Energy-saving and environment-friendly hot galvanizing production device and method

By designing an air pump and displacement rod system in the hot-dip galvanizing unit, the hot gas generated by the zinc liquid is used to preheat the steel pipe rod, which solves the problem of insufficient heat utilization, improves the coating bonding strength and structural stability, and realizes green and environmentally friendly hot-dip galvanizing production.

CN118957477AInactive Publication Date: 2024-11-15JIANGSU QITIAN TOWER MFG CO LTD

Patent Information

Application Number
CN202411457049.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing hot-dip galvanizing equipment cannot effectively utilize the heat generated by the zinc liquid, resulting in resource waste and insufficient coating bonding strength and structural stability.

Method used

By designing an air pump, a trough, a displacement rod, a mounting plate, and a processing chamber, the hot gas generated by the zinc liquid is used to preheat the steel pipe rod to be processed. The air pump draws the hot gas into the trough and through the displacement rod into the processing chamber. After being filtered by a filter plate, the gas enters the feeding box to preheat the steel pipe rod.

Benefits of technology

This technology enables the secondary utilization of heat from the molten zinc, reduces the temperature difference between the steel pipe rod and the molten zinc, improves the bonding strength of the coating and the stability of the overall structure, and enhances its green and environmentally friendly properties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118957477A_ABST
    Figure CN118957477A_ABST
Patent Text Reader

Abstract

The invention discloses an energy-saving and environment-friendly hot-dip galvanizing production device and method, belongs to the technical field of hot-dip galvanizing production, and aims to solve the problem that an existing hot-dip galvanizing device is difficult to generate heat by using zinc liquid. Through an air pump, a penetrating groove, a displacement rod, a mounting plate, a treatment box body and a feeding box, an electric heating rod is electrified to heat, molten zinc in the main box body is heated, then the air pump is started, hot air of the main box body is sucked into the penetrating groove through the air pump, and then the hot air enters the displacement rod through the penetrating groove; gas in the displacement rod enters the treatment box body along the ventilation pipe, and hot air flow firstly impacts a choke plate, so that on one hand, particles in the gas fall onto a filter plate due to impact on the choke plate, and on the other hand, an elastic thin plate vibrates, so that the filter plate vibrates, and the filtering quality is improved; and filtered hot gas enters the feeding box through a gas guide pipe and a control valve, the to-be-treated steel pipe pole in the feeding box is preheated, and the device is more environmentally friendly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hot-dip galvanizing production, and in particular to an energy-saving and environment-friendly hot-dip galvanizing production device and method. Background Art

[0002] Hot-dip galvanizing is an industrial equipment system specially used for hot-dip galvanizing of steel materials to enhance the corrosion resistance of steel products. This process involves immersing clean steel parts in molten zinc to form a dense zinc-iron alloy coating on the surface of the steel.

[0003] In the Chinese patent with application number CN202211598217.8, a hot-dip galvanizing device includes a machine body, a liquid storage tank is provided in the machine body, a filter plate adapted to the liquid storage tank is provided in the machine body, the filter plate is provided with a plurality of drainage holes, the machine body includes a bottom plate, a first side plate and a second side plate, the first side plate is connected to a motor, the motor output shaft is connected to a first threaded rod rotatably connected to the bottom plate, the first threaded rod passes through the filter plate and is threadedly connected to the filter plate, and a cleaning component for cleaning the iron slag on the filter plate is provided between the first side plate and the second side plate. The machine body is provided with a heating chamber, and a plurality of heating tubes are provided in the heating chamber. The rotation of the motor output shaft drives the first threaded rod to rotate, thereby driving the filter plate to move up, the filter plate moves to above the zinc liquid, the zinc liquid flows back into the liquid storage tank from the drainage hole, the iron slag remains on the filter plate, and then the cleaning component cleans the iron slag on the filter plate, and it is relatively convenient to remove the iron slag in the machine body, which is conducive to ensuring the galvanizing effect of steel products; In the above patent, the heat generated during the hot-dip galvanizing process is not fully utilized, and the object to be processed is not preheated, which increases the temperature difference between the object and the zinc liquid encountered during the hot-dip galvanizing process, thereby increasing the stress caused by thermal shock. At the same time, it also increases the thermal stress and tissue stress between the coating and the substrate, reducing the bonding strength of the coating and the stability of the overall structure. At the same time, the heat generated by the hot zinc solution is not utilized, resulting in a waste of resources, which is contrary to the concept of green and environmentally friendly production.

