Dredged mud treatment system

Through the dredged slurry treatment system with multi-stage precipitation and air-floating treatment, the problems of high water content and low dehydration efficiency are solved, land resources conservation and residual water emissions are achieved, and dehydration efficiency and purification effect are improved.

CN118908521APending Publication Date: 2024-11-08CCCC SHANGHAI DREDGING CO LTD

Patent Information

Application Number
CN202411184104.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing dredging mud treatment process has the problems of high mud moisture content, low dehydration efficiency, large land resource occupation, and difficult surplus water treatment, especially in urban environments, which are difficult to achieve effective dehydration and purification.

Method used

A dredged mud treatment system was designed, including primary treatment unit, primary, secondary and tertiary mud pool treatment unit, mud conditioning tank and plate and frame filter press dehydration unit, which reduces the water content of mud by multi-stage precipitation and air floatation treatment. , improve dehydration efficiency, and use artificial wetlands to purify residual water.

Benefits of technology

It effectively reduces the moisture content of mud before filtration of the plate and frame, reduces the dehydration load, saves land resources, improves the dehydration efficiency and residual water purification effect, and achieves the standard emission of residual water.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908521A_ABST
    Figure CN118908521A_ABST
Patent Text Reader

Abstract

The invention discloses a dredged mud treatment system which comprises a primary treatment unit, a first-stage mud pool treatment unit, a second-stage mud pool treatment unit, a third-stage mud pool treatment unit, a first-stage residual water pool treatment unit and a second-stage residual water pool treatment unit which are connected in sequence, the second-stage residual water pool treatment unit is further connected with the first-stage mud pool treatment unit; the mud conditioning tank unit is simultaneously connected with the first-stage mud tank treatment unit, the second-stage mud tank treatment unit, the third-stage mud tank treatment unit and the second-stage residual water tank treatment unit; the plate-and-frame filter press dehydration unit is connected with the slurry conditioning tank unit; and the air floatation unit is connected between the plate-and-frame filter press dehydration unit and the primary residual water tank treatment unit. According to the invention, the plate-and-frame filter pressing treatment load is effectively reduced, land resources are saved, the dehydration efficiency of the plate-and-frame filter press is enhanced, the arrangement of a dehydration site is optimized, and the residual water purification effect is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water conservancy and ecological environment, in particular to the field of mud solidification and dehydration generated during the dredging process of rivers, lakes, waterways and reservoirs, and specifically to a dredging mud treatment system. Background Art

[0002] At present, my country is carrying out large-scale dredging and desilting projects for rivers, lakes, waterways and reservoirs. Dredging and desilting for rivers, lakes, waterways and reservoirs is an important measure for ecological governance, water conservancy and shipping, and increasing reservoir capacity. Due to the large volume of dredged mud (the volume of the original bottom mud increases significantly after suction dredging, making the mud volume close to 7 times that of the original bottom mud), high water content and complex components, it is difficult to handle dredged mud due to restrictions such as dehydration requirements, stacking sites, and transportation distances.

[0003] In the current engineering application field, the main treatment processes for dredged mud include natural dehydration, vacuum preloading, geotube bags, and mechanical dehydration (plate and frame filter press). Among the above processes, natural dehydration, vacuum preloading, and geotube bag processes occupy a large area of ​​land, take a long time to dehydrate, and have poor dehydration effects, making them difficult to implement around cities. The process using mechanical dehydration (plate and frame filter press) has the characteristics of relatively small footprint, continuous operation, and good dehydration effects. It is mainly used for dredging and desilting mud treatment in rivers, lakes, and waterways near cities. But in general, the use of mechanical dehydration (plate and frame filter press) also has certain limitations, which are reflected in the following three aspects:

[0004] The first is the influence of mud moisture content and volume. Affected by the mud moisture content, the mud volume changes greatly. For example, when the mud moisture content is concentrated from 95% to 70%, the mud volume is only 1 / 6 of the original. The mud volume is an important factor in the efficiency of the plate and frame filter press, which directly affects the dehydration efficiency of the mud and the configuration quantity, specifications and operation and maintenance costs of the plate and frame filter press.

[0005] Second, it is limited by urban land resources. For the process of mechanical dehydration, the layout of sites and facilities such as mud pools, conditioning pools, mechanical dehydration sites, and residual water treatment facilities should be considered to seek a reasonable layout.

