Embedded tunnel waterproof and drainage plate structure convenient to install and construct

By using the snap-fit ​​boss and conical boss design of the embedded tunnel waterproofing board structure, combined with polystyrene foam and polyester fiber materials, the problems of complex construction and insufficient waterproofing of tunnel waterproofing devices are solved, achieving rapid installation and efficient waterproofing effect.

CN118933917APending Publication Date: 2024-11-12RAILWAY CONSTR RES INST OF CHINA ACAD OF RAILWAY SCI CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411234608.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing tunnel waterproofing devices suffer from problems such as loss of strength and waterproofing performance, complex processes, and high labor intensity during construction.

Method used

The embedded tunnel drainage board structure utilizes the staggered arrangement of snap-fit ​​bosses and conical bosses, combined with polystyrene foam and polyester fiber materials. Through the cooperation of the snap-fit ​​bosses and snap-fit ​​grooves, it achieves rapid installation and active water guidance, forming a sealed structure.

Benefits of technology

This technology enables rapid installation of tunnel waterproofing membranes, reduces labor intensity during construction, improves waterproofing effectiveness, enhances the durability and impermeability of the waterproofing layer, and lowers construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933917A_ABST
    Figure CN118933917A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of tunnel waterproof installation, and provides an embedded tunnel waterproof and drainage plate structure convenient to install and construct, the embedded tunnel waterproof and drainage plate structure comprises a waterproof and drainage plate and conical bosses, the waterproof and drainage plate is provided with a plurality of clamping bosses, the conical bosses are arranged between the clamping bosses, and the conical bosses are arranged on the waterproof and drainage plate. A fixing plate is arranged on the side, provided with the clamping boss, of the waterproof and drainage plate. The waterproof and drainage plate is laid in a segmented mode, in the laying process, a laying tool needs to be close to the fixing plate to the maximum extent, so that the clamping boss enters the clamping groove, when the table bottom makes contact with the bottom of the clamping groove, the table end is squeezed by external force, the middle position of the joint of the table bottom and the table end deforms at the moment, and the waterproof and drainage plate is laid. The sliding blocks on the two sides are pushed to slide towards the side edge through the inclined face, the sliding blocks push polystyrene foam on the middle layer of the fixing plate in the sliding process, the sliding blocks are easily clamped into the fixing plate and connected with the fixing plate in a clamped mode, and the workload of workers is relieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel waterproof installation, in particular to an embedded tunnel waterproof and drainage board structure which is easy to install and construct. Background Art

[0002] Tunnel drainage and waterproofing refers to the waterproofing and drainage measures taken to ensure that tunnel buildings will not be damaged by water leakage, endanger driving safety, corrode equipment in the tunnel, and reduce the service life of the structure. It is a comprehensive work involving factors such as topography, climate, engineering strata and hydrogeology, structural schemes, construction methods and material properties. The basic requirement should be prevention first. The current tunnel drainage and waterproofing system is mainly composed of initial waterproofing of initial support, waterproofing of waterproof boards, drainage of drainage pipes between initial support and waterproof boards, self-waterproofing of secondary lining structures, and water-stopping measures for various joints.

[0003] At present, the existing tunnel waterproofing devices usually include self-adhesive cloth or geotextile, installation nails, adhesive plastic blocks and waterproof boards; hot melt pad anchor welding, anchorless hanging method and concealed buckle hanging method are generally used in the laying construction. No matter which method is used, there are different degrees of damage to the strength and waterproofness of the waterproof board, and the laying method has the disadvantages of high on-site labor intensity and complex process.

[0004] In summary, the present invention provides an embedded tunnel drainage board structure that is easy to install and construct to solve the above problems. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides an embedded tunnel drainage board structure that is easy to install and construct, so as to overcome the shortcomings in the prior art.

[0006] An embedded tunnel drainage board structure which is easy to install and construct comprises: a drainage board and a conical boss, wherein the drainage board is provided with a clamping boss, wherein a plurality of clamping bosses are provided, wherein the conical boss is provided between each of the clamping bosses, and the drainage board is provided with a fixing plate on one side where the clamping boss is provided.