[0004] To this end, we propose an energy-saving and environment-friendly hot-dip galvanizing production device and method. Summary of the invention

[0005] The purpose of the present invention is to provide an energy-saving and environment-friendly hot-dip galvanizing production device and method, which solves the problem in the background technology that the current hot-dip galvanizing device is difficult to generate heat using zinc liquid.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an energy-saving and environment-friendly hot-dip galvanizing production device, comprising a main box, electric telescopic rods A fixedly mounted on both sides of the main box, a cover plate fixedly mounted on the upper end of the electric telescopic rod A, a processing box fixedly mounted on the outer surface of the main box, and a placement assembly arranged inside the main box for holding steel pipe rods to be processed, wherein the upper end of the placement assembly is connected to the cover plate, and a feeding assembly is arranged at the upper end of the processing box; The feed assembly includes a mounting plate hinged on the upper surface of the processing box, a displacement rod hinged on one side of the mounting plate, a feed box fixedly mounted on the upper surface of the mounting plate, and an electric telescopic rod B fixedly mounted on the upper surface of the feed box, one end of the electric telescopic rod B is installed with a connecting plate, a baffle is movably embedded in the interior of the feed box, the upper end of the baffle is connected to the connecting plate, a feed port is opened on the upper surface of the feed box, the feed port is connected to a storage cavity opened in the feed box for storing steel pipe rods to be processed, one end of the displacement rod is movably inserted in the cover plate, and the displacement rod is connected to the main box body through the cover plate.

[0007] Furthermore, an air pump is fixedly installed on the upper surface of the cover plate, a through groove is provided inside the cover plate, an air suction plate is fixedly installed on the lower bottom surface of the cover plate, air suction holes are opened on the outer surface of the air suction plate, and the air suction plate is connected to the through groove through the air pump.

[0008] Furthermore, a trapezoidal block is fixedly installed on one side of the mounting plate, the trapezoidal block is hinged to the displacement rod, a ventilation pipe is penetrated on the outer surface of the mounting plate, a ventilation hole is opened on the lower bottom surface of the displacement rod, the ventilation pipe corresponds to the ventilation hole, and a docking hole is opened on the upper surface of the processing box, the docking hole corresponds to the ventilation pipe.

[0009] Furthermore, slide grooves are provided on both sides of the processing box body, and a slider and a return spring are provided inside the slide groove. One end of the return spring is fixedly connected to the inner wall of the slide groove, and the other end of the return spring is connected to the slider. A positioning block is fixedly installed on the outer surface of the slider, and an electric push rod A is installed inside the positioning block. Rotating parts are fixedly installed on both sides of the mounting plate, and one end of the electric push rod A is rotatably connected to the rotating part.

[0010] Furthermore, an air duct is provided on the upper surface of the processing box, a filter plate is provided inside the processing box, rubber pads are fixedly installed at both ends of the filter plate, the filter plate is connected to the inner wall of the processing box through the rubber pads, the filter plate and the inner wall of the processing box form a closed quadrilateral, an elastic thin plate is provided on the outer surface of the filter plate, a wind blocking plate is fixedly installed on one end of the elastic thin plate, a tension spring is fixedly installed on one side of the elastic thin plate, one end of the tension spring is connected to the outer surface of the filter plate, the wind blocking plate corresponds to the docking hole, an air guide groove is opened at the bottom of the mounting plate, a control valve is provided inside the air guide groove, and the air guide groove corresponds to the air duct.

[0011] Furthermore, a sealing plate is provided on the outer surface of the feed box, one side of the sealing plate is hinged to the feed port, and a support rod is fixedly installed on the lower end of the processing box body.

[0012] Furthermore, a groove tube is movably inserted inside the groove, a rubber ring plate is fixedly installed at one end of the displacement rod, grooves are opened on both sides of the displacement rod, and rollers are rotatably arranged inside the grooves.

[0013] Furthermore, the placement assembly includes a placement ring plate arranged inside the main box body, a placement frame arranged on one side of the placement ring plate, and a pull rod fixedly installed on the upper end of the placement ring plate, the upper end of the pull rod is connected to the cover plate, and an electric heating rod is arranged at the bottom of the main box body, and the electric heating rod is connected to an external power supply.