[0006] The third is the discharge requirements of plate and frame filter press residual water. The discharge of plate and frame filter press tail water may cause secondary pollution, so the residual water needs to be further treated. For plate and frame filter press residual water, the overall drainage standard requirements are not lower than the water quality conditions and water quality targets of the receiving water body for residual water discharge of the local environmental protection department. Therefore, ensuring that the plate and frame filter press residual water meets the discharge standards is an important link in control.

[0007] Therefore, there is an urgent need to develop a dredged mud treatment system that can reduce the moisture content of dredged mud before plate and frame filter press treatment, reduce the plate and frame filter press treatment load, reasonably arrange the dehydration site, save land resources, and ensure that the residual water is discharged stably and meets the standards. It can enhance the dehydration efficiency of the plate and frame filter press, optimize the dehydration site layout, and strengthen the residual water purification effect. It has broad promotion value and significant environmental, economic and social benefits. Summary of the invention

[0008] The purpose of the present invention is to overcome the defects of the prior art and provide a dredged mud treatment system, which reduces the moisture content of the dredged mud before the plate and frame filter press treatment, reduces the plate and frame filter press treatment load, reasonably arranges the dehydration site, saves land resources, and ensures that the residual water is stably discharged in compliance with the standards, enhances the dehydration efficiency of the plate and frame filter press, optimizes the dehydration site layout, and strengthens the residual water purification effect.

[0009] A dredging mud processing system according to the present invention comprises:

[0010] A primary treatment unit, a primary mud pool treatment unit, a secondary mud pool treatment unit, a tertiary mud pool treatment unit, a primary residual water pool treatment unit and a secondary residual water pool treatment unit connected in sequence, wherein the secondary residual water pool treatment unit is also connected to the primary mud pool treatment unit;

[0011] A mud conditioning tank unit connected to the primary mud tank treatment unit, the secondary mud tank treatment unit, the tertiary mud tank treatment unit and the secondary residual water tank treatment unit;

[0012] a plate and frame filter press dewatering unit connected to the mud conditioning tank unit; and

[0013] An air flotation unit connected between the plate and frame filter press dehydration unit and the primary residual water tank treatment unit;

[0014] The primary treatment unit removes impurities in the mud; the primary mud pool treatment unit mixes the mud discharged from the primary treatment unit with a reagent to form a first precipitate; the secondary mud pool treatment unit mixes the mud discharged from the primary mud pool treatment unit with a reagent to form a second precipitate; the tertiary mud pool treatment unit mixes the mud discharged from the secondary mud pool treatment unit with a reagent to form a third precipitate;

[0015] The mud conditioning tank unit mixes the first precipitate, the second precipitate and the third precipitate with the reagent to form conditioned mud; the plate and frame filter press dehydration unit dehydrates the conditioned mud to form a mud cake; the air flotation unit removes scum in the residual water discharged by the plate and frame filter press dehydration unit;

[0016] The first-level residual water tank treatment unit processes the supernatant discharged from the third-level mud tank treatment unit and the residual water discharged from the flotation unit to form first-level tail water; the second-level residual water tank treatment unit processes the first-level tail water to form qualified tail water, and on the one hand, uses the qualified tail water to flush the first-level mud tank treatment unit, and on the other hand, uses the qualified tail water to adjust the concentration of the conditioned mud.

[0017] Preferably, the primary treatment unit comprises: a grit chamber and an electric screen machine arranged in sequence.

[0018] Preferably, the primary mud pool treatment unit includes: a primary mud pool for storing mud discharged from the primary treatment unit, a first dosing mechanism for adding chemicals into the primary mud pool, a first suction dredger for sucking the first sediment, and a first mud pump for extracting the first sediment to the mud conditioning pool unit.

[0019] Preferably, the secondary mud pool treatment unit includes: a secondary mud pool for storing mud discharged from the primary mud pool treatment unit, a second dosing mechanism for adding chemicals into the secondary mud pool, a second suction dredger for sucking the second sediment, and a second mud pump for extracting the second sediment to the mud conditioning pool unit.

[0020] Preferably, the tertiary mud pool treatment unit includes: a tertiary mud pool for storing mud discharged from the secondary mud pool treatment unit, a third dosing mechanism for adding chemicals to the tertiary mud pool, a third suction dredger for sucking the third sediment, and a third mud pump for extracting the third sediment to the mud conditioning pool unit.

[0021] Preferably, the mud conditioning tank unit comprises: a stirring device for stirring the first sediment, the second sediment and the third sediment and a fourth dosing mechanism for adding a chemical into the stirring device.

