Electronic saw rear feeding production control method and system, electronic equipment and medium
Patent Information
- Application Number
- CN202410927724.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-11
AI Technical Summary
In the prior art, the production efficiency of the loading after the electronic saw is low and the conveying process is poor, which mainly relies on manual operations, resulting in poor production efficiency and efficiency.
By obtaining production tasks, obtaining the type and quantity of plate stacks based on production tasks, and obtaining the buffer position status of each electronic saw, the plate pushing machine is used to automatically send the plate stacks into the buffer position of the target electronic saw for cutting, realizing automatic Feeding control.
It improves the timeliness and real-timeness of production feeding, reduces the production waiting time due to the conveying time, and improves the efficiency of production control after electronic sawing.
Smart Images

Figure CN118915637A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a method, system, electronic equipment and medium for controlling the production of electronic saw rear loading. Background Art
[0002] In the production process of panels, the original panels need to be cut by electronic saws. However, the existing technology for obtaining panels and conveying them to electronic saws often relies on manual labor or only relies on manual control of related transportation equipment to convey the panels after the electronic saw, resulting in low production efficiency and poor transportation application process effects. Summary of the invention
[0003] The main purpose of the embodiments of the present invention is to propose a method, system, electronic device and medium for controlling the production of electronic saw post-loading, in order to solve at least one problem of the prior art. The present invention can efficiently perform the production control of electronic saw post-loading.
[0004] To achieve the above-mentioned purpose, one aspect of an embodiment of the present invention provides a method for controlling the production of electronic saw rear loading, the method comprising:
[0005] Obtaining a production task, and based on the production task, obtaining a first plate stack and placing it in a first cache position; the production task includes a plate stack type, a plate stack number, and a plate stack quantity;
[0006] Acquire the state of the second cache bit of each electronic saw, and respond to the material request of the target electronic saw based on the state; the state includes idle, occupied and allocated;
[0007] Based on the material request of the target electronic saw, the second board stack is obtained from the first buffer position by the board pusher and sent to the target second buffer position of the target electronic saw for cutting processing.
[0008] In some embodiments, obtaining a production task, and based on the production task, obtaining a first plate stack and placing it in a first cache position, comprises the following steps:
[0009] The stacker obtains the production task from the warehouse management system, and based on the board stack number and the board stack quantity, the stacker obtains the first board stack and places it in the first cache position.
[0010] In some embodiments, obtaining a production task from a warehouse management system through a stacker, obtaining a first stack of boards and placing it in a first cache position through the stacker based on the stack number and the number of stacks of boards, includes the following steps:
[0011] Send task requests to the warehouse management system through the stacker based on the preset communication protocol;
[0012] Adjust the second identification number of the warehouse management system to be the same as the first identification number of the stacker;
[0013] When there is a production task in the warehouse management system, the warehouse management system transmits the production task to the stacker in response to the task application; otherwise, the second identification number of the warehouse management system is adjusted to be the same as the first identification number of the stacker, and after a preset interval, the stacker returns to execute the step of sending the task application to the warehouse management system based on the preset communication protocol;
[0014] The stacker takes out the first stack of plates from the designated storage location based on the stack number and the number of stacks of plates, and then places the first stack of plates in the first cache position; the first identification number of the stacker is increased by 1, and the stacker returns to execute the step of sending a task application to the warehouse management system based on a preset communication protocol.
[0015] In some embodiments, obtaining the state of the second cache bit of each electronic saw and responding to the material request of the target electronic saw based on the state includes the following steps:
[0016] Obtain the number of second cache bits of each electronic saw that are in a free state;
[0017] The electronic saw with the largest number of second cache bits being idle is used as the target electronic saw; and the material request of the target electronic saw is obtained and responded to.
[0018] In some embodiments, the method further comprises the following steps:
[0019] When the states of the second cache bits of all electronic saws are the same as the number of free bits, the electronic saw farthest from the first cache bit is used as the target electronic saw.
[0020] In some embodiments, there are at least two pushers, at least one of which is used as a working pusher and at least one is used as a standby pusher; based on the material request of the target electronic saw, the pusher obtains the second board stack from the first buffer position and sends it to the target second buffer position of the target electronic saw for cutting, including the following steps:
[0021] Based on the material request of the target electronic saw, the state of the target second cache position of the target electronic saw is adjusted to allocation, a first preset number of plate stacks are obtained from the first cache position by using a plate pusher and sent to the target second cache position of the target electronic saw, the state of the target second cache position is adjusted to occupation, the target electronic saw responds to the material cutting instruction to perform material cutting processing, and a second preset number of plate stacks are obtained from the first cache position by a standby plate pusher for standby;
[0022] When the target electronic saw completes the cutting process for all the plate stacks in the target second cache position, the state of the target second cache position is adjusted to idle;
[0023] When all the board stacks in the used push plate machine are sent to the target second cache position, the used push plate machine and the spare push plate machine are switched, and the execution returns to the step of obtaining the status of the second cache position of each electronic saw, and responding to the material request of the target electronic saw based on the status.