[0014] Furthermore, a water storage chamber and a water outlet pipe are provided inside the baffle, a one-way valve pipe is connected between the water storage chamber and the water outlet pipe, a piston plate is movably provided inside the water storage chamber, a push rod is provided at the lower end of the piston plate, a water inlet is provided on the upper surface of the baffle, an embedding groove is provided on the lower bottom surface of the baffle, a pear-shaped cloth roller is rotatably provided in the embedding groove, and the pear-shaped cloth roller and the push rod are provided in the same vertical plane.

[0015] Another technical solution proposed by the present invention is to provide an implementation method of an energy-saving and environment-friendly hot-dip galvanizing production device, comprising the following steps: S1: Put the steel pipes to be processed into the feed box, start the electric heating rod to heat the zinc liquid inside the main box, open the baffle, let the steel pipes to be processed in the feed box roll into the placement frame, and then immerse the placement frame into the zinc liquid, and finally use the electric telescopic rod A to move the cover down to seal the main box to complete the hot dip galvanizing; S2: During the hot-dip galvanizing process, a large amount of hot gas will be generated. When the air pump is turned on, the hot gas inside the main box will be sucked into the air intake plate, and then the hot gas will enter the through groove from the air intake plate, and finally the hot gas will enter the displacement rod. When the cover plate is sealed with the main box, the displacement rod, the mounting plate and the processing box will contact in turn, and the hot gas in the displacement rod will enter the processing box. After being filtered by the filter plate, the hot gas will enter the feed box to preheat the steel pipe rod; S3: After the hot-dip galvanizing is completed, the cover plate is lifted up to separate the placement frame from the zinc liquid. During the lifting process, the electric telescopic rod A and the electric push rod A are started at the same time and maintain the same speed, so that the mounting plate and the processing box body rotate relative to each other. Even if one end of the mounting plate tends to move upward, the displacement rod has a force to move to the left, so that the displacement rod moves in the groove; S4: Take out the hot-dip galvanized steel pipe rods in the placement frame. At this time, the steel pipe rods in the feed box are also preheated. Open the baffle to allow the next group of steel pipe rods to enter the placement frame. At this point, all implementation steps are completed.

[0016] Compared with the prior art, the present invention has the following beneficial effects: The present invention proposes an energy-saving and environment-friendly hot-dip galvanizing production device and method. In the prior art, it is difficult for the hot-dip galvanizing device to utilize the heat generated by the zinc liquid. The present invention uses an air pump, a groove, a displacement rod, a mounting plate, a processing box and a feed box to put the steel pipe rod to be processed into the feed box, energize the electric heating rod to make it generate heat, and heat the zinc liquid placed in the main box. Then the air pump is started, and the hot air from the main box is sucked into the groove by the air pump, and then enters the displacement rod from the groove. At this time, the displacement rod is connected to the processing box through a ventilation pipe, and the gas in the displacement rod will enter the processing box along the ventilation pipe. The hot air flow will first hit the wind block plate, and then the hot air will enter the processing box. On the one hand, the particles in the gas hit the wind baffle and fall onto the filter plate. On the other hand, the elastic thin plate vibrates, which in turn causes the filter plate to vibrate, thereby improving the filtration quality. The hot gas after filtration enters the feed box through the air duct and the control valve, and preheats the steel pipe rods to be processed inside the feed box. The heat generated during the hot-dip galvanizing process is reused, which is more green and environmentally friendly. At the same time, preheating the steel pipe rods first can reduce the temperature difference between the object and the zinc liquid encountered during the hot-dip galvanizing process, thereby reducing the stress caused by thermal shock, and also reduces the thermal stress and tissue stress between the coating and the substrate, thereby improving the bonding strength of the coating and the stability of the overall structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the overall structure of the energy-saving and environment-friendly hot-dip galvanizing production device of the present invention; Figure 2 This is a schematic diagram of the main box structure of the energy-saving and environmentally friendly hot-dip galvanizing production device of the present invention. Figure 1 ; Figure 3 This is a schematic diagram of the main box structure of the energy-saving and environmentally friendly hot-dip galvanizing production device of the present invention. Figure 2 ; Figure 4 The schematic diagram of the processing box and feeding assembly structure of the energy-saving and environmentally friendly hot-dip galvanizing production device of the present invention Figure 1 ; Figure 5 The schematic diagram of the processing box and feeding assembly structure of the energy-saving and environmentally friendly hot-dip galvanizing production device of the present invention Figure 2 ; Figure 6 This is a schematic structural diagram of a feed assembly of an energy-saving and environment-friendly hot-dip galvanizing production device of the present invention; Figure 7 This is a schematic diagram of the processing box structure of the energy-saving and environmentally friendly hot-dip galvanizing production device of the present invention. Figure 1 ; Figure 8 This is a schematic diagram of the processing box structure of the energy-saving and environmentally friendly hot-dip galvanizing production device of the present invention. Figure 2 ; Fig. 9 This is a schematic diagram of the internal structure of the baffle of the energy-saving and environment-friendly hot-dip galvanizing production device of the present invention; Fig.10 The invention provides an energy-saving and environment-friendly hot-dip galvanizing production device. Figure 6 Enlarged view of point A.