[0022] Preferably, the plate and frame filter press dehydration unit comprises: a plate and frame filter press for dehydrating the conditioned mud and a plunger pump for pumping the conditioned mud into the plate and frame filter press.

[0023] Preferably, the flotation unit comprises: a bubble flotation device for forming the scum, a fifth dosing mechanism for adding reagents to the bubble flotation device, an air intake device for ventilating the bubble flotation device, and a scum removal device for removing the scum.

[0024] Preferably, the secondary residual water pool treatment unit includes: a secondary residual water pool for storing the primary tail water, an artificial wetland arranged in the secondary residual water pool, and a flow pump for extracting the qualified tail water to the primary mud pool treatment unit and the mud conditioning pool unit, wherein the artificial wetland includes artificial fillers and aquatic plants.

[0025] Preferably, the artificial filler includes, from top to bottom, a first gravel layer with a thickness of 0.5 m and a particle size of 30-50 mm, a ceramsite layer with a thickness of 0.5 m and a particle size of 20-30 mm, a slow-release carbon source layer with a thickness of 0.2 m and a particle size of 5-20 mm, and a second gravel layer with a thickness of 0.2 m and a particle size of 5-10 mm;

[0026] The aquatic plants include submerged plants, floating plants and emergent plants, wherein the submerged plants are hornwort and foxtail algae planted in a 1:2 mosaic combination, with a planting density of 10-15 clumps / m 2 The floating plant is Eupatorium crassifolium, and its planting density is 1-2 clumps / m 2 The emergent plants are windmill grass and spatholobi, and the planting density is 3-6 bushes / m 2 .

[0027] The present invention provides a dredging mud treatment system, which has the following beneficial effects:

[0028] 1. The dredged mud treatment system increases the dredged mud retention path by setting up one to three mud pool treatment units, and by adding flocculants, the mud is gradually precipitated and concentrated, and then the mud pump is used to extract the bottom mud of each mud pool treatment unit for dehydration treatment. The design of the three-stage mud pool treatment unit reduces the water content of the dredged mud, realizes mud volume reduction, improves the dehydration efficiency of the plate and frame filter press, reduces the number of plate and frame filter presses, and reduces the operation and maintenance costs of the plate and frame filter presses.

[0029] 2. The dredged mud treatment system forms a loop by connecting the primary treatment unit, the first to third mud pool treatment units, and the first to second residual water pool treatment units in series. The supernatant flows by gravity and finally reaches the discharge standard through the surface flow artificial wetland. This process effectively targets the high water content of the mud, reduces the supernatant treatment path, and reduces the treatment fee and cost.

[0030] 3. The dredged mud treatment system, through the combination of various levels of treatment units and treatment facilities, forms a dredged mud treatment system with coagulation sedimentation-plate and frame filter press-residual water flotation-surface flow wetland as the core, and can design the size of each treatment unit and the selection of treatment facilities according to the characteristics of different mud sources, and optimize the site layout.

[0031] 4. The dredged mud treatment system, by selecting the combined flotation-surface flow artificial wetland wastewater treatment process, gives full play to the effects of flotation, coagulation sedimentation, biological absorption metabolism, adsorption and degradation, reduces the SS, TP, TN, ammonia nitrogen and other indicators in the wastewater, enhances the effluent quality, and achieves the standard discharge of wastewater. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a process diagram of a dredging mud treatment system of the present invention;

[0033] Figure 2 The present invention is a flow chart of a dredging mud treatment system.

[0034] In the figure: 100, mud; 1, primary treatment unit; 11, first pipeline; 12, sand settling tank; 13, electric screen machine; 14, debris; 2, primary mud pool treatment unit; 21, first sediment; 22, first cutter suction excavator ship; 23, first mud pump; 24, second pipeline; 25, first dosing mechanism; 26, primary mud pool; 3, secondary mud pool treatment unit; 31, second sediment; 32, second cutter suction excavator ship; 33, second mud pump; 34, third pipeline; 35, second dosing mechanism; 36, secondary mud pool; 4, tertiary mud pool treatment unit; 41, third sediment; 42, third cutter suction excavator ship; 43, third mud pump; 44, fourth pipeline; 45, third dosing mechanism; 46 , third-level mud pool; 47, supernatant; 5, mud conditioning pool unit; 51, conditioning mud; 52, fourth dosing mechanism; 53, stirring device; 6, plate and frame filter press dehydration unit; 61, residual water; 62, mud cake; 63, plunger pump; 64, plate and frame filter press; 65, transport vehicle; 7, flotation unit; 71, fifth pipeline; 72, fifth dosing mechanism; 73, air intake device; 74, scum removal device; 75, bubble flotation equipment; 8, first-level residual water pool treatment unit; 81, sixth pipeline; 82, first-level tail water; 9, second-level residual water pool treatment unit; 91, second-level residual water pool; 92, artificial wetland; 921, artificial filler; 922, aquatic plants; 93, drainage pipe; 94, flow pump; 95, qualified tail water. DETAILED DESCRIPTION

[0035] The present invention will be further described below in conjunction with the accompanying drawings.