[0007] Furthermore, a convex snap-in strip is provided at one end of the anti-drainage board, and a concave snap-in strip is provided at the other end of the anti-drainage board. The end of the convex snap-in strip away from the anti-drainage board is conical, and two protrusions are provided on both sides. The groove size of the concave snap-in strip is the same as that of the convex snap-in strip, and the two anti-drainage boards are snap-connected.

[0008] Furthermore, the clamping boss includes a platform bottom, a clamping block and a platform end, the bottom of the platform bottom passes through the drainage plate, the clamping block is arranged at one-third of the platform bottom near one end of the fixed plate, the platform end is fixedly connected to the platform bottom near one end of the fixed plate, gaps are left on both sides of the connection between the platform bottom and the platform end, the middle position of the connection between the platform bottom and the platform end is made of flexible and deformable material, and the end of the platform end near the platform bottom is slidably connected to a slider, and there are two sliders in total.

[0009] Furthermore, a clamping groove is provided on one side of the fixing plate close to the anti-drainage plate, and nail holes are provided between each row of the clamping grooves to facilitate fixing of the fixing plate.

[0010] Furthermore, the material in the middle of the fixed plate is polystyrene foam, which has good low-temperature performance and anti-static performance, as well as good fire resistance and heat insulation performance, so it is often used as fireproof and heat-insulating materials, and has good wear resistance and impact resistance, and has good lightweight and buffering performance. The materials on both sides are polyester fibers, which can enhance the impermeability and durability of the waterproof layer, thereby improving the integrity and reliability of the waterproof layer, preventing the intrusion and penetration of groundwater, and also resisting the corrosion of the waterproof layer by chemical corrosive substances such as acids and alkalis, thereby improving the service life and reliability of the waterproof layer.

[0011] Furthermore, the thickness of the slider is the same as the thickness of the middle layer of the fixing plate, so that the slider can be easily clamped in the fixing plate.

[0012] Furthermore, the clamping boss is higher than the conical boss, and when the clamping boss enters the clamping groove, the conical boss just contacts the fixing plate.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] 1. The present invention lays the drainage board in sections, and the side provided with the snap-in boss faces the fixed plate, the snap-in boss is snapped into the snap-in groove, and then the drainage board is laid by professional tools. During the laying process, the laying tool needs to be as close to the fixed plate as possible so that the snap-in boss enters the snap-in groove. Since the middle position of the connection between the table bottom and the table end is made of flexible and deformable material, when the table bottom touches the bottom of the snap-in groove, the table end feels the squeeze of external force. At this time, the middle position of the connection between the table bottom and the table end is deformed, so that the table bottom and the table end are close to each other, and the sliders on both sides are pushed to slide sideways through the inclined surface. During the sliding process, the slider pushes the polystyrene foam in the middle layer of the fixed plate, so that the slider is easily snapped into the fixed plate and snap-connected with the fixed plate, thereby reducing the workload of the staff.

[0015] 2. The present invention adopts the staggered arrangement of the snap-fit ​​bosses and the conical bosses. When the snap-fit ​​bosses are inserted into the fixed plate, the conical bosses just contact the surface of the fixed plate. The concave and convex hollow rib structure on the surface of the drainage board can quickly and effectively drain rainwater, greatly reducing or even eliminating the hydrostatic pressure of the waterproof layer. The active water-conducting principle can achieve the effect of active waterproofing, which not only retains the original function of the drainage board, but also adds the function of convenient installation.

[0016] 3. According to the present invention, before starting the laying tool, the staff first connects the concave groove strip on the second-side anti-drainage board with the convex connecting strip on the first side. During the laying process, the second-side anti-drainage board is laid along the track of the convex connecting strip on the first-side anti-drainage board. A sealing structure is formed between the two anti-drainage boards, which effectively prevents water from flowing out of the joints, achieves a better waterproof effect, and also reduces work costs, without the need to use other tools to complete the sealing. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional diagram of the structure of the present invention;

[0018] Figure 2 The present invention Figure 1 The enlarged view of point A in the middle;

[0019] Figure 3 The present invention Figure 1 The enlarged view of point B in the middle;

[0020] Figure 4 It is a structural diagram of the fixing plate of the present invention;

[0021] Figure 5 It is a cross-sectional view of the connection between the drainage board and the fixing board of the present invention;

[0022] Figure 6 It is a structural diagram of the clamping boss of the present invention.