[0018] In the figure: 1. Main box; 11. Electric heating rod; 2. Electric telescopic rod A; 3. Cover plate; 31. Air pump; 33. Through slot; 34. Slot tube; 35. Air suction plate; 36. Air suction hole; 4. Processing box; 41. Slide; 42. Return spring; 43. Positioning block; 44. Electric push rod A; 45. Rotating part; 46. Docking hole; 47. Air guide tube; 48. Filter plate; 481. Rubber pad; 482. Elastic sheet; 483. Wind resistance plate; 484. Tension spring; 5. Support rod; 6. Feed assembly; 61. Installation Mounting plate; 611, ventilation pipe; 612, control valve; 62, trapezoidal block; 63, displacement rod; 631, groove; 632, roller; 633, rubber ring plate; 64, feed box; 65, sealing plate; 66, electric telescopic rod B; 661, connecting plate; 67, baffle; 671, water storage chamber; 672, water outlet pipe; 673, one-way valve pipe; 674, piston plate; 675, push rod; 676, pear-shaped cloth roller; 677, water inlet; 7, placement component; 71, placement ring plate; 72, placement frame; 73, pull rod. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] In order to solve the technical problem of how to reuse the heat generated in the production process, such as Figure 1-Figure 6 , Fig. 9 and Fig.10 As shown, the following preferred technical solutions are provided: An energy-saving and environment-friendly hot-dip galvanizing production device comprises a main box body 1, electric telescopic rods A2 fixedly mounted on both sides of the main box body 1, a cover plate 3 fixedly mounted on the upper end of the electric telescopic rods A2, a processing box body 4 fixedly mounted on the outer surface of the main box body 1, and a placement component 7 arranged inside the main box body 1 for holding steel pipe rods to be processed, wherein the upper end of the placement component 7 is connected to the cover plate 3, and a feeding component 6 is arranged at the upper end of the processing box body 4.

[0021] The feed assembly 6 includes a mounting plate 61 hinged on the upper surface of the processing box body 4, a displacement rod 63 hinged on one side of the mounting plate 61, a feed box 64 fixedly mounted on the upper surface of the mounting plate 61, and an electric telescopic rod B66 fixedly mounted on the upper surface of the feed box 64, one end of the electric telescopic rod B66 is installed with a connecting plate 661, a baffle 67 is movably embedded in the feed box 64, the upper end of the baffle 67 is connected to the connecting plate 661, a feed port is provided on the upper surface of the feed box 64, and the feed port is connected to a storage cavity provided in the feed box 64 for storing steel pipe rods to be processed, and one end of the displacement rod 63 is movably inserted in the cover plate 3 Internally, the displacement rod 63 is connected to the main box body 1 through the cover plate 3, and the electric telescopic rod A2 can drive the cover plate 3 to move up and down, thereby making the cover plate 3 drive the placement component 7 to move up and down along the inside of the main box body 1. When the cover plate 3 moves up and down, it can drive the displacement rod 63 to move up and down, thereby making the displacement rod 63 and the mounting plate 61 rotate, and the mounting plate 61 and the processing box body 4 rotate, and the steel pipe rod to be processed is placed into the feed box 64 through the feed port. Through the extension and retraction of the electric telescopic rod B66, the baffle 67 can be moved up and down along the inside of the feed box 64, thereby realizing the opening and closing of the feed box 64 and realizing feeding control.

[0022] An air pump 31 is fixedly installed on the upper surface of the cover plate 3, a through groove 33 is penetrated inside the cover plate 3, an air intake plate 35 is fixedly installed on the lower bottom surface of the cover plate 3, and an air intake hole 36 is opened on the outer surface of the air intake plate 35. The air intake plate 35 is connected with the through groove 33 through the air pump 31. The hot gas inside the main box body 1 is sucked into the air intake plate 35 through the air pump 31, and the hot gas then enters the through groove 33 from the air intake plate 35, and finally the hot gas enters the displacement rod 63.

