, gas collecting pipe; 19, condenser pipe; 20, liquid injection pipe; 21, Connecting pipe; 22, sedimentation box; 23, baffle plate; 24, blocking member; 25, collecting pipe; 26, filter hole; 27, first baffle plate; 28, second baffle plate; 29, waste liquid pipe; 30, rotating box; 31, rotating shaft; 32, arc-shaped liquid collecting plate; 33, rotating rod; 34, stirring blade; 35, drain pipe; 36, annular inclined panel; 37, ceramic column; 38, reflux pipe; 39, column; 40, ventilation pipe; 41, exhaust hole. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Example 1

[0019] Reference Figure 1 and Figure 2 A distillation tower is used in the field of bromine production, comprising a tower body 1 and a packing layer 7 fixed in the tower body 1. An annular spray pipe 6 located above the packing layer 7 is rotatably connected in the tower body 1, and the annular spray pipe 6 is used to spray the mother liquid onto the packing layer 7. A conical partition 2 located below the packing layer 7 is fixed in the tower body 1 for collecting the liquid after the reaction. A waste liquid pipe 29 is fixedly penetrated through the bottom of the conical partition 2, and one end of the waste liquid pipe 29 is fixedly extended to one side of the tower body 1 for discharging the collected liquid to the outside.

[0020] Reference Figure 1 , Figure 2 and Figure 4 The distillation tower further includes a condensation cylinder 17, which is disposed on one side of the tower body 1. A connecting pipe 21 is fixed to one side of the condensation cylinder 17, and one end of the connecting pipe 21 extends into the tower body 1. A liquid injection pipe 20 is fixed to the side of the condensation cylinder 17 away from the connecting pipe 21. A condensation pipe 19 is disposed in the condensation cylinder 17 for initially preheating the mother liquid entering the condensation cylinder 17.

[0021] Reference Figure 1 , Figure 2 and Figure 4 The distillation tower further includes a sedimentation tank 22 , which is disposed below the condensation cylinder 17 and is used to filter impurities contained in the liquid bromine condensed in the condensation tube 19 .

[0022] Reference Figure 1 and Figure 2 The distillation tower is also provided with a preheating structure, which is arranged in the tower body 1 and is used for secondary preheating of the mother liquor after the initial preheating. The tower body 1 is also provided with a spraying structure, which is used to spray the mother liquor after the secondary preheating evenly downward onto the packing layer 7. The sedimentation tank 22 is provided with a filtering structure, which is used to filter impurities in the liquid bromine. The distillation tower is also provided with a plurality of stirring structures, which are arranged on the outer wall of the waste liquid pipe 29 from top to bottom, and two adjacent stirring structures are arranged vertically. The waste liquid in the waste liquid pipe 29 drives the stirring structure to stir the mother liquor in the tower body 1.

[0023] Reference Figure 2 , Figure 5 and Figure 6 Specifically, the spray structure includes a liquid storage ring 11 fixed in the tower body 1, and the liquid storage ring 11 is sealed and slidably arranged on the top of the annular spray pipe 6. A plurality of arc plates 15 are fixed on the top of the annular spray pipe 6, and the arc plates 15 are located in the liquid storage ring 11. A plurality of injection holes 16 are provided on the top of the annular spray pipe 6, and the injection holes 16 cooperate with the arc plates 15 to inject the mother liquid into the annular spray pipe 6. A plurality of guide pipes 4 are fixed on the outer wall of the tower body 1, and the bottom end of the guide pipe 4 extends into the tower body 1 and is located below the conical partition 2, and the top end of the guide pipe 4 extends into the tower body 1 and is located above the liquid storage ring 11. An L-shaped pipe 12 is fixed on one side of the guide pipe 4, and a plurality of liquid storage pipes 13 are fixed in the liquid storage ring 11, and the bottom end of the L-shaped pipe 12 extends into the liquid storage ring 11 and is connected with the liquid storage pipe 13. A plurality of nozzles 14 are fixed on one side of the liquid storage pipe 13, and the nozzles 14 cooperate with the arc plate 15 to drive the annular spray pipe 6 to rotate. The mother liquor after secondary heating is sprayed toward the arc plate 15 through the nozzles 14 under the action of the guide pipe 4 and the booster pump 5, driving the annular spray pipe 6 to rotate. The annular spray pipe 6 rotates in the process of spraying liquid bromine, and can evenly spray the liquid bromine to the packing layer 7. In this way, the chlorine gas can fully react with the bromide ions in the mother liquor in the packing layer 7 in the later stage, thereby improving the utilization rate of chlorine gas and the production efficiency of bromine gas.