[0036] See also Figure 1-2 The present invention, namely, a dredging mud processing system, comprises:

[0037] A primary treatment unit 1, a primary mud pool treatment unit 2, a secondary mud pool treatment unit 3, a tertiary mud pool treatment unit 4, a primary residual water pool treatment unit 8 and a secondary residual water pool treatment unit 9 connected in sequence, wherein the secondary residual water pool treatment unit 9 is also connected to the primary mud pool treatment unit 2;

[0038] A mud conditioning tank unit 5 connected to the primary mud tank treatment unit 2, the secondary mud tank treatment unit 3, the tertiary mud tank treatment unit 4 and the secondary residual water tank treatment unit 9;

[0039] a plate and frame filter press dewatering unit 6 connected to the mud conditioning tank unit 5; and

[0040] An air flotation unit 7 connected between the plate and frame filter press dehydration unit 6 and the primary residual water tank treatment unit 8;

[0041] The primary treatment unit 1 removes larger debris 14 from the mud 100. In this embodiment, the primary treatment unit 1 is a brick-concrete structure, which includes: a sand settling tank 12 and an electric screen machine 13 arranged in sequence; in addition, the debris 14 includes: bricks, gravel, garbage and floating objects, etc. The treated mud 100 flows into the primary mud pool treatment unit 2 through the first pipe 11 by its own gravity;

[0042] The primary mud pool treatment unit 2 mixes the mud 100 discharged from the primary treatment unit 1 with a reagent to form a first sediment 21; in this embodiment, the primary mud pool treatment unit 2 includes: a primary mud pool 26 for storing the mud 100 discharged from the primary treatment unit 1, a first dosing mechanism 25 for adding a reagent to the primary mud pool 26, a first suction dredger 22 for sucking the first sediment 21, and a first mud pump 23 for pumping the first sediment 21 to the mud conditioning pool unit 5, wherein the reagent is a flocculant, and the flocculant has a concentration of 8.8 kg / m 3 The treated mud 100 flows into the secondary mud pool treatment unit 3 through the second pipe 24 by its own gravity;

[0043] The secondary mud pool treatment unit 3 mixes the mud 100 discharged from the primary mud pool treatment unit 2 with a reagent to form a second sediment 31; in this embodiment, the secondary mud pool treatment unit 3 includes: a secondary mud pool 36 for storing the mud 100 discharged from the primary mud pool treatment unit 2, a second dosing mechanism 35 for adding a reagent to the secondary mud pool 36, a second suction dredger 32 for sucking the second sediment 31, and a second mud pump 33 for extracting the second sediment 31 to the mud conditioning pool unit 5, wherein the reagent is a flocculant, and the flocculant has a concentration of 8.8 kg / m 3The treated mud 100 flows into the tertiary mud pool treatment unit 4 through the third pipeline 34 by its own gravity;

[0044] The tertiary mud pool treatment unit 4 mixes the mud 100 discharged from the secondary mud pool treatment unit 3 with the reagent to form a third sediment 41; in this embodiment, the tertiary mud pool treatment unit 4 includes: a tertiary mud pool 46 for storing the mud 100 discharged from the secondary mud pool treatment unit 3, a third dosing mechanism 45 for adding the reagent to the tertiary mud pool 46, a third suction dredger 42 for sucking the third sediment 41, and a third mud pump 43 for extracting the third sediment 41 to the mud conditioning pool unit 5, wherein the reagent is a flocculant, and the flocculant has a concentration of 8.8 kg / m 3 The slurry 100 is treated to form a supernatant 47 and flows into the primary residual water tank treatment unit 8 through the fourth pipeline 44;