[0024] In some embodiments, the number of pushers is at least two, at least one of which is a flexible line pusher, and at least one of which is an automatic line pusher; the board stack type includes an automatic line, and when the board stack type also includes a flexible line, based on the material application of the target electronic saw, the second board stack is obtained from the first cache position by the pusher and sent to the target second cache position of the target electronic saw for cutting processing, including the following steps:
[0025] When the material request is generated based on the type of the board stack of the automatic line, based on the material request of the first target electronic saw, the third preset number of board stacks are obtained from the first buffer position by the automatic line pusher and sent to the target second buffer position of the first target electronic saw for material cutting processing;
[0026] When the material request is generated based on the board stack type of the flexible line, based on the material request of the second target electronic saw, the fourth preset number of board stacks are obtained from the first cache position through the flexible line pusher and sent to the target second cache position of the second target electronic saw for material cutting processing.
[0027] To achieve the above purpose, another aspect of the embodiment of the present invention provides an electronic saw rear loading production control system, the system comprising:
[0028] The first module is used to obtain a production task, and based on the production task, obtain a first plate stack and place it in a first cache position; the production task includes a plate stack type, a plate stack number, and a plate stack quantity;
[0029] The second module is used to obtain the state of the second cache bit of each electronic saw, and respond to the material request of the target electronic saw based on the state; the state includes idle, occupied and allocated;
[0030] The third module is used to obtain the second board stack from the first cache position through the board pusher based on the material request of the target electronic saw and send it to the target second cache position of the target electronic saw for material cutting processing.
[0031] In some embodiments, the system further comprises:
[0032] The fourth module is used for taking the electronic saw farthest from the first cache bit as the target electronic saw when the states of the second cache bits of all electronic saws are the same as the number of free bits.
[0033] To achieve the above objective, another aspect of an embodiment of the present invention provides an electronic device, the electronic device comprising a memory and a processor, the memory storing a computer program, and the processor implementing the above method when executing the computer program.
[0034] To achieve the above objective, another aspect of an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above method is implemented.
[0035] The embodiments of the present invention include at least the following beneficial effects: The present invention provides a method, system, electronic device and medium for controlling the post-loading production of an electronic saw. The scheme obtains a production task, and based on the production task, obtains a first plate stack and places it in a first cache position; the production task includes the plate stack type, plate stack number and plate stack quantity; obtains the status of the second cache position of each electronic saw, and responds to the material request of the target electronic saw based on the status; the status includes idle, occupied and allocated; based on the material request of the target electronic saw, obtains the second plate stack from the first cache position through a plate pusher and sends it to the target second cache position of the target electronic saw for cutting. The embodiment of the present invention automatically takes out and pushes the plate to the electronic saw according to the configuration rules, which can realize the timeliness and real-time nature of production feeding and reduce the production waiting time caused by the conveying time. The embodiment of the present invention can efficiently realize the post-loading production control of the electronic saw. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a flow chart of the electronic saw rear loading production control method provided by an embodiment of the present invention;
[0037] Figure 2 It is a schematic diagram of a process for applying for a board stack at a board removal buffer location provided by an embodiment of the present invention;
[0038] Figure 3 is a schematic diagram of a panel removal mode switching process provided by an embodiment of the present invention;
[0039] Figure 4 It is a schematic diagram of a material loading process of a push plate buffer position provided by an embodiment of the present invention;
[0040] Figure 5 It is a schematic diagram of a panel disassembly process of a panel disassembly machine provided in an embodiment of the present invention;
[0041] Figure 6 A schematic diagram of the feeding process of an electronic saw provided by an embodiment of the present invention;
[0042] Figure 7 It is a schematic diagram of the hardware structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0043] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the embodiments of the present invention. They are only examples of systems and methods consistent with some aspects of the embodiments of the present invention as detailed in the attached claims.
[0044] It is understood that the terms "first", "second", etc. used in the present invention may be used herein to describe various concepts, but unless otherwise specified, these concepts are not limited by these terms. These terms are only used to distinguish one concept from another. For example, without departing from the scope of the embodiments of the present invention, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the words "if" and "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".
[0045] The terms "at least one", "multiple", "each", "any", etc. used in the present invention, at least one includes one, two or more, multiple includes two or more, each refers to each of the corresponding multiple, and any refers to any one of the multiple.
[0046] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present invention belongs. The terms used herein are only for the purpose of describing the embodiments of the present invention and are not intended to limit the present invention.
[0047] The electronic saw back-loading production control method provided by the embodiment of the present invention relates to the field of computer technology. The electronic saw back-loading production control method provided by the embodiment of the present invention can be applied to a terminal, can also be applied to a server, and can also be software running in a terminal or a server. In some embodiments, the terminal can be a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart speaker, a smart watch, and a car terminal, etc., but is not limited to this; the server side can be configured as an independent physical server, or it can be configured as a server cluster or distributed system composed of multiple physical servers, and can also be configured as a cloud server that provides cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms and other basic cloud computing services. The server can also be a node server in a blockchain network; the software can be an application that implements the electronic saw back-loading production control method, etc., but is not limited to the above forms.
[0048] The present invention can be used in many general or special computer system environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronic devices, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc. The present invention can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present invention can also be practiced in distributed computing environments, in which tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.
[0049] Figure 1 is an optional flow chart of the electronic saw rear feeding production control method provided by an embodiment of the present invention, Figure 1 The method may include but is not limited to steps S100 to S300.