[0024] Reference Figure 2 , Figure 4 and Figure 8The filtering structure includes a baffle plate 23 that is detachably fixed in a sedimentation box 22, and the bottom end of the condenser tube 19 is fixedly extended into the sedimentation box 22 and penetrates the baffle plate 23. A plurality of filter holes 26 are provided on the top of the sedimentation box 22 away from the condenser tube 19, which are used to filter impurities in the liquid bromine. A plurality of blocking members 24 are fixed to the bottom inner wall of the sedimentation box 22, and the blocking members 24 are used to block the flow of liquid bromine under the baffle plate 23. A collecting pipe 25 located above the baffle plate 23 is fixed to one side of the sedimentation box 22. The liquid bromine flows into the bottom of the baffle plate 23, and the flow rate of the liquid bromine can be reduced under the action of the plurality of blocking members 24, so that the impurities carried in the liquid bromine are precipitated. As the liquid bromine gradually increases, the impurities are filtered through the filter holes 26, and then the injection pipe 20 can collect relatively pure liquid bromine.

[0025] Reference Figure 1-Figure 8 In actual operation, the mother liquid first enters the condenser tube 19 in the condenser cylinder 17 for initial preheating, and then enters the tower body 1 through the connecting pipe 21. In the tower body 1, the mother liquid enters the spray structure after secondary preheating through the preheating structure. Specifically, the mother liquid enters the liquid storage pipe 13 in the liquid storage ring 11 through the guide pipe 4 and the L-shaped pipe 12, and then is sprayed onto the arc plate 15 through the nozzle 14, driving the annular spray pipe 6 to rotate, so that the mother liquid is evenly sprayed onto the packing layer 7. Chlorine gas enters the tower body 1 from the annular chlorine gas discharge pipe 8, and reacts with the bromide ions in the mother liquid on the packing layer 7 to generate bromine gas. The reacted liquid is collected by the conical partition plate 2 and discharged through the waste liquid pipe 29. At the same time, the waste liquid in the waste liquid pipe 29 drives the stirring structure to stir the mother liquid in the tower body 1 to improve the reaction efficiency. The generated bromine gas is condensed through the condenser tube 19 and enters the precipitation tank 22 for filtration, and finally a relatively pure liquid bromine is obtained.

[0026] Reference Figure 4 and Figure 8 Specific design of the barrier member: The barrier member 24 in the distillation tower is composed of a first partition 27 and two second partitions 28. The tops of the first partition 27 and the two second partitions 28 are in close contact with the bottom of the barrier plate 23. The two second partitions 28 are respectively fixed on the inner walls of the two sides of the precipitation tank 22. A first gap is formed between the two sides of the first partition 27 and the inner walls of the two sides of the precipitation tank 22. The side where the two second partitions 28 are close to each other forms a second gap. When the liquid bromine flows through these gaps, its flow rate will be effectively reduced, so that the impurities carried in the liquid bromine can be precipitated.