[0023] A trapezoidal block 62 is fixedly installed on one side of the mounting plate 61, and the trapezoidal block 62 is hinged to the displacement rod 63. A ventilation pipe 611 is penetrated on the outer surface of the mounting plate 61, and a ventilation hole is provided on the lower bottom surface of the displacement rod 63, and the ventilation pipe 611 corresponds to the ventilation hole. A docking hole 46 is provided on the upper surface of the processing box 4, and the docking hole 46 corresponds to the ventilation pipe 611. When the mounting plate 61 contacts the displacement rod 63 and the processing box 4, one end of the ventilation pipe 611 will be inserted into the displacement rod 63 through the ventilation hole, and the other end of the ventilation pipe 611 will be inserted into the interior of the processing box 4 through the docking hole 46, and the hot gas in the displacement rod 63 will enter the interior of the processing box 4 along the ventilation pipe 611.

[0024] Slide grooves 41 are provided on both sides of the processing box 4, and a slider and a return spring 42 are provided inside the slide groove 41. One end of the return spring 42 is fixedly connected to the inner wall of the slide groove 41, and the other end of the return spring 42 is connected to the slider. A positioning block 43 is fixedly installed on the outer surface of the slider, and an electric push rod A44 is installed inside the positioning block 43. Rotating parts 45 are fixedly installed on both sides of the mounting plate 61, and one end of the electric push rod A44 is rotatably connected to the rotating part 45. A placement cavity is provided inside the positioning block 43, and the fixed end of the electric push rod A44 is in contact with the placement cavity. The mounting plate 61 and the processing box 4 can be rotated by the electric push rod A44, even if one end of the mounting plate 61 tends to move upward, thereby causing the displacement rod 63 to have a force to move to the left, so that the displacement rod 63 moves in the through groove 33.

[0025] A sealing plate 65 is provided on the outer surface of the feed box 64 , one side of the sealing plate 65 is hinged to the feed port, and a support rod 5 is fixedly mounted on the lower end of the processing box body 4 .

[0026] A slot tube 34 is movably inserted inside the through slot 33, a rubber ring plate 633 is fixedly installed at one end of the displacement rod 63, grooves 631 are provided on both sides of the displacement rod 63, and a roller 632 is rotatably provided inside the groove 631. When the displacement rod 63 moves in the through slot 33, the rubber ring plate 633 can remove impurities adhered to the inner wall of the through slot 33, and the removed impurities will be pushed into the slot tube 34. At this time, the slot tube 34 can be pulled out from the through slot 33 to remove the impurities. At the same time, the roller 632 can reduce the friction between the displacement rod 63 and the through slot 33.

[0027] The placement assembly 7 includes a placement ring plate 71 arranged inside the main box body 1, a placement frame 72 arranged on one side of the placement ring plate 71, and a pull rod 73 fixedly installed on the upper end of the placement ring plate 71, the upper end of the pull rod 73 is connected to the cover plate 3, and an electric heating rod 11 is arranged at the bottom of the main box body 1. The electric heating rod 11 is connected to an external power supply, and the baffle 67 is opened to allow the steel pipe rods to be processed in the feed box 64 to roll into the placement frame 72. The electric heating rod 11 is started to heat the zinc liquid inside the main box body 1, and then the placement frame 72 is immersed in the zinc liquid to complete hot-dip galvanizing.

[0028] The baffle plate 67 is provided with a water storage chamber 671 and a water outlet pipe 672, a one-way valve pipe 673 is connected between the water storage chamber 671 and the water outlet pipe 672, a piston plate 674 is movably provided inside the water storage chamber 671, a push rod 675 is provided at the lower end of the piston plate 674, a water injection port 677 is provided on the upper surface of the baffle plate 67, an embedding groove is provided on the lower bottom surface of the baffle plate 67, a pear-shaped cloth roller 676 is rotatably provided in the embedding groove, the pear-shaped cloth roller 676 and the push rod 675 are provided in the same vertical plane, and when needed, the pear-shaped cloth roller 676 and the push rod 675 are provided in the same vertical plane. When discharging the material, the baffle 67 is opened so that the steel pipe rod can just pass through the feed box 64. When the steel pipe rod rolls, the pear-shaped cloth roller 676 is driven to rotate to clean the surface of the steel pipe rod. When the protruding part of the pear-shaped cloth roller 676 touches the top rod 675, the top rod 675 moves upward to squeeze the water inside the water storage chamber 671 and squeeze the water to the water outlet pipe 672, and the water flows out from the pipe mouth of the water outlet pipe 672, soaking the pear-shaped cloth roller 676, thereby improving the cleaning quality of the steel pipe rod.