[0050] S100, obtaining a production task, and based on the production task, obtaining a first plate stack and placing it in a first cache position;
[0051] Among them, the production task includes the board stack type, board stack number and board stack quantity;
[0052] It should be noted that, in some embodiments, step S100 may include the following steps: obtaining a production task from a warehouse management system via a stacker, and obtaining a first stack of boards via the stacker and placing the first stack of boards in a first cache position based on the stack number and the stack quantity.
[0053] Among them, in some embodiments, obtaining a production task from a warehouse management system through a stacker, and obtaining a first stack of boards and placing it in a first cache position based on the stack number and the number of stacks of boards through the stacker can include the following steps: sending a task application to the warehouse management system through the stacker based on a preset communication protocol; adjusting the second identification number of the warehouse management system to be the same as the first identification number of the stacker; when there is a production task in the warehouse management system, passing the production task to the stacker through the warehouse management system in response to the task application; otherwise, adjusting the second identification number of the warehouse management system to be the same as the first identification number of the stacker, and after a preset interval, returning to execute the step of sending a task application to the warehouse management system through the stacker based on the preset communication protocol; taking out the first stack of boards from a designated storage location through the stacker based on the stack number and the number of stacks of boards, and then placing the first stack of boards in the first cache position; adding 1 to the first identification number of the stacker, and returning to execute the step of sending a task application to the warehouse management system through the stacker based on the preset communication protocol.
[0054] For example, in some specific implementations, the stacker is a device for picking up and placing goods in a vertical warehouse, and can take out goods from a specified location in the warehouse and put them at a specified exit, or deliver the goods from a fixed entrance to a specified location according to task instructions. Specifically:
[0055] The stacker can use PLC (Programmable Logic Controller), so the task information transmission between WMS (Warehouse Management System) and the stacker can be exchanged through the S7 communication protocol. When the equipment is in normal state and there is no task, the stacker will send an idle task request to the WMS system. Both parties use the method of comparing the two numbers to confirm whether the interaction signal is received. For example, the number written by PLC is 2, and the number written by WMS is 1. PLC is 1 larger than WMS, which means that WMS receives the interaction request and starts to find out whether there is a task in the system database. If there is a task, the task data will be passed to PLC, and the number of WMS will be changed to be consistent with PLC to confirm that the interaction is completed. PLC will execute the task, and after the execution is completed, it will add 1 to the number and apply for a new task. If WMS receives the interaction signal and there is no task, it will also change the number to be consistent with PLC. PLC without task will initiate a new task application after an interval of 3 seconds. This is for both parties to confirm that the communication with each other is normal.
[0056] S200, obtaining the state of the second cache bit of each electronic saw, and responding to the material request of the target electronic saw based on the state;
[0057] Among them, states include idle, occupied, and allocated;
[0058] It should be noted that, in some embodiments, step S200 may include the following steps: obtaining the number of free second cache bits of each electronic saw; taking the electronic saw with the largest number of free second cache bits as the target electronic saw; obtaining and responding to the material request of the target electronic saw.
[0059] In some embodiments, the method further includes the following steps: when the number of second cache bits in the state of all electronic saws is the same as that of free bits, the electronic saw farthest from the first cache bit is used as the target electronic saw.
[0060] For example, in some specific implementations, it is necessary to distinguish between two types of equipment, the plate pusher and the electronic saw. Take the case where there are two plate pushers, 1# and 2#, and the electronic saws include six electronic saws, 1# to 6#, as an example: the plate pushers and the electronic saws are not fixedly paired, and both plate pushers can push plates to the 1# to 6# electronic saws. The status of the cache stations in the system can be updated in real time based on the signal collected from the PLC that there are plates at the cache stations, and the plates can be pushed and divided according to the number of cacheable stations of each cutting saw. The system has three settings for the status of the cache stations: idle, allocated (allocated), and occupied. Idle means empty, allocated means that the plate pusher has already allocated 1 plate to this cache position, and it is still on the conveyor route at that time, and occupied means that the plate that was just allocated but not yet arrived has now arrived. Only when there is an idle cache position can the plate pusher divide the plate to the electronic saw.
[0061] For example, the 1# electronic saw has 3 cache stations. If one of the stations has a board, the cache quantity is 2. The 2# electronic saw has 3 cache stations. If none of the 3 stations has a board, the cache quantity is 3. The 6# electronic saw has 2 cache stations. If none of the 2 stations has a board, the cache quantity is 2. When the pusher distributes the boards, the device with a larger serial number will be given priority under the same conditions. This is because the larger the serial number of the device, the farther it is from the pusher. In order to ensure a balanced workload, the device that is farther away will be given priority. In addition, it will be calculated based on the amount of cache. If the cache quantity of the 1# electronic saw is 3 and the cache quantity of the 5# electronic saw is 2, it will be allocated to the 3# electronic saw.
[0062] The distribution of electronic saws and board pushers is that the larger the serial number of the electronic saw, the farther it is from the board pusher. Taking into account the balanced output of each electronic saw, the principle of dividing the boards is to place them far away first and then near. To put it simply, everyone has work to do.