[0027] Reference Figure 1-Figure 3, the specific design of the preheating structure: the preheating structure includes a spiral heating steam pipe 3 in the tower body 1, which is located below the conical partition 2. The bottom end of the spiral heating steam pipe 3 is connected to a vent pipe 40, which extends to the bottom of the tower body 1. A plurality of columns 39 are fixed on the top of the conical partition 2, and the tops of these columns 39 jointly support an annular exhaust pipe 10. The top of the spiral heating steam pipe 3 passes through the conical partition 2 and is connected to the annular exhaust pipe 10. An annular chlorine gas discharge pipe 8 is also fixed in the tower body 1, and a gas injection pipe 9 is connected to one side of the pipe. One end of the gas injection pipe 9 extends to one side of the tower body 1 for injecting chlorine into the annular chlorine gas discharge pipe 8. The annular chlorine gas discharge pipe 8 is located above the annular exhaust pipe 10. The mother liquor is first preheated through the condenser 19, and then enters the tower body 1 through the connecting pipe 21. Steam is injected into the spiral heating steam pipe 3 through the vent pipe 40 to preheat the mother liquid for a second time, thereby making full use of the heat energy in the steam.

[0028] Reference Figure 2 and Figure 7 , the specific design of the stirring structure: the stirring structure includes a rotating box 30 fixed to the outer wall of the waste liquid pipe 29. A rotating shaft 31 is rotatably connected in the rotating box 30, and a plurality of arc-shaped liquid collecting plates 32 are fixed on the outer wall of the rotating shaft 31, and one side of these arc-shaped liquid collecting plates 32 extends into the waste liquid pipe 29. When the liquid flows downward through the waste liquid pipe 29, it drives the arc-shaped liquid collecting plates 32 and the rotating shaft 31 to rotate. A rotating rod 33 is fixed at both ends of the rotating shaft 31, and one end of the rotating rod 33 extends to one side of the rotating box 30, and a plurality of stirring blades 34 are fixed on the outer wall of the rotating rod 33. When the mother liquor after the reaction is discharged to the outside through the waste liquid pipe 29 under the action of the conical partition plate 2, the liquid drives the arc-shaped liquid collecting plates 32 and the rotating shaft 31 to rotate, and then drives the rotating rod 33 and the stirring blades 34 to rotate, which is used to stir the mother liquor in the tower body 1, so that the mother liquor can be evenly heated under the action of the spiral heating steam pipe 3, so as to facilitate the exchange reaction between the bromide ions and the chlorine gas in the mother liquor in the later stage.

[0029] Reference Figure 1-Figure 3 , Specific design of the annular exhaust pipe and the guide pipe: A plurality of exhaust holes 41 are fixed on the inner wall and the outer wall of the annular exhaust pipe 10, and these exhaust holes 41 are placed obliquely downward to prevent liquid from entering the annular exhaust pipe 10 through the exhaust holes 41. A booster pump 5 is provided on the guide pipe 4, and the booster pump 5 cooperates with the guide pipe 4 to increase the flow rate of the mother liquid injected into the liquid storage ring 11 by the guide pipe 4, so as to achieve the purpose of driving the annular spray pipe 6 to rotate.

[0030] Reference Figure 1 , Figure 2 and Figure 4, Design of gas collecting pipe and liquid drain pipe: A gas collecting pipe 18 is fixed at the top of the distillation tower, and a liquid drain pipe 35 is fixed at the bottom. The main function of the liquid drain pipe 35 is to discharge the mother liquor remaining in the tower body 1. One end of the gas collecting pipe 18 extends into the condenser tube 17 and is connected to the top of the condenser tube 19. This design allows the collected bromine gas to be condensed in the condenser tube 19, and at the same time, the mother liquor in the condenser tube 17 is preheated for the first time, thereby improving the utilization rate of thermal energy.

[0031] Reference Figure 2 and Figure 5 , Cross-tube design: Cross-tubes are provided in the annular chlorine gas discharge pipe 8 and the annular spray pipe 6, and the two cross-tubes are respectively connected to the corresponding annular chlorine gas discharge pipe 8 and the annular spray pipe 6. Multiple through holes are provided on the side where the two cross-tubes are close to each other, and such a design can increase the efficiency and area of ​​spraying and exhaust. Example 2

[0032] refer to Fig. 9 , based on the improvement of Example 1: Design of the annular inclined panel and the ceramic column: An annular inclined panel 36 is fixed in the tower body 1, and a plurality of ceramic columns 37 are fixed at the bottom of the panel. The bottom ends of these ceramic columns 37 are fixedly extended into the liquid storage ring 11. The annular inclined panel 36 is made of ceramic material, which can guide the heat energy of the mother liquid in the liquid storage ring 11 to the annular inclined panel 36 under the action of the ceramic columns 37, thereby preventing the bromine gas from condensing at the bottom of the annular inclined panel 36.