[0029] Specifically, the steel pipe rod to be processed is placed in the feed box 64, the electric heating rod 11 is energized to generate heat, and the zinc liquid placed in the main box body 1 is heated, and then the air pump 31 is started, and the hot air of the main box body 1 is sucked into the through groove 33 by the air pump 31, and then enters the displacement rod 63 through the through groove 33. At this time, the displacement rod 63 is connected with the processing box body 4 through the ventilation pipe 611, and the gas in the displacement rod 63 will enter the processing box body 4 along the ventilation pipe 611. The hot air flow will first hit the wind blocking plate 483, on the one hand, the particles in the gas will fall onto the filter plate 48 due to hitting the wind blocking plate 483, and on the other hand, On the one hand, the elastic thin plate 482 is vibrated, and then the filter plate 48 is vibrated to improve the filtering quality. The hot gas after filtration enters the feed box 64 through the air guide pipe 47 and the control valve 612, and the steel pipe rods to be processed in the feed box 64 are preheated, and the heat generated in the hot-dip galvanizing process is reused, which is more environmentally friendly. At the same time, preheating the steel pipe rods first can reduce the temperature difference between the object and the zinc liquid encountered in the hot-dip galvanizing process, thereby reducing the stress caused by thermal shock, and also reducing the thermal stress and tissue stress between the coating and the substrate, thereby improving the bonding strength of the coating and the stability of the overall structure.

[0030] In order to solve the technical problems of how to improve the quality of hot-dip galvanizing, such as Figure 7 and Figure 8 As shown, the following preferred technical solutions are provided: An air guide pipe 47 is provided on the upper surface of the processing box 4, and a filter plate 48 is provided inside the processing box 4. Rubber pads 481 are fixedly installed at both ends of the filter plate 48. The filter plate 48 is connected to the inner wall of the processing box 4 through the rubber pads 481. The filter plate 48 and the inner wall of the processing box 4 form a closed quadrilateral. An elastic thin plate 482 is provided on the outer surface of the filter plate 48, and a wind blocking plate 483 is fixedly installed on one end of the elastic thin plate 482. A tension spring 484 is fixedly installed on one side of the elastic thin plate 482, and one end of the tension spring 484 is connected to the outer surface of the filter plate 48. The wind blocking plate 483 corresponds to the docking hole 46. An air guide groove is opened at the bottom of the mounting plate 61, and a control valve 612 is provided inside the air guide groove, and the air guide groove corresponds to the air guide pipe 47.

[0031] Specifically, the gas is sprayed from the docking hole 46 into the processing box 4, and the airflow will first hit the wind blocking plate 483. On the one hand, the particles in the gas will fall onto the filter plate 48 due to hitting the wind blocking plate 483, and on the other hand, the elastic thin plate 482 will vibrate, thereby causing the filter plate 48 to vibrate, thereby improving the filtering quality. The hot gas after filtration enters the feed box 64 through the air guide pipe 47 and the control valve 612, and preheats the steel pipe rods to be processed in the feed box 64. The hot gas after filtration will become cleaner, preventing the impurity particles in the hot gas from adhering to the surface of the steel pipe rods to be processed, thereby indirectly improving the quality of hot-dip galvanizing.