[0063] When the cache of all electronic saws is empty, the 6# electronic saw will first distribute a board, and then the pusher will distribute a board to the 5# pusher during the conveying process, and then distribute a board to the 4#. Since the 6# electronic saw is farther away and the 4# electronic saw is closer, everyone can receive the boards for production at almost the same time. Another situation is that when the cache of the 4# electronic saw is completely empty, and the 6# electronic saw already has a board in the cache, then the principle of far first and near later cannot take effect, and the 4# machine has no work to do, so a board must be distributed to the 4# machine first.
[0064] S300, based on the material request of the target electronic saw, the second board stack is obtained from the first buffer position by the board pusher and sent to the target second buffer position of the target electronic saw for cutting.
[0065] It should be noted that, in some embodiments, the number of pushers is at least two, at least one of which is used as a pusher, and at least one is used as a standby pusher; step S300 may include the following steps: based on the material request of the target electronic saw, adjusting the state of the target second cache position of the target electronic saw to allocation, obtaining a first preset number of board stacks from the first cache position by using the pusher and sending them into the target second cache position of the target electronic saw, adjusting the state of the target second cache position to occupation, responding to the material cutting instruction by the target electronic saw to perform material cutting processing, and obtaining a second preset number of board stacks from the first cache position by the standby pusher for standby; wherein, when the target electronic saw completes the material cutting processing for all board stacks in the target second cache position, the state of the target second cache position is adjusted to idle; when all board stacks in the used pusher are sent to the target second cache position, the used pusher and the standby pusher are switched, and the step of returning to execute obtaining the state of the second cache position of each electronic saw and responding to the material request of the target electronic saw based on the state is performed.
[0066] In some embodiments, the number of pushers is at least two, at least one of which is used as a flexible line pusher, and at least one is used as an automatic line pusher; the board stack type includes an automatic line, and when the board stack type also includes a flexible line, step S300 may include the following steps: when a material request is generated based on the board stack type of the automatic line, based on the material request of the first target electronic saw, a third preset number of board stacks are obtained from the first cache position by the automatic line pusher and sent to the target second cache position of the first target electronic saw for material cutting; when a material request is generated based on the board stack type of the flexible line, based on the material request of the second target electronic saw, a fourth preset number of board stacks are obtained from the first cache position by the flexible line pusher and sent to the target second cache position of the second target electronic saw for material cutting.
[0067] For example, in some specific implementations, two plate pushers are taken as an example: the working status of the plate pushers has two modes, use and standby. The working mode of the two plate pushers is one use and one standby, working in turns, one set is in use and the other is standby, until the plate that is in use is pushed out, the other will switch to the use state and start pushing the plate, the original plate pusher will start to feed new plates, and then standby and wait, this is one situation. Another situation is that if the production plan has a flexible line winning task, then the two plate pushers will be responsible for the flexible line and the automatic line, and both are in use at the same time.
[0068] The material cutting cache station is configured in the system with a corresponding number of material cutting cache stations (i.e., the second cache position) according to the number of material cutting cache stations on site. Specifically:
[0069] The cache station (same as the second cache station) is a system-level name, which is actually a piece of equipment. Three cache stations are three conveying equipment. The equipment on site is fixed, and the system is only configured according to the layout of the equipment on site. For example, there are three devices behind the No. 1 electronic saw, so the number of configured caches is 3. This configuration is to create a data in the database, No. 1 push plate machine is equipped with 3 cache stations, and then add 3 cache station number data. Adding 3 cache stations is to manage the status of Guancun stations. For example, if a board has been assigned to a cache station, then the status of the cache station is allocated. Then the system will collect signals from the PLC (electrical) to indicate whether there is a board in the cache station. If there is a board, the status of the cache station will be changed to occupied, and if there is no board, it will be changed to idle. In short, there is a set of logic for the actual program to change the status, and the logic is as follows:
[0070] The initial state of the cache position is idle. When the pusher machine separates the board into a cache position, the state changes to allocated. Although the signal collected from the PLC is that there is no board, the state is still allocated and will not change to idle until the allocated board reaches the cache position and the signal with the board is collected from the PLC. The state will change to occupied. Then the board enters the electronic saw production and the signal of no board is collected from the PLC. The state will change to idle and then wait for the pusher machine to separate the board.
[0071] It should be noted that when the stack type also includes flexible wires, an electronic saw can be designated as a dedicated flexible wire processing device. Usually, the electronic saw that is the farthest away can be designated as the flexible wire processing device. At this time, the material application of the electronic device is generated only based on the stack type of the flexible wire. The state adjustment principle is similar to that of the first embodiment of step S300 and will not be repeated here. The remaining electronic saws also refer to the relevant logical principles similar to the first embodiment for stack allocation processing.
[0072] In order to explain the principle of the technical solution of the present invention in detail, the overall process of the present invention is described below in combination with some specific embodiments. It is easy to understand that the following is an explanation of the technical principle of the present invention and cannot be regarded as a limitation of the present invention.
[0073] First of all, it should be explained that the present invention is to provide a method for production loading, pushing plates to the destination, feeding electronic saws, and forming a logistics control system with a solution knowledge base system to achieve efficient and intelligent solutions. One of the important highlights is that the plate stack is automatically split and pushed to the electronic saw according to the configuration rules. Through innovative technical implementation, the timeliness and real-time nature of production feeding can be achieved, reducing the production waiting time caused by the long transportation time.