[0045] The mud conditioning tank unit 5 mixes and stirs the first sediment 21, the second sediment 31 and the third sediment 41 with the reagent to form a conditioned mud 51; in this embodiment, the mud conditioning tank unit 5 includes: a stirring device 53 for stirring the first sediment 21, the second sediment 31 and the third sediment 41 and a fourth dosing mechanism 52 for adding the reagent into the stirring device 53; wherein the reagent is a flocculant, and the flocculant has a concentration of 0.7 kg / m 3 Polyacrylamide (PAM);

[0046] The plate-frame filter press dewatering unit 6 dehydrates the conditioned mud 51 to form a mud cake 62, and the residual water 61 after dehydration is discharged to the flotation unit 7, while the mud cake 62 is transported out through a transport vehicle 65; in this embodiment, the plate-frame filter press dewatering unit 6 includes: a plate-frame filter press 64 for dehydrating the conditioned mud 51 and a plunger pump 63 for pumping the conditioned mud 51 into the plate-frame filter press 64;

[0047] The air flotation unit 7 removes the scum in the residual water 61 discharged from the dehydration unit 6 of the plate and frame filter press; in this embodiment, the air flotation unit 7 includes: a bubble flotation device 75 for forming scum, a fifth dosing mechanism 72 for adding a reagent to the bubble flotation device 75, an air intake device 73 for ventilating the bubble flotation device 75, and a scum removal device 74 for removing scum; wherein the reagents are flocculants A and B, and the flocculant A has a concentration of 125 kg / m 3 Polyaluminium chloride (PAC), flocculant B is 2kg / m 3 Polyacrylamide (PAM);

[0048] The primary residual water tank treatment unit 8 processes the supernatant 47 discharged from the tertiary mud tank treatment unit 4 and the residual water 61 discharged from the flotation unit 7 to form primary tail water 82; the primary tail water 82 is discharged to the secondary residual water tank treatment unit 9 through the sixth pipeline 81;

[0049] The secondary residual water pool treatment unit 9 treats the primary tail water 82 to form the qualified tail water 95, and on the one hand, uses the qualified tail water 95 to flush the primary mud pool treatment unit 2, and on the other hand, uses the qualified tail water 95 to adjust the concentration of the conditioned mud 51; in this embodiment, the secondary residual water pool treatment unit 9 includes: a secondary residual water pool 91 storing the primary tail water 82, an artificial wetland 92 arranged in the secondary residual water pool 91, and a flow pump 94 for extracting the qualified tail water 95 to the primary mud pool treatment unit 2 and the mud conditioning pool unit 5, wherein the artificial wetland 92 is used to form the qualified tail water 95 through the coagulation sedimentation, biological absorption metabolism and adsorption degradation of the primary tail water 82, and then discharge it through the drain pipe 93, and the artificial wetland 92 includes artificial fillers 921 and aquatic plants 922;

[0050] The artificial filler 921 includes, from top to bottom, a first gravel layer with a thickness of 0.5 m and a particle size of 30-50 mm, a ceramsite layer with a thickness of 0.5 m and a particle size of 20-30 mm, a slow-release carbon source layer with a thickness of 0.2 m and a particle size of 5-20 mm, and a second gravel layer with a thickness of 0.2 m and a particle size of 5-10 mm.

[0051] Aquatic plants 922 include submerged plants, floating plants and emergent plants. The submerged plants are hornwort and foxtail algae planted in a 1:2 mosaic combination, with a planting density of 10-15 clumps / m 2 The floating plant is Echeveria, and its planting density is 1-2 clumps / m 2 The emergent plants are windmill grass and spatholobi, and the planting density is 3-6 clumps / m 2 .

[0052] In addition, in this embodiment, the first-level mud pool treatment unit 2, the second-level mud pool treatment unit 3, the third-level mud pool treatment unit 4, the first-level residual water pool treatment unit 8 and the second-level residual water pool treatment unit 9 are all covered with an anti-seepage layer, which includes, from bottom to top, a base, a 7.0 mm thick HDPE anti-seepage membrane, two layers of 400 g / m 2 Non-woven geotextile and 300mm thick loam.

[0053] The processing steps and principles of the present invention are as follows:

[0054] Taking the ecological dredging project of a lake water environment deep governance in the Taihu Lake Basin as an example, the dredging volume of the project is about 600,000 m 3The moisture content of the surface layer of the bottom mud is about 66%. The dredged mud comes from this project. After the bottom mud is dredged by the suction dredger, the mud is transported to this system through pipelines.