[0033] Design of reflux pipe: A reflux pipe 38 is fixedly passed through the tower body 1, one end of which extends to the outside of the tower body 1 and is connected to the gas collecting pipe 18. A one-way valve is arranged in the reflux pipe 38. When the bromine gas and steam move upward and enter the condenser pipe 19 through the gas collecting pipe 18, the bromine gas will condense on the top inner wall of the tower body 1. At this time, the condensed liquid bromine will fall on the annular inclined plate 36 along the inner wall of the tower body 1. Through the reflux pipe 38, the condensed liquid bromine can be introduced into the gas collecting pipe 18 to avoid the waste caused by the reflux of liquid bromine into the tower body 1.

[0034] A method for using a distillation tower for bromine production comprises the following steps: S1, injecting mother liquid into the condensing cylinder 17 through the liquid injection pipe 20, performing heat exchange through the condensing pipe 19, completing the primary preheating of the mother liquid, and then the mother liquid enters the tower body 1 through the connecting pipe 21, injecting steam into the spiral heating steam pipe 3 through the ventilation pipe 40, and performing secondary preheating on the mother liquid through the steam and the spiral heating steam pipe 3, and the preheated mother liquid is sprayed downward through the annular spray pipe 6 under the action of the guide pipe 4 and the booster pump 5; injecting chlorine into the annular chlorine discharge pipe 8 through the gas injection pipe 9, the chlorine and the steam in the annular exhaust pipe 10 move upward into the packing layer 7, so that the mother liquid and the chlorine can be in contact in the packing layer 7, and the chlorine and the bromide ions exchange reaction to generate bromine gas; S2, the bromine gas is heated together with the water vapor and rises along the inner wall of the tower body 1, and finally flows back to the condenser 19 under the action of the gas collecting pipe 18, and is condensed into liquid bromine under the action of the mother liquid in the condenser tube 17, making full use of the heat energy in the steam, and the liquid bromine flows under the baffle plate 23, and the flow rate of the liquid bromine can be reduced under the action of multiple blocking members 24, so as to precipitate impurities carried in the liquid bromine, and as the liquid bromine gradually increases, the impurities are filtered through the filter hole 26, and then the injection pipe 20 can collect relatively pure liquid bromine; S3, the mother liquor after secondary heating is sprayed toward the arc plate 15 through the nozzle 14 under the action of the guide pipe 4 and the booster pump 5, which is used to drive the annular spray pipe 6 to rotate. The annular spray pipe 6 rotates during the process of spraying liquid bromine, so that the liquid bromine can be evenly sprayed toward the packing layer 7. Later, the chlorine gas can fully react with the bromide ions in the mother liquor in the packing layer 7, thereby improving the utilization rate of the chlorine gas and the production efficiency of the bromine gas; S4, the mother liquid after the reaction is discharged to the outside through the waste liquid pipe 29 under the action of the conical partition plate 2, and when the liquid flows downward through the waste liquid pipe 29, the liquid drives the arc-shaped liquid collecting plate 32 and the rotating shaft 31 to rotate, and the rotating shaft 31 drives the rotating rod 33 and the stirring blade 34 to rotate, which is used to stir the mother liquid in the tower body 1, so that the mother liquid can be evenly heated under the action of the spiral heating steam pipe 3, so as to facilitate the exchange reaction between the bromide ions and the chlorine gas in the mother liquid in the later stage; S5. When the bromine gas and steam move upward and enter the condenser 19 through the gas collecting pipe 18, the bromine gas condenses on the top inner wall of the tower body 1. At this time, the condensed liquid bromine falls on the annular inclined plate 36 along the inner wall of the tower body 1. The condensed liquid bromine can be poured into the gas collecting pipe 18 through the reflux pipe 38, avoiding the liquid bromine from flowing back into the tower body 1 and causing waste of liquid bromine.