[0074] The process principle of the technical solution of the present invention is implemented as follows:
[0075] 1. Application for board stacking in the board dismantling and buffering position:
[0076] like Figure 2 As shown, configuring the "platform" means configuring the platform number to which the cache station belongs. The platform number is a unique number defined by the system for each station.
[0077] The calculation of electronic data mode is to obtain the electronic data information stored in the system from the database, and determine whether there is an unproduced flexible line production plan in the production plan of the day. If there is, the electronic saw with the largest serial number is fixed in the flexible line production mode. The larger the serial number, the farther it is from the push plate machine.
[0078] MES production tasks are sent by the MES system to the database of this system through the WEB API interface.
[0079] According to the electronic saw production mode calculated above, if the production mode of the electronic saw is a flexible line, the production plan of the flexible line is obtained from the database, otherwise the production plan of the automatic line is obtained.
[0080] Calculate the cacheable stacks: the record of the plate stack leaving the cache station - the record of the plate stack applied for by the cache station + 2 cache lines = the number of cacheable stacks.
[0081] There are two concepts here, cache station and cache line body, which are actually the same concept, just called from different angles. At the software system level, it is called cache station, and at the equipment level, it is cache line body, which is actually two chain machines. The record of applying for board stacks at the cache station is actually the number of boards entering the cache, and the record of leaving the cache is the number of boards leaving the two cache stations. The difference between the two numbers is the number of boards left in the cache for the station. If the number of boards leaving is 1 less than the number of boards entering, then there will be a stack of boards left in the cache area, and the number of boards that can be cached will be 1.
[0082] Applying for the plate stack to be shipped out is to call the interface of the WMS system, and WMS returns the plate stack to be shipped out task.
[0083] The interface parameters include panel level, required quantity, panel stack quantity, and panel batch. Panel batch is not mandatory. It will only be transmitted when the production plan specifies the batch to be used. If the interface call is successful, the panel stack number, storage location, and panel stack quantity to be shipped will be returned. If the interface call fails, the corresponding error message will be returned, such as: there is no suitable panel stack. If an error message is returned, an enterprise WeChat message will be sent to notify the production staff to handle it.
[0084] The calculation of the number of plates is to obtain the number of large plates in the outbound task returned by the WMS (Warehouse Management System).
[0085] A stacker is a device used to pick up and place goods in a vertical warehouse. It can take out goods from designated locations in the warehouse and place them at designated exits according to task instructions, or deliver goods to designated locations from fixed entrances.
[0086] The stacker uses Siemens PLC, so the task information transmission between WMS and the stacker is carried out through Siemens S7 communication protocol for data interaction. When the stacker is in normal equipment status and has no tasks, it will send an idle task request to the WMS system. Both parties use the method of comparing the two numbers to confirm whether the interaction signal has been received. For example, if the number written by PLC is 2 and the number written by WMS is 1, PLC is 1 larger than WMS, which means that WMS receives the interaction request and starts to look for tasks in the system database. If there are tasks, the task data will be passed to PLC, and the number of WMS will be changed to be consistent with PLC to confirm that the interaction is completed. PLC will execute the task, and after the execution is completed, it will add 1 to the number and apply for a new task. If WMS receives the interaction signal and there is no task, it will also change the number to be consistent with PLC. PLC without tasks will initiate a new task application after an interval of 3 seconds. This is done by both parties to confirm that the communication with each other is normal.
[0087] 2. Switching process of disassembly mode:
[0088] According to the current production tasks in the system, determine whether there is an unproduced flexible line production plan. If so, saw No. 6 should be set to flexible line mode.
[0089] There are two push plate machines in the system, and the working states of the push plate machines include two modes: use and standby.
[0090] The two pushers work in a one-in-one standby mode, working in turns, one in use and the other on standby, until the one in use finishes pushing the boards, the other will switch to use and start pushing boards, the original pusher will start to feed new boards, and then standby and wait, this is one situation. Another situation is that if the production plan has a flexible line winning task, then one of the two pushers will be responsible for the flexible line and the other for the automatic line, and both are in use at the same time.
[0091] Determine whether the pusher continues to push. Before pushing the board, the pusher needs to wait for the board stack to enter the pusher. During the waiting process, the system will detect whether the standby pusher is ready (the ready condition needs to meet whether there is a board in the pusher, and whether the board stack in the pusher belongs to the same batch as the currently produced board stack). If the standby pusher is ready and the current pusher is waiting for the board stack to enter, the standby pusher will be set to use and the current pusher will be set to standby. If the standby pusher is not ready, the current pusher can continue to push (use).
[0092] There is an interface in the system for managing the push plate machine. The interface can be used to disable or enable the push plate machine. If the push plate machine is in disabled state, the system will not send the plate stack into it. To determine whether the push plate machine is ready, it will determine whether the push plate machine is enabled, whether there is a plate stack in the push plate machine, what color and batch the plate stack in the push plate machine belongs to, and whether the plate stack of this batch and color can be produced now. For example, there are plates in the 1# push plate machine, and the plates inside belong to batch A, but the current system is producing batch B, then the 1# push plate machine cannot be ready.