[0023] In the figure:

[0024] 1. Drainage plate; 11. Convex snap-in strip; 12. Concave snap-in groove strip; 2. Snap-in boss; 21. Bottom of platform; 22. Block; 23. Top of platform; 24. Slider; 3. Conical boss; 4. Fixing plate; 41. Snap-in groove; 42. Nail hole. DETAILED DESCRIPTION

[0025] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0026] like Figure 1-6As shown, the present invention provides an embedded tunnel drainage board structure which is easy to install and construct, comprising: a drainage board 1 and a conical boss 3, the drainage board 1 is provided with a clamping boss 2, a plurality of clamping bosses 2 are provided, the conical boss 3 is provided between each of the clamping bosses 2, and the drainage board 1 is provided with a fixing plate 4 on one side where the clamping boss 2 is provided.

[0027] As an embodiment of the present invention, a convex snap-in strip 11 is provided at one end of the anti-drainage board 1, and a concave snap-in strip 12 is provided at the other end of the anti-drainage board 1. The end of the convex snap-in strip 11 away from the anti-drainage board 1 is conical, and two protrusions are provided on both sides. The groove size of the concave snap-in strip 12 is the same as that of the convex snap-in strip 11, and the two anti-drainage boards 1 are snap-connected.

[0028] As an embodiment of the present invention, the clamping boss 2 includes a platform bottom 21, a clamping block 22 and a platform end 23. The bottom of the platform bottom 21 passes through the drainage board 1, and the clamping block 22 is arranged at one-third of the end of the platform bottom 21 close to the fixed plate 4. The platform end 23 is fixedly connected to the end of the platform bottom 21 close to the fixed plate 4. Gaps are left on both sides of the connection between the platform bottom 21 and the platform end 23. A flexible and deformable material is used at the middle position of the connection between the platform bottom 21 and the platform end 23. The end of the platform end 23 close to the platform bottom 21 is slidably connected to a slider 24, and two sliders 24 are arranged in total.

[0029] As an embodiment of the present invention, a clamping groove 41 is provided on one side of the fixing plate 4 close to the drainage plate 1 , and nail holes 42 are provided between each row of the clamping grooves 41 to facilitate fixing the fixing plate 4 .

[0030] As an embodiment of the present invention, the material in the middle of the fixing plate 4 is polystyrene foam. Polystyrene foam has good low temperature performance and antistatic performance, as well as good fire resistance and heat insulation performance, so it is often used as fireproof and heat-insulating materials. It also has good wear resistance and impact resistance, and has good lightweight and buffering performance. The materials on both sides are polyester fibers, which can enhance the impermeability and durability of the waterproof layer, thereby improving the integrity and reliability of the waterproof layer, preventing the intrusion and penetration of groundwater, and also resisting the corrosion of the waterproof layer by chemical corrosive substances such as acids and alkalis, thereby improving the service life and reliability of the waterproof layer.

[0031] As an implementation manner of the present invention, the thickness of the slider 24 is the same as the thickness of the middle layer of the fixing plate 4 , so that the slider 24 can be easily clamped in the fixing plate 4 .

[0032] As an implementation mode of the present invention, the clamping boss 2 is higher than the conical boss 3 , and when the clamping boss 2 enters the clamping groove 41 , the conical boss 3 just contacts the fixing plate 4 .

[0033] Specific working principle:

[0034] The present invention provides a new technical solution. First, Figure 1 and Figure 4 As shown, the staff first cleans the surface of the inner wall of the tunnel to make it dry, clean and solid, and then drives the nails into the holes 42 to fix the fixing plate 4. When laying the fixing plate 4, it is necessary to pay attention to the side with the snap-in groove 41 facing away from the wall, and it needs to be laid in sections to facilitate better maintenance and installation.