[0035] However, the working principle and wiring method of the boost pump 5 are commonplace, and are conventional means or common knowledge, and will not be elaborated here. Those skilled in the art may make any selections according to their needs or convenience.

[0036] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A distillation tower for bromine production, characterized in that: It comprises a tower body (1) and a packing layer (7) fixed in the tower body (1), wherein an annular spray pipe (6) located above the packing layer (7) is rotatably connected in the tower body (1), and the annular spray pipe (6) is used to spray mother liquid onto the packing layer (7); A conical partition (2) is fixedly provided in the tower body (1) and is located below the packing layer (7) for collecting liquid after the reaction. A waste liquid pipe (29) is fixedly passed through the bottom of the conical partition (2), and one end of the waste liquid pipe (29) is fixedly extended to one side of the tower body (1) for discharging the collected liquid to the outside. It also comprises a condensation cylinder (17) which is arranged on one side of the tower body (1); a connecting pipe (21) is fixed on one side of the condensation cylinder (17); one end of the connecting pipe (21) extends into the tower body (1); a liquid injection pipe (20) is fixed on the side of the condensation cylinder (17) away from the connecting pipe (21); a condensation pipe (19) is arranged in the condensation cylinder (17) for initially preheating the mother liquid entering the condensation cylinder (17); It also includes a sedimentation box (22), which is arranged below the condensation cylinder (17) and is used to filter impurities contained in the liquid bromine after condensation in the condensation tube (19); A preheating structure is arranged in the tower body (1) and is used to perform secondary preheating on the mother liquor after the initial preheating; A spray structure, arranged in the tower body (1), for uniformly spraying the second preheated mother liquid downward onto the packing layer (7); A filtering structure, disposed in the sedimentation tank (22), for filtering impurities in the liquid bromine; A plurality of stirring structures are arranged in sequence from top to bottom on the outer wall of the waste liquid pipe (29), and two adjacent stirring structures are arranged vertically. The waste liquid in the waste liquid pipe (29) drives the stirring structure to stir the mother liquid in the tower body (1).

2. A distillation tower for bromine production according to claim 1, characterized in that: The spray structure comprises a liquid storage ring (11) fixed in the tower body (1), and the liquid storage ring (11) is sealingly slidably arranged on the top of the annular spray pipe (6), a plurality of arc plates (15) are fixed on the top of the annular spray pipe (6), and the arc plates (15) are located in the liquid storage ring (11), a plurality of liquid injection holes (16) are provided on the top of the annular spray pipe (6), and the liquid injection holes (16) cooperate with the arc plates (15) to inject mother liquid into the annular spray pipe (6), and a plurality of guide pipes (4) are fixed on the outer wall of the tower body (1), and the bottom ends of the guide pipes (4) extend The tower body (1) is provided with a plurality of nozzles (14) which are connected to the tower body (1) and are located below the conical partition plate (2). The top end of the guide pipe (4) extends into the tower body (1) and is located above the liquid storage ring (11). An L-shaped pipe (12) is fixed on one side of the guide pipe (4). A plurality of liquid storage pipes (13) are fixed on the liquid storage ring (11). The bottom end of the L-shaped pipe (12) extends into the liquid storage ring (11) and is connected to the liquid storage pipe (13). A plurality of nozzles (14) are fixed on one side of the liquid storage pipe (13). The nozzles (14) cooperate with the arc plate (15) to drive the annular spray pipe (6) to rotate.