[0093] 3. Push plate buffer position loading:
[0094] like Figure 4 As shown, only 1#, 2# and 6# of the push plate machines are electronic saws. There are 1# to 6# electronic saws, but only 6# electronic saw can process flexible wire boards.
[0095] There are two types of equipment that need to be distinguished here, the pusher and the electronic saw. There are two pushers, 1# and 2#; there are six electronic saws, 1-6#. There is no fixed pairing between the pusher and the electronic saw, and both pushers can push the board to the 1-6# electronic saw.
[0096] 4. Board removal process of the board removal machine:
[0097] like Figure 5 As shown, the material cutting cache stations are configured in the system in corresponding number according to the number of material cutting cache stations on site.
[0098] The cache station is a system-level term, which actually refers to a piece of equipment. Three cache stations are three conveying equipment. The equipment on site is fixed, and the system is only configured according to the layout of the equipment on site. For example, there are three devices behind the No. 1 electronic saw, so the number of configured caches is 3. This configuration is to create a piece of data in the database. The No. 1 push plate machine is equipped with three cache positions, and then add three cache position number data. The three cache positions are added to manage the status of the Guancun position. For example, if a board has been assigned to a cache position, the status of the cache position is allocated. Then the system will also collect signals from the PLC (electrical) to determine whether there is a board in the cache position. If there is a board, the status of the cache position will be changed to occupied, and if there is no board, it will be changed to idle. In short, there is a set of logic for the actual program to change the status, and the logic is as follows:
[0099] The initial state of the cache position is idle. When the push plate machine separates the board into a cache position, the state changes to allocated. At this time, although the signal collected from the PLC is that there is no board, the state is still allocated and will not change to idle until the allocated board reaches the cache position and the signal with the board is collected from the PLC. The state will change to occupied. Then the board enters the electronic saw production, and the signal of no board is collected from the PLC. The state will change to idle, and then wait for the push plate machine to separate the board.
[0100] The system updates the status of the cache station in the system in real time based on the signal collected from the PLC that there is a board at the cache station, and pushes and separates the boards according to the number of cache stations that can be cached for each saw. The system has three settings for the status of the cache station: free, allocated, and occupied. Free means empty, allocated means that the pusher has already divided a board into this cache position, and it is still on the way to the conveyor, and occupied means that the board that was just allocated but not yet arrived has now arrived. Only when there is a free cache position can the pusher separate the board to the electronic saw.
[0101] For example, the 1# electronic saw has 3 cache stations. If one of the stations has a board, the cacheable quantity is 2. The 2# electronic saw has 3 cache stations. If none of the 3 stations have a board, the cacheable quantity is 3. The 6# electronic saw has 2 cache stations. If none of the 2 stations have a board, the cacheable quantity is 2. When the push plate machine distributes the boards, the device with a larger serial number will be given priority under the same conditions, because the larger the device serial number, the farther away from the push plate machine. In order to ensure a balanced workload, the device with a larger serial number will be given priority. In addition, it will also be calculated based on the amount of cacheable quantity. If the cacheable quantity of the 1# electronic saw is 3 and the cacheable quantity of the 5# electronic saw is 2, it will be allocated to number 3.
[0102] The distribution of electronic saws and board pushers is that the larger the serial number of the electronic saw, the farther it is from the board pusher. Taking into account the balanced output of each electronic saw, the principle of dividing the boards is to place them far away first and then near. To put it simply, everyone has work to do.
[0103] When the cache of all electronic saws is empty, the 6# electronic saw will first distribute a board, and then the pusher will distribute a board to the 5# pusher during the conveying process, and then distribute a board to the 4#. Since the 6# electronic saw is farther away and the 4# electronic saw is closer, everyone can receive the boards for production at almost the same time. Another situation is that when the cache of the 4# electronic saw is completely empty, and the 6# electronic saw already has a board in the cache, then the principle of far first and near later cannot take effect, and the 4# machine has no work to do, so a board must be distributed to the 4# machine first.
[0104] 5. Electronic saw feeding process, such as Figure 6 shown.
[0105] Among them, exemplarily, in some specific implementations, the overall implementation process of the electronic saw rear feeding production control method can be as follows:
[0106] Production material request: The electronic saw will proactively initiate a material request based on the production task.
[0107] Panel splitting machine: split the panels according to the required number of panels in the sawing file.
[0108] Board conveying: The split boards are conveyed to the electronic saw.
[0109] Loading is completed: After the plate reaches the electronic saw, feedback information is given.
[0110] Cutting files: Cutting files are sent to the electronic saw.
[0111] Return of remaining plates to warehouse: The plate stacks that have not been used by the plate removal mechanism are returned to the warehouse.
[0112] In summary, the present invention is a method for data management, monitoring, and real-time scheduling based on massive business data, which mainly splits plate stacks, transports plates, and returns surplus plates to the warehouse according to set rules. Specifically, by continuously improving data rules and intelligent systems, managers can discover problems more quickly, and make adjustments and avoid risks in a timely manner, avoiding problems after they occur; it improves the situation before the use of this intelligent system, which mainly relied on internal personnel to actively conduct audits, manual material preparation, and manual picking. On the one hand, the present invention reduces the workload of workshop personnel, and on the other hand, it improves the production efficiency of the production line. The present invention can assist in realizing the transformation of business data and production intelligence, and continuously improve the intelligent system that forms a solution knowledge base system through automation and intelligence, to achieve high efficiency and intelligence, and improve production efficiency and quality.