[0032] In order to further better explain the above embodiment, the present invention also provides an implementation scheme, providing an implementation method of an energy-saving and environmentally friendly hot-dip galvanizing production device, comprising the following steps: S1: Put the steel pipe rod to be processed into the feed box 64, start the electric heating rod 11, heat the zinc liquid inside the main box 1, open the baffle 67, let the steel pipe rod to be processed in the feed box 64 roll into the placement frame 72, and then immerse the placement frame 72 into the zinc liquid, and finally use the electric telescopic rod A2 to move the cover plate 3 downward, seal the main box 1, and complete the hot-dip galvanizing; S2: During the hot-dip galvanizing process, a large amount of hot gas will be generated. The air pump 31 is turned on to suck the hot gas inside the main box 1 into the air intake plate 35. The hot gas then enters the through groove 33 from the air intake plate 35, and finally enters the displacement rod 63. When the cover plate 3 is sealed with the main box 1, the displacement rod 63, the mounting plate 61 and the processing box 4 are contacted in sequence, and the hot gas in the displacement rod 63 will enter the processing box 4. After being filtered by the filter plate 48, the hot gas enters the feed box 64 to preheat the steel pipe rod; S3: After the hot-dip galvanizing is completed, the cover plate 3 is lifted up to separate the placement frame 72 from the zinc liquid. During the lifting process, the electric telescopic rod A2 and the electric push rod A44 are started at the same time and maintain the same speed, so that the mounting plate 61 and the processing box 4 rotate relative to each other, even if one end of the mounting plate 61 tends to move upward, thereby causing the displacement rod 63 to have a force to move to the left, so that the displacement rod 63 moves in the through groove 33; S4: Take out the hot-dip galvanized steel pipe rods in the placement frame 72. At this time, the steel pipe rods in the feed box 64 are also preheated. Open the baffle 67 to allow the next group of steel pipe rods to enter the placement frame 72. At this point, all implementation steps are completed.

[0033] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An energy-saving and environment-friendly hot-dip galvanizing production device, comprising a main box (1), electric telescopic rods A (2) fixedly mounted on both sides of the main box (1), a cover plate (3) fixedly mounted on the upper end of the electric telescopic rods A (2), a processing box (4) fixedly mounted on the outer surface of the main box (1), and a placement component (7) arranged inside the main box (1) for holding a steel pipe rod to be processed, wherein the upper end of the placement component (7) is connected to the cover plate (3), characterized in that: A feed assembly (6) is provided at the upper end of the processing box (4); The feed assembly (6) comprises a mounting plate (61) hinged on the upper surface of the processing box (4), a displacement rod (63) hinged on one side of the mounting plate (61), a feed box (64) fixedly mounted on the upper surface of the mounting plate (61), and an electric telescopic rod B (66) fixedly mounted on the upper surface of the feed box (64), one end of the electric telescopic rod B (66) being mounted with a connecting plate (661), a baffle (67) being movably embedded in the interior of the feed box (64), the upper end of the baffle (67) being connected to the connecting plate (661), a feed port being provided on the upper surface of the feed box (64), the feed port being connected to a storage cavity provided in the interior of the feed box (64) for storing steel pipe rods to be processed, one end of the displacement rod (63) being movably inserted in the interior of the cover plate (3), and the displacement rod (63) being connected to the main box (1) through the cover plate (3).

2. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 1, characterized in that: An air pump (31) is fixedly mounted on the upper surface of the cover plate (3), a through groove (33) is provided through the interior of the cover plate (3), an air suction plate (35) is fixedly mounted on the lower bottom surface of the cover plate (3), an air suction hole (36) is provided on the outer surface of the air suction plate (35), and the air suction plate (35) is connected to the through groove (33) via the air pump (31).

3. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 2, characterized in that: A trapezoidal block (62) is fixedly mounted on one side of the mounting plate (61), the trapezoidal block (62) being hinged to the displacement rod (63), a vent pipe (611) being provided through the outer surface of the mounting plate (61), a vent hole being provided on the lower bottom surface of the displacement rod (63), the vent pipe (611) corresponding to the vent hole, and a docking hole (46) being provided on the upper surface of the processing box (4), the docking hole (46) corresponding to the vent pipe (611).

4. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 3, characterized in that: A slide groove (41) is provided on both sides of the processing box body (4), a slider and a return spring (42) are provided inside the slide groove (41), one end of the return spring (42) is fixedly connected to the inner wall of the slide groove (41), and the other end of the return spring (42) is connected to the slider, a positioning block (43) is fixedly installed on the outer surface of the slider, an electric push rod A (44) is installed inside the positioning block (43), and a rotating member (45) is fixedly installed on both sides of the mounting plate (61), and one end of the electric push rod A (44) is rotatably connected to the rotating member (45).

5. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 4, characterized in that: An air guide pipe (47) is provided on the upper surface of the processing box (4), a filter plate (48) is provided inside the processing box (4), rubber pads (481) are fixedly installed at both ends of the filter plate (48), the filter plate (48) is connected to the inner wall of the processing box (4) through the rubber pads (481), the filter plate (48) and the inner wall of the processing box (4) form a closed quadrilateral, an elastic thin plate (482) is provided on the outer surface of the filter plate (48), a wind blocking plate (483) is fixedly installed on one end of the elastic thin plate (482), a tension spring (484) is fixedly installed on one side of the elastic thin plate (482), one end of the tension spring (484) is connected to the outer surface of the filter plate (48), the wind blocking plate (483) corresponds to the docking hole (46), an air guide groove is provided at the bottom of the mounting plate (61), a control valve (612) is provided inside the air guide groove, and the air guide groove corresponds to the air guide pipe (47).

6. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 5, characterized in that: A sealing plate (65) is provided on the outer surface of the feed box (64), one side of the sealing plate (65) is hinged to the feed port, and a support rod (5) is fixedly mounted on the lower end of the processing box body (4).

7. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 6, characterized in that: A slot tube (34) is movably inserted inside the through slot (33), a rubber ring plate (633) is fixedly mounted on one end of the displacement rod (63), grooves (631) are provided on both sides of the displacement rod (63), and a roller (632) is rotatably provided inside the groove (631).

8. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 7, characterized in that: The placement assembly (7) comprises a placement ring plate (71) arranged inside the main box (1), a placement frame (72) arranged on one side of the placement ring plate (71), and a pull rod (73) fixedly mounted on the upper end of the placement ring plate (71), wherein the upper end of the pull rod (73) is connected to the cover plate (3), and an electric heating rod (11) is arranged at the bottom of the main box (1), and the electric heating rod (11) is externally connected to a power source.

9. An energy-saving and environment-friendly hot-dip galvanizing production device as claimed in claim 8, characterized in that: A water storage chamber (671) and a water outlet pipe (672) are provided inside the baffle plate (67), a one-way valve pipe (673) is connected between the water storage chamber (671) and the water outlet pipe (672), a piston plate (674) is movably provided inside the water storage chamber (671), a push rod (675) is provided at the lower end of the piston plate (674), a water injection port (677) is provided on the upper surface of the baffle plate (67), an embedding groove is provided on the lower bottom surface of the baffle plate (67), a pear-shaped cloth roller (676) is rotatably provided in the embedding groove, and the pear-shaped cloth roller (676) and the push rod (675) are provided in the same vertical plane.

10. An implementation method of the energy-saving and environment-friendly hot-dip galvanizing production device according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: placing the steel pipe rod to be processed into the feed box (64), starting the electric heating rod (11), heating the zinc liquid inside the main box (1), opening the baffle (67), allowing the steel pipe rod to be processed in the feed box (64) to roll into the placement frame (72), and then immersing the placement frame (72) into the zinc liquid, and finally using the electric telescopic rod A (2) to move the cover plate (3) downward to seal the main box (1), thereby completing the hot-dip galvanizing; S2: During the hot-dip galvanizing process, a large amount of hot gas is generated. The air pump (31) is turned on to suck the hot gas inside the main box (1) into the air suction plate (35). The hot gas then enters the through groove (33) from the air suction plate (35), and finally enters the displacement rod (63). When the cover plate (3) and the main box (1) are sealed, the displacement rod (63), the mounting plate (61) and the processing box (4) are contacted in sequence, and the hot gas in the displacement rod (63) enters the processing box (4). After being filtered by the filter plate (48), the hot gas enters the feed box (64) to preheat the steel pipe rod. S3: After the hot-dip galvanizing is completed, the cover plate (3) is lifted up so that the placement frame (72) is separated from the zinc liquid. During the lifting process, the electric telescopic rod A (2) and the electric push rod A (44) are started simultaneously and at the same speed, so that the mounting plate (61) and the processing box (4) rotate relative to each other. Even if one end of the mounting plate (61) tends to move upward, the displacement rod (63) has a force to move to the left, so that the displacement rod (63) moves in the through groove (33); S4: Take out the hot-dip galvanized steel pipe rods in the placement frame (72). At this time, the steel pipe rods in the feed box (64) are also preheated. Open the baffle (67) to allow the next group of steel pipe rods to enter the placement frame (72). At this point, all implementation steps are completed.

Citation Information

Patent Citations

  • Biological fermentation tank waste gas treatment device

    CN111214947A

  • High-efficiency heat absorption device used for hot-galvanizing pot

    CN111809132A

  • Recycling tail gas preheating processing equipment for bolt galvanization

    CN217265966U

  • Hot galvanizing strip steel production waste heat utilization device

    CN220454372U

  • A waste heat utilization device for hot-dip galvanizing

    CN221028625U

Cited By

  • Hot-dip galvanizing device for bolt production and processing technology of hot-dip galvanizing device

    CN119332189A