[0055] In this system, the primary treatment unit is a brick-concrete structure, 9m long and 4m wide;

[0056] The volume of the mud pool treatment unit yard at each level is calculated by the formula VP = KV + (h1 + h2) S; where: VP is the volume of the mud pool, unit m 3 ; K is the loose coefficient of silt, which is 1.05; V is the total dredging volume, in m 3 ; h1 is the excess water depth of the mud pool, in m, taken as 0.5; h2 is the wind and wave height, in m, taken as 0.5; S is the area of ​​the sludge yard minus the surrounding cofferdam and the middle grid area, in m 2 ; The calculated volume of the mud pool treatment unit yard VP = 140,000 m 3 ;

[0057] The volume ratio of the primary mud pool treatment unit 2, the secondary mud pool treatment unit 3, and the tertiary mud pool treatment unit 4 is 2:1:1, and the effective water depth of the cofferdam is 3.5m; and the areas of the primary mud pool treatment unit 2, the secondary mud pool treatment unit 3, and the tertiary mud pool treatment unit 4 are 20000m 2 , 10000m 2 , 10000m 2 ;

[0058] The volume ratio of the primary residual water tank treatment unit 8 and the secondary residual water tank treatment unit 9 is 2:1, and the total volume is about 60,000 m 3 The effective water depth of the cofferdam is 3.0m; and the areas of the first-level residual water pool treatment unit 8 and the second-level residual water pool treatment unit 9 are 7000m 2 、13000m 2 .

[0059] In step 1, the mud 100 passes through the primary treatment unit 1 to remove larger bricks, gravel, floating objects and debris 14, etc.

[0060] Step 2: The treated mud 100 flows into the primary mud pool treatment unit 2 through the first pipe 11 by its own gravity, and then the first dosing mechanism 25 adds 8.8 kg / m 3The polyaluminium chloride (PAC) is used as a flocculant and mixed with the mud 100 to form a first precipitate, and then the first precipitate 21 is sucked and pumped to the mud conditioning tank unit 5 by the first suction dredger ship 22 and the first mud pump 23; when the first precipitate 21 solidifies and the first suction dredger ship 22 cannot suck, the flow pump 94 is used to pump the qualified tail water 95 discharged from the secondary residual water tank treatment unit 9 to flush the primary mud tank treatment unit 2.

[0061] Step 3: The treated mud 100 flows into the secondary mud pool treatment unit 3 through the second pipe 24 by its own gravity, and then the concentration of 8.8 kg / m is added to the secondary mud pool 36 through the second dosing mechanism 35. 3 The polyaluminium chloride (PAC) is used as a flocculant and mixed with the mud 100 to form a second sediment 31, and then the second sediment 31 is sucked and pumped to the mud conditioning tank unit 5 by the second suction dredger ship 32 and the second mud pump 33;

[0062] Step 4: The treated mud 100 flows into the tertiary mud pool treatment unit 4 through the third pipe 34 by its own gravity, and then the third dosing mechanism 45 adds 8.8 kg / m 3 The polyaluminium chloride (PAC) is used as a flocculant to mix with the mud 100 to form a third sediment 41, and then the third sediment 41 is sucked and pumped to the mud conditioning tank unit 5 by the third suction dredger ship 42 and the third mud pump 43; and the supernatant 47 formed by the mud 100 treated by the third mud tank treatment unit flows into the first residual water tank treatment unit 8 through the fourth pipeline 44;

[0063] Step 5: The first sediment 21, the second sediment 31 and the third sediment 41 are transported to the mud conditioning tank unit 5 by a mud pump. The mud conditioning tank unit 5 is equipped with 4 modules, each module has a size of 15m*4m*2m, and can condition 500m 3 The sediment is then added to the stirring device 53 in the mud conditioning tank unit 5 through the fourth dosing mechanism 52 with a concentration of 0.7 kg / m 3 The polyacrylamide (PAM) is used as a flocculant to mix with the precipitate to increase the solid content of the precipitate entering the subsequent process. During the mixing process, the precipitate is stirred by a stirring device 53. After sufficient stirring and mixing, a conditioned mud 51 is formed. The conditioned mud 51 is then transported to the plate and frame filter press dehydration unit 6 by a plunger pump 63. In addition, during the stirring and mixing process, a flow pump 94 can be used to extract the qualified tail water 95 discharged from the secondary residual water tank treatment unit 9 to adjust the sediment concentration in the mud conditioning tank unit 5 to meet the concentration requirements of the plate and frame filter press dehydration unit 6.