[0113] The embodiment of the present invention further provides an electronic saw rear loading production control system, which can implement the above-mentioned electronic saw rear loading production control method, and the system includes:
[0114] The first module is used to obtain a production task, and based on the production task, obtain a first plate stack and place it in a first cache position; the production task includes a plate stack type, a plate stack number, and a plate stack quantity;
[0115] The second module is used to obtain the state of the second cache bit of each electronic saw, and respond to the material request of the target electronic saw based on the state; the state includes idle, occupied and allocated;
[0116] The third module is used to obtain the second board stack from the first cache position through the board pusher based on the material request of the target electronic saw and send it to the target second cache position of the target electronic saw for material cutting processing.
[0117] In some embodiments, the system may further include:
[0118] The fourth module is used for taking the electronic saw farthest from the first cache bit as the target electronic saw when the states of the second cache bits of all electronic saws are the same as the number of free bits.
[0119] It can be understood that the contents of the above method embodiments are all applicable to the present system embodiments, the functions specifically implemented by the present system embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0120] The embodiment of the present invention further provides an electronic device, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the above-mentioned electronic saw rear feeding production control method when executing the computer program. The electronic device can be any intelligent terminal including a tablet computer, a car computer, etc.
[0121] It can be understood that the contents of the above method embodiments are all applicable to the present device embodiments, the functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0122] See also Figure 7 , Figure 7 The hardware structure of an electronic device 1000 of another embodiment is illustrated. The electronic device includes:
[0123] The processor 1001 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present invention;
[0124] The memory 1002 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 1002 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 1002, and the processor 1001 calls and executes the electronic saw rear feeding production control method of the embodiment of the present invention;
[0125] Input / output interface 1003, used to implement information input and output;
[0126] The communication interface 1004 is used to realize the communication interaction between the device and other devices. The communication can be realized through a wired manner (such as USB, network cable, etc.) or a wireless manner (such as mobile network, WIFI, Bluetooth, etc.);
[0127] A bus 1005 , which transmits information between various components of the device (e.g., the processor 1001 , the memory 1002 , the input / output interface 1003 , and the communication interface 1004 );
[0128] The processor 1001 , the memory 1002 , the input / output interface 1003 and the communication interface 1004 are connected to each other in communication within the device via the bus 1005 .
[0129] An embodiment of the present invention further provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the above-mentioned electronic saw rear loading production control method is implemented.
[0130] It can be understood that the contents of the above method embodiments are all applicable to the present storage medium embodiments, the functions specifically implemented by the present storage medium embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0131] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0132] The electronic saw back-loading production control method, electronic saw back-loading production control system, electronic equipment and medium provided by the embodiment of the present invention obtain production tasks, and based on the production tasks, obtain the first plate stack and place it in the first cache position; the production tasks include plate stack type, plate stack number and plate stack quantity; obtain the status of the second cache position of each electronic saw, and respond to the material request of the target electronic saw based on the status; the status includes idle, occupied and allocated; based on the material request of the target electronic saw, obtain the second plate stack from the first cache position through the plate pusher and send it to the target second cache position of the target electronic saw for cutting processing. The embodiment of the present invention automatically takes out and pushes the plate to the electronic saw according to the configuration rules, which can realize the timeliness and real-time nature of production feeding and reduce the production waiting time caused by the conveying time. The embodiment of the present invention can efficiently realize the electronic saw back-loading production control.
[0133] The embodiments described in the embodiments of the present invention are intended to more clearly illustrate the technical solutions of the embodiments of the present invention, and do not constitute a limitation on the technical solutions provided by the embodiments of the present invention. Those skilled in the art can appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided by the embodiments of the present invention are also applicable to similar technical problems.
[0134] Those skilled in the art will appreciate that the technical solutions shown in the figures do not limit the embodiments of the present invention and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.
[0135] The system embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the present embodiment.
[0136] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0137] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0138] It should be understood that in the present invention, "at least one (item)" refers to one or more, and "plurality" refers to two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can represent: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the previous and next associated objects are in an "or" relationship. "At least one of the following items" or similar expressions refers to any combination of these items, including any combination of single items or plural items. For example, at least one of a, b or c can represent: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.
[0139] In the several embodiments provided by the present invention, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of systems or units, which can be electrical, mechanical or other forms.
[0140] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0141] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0142] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including multiple instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods of various embodiments of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, etc., various media that can store programs.
[0143] The preferred embodiments of the present invention are described above with reference to the accompanying drawings, but the scope of the rights of the embodiments of the present invention is not limited thereby. Any modification, equivalent substitution and improvement made by those skilled in the art without departing from the scope and essence of the embodiments of the present invention shall be within the scope of the rights of the embodiments of the present invention.
Claims
1. A method for controlling the production of electronic sawing rear loading, It is characterized in that The method comprises the following steps: Acquire a production task, and based on the production task, obtain a first plate stack and place it in a first cache position; the production task includes a plate stack type, a plate stack number, and a plate stack quantity; Acquire the state of the second cache bit of each electronic saw, and respond to the material request of the target electronic saw based on the state; the state includes idle, occupied and allocated; Based on the material request of the target electronic saw, a second board stack is obtained from the first buffer position by a board pusher and sent to a target second buffer position of the target electronic saw for cutting.