3. A distillation tower for bromine production according to claim 2, characterized in that: The filtering structure comprises a baffle plate (23) which is detachably fixedly arranged in a sedimentation box (22); the bottom end of the condensation tube (19) is fixedly extended into the sedimentation box (22); the bottom end of the condensation tube (19) passes through the baffle plate (23); a plurality of filter holes (26) are provided on a side of the top of the sedimentation box (22) away from the condensation tube (19) for filtering impurities in the liquid bromine; a plurality of blocking components (24) are fixedly arranged on the inner wall of the bottom of the sedimentation box (22); the blocking components (24) are used to hinder the flow of the liquid bromine below the baffle plate (23); and a collecting pipe (25) located above the baffle plate (23) is fixedly arranged on one side of the sedimentation box (22).

4. A distillation tower for bromine production according to claim 3, characterized in that: The blocking member (24) is composed of a first baffle (27) and two second baffles (28), and the tops of the first baffle (27) and the second baffle (28) are in contact with the bottom of the blocking plate (23), and the sides of the two second baffles (28) that are away from each other are fixedly connected to the inner wall of one side of the sedimentation box (22), and the two sides of the first baffle (27) and the two sides of the inner wall of the sedimentation box (22) form a first gap, and the sides of the two second baffles (28) that are close to each other form a second gap. The cooperation of the first gap and the second gap can effectively reduce the flow rate of the liquid bromine, so that impurities carried in the liquid bromine are precipitated.

5. A distillation tower for bromine production according to claim 4, characterized in that: The preheating structure comprises a spiral heating steam pipe (3) arranged in a tower body (1), and the spiral heating steam pipe (3) is located below the conical partition (2); a ventilation pipe (40) is fixed to the bottom end of the spiral heating steam pipe (3), and the bottom end of the ventilation pipe (40) is fixed and extends to the bottom of the tower body (1); a plurality of columns (39) are fixed to the top of the conical partition (2); the top ends of the plurality of columns (39) are fixed with the same annular exhaust pipe (10); the top end of the spiral heating steam pipe (3) passes through the conical partition (2) and is connected to the annular exhaust pipe (10); an annular chlorine gas discharge pipe (8) is fixed in the tower body (1); a gas injection pipe (9) is fixed to one side of the annular chlorine gas discharge pipe (8), and one end of the gas injection pipe (9) extends to one side of the tower body (1) and is used for injecting chlorine into the annular chlorine gas discharge pipe (8); the annular chlorine gas discharge pipe (8) is located above the annular exhaust pipe (10).

6. A distillation tower for bromine production according to claim 5, characterized in that: The stirring structure comprises a rotating box (30) fixed to the outer wall of the waste liquid pipe (29), a rotating shaft (31) being rotatably connected inside the rotating box (30), a plurality of arc-shaped liquid collecting plates (32) being fixed to the outer wall of the rotating shaft (31), and one side of the arc-shaped liquid collecting plates (32) extending into the waste liquid pipe (29), the arc-shaped liquid collecting plates (32) rotating under the action of the downstream liquid, rotating rods (33) being fixed at both ends of the rotating shaft (31), and one end of the rotating rod (33) extending to one side of the rotating box (30), and a plurality of stirring blades (34) being fixed to the outer wall of the rotating rod (33).

7. A distillation tower for bromine production according to claim 6, characterized in that: The inner wall and the outer wall of the annular exhaust pipe (10) are both fixed with a plurality of exhaust holes (41), and the exhaust holes (41) are arranged obliquely downward to prevent liquid from entering the annular exhaust pipe (10) through the exhaust holes (41). The guide pipe (4) is provided with a booster pump (5), and the booster pump (5) cooperates with the guide pipe (4) to increase the flow rate of the mother liquid injected into the liquid storage ring (11) by the guide pipe (4).

8. A distillation tower for bromine production according to claim 7, characterized in that: A gas collecting pipe (18) and a liquid discharge pipe (35) are fixed to the top and bottom of the tower body (1), respectively. The liquid discharge pipe (35) is used to discharge the mother liquor remaining in the tower body (1). One end of the gas collecting pipe (18) extends into the condensing tube (17) and is connected to the top of the condensing tube (19), so as to condense the collected bromine gas in the condensing tube (19) and preheat the mother liquor in the condensing tube (17) to improve the utilization rate of thermal energy. The annular chlorine gas discharge pipe (8) and the annular spray pipe (6) are both provided with cross pipes, and the two cross pipes are connected to the corresponding annular chlorine gas discharge pipe (8) and the annular spray pipe (6). A plurality of through holes are provided on the sides of the two cross pipes close to each other, so as to increase the efficiency and area of ​​spraying and exhaust.

9. A distillation tower for bromine production according to claim 8, characterized in that: An annular inclined plate (36) is fixed in the tower body (1), and a plurality of ceramic columns (37) are fixed at the bottom of the annular inclined plate (36). The bottom ends of the plurality of ceramic columns (37) are fixedly extended into the liquid storage ring (11), and the annular inclined plate (36) is made of ceramic material. Under the action of the ceramic columns (37), the annular inclined plate (36) can introduce the heat energy of the mother liquid in the liquid storage ring (11) to the annular inclined plate (36), thereby preventing the bromine gas from condensing at the bottom of the annular inclined plate (36). A reflux pipe (38) is fixedly passed through the tower body (1), and one end of the reflux pipe (38) extends to the outside of the tower body (1) and is connected to the gas collecting pipe (18). A one-way valve is provided in the reflux pipe (38), and the reflux pipe (38) cooperates with the one-way valve to introduce the liquid bromine condensed at the top of the tower body (1) into the gas collecting pipe (18).

10. The method for using a distillation tower for bromine production according to claim 9, characterized in that: The following steps are involved: S1, the mother liquor is injected into the condenser (17) through the liquid injection pipe (20), first preheated by the condenser pipe (19), and then enters the tower body (1); in the tower, steam is preheated for a second time by the spiral heating steam pipe (3), and is evenly sprayed by the annular spray pipe (6); at the same time, chlorine is injected through the annular chlorine discharge pipe (8), rises together with the steam and enters the packing layer (7), and reacts with the bromide ions in the mother liquor to generate bromine gas; S2, bromine gas and water vapor mix and rise, and flow back to the condenser (19) through the gas collecting pipe (18), and condense into liquid bromine under the action of the mother liquid in the condenser cylinder (17); the liquid bromine passes under the baffle plate (23), and passes through a plurality of blocking components (24) to slow down the flow rate to promote the precipitation of impurities, and then is filtered through the filter hole (26) and the pure bromine liquid is collected by the injection pipe (20); S3, the preheated mother liquor is sprayed onto the arc plate (15) through the nozzle (14), driving the annular spray pipe (6) to rotate, so that the bromine liquid is evenly sprayed onto the packing layer (7), thereby enhancing the reaction efficiency of chlorine gas and bromide ions, and improving the utilization rate of chlorine gas and the output of bromine gas; S4, the mother liquor after the reaction is guided to the waste liquid pipe (29) through the conical partition (2) for discharge, and at the same time, the arc-shaped liquid collecting plate (32) and the rotating shaft (31) are driven to rotate, driving the stirring blade (34) to rotate, ensuring that the mother liquor is evenly heated in the tower, thereby promoting the full reaction of bromide ions and chlorine gas; S5. After bromine gas and steam are condensed at the top of the tower, they slide down the annular inclined plate (36) to the reflux pipe (38) and are then introduced into the gas collecting pipe (18), effectively preventing the condensed bromine liquid from flowing back into the tower and reducing waste.

Citation Information

Patent Citations

  • An energy-saving bromine production system

    CN107892276A

  • NMP waste liquid recovery equipment and recovery process thereof

    CN113877230A

  • Distillation tower for bromine production

    CN211004549U

  • Bromine rectification device

    CN213965223U

  • Liquid treatment device and method

    US20090152093A1

Cited By

  • Intelligent uniform heating coke tower preheating device

    CN119685051A

  • An intelligent and uniformly heated coke tower preheating device

    CN119685051B