[0064] Step 6: Dewater the conditioned mud 51 through the plate and frame filter press dewatering unit 6. Specifically, the conditioned mud 51 is pumped into 16 600m 2 Mechanical dehydration is performed in the plate and frame filter press 64, during which the mixed liquid flows through the filter medium (filter cloth), the solids stay on the filter cloth, and gradually accumulate on the filter cloth to form a filter cake 62, while the filtrate part penetrates the filter cloth to become residual water 61 without solids, thereby achieving mud and water separation; the moisture content of the solidified mud cake 62 is below 40%, and the mud cake 62 is transported out and used as greening soil backfill, and the dehydrated residual water 61 is discharged to the flotation unit 7;

[0065] Step 7: In the air flotation unit 7, flocculants A and B are added to the bubble flotation device 75 through the fifth dosing mechanism 72. The concentration of flocculant A is 125 kg / m 3 Polyaluminium chloride (PAC), flocculant B is 2kg / m 3 The polyacrylamide (PAM) is then transported to the bubble flotation device 75 through the air intake device 73, and the residual water 61 is stirred and floated with the flocculant, the coagulant and the air. During the contact and stirring process between the residual water 61 (sewage) and the flocculant, a light floc with a stable structure is formed. At the same time, under the action of the coagulant, the light floc gradually adheres to form a large floc, and the floc enters the flotation unit 7 with the water flow, and the air bubbles enter the hollow structure of the large floc, so that the large floc floats on the surface of the water body. At the same time, the purification effect of the nanobubbles can simultaneously degrade some soluble pollutants in the sewage. The treated residual water 61 is discharged to the primary residual water tank treatment unit 8 through the fifth pipeline 71, and the scum generated after the treatment is transported out for treatment through the scum removal device 74;

[0066] Step 8, in the primary residual water tank treatment unit 8, the supernatant 47 discharged from the tertiary mud tank treatment unit 4 and the residual water 61 discharged from the flotation unit 7 are treated to form primary tail water 82, and then the primary tail water 82 is discharged to the secondary residual water tank treatment unit 9 through the sixth pipeline 81;

[0067] Step nine, in the secondary residual water pool treatment unit 9 (surface flow artificial wetland), the primary tail water 82 stored in the secondary residual water pool 91 is subjected to coagulation and sedimentation, biological absorption metabolism and adsorption and degradation in the artificial wetland 92 of artificial fillers 921 and aquatic plants 922 to form qualified tail water 95, and finally discharged through the drain pipe 93;

[0068] Step ten, sampling and testing the discharged qualified tail water 95, analyzing the indicators such as SS, total phosphorus, total nitrogen, COD, and ammonia nitrogen; the total phosphorus TP = 0.06 mg / L, chemical oxygen demand COD = 11.30 mg / L, ammonia nitrogen NH3-N = 1.14 mg / L, SS = 12 mg / L; the discharge complies with the "Surface Water Environmental Quality Standard" (GB 3838-2002) Class III to Class IV.

[0069] In summary, the present invention has the following advantages:

[0070] The dredged mud treatment system, through the setting of first to third level mud pool treatment units, first to second level residual water pool treatment units, mud conditioning pool units and plate and frame filter press dehydration units, increases the dredged mud retention path, reduces the water content of the dredged mud, achieves mud volume reduction, improves the dehydration efficiency of the plate and frame filter press, reduces the number of plate and frame filter presses invested, and reduces the operation and maintenance costs of the plate and frame filter presses.

[0071] The above embodiments are only used to illustrate the present invention, rather than to limit the present invention. Those skilled in the relevant technical field may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.

