Integral dismantling method for high-altitude large-span upper cross beam support of bridge tower
By using a method of synchronous control of four steel strands and a hydraulic system, the overall dismantling of the bridge's main tower crossbeam support was achieved, solving the problems of low dismantling efficiency and high risk in high-altitude, large-span environments, and achieving safe and reliable construction results.
Patent Information
- Application Number
- CN202411235750.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-15
AI Technical Summary
Existing methods for dismantling the main tower crossbeam supports of bridges are inefficient and risky, especially in high-altitude, large-span environments where it is difficult to dismantle them safely as a whole.
Four steel strands are threaded through four hydraulic cylinders. The steel strands are simultaneously tensioned and lowered through a hydraulic pump station and control center. Combined with sensors and valve blocks, load monitoring and attitude monitoring are carried out to achieve the overall dismantling of the upper crossbeam support.
It improved construction efficiency, reduced construction risks, ensured the safety and stability of the demolition process, and transformed high-altitude construction into land-based construction.
Smart Images

Figure CN118958183A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to a method for integrally dismantling a high-altitude large-span upper crossbeam support of a bridge tower. Background Art
[0002] At present, the removal of the beam supports of the main tower of the bridge is an important task in the construction project, which usually requires detailed planning and safety considerations. During the construction of the main tower of the bridge, the beam supports played a key role in the construction process, ensuring the overall stability of the upper beam structure. However, as the project is gradually completed, the upper beam supports need to be removed safely and effectively. Removing the upper beam supports is a complex project that requires comprehensive consideration of multiple factors, including structural safety, surrounding environment, worker safety, etc. The engineering team needs to develop a detailed removal plan to ensure that risks are minimized during the removal process.
[0003] In the related art, the upper crossbeam support is generally dismantled manually. However, because the upper crossbeam support is located directly below the crossbeam body, the dismantling space is limited and it is difficult to lower the hook of the tower crane, so it can only be dismantled by loose dismantling.
[0004] However, the loose dismantling method involves crooked and slanted lifting operations and requires a large number of lifting times, which greatly increases the risk of dismantling and leads to extremely low dismantling efficiency. Summary of the invention
[0005] The present application provides a method for integrally dismantling a high-altitude large-span upper crossbeam support of a bridge tower. The method for integrally dismantling the upper crossbeam support is safe and reliable, and greatly reduces construction risks.
[0006] The present application embodiment provides a method for integrally removing a large-span upper crossbeam support of a bridge tower, comprising the following steps:
[0007] Cut a number of steel strands of equal length and divide them into four strands, and insert the four strands into four oil cylinders one by one;
[0008] Lift and install the four oil cylinders with the steel strands to the four corners of the top surface of the upper beam respectively; pass the bottom end of the steel strand through the upper beam and fix it to the upper beam bracket;
[0009] Install a control center and a hydraulic pump station, the hydraulic pump station is connected to all cylinders through hydraulic oil pipes; the control center is connected to the hydraulic pump station and the cylinders through signal lines;
[0010] The control center controls the steel strands of the four cylinders to tighten synchronously through the hydraulic pump station, transferring the force of the upper beam from the corbel to the steel strands;
[0011] Remove the corbels;
[0012] The control center controls the steel strands of the four cylinders through the hydraulic pump station to synchronously lower the entire upper beam support.
[0013] On the basis of the above technical solution, the oil cylinder comprises an oil cylinder body, an upper anchor and a lower anchor arranged coaxially;
[0014] Cut a number of steel strands of equal length and divide them into four strands. Pass the four strands through four cylinders one by one, including:
[0015] Cutting a number of steel strands of a first set length according to the lowering height;
[0016] Mark the threading position at the second set length at the bottom end of all steel strands;
[0017] The steel strands pass through the compressed oil cylinder body, the upper anchor and the lower anchor, and the threading position mark of each steel strand is just located on the lower surface of the oil cylinder body.
[0018] On the basis of the above technical solutions, the installation of the control center and hydraulic pump station also includes:
[0019] Install the cylinder anchor sensor, cylinder stroke sensor and oil pressure sensor, and all sensors are connected to the control center through signal lines; the oil pressure sensor is installed on the large cavity side of the cylinder to detect the oil pressure in the large cavity of the cylinder; the cylinder stroke sensor is installed on the piston rod end of the main cylinder to detect the displacement value within a single stroke of the lifting cylinder body; the two cylinder anchor sensors are respectively installed on the two anchors of the cylinder to detect the clamping or loose state of the upper anchor and the lower anchor.
[0020] On the basis of the above technical solution, a hydraulic lock is installed inside the oil cylinder body, and the hydraulic lock is used to lock the oil pressure of the oil cylinder body.
[0021] On the basis of the above technical solution, a combined valve block is installed inside the cylinder body, and the combined valve block includes a speed limiting valve for preventing the cylinder body from rapidly sliding down, a load limiting valve for preventing the cylinder body from being subjected to excessive load, a throttle valve for reducing the flow rate of the liquid oil and controlling the cylinder power, and a load limiting valve for unloading when the cylinder body is subjected to excessive load.
[0022] On the basis of the above technical solution, the method of cutting a plurality of steel strands of a first set length according to the lowering height comprises:
[0023] Arrange laser measuring points at the four top corners of the upper crossbeam support;
[0024] The distance from the laser measuring point to the ground is collected by a laser rangefinder, and then the first set length is calculated based on the known height of the upper crossbeam support.
[0025] On the basis of the above technical solution, the four oil cylinders with steel strands are hoisted and installed to the four corners of the top surface of the upper beam, including:
[0026] Use a crane to lift the four cylinders with steel strands installed on them to the top surface of the upper beam.
[0027] On the basis of the above technical solution, the bottom end of the steel strand is passed through the upper crossbeam and connected to the upper crossbeam support, including:
[0028] Pass the bottom end of the steel strand downward through the upper crossbeam and the upper crossbeam support in sequence;
[0029] A distribution beam is arranged at the bottom end of the steel strand, and the distribution beam is welded to the upper crossbeam support.
[0030] On the basis of the above technical solution, before removing the corbel, it also includes:
[0031] Use a cutting knife to cut off the multiple pads between the corbel and the upper beam support one by one from top to bottom.
[0032] On the basis of the above technical solution, after the entire upper beam support is lowered synchronously, it also includes:
[0033] When the upper crossbeam support is lowered to 2m from the ground, check and inspect the flatness of the top surface of the previously prepared pile cap;
[0034] After the flatness meets the set requirements, the upper beam support slowly falls onto the pile cap.
[0035] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:
[0036] 1. The overall dismantling method of the upper crossbeam support of the present application is to set up four oil cylinders, and respectively pass steel strands through them. A control center and a hydraulic pump station are also set up to provide power and control the oil cylinders. The control center controls the steel strands of the four oil cylinders through the hydraulic pump station to be tightened synchronously, and the force on the upper crossbeam is transferred from the corbels to the steel strands. Then the corbels are removed, and the steel strands are synchronously lowered to the entire upper crossbeam support. Compared with the traditional scattered dismantling construction method, the present application adopts an overall dismantling method for the upper crossbeam support. The overall lowering can transform high-altitude construction into land construction, improve on-site construction efficiency, be safe and reliable, greatly reduce construction risks, and improve construction efficiency.
[0037] 2. The overall dismantling method of