2. The method according to claim 1, It is characterized in that The step of obtaining a production task and placing a first plate stack in a first cache position based on the production task comprises the following steps: The production task is obtained from a warehouse management system through a stacker, and based on the plate stack number and the plate stack quantity, the first plate stack is obtained through the stacker and placed in the first cache position.
3. The method according to claim 2, It is characterized in that The step of obtaining the production task from the warehouse management system by using a stacker, and obtaining the first stack of plates by using the stacker and placing the first stack of plates in the first cache position based on the stack number of the plate stack and the number of the plate stacks, comprises the following steps: Sending a task request to the warehouse management system through the stacker based on a preset communication protocol; Adjusting the second identification number of the warehouse management system to be the same as the first identification number of the stacker; When the production task exists in the warehouse management system, the warehouse management system transmits the production task to the stacker in response to the task application; otherwise, the second identification number of the warehouse management system is adjusted to be the same as the first identification number of the stacker, and after a preset interval, the stacker returns to the step of sending the task application to the warehouse management system based on the preset communication protocol; The stacker takes out the first stack of plates from the designated storage location based on the stack number and the number of stacks of plates, and then places the first stack of plates in the first cache location; the first identification number of the stacker is increased by 1, and the stacker returns to execute the step of sending a task application to the warehouse management system based on a preset communication protocol.
4. The method according to claim 1, It is characterized in that The method of obtaining the state of the second cache bit of each electronic saw and responding to the material request of the target electronic saw based on the state includes the following steps: Obtaining the number of the second cache bits of each electronic saw whose state is the idle state; The electronic saw having the largest number of the second cache bits being in the idle state is used as the target electronic saw; and the material request of the target electronic saw is obtained and responded to.
5. The method according to claim 4, It is characterized in that The method further comprises the following steps: When the states of the second cache bits of all the electronic saws are the same as the number of idle bits, the electronic saw that is farthest from the first cache bit is used as the target electronic saw.
6. The method according to claim 1, It is characterized in that The number of the plate pushers is at least two, at least one of which is used as a plate pusher and at least one is used as a standby plate pusher; based on the material request of the target electronic saw, the second plate stack is obtained from the first buffer position by the plate pusher and sent to the target second buffer position of the target electronic saw for cutting, including the following steps: Based on the material request of the target electronic saw, the state of the target second cache position of the target electronic saw is adjusted to the allocation, a first preset number of plate stacks are obtained from the first cache position by using the plate pusher and sent to the target second cache position of the target electronic saw, the state of the target second cache position is adjusted to the occupation, the target electronic saw responds to the material cutting instruction to perform material cutting processing, and the standby plate pusher obtains a second preset number of plate stacks from the first cache position for standby; Wherein, when the target electronic saw completes the cutting process for all the plate stacks in the target second cache position, the state of the target second cache position is adjusted to the idle state; When all the board stacks in the used push plate machine are sent to the target second cache position, the used push plate machine and the spare push plate machine are switched, and the process returns to execute the step of obtaining the status of the second cache position of each electronic saw, and responding to the material request of the target electronic saw based on the status.
7. The method according to claim 1, It is characterized in that The number of the pushers is at least two, at least one of which is a flexible line pusher, and at least one of which is an automatic line pusher; the board stack type includes an automatic line, and when the board stack type also includes a flexible line, the second board stack is obtained from the first cache position by the pusher based on the material request of the target electronic saw and sent to the target second cache position of the target electronic saw for cutting processing, including the following steps: When the material request is generated based on the type of the board stack of the automatic line, based on the material request of the first target electronic saw, the board pusher of the automatic line obtains a third preset number of board stacks from the first cache position and sends them into the target second cache position of the first target electronic saw for material cutting; When the material request is generated based on the type of board stack of the flexible line, based on the material request of the second target electronic saw, the flexible line board pusher obtains a fourth preset number of board stacks from the first cache position and sends them into the target second cache position of the second target electronic saw for material cutting processing.
8. An electronic sawing post-feeding production control system, It is characterized in that The system comprises: The first module is used to obtain a production task, and based on the production task, obtain a first plate stack and place it in a first cache position; the production task includes a plate stack type, a plate stack number, and a plate stack quantity; The second module is used to obtain the state of the second cache bit of each electronic saw, and respond to the material request of the target electronic saw based on the state; the state includes idle, occupied and allocated; The third module is used to obtain the second board stack from the first cache position through a board pusher based on the material request of the target electronic saw and send it into the target second cache position of the target electronic saw for material cutting processing.
9. An electronic device, It is characterized in that The electronic device comprises a memory and a processor, the memory stores a computer program, and the processor implements the method according to any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Intelligent board cutting method, system and control terminal
CN107346127A
Intelligent woodworking flexible production line
CN112919092A
Automatic plate matching and feeding system and method for household plate processing
CN112978194A
Scheduling method and device of one-rail multi-vehicle stacker and computer equipment
CN114408435A
Low-energy-consumption plate-shaped material production line cutting equipment and method
CN114895643A
Cited By
Sorting scheduling method and device, electronic equipment and storage medium
CN120662558A