Claims

1. A dredging mud treatment system, characterized in that: The system comprises: A primary treatment unit, a primary mud pool treatment unit, a secondary mud pool treatment unit, a tertiary mud pool treatment unit, a primary residual water pool treatment unit and a secondary residual water pool treatment unit connected in sequence, wherein the secondary residual water pool treatment unit is also connected to the primary mud pool treatment unit; A mud conditioning tank unit connected to the primary mud tank treatment unit, the secondary mud tank treatment unit, the tertiary mud tank treatment unit and the secondary residual water tank treatment unit; a plate and frame filter press dewatering unit connected to the mud conditioning tank unit; and An air flotation unit connected between the plate and frame filter press dehydration unit and the primary residual water tank treatment unit; The primary treatment unit removes impurities in the mud; the primary mud pool treatment unit mixes the mud discharged from the primary treatment unit with a reagent to form a first precipitate; the secondary mud pool treatment unit mixes the mud discharged from the primary mud pool treatment unit with a reagent to form a second precipitate; the tertiary mud pool treatment unit mixes the mud discharged from the secondary mud pool treatment unit with a reagent to form a third precipitate; The mud conditioning tank unit mixes the first precipitate, the second precipitate and the third precipitate with the reagent to form conditioned mud; the plate and frame filter press dehydration unit dehydrates the conditioned mud to form a mud cake; the air flotation unit removes scum in the residual water discharged by the plate and frame filter press dehydration unit; The first-level residual water tank treatment unit processes the supernatant discharged from the third-level mud tank treatment unit and the residual water discharged from the flotation unit to form first-level tail water; the second-level residual water tank treatment unit processes the first-level tail water to form qualified tail water, and on the one hand, uses the qualified tail water to flush the first-level mud tank treatment unit, and on the other hand, uses the qualified tail water to adjust the concentration of the conditioned mud.

2. The dredging mud processing system according to claim 1, characterized in that: The primary treatment unit comprises: a grit chamber and an electric screen machine which are arranged in sequence.

3. The dredging mud processing system according to claim 1, characterized in that: The primary mud pool treatment unit includes: a primary mud pool for storing mud discharged from the primary treatment unit, a first dosing mechanism for adding chemicals to the primary mud pool, a first suction dredger for sucking the first sediment, and a first mud pump for extracting the first sediment to the mud conditioning pool unit.

4. The dredging mud processing system according to claim 1, characterized in that: The secondary mud pool treatment unit includes: a secondary mud pool for storing mud discharged from the primary mud pool treatment unit, a second dosing mechanism for adding chemicals to the secondary mud pool, a second cutter suction dredger for cutter suctioning the second sediment, and a second mud pump for extracting the second sediment to the mud conditioning pool unit.

5. The dredging mud processing system according to claim 1, characterized in that: The tertiary mud pool treatment unit includes: a tertiary mud pool for storing mud discharged from the secondary mud pool treatment unit, a third dosing mechanism for adding chemicals to the tertiary mud pool, a third suction dredger for sucking the third sediment, and a third mud pump for extracting the third sediment to the mud conditioning pool unit.

6. The dredging mud processing system according to claim 1, characterized in that: The mud conditioning tank unit comprises: a stirring device for stirring the first sediment, the second sediment and the third sediment, and a fourth dosing mechanism for adding a chemical into the stirring device.

7. The dredging mud processing system according to claim 1, characterized in that: The plate and frame filter press dewatering unit comprises: a plate and frame filter press for dewatering the conditioned mud and a plunger pump for pumping the conditioned mud into the plate and frame filter press.

8. The dredging mud processing system according to claim 1, characterized in that: The air flotation unit comprises: a bubble flotation device for forming the scum, a fifth dosing mechanism for dosing reagents into the bubble flotation device, an air intake device for ventilating the bubble flotation device, and a scum removal device for removing the scum.

9. The dredging mud processing system according to claim 1, characterized in that: The secondary residual water pool treatment unit includes: a secondary residual water pool for storing the primary tail water, an artificial wetland arranged in the secondary residual water pool, and a flow pump for extracting the qualified tail water to the primary mud pool treatment unit and the mud conditioning pool unit, wherein the artificial wetland includes artificial fillers and aquatic plants.

10. The dredging mud processing system according to claim 9, characterized in that: The artificial filler includes, from top to bottom, a first gravel layer with a thickness of 0.5 m and a particle size of 30-50 mm, a ceramsite layer with a thickness of 0.5 m and a particle size of 20-30 mm, a slow-release carbon source layer with a thickness of 0.2 m and a particle size of 5-20 mm, and a second gravel layer with a thickness of 0.2 m and a particle size of 5-10 mm; The aquatic plants include submerged plants, floating plants and emergent plants, wherein the submerged plants are hornwort and foxtail algae planted in a 1:2 mosaic combination, with a planting density of 10-15 clumps / m 2 The floating plant is Eupatorium crassifolium, and its planting density is 1-2 clumps / m 2 The emergent plants are windmill grass and spatholobi, and the planting density is 3-6 bushes / m 2 .

Citation Information

Patent Citations

  • Environment-friendly dredged sediment integrated mechanical deep-drying system

    CN104030536A

  • Tail water advanced treatment method and device

    CN111233248A

  • Composite surface flow wetland system

    CN114031183A

  • Dosing and stirring integrated sludge mixer and sludge treatment system