[0035] Then, if Figure 1 and Figure 4-6 As shown, after the fixed plate 4 is laid, the drainage board 1 is laid in sections, and the side provided with the clamping boss 2 faces the fixed plate 4, the clamping boss 2 is clamped into the clamping groove 41, and then the drainage board 1 is laid by professional tools, and during the laying process, the laying tool needs to be as close to the fixed plate 4 as possible so that the clamping boss 2 enters the clamping groove 41. Since the middle position of the connection between the platform bottom 21 and the platform end 23 is made of flexible and deformable material, when the platform bottom 21 touches the bottom of the clamping groove 41, the platform end 23 feels the squeeze of external force, and the middle position of the connection between the platform bottom 21 and the platform end 23 is deformed. , so that the platform bottom 21 and the platform end 23 are close to each other, and the sliders 24 on both sides are pushed to slide sideways through the inclined surface. During the sliding process, the sliders 24 push the polystyrene foam in the middle layer of the fixed plate 4, so that the sliders 24 are easily inserted into the fixed plate 4 and connected with the fixed plate 4, which reduces the workload of the staff; when the clamping boss 2 is inserted into the fixed plate 4, the concave and convex hollow rib structure on the surface of the drainage board 1 can quickly and effectively drain rainwater, greatly reducing or even eliminating the static water pressure of the waterproof layer. The active waterproof effect can be achieved through this active water conduction principle.

[0036] Finally, if Figure 1-3 As shown, after laying one side of the drainage board 1, before starting the laying tool, the staff first connects the concave groove strip 12 on the second side of the drainage board 1 with the convex snap-in strip 11 on the first side. During the laying process, the second side of the drainage board 1 is laid along the track of the convex snap-in strip 11 on the first side of the drainage board 1. A sealing structure is formed between the two drainage boards 1, which effectively prevents water from flowing out of the joints, achieves a better waterproof effect, and also reduces work costs, and there is no need to use other tools to complete the sealing.

[0037] The embodiments of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. An embedded tunnel drainage board structure that is easy to install and construct, comprising: The anti-drainage plate (1) and the conical boss (3) are characterized in that: the anti-drainage plate (1) is provided with a clamping boss (2), a plurality of the clamping bosses (2) are provided, the conical boss (3) is provided between each of the clamping bosses (2), and the anti-drainage plate (1) is provided with a fixing plate (4) on the side where the clamping boss (2) is provided.

2. The embedded tunnel drainage board structure that is easy to install and construct as claimed in claim 1 is characterized by: A convex snap-in strip (11) is provided at one end of the anti-drainage board (1), and a concave snap-in strip (12) is provided at the other end of the anti-drainage board (1); the end of the convex snap-in strip (11) away from the anti-drainage board (1) is conical, and two protrusions are provided on both sides; the groove size of the concave snap-in strip (12) is the same as that of the convex snap-in strip (11).

3. The embedded tunnel drainage board structure that is easy to install and construct as claimed in claim 1 is characterized by: The clamping boss (2) comprises a platform bottom (21), a clamping block (22) and a platform end (23); the bottom of the platform bottom (21) passes through the anti-drainage board (1); the clamping block (22) is arranged at one third of the end of the platform bottom (21) close to the fixed plate (4); the platform end (23) is fixedly connected to the end of the platform bottom (21) close to the fixed plate (4); gaps are left on both sides of the connection between the platform bottom (21) and the platform end (23); the middle position of the connection between the platform bottom (21) and the platform end (23) is made of a flexible and deformable material; the end of the platform end (23) close to the platform bottom (21) is slidably connected to a slider (24); and two sliders (24) are arranged in total.

4. The embedded tunnel drainage board structure that is easy to install and construct as claimed in claim 3 is characterized by: A clamping groove (41) is provided on one side of the fixing plate (4) close to the drainage plate (1), and nail holes (42) are provided between each row of the clamping grooves (41).

5. The embedded tunnel drainage board structure that is easy to install and construct as claimed in claim 4 is characterized by: The material in the middle of the fixing plate (4) is polystyrene foam, and the materials on both sides are polyester fibers.

6. The embedded tunnel drainage board structure that is easy to install and construct as claimed in claim 5, characterized in that: The thickness of the sliding block (24) is the same as the thickness of the middle layer of the fixing plate (4).

7. The embedded tunnel drainage board structure that is easy to install and construct as claimed in claim 1 is characterized by: The clamping boss (2) is higher than the conical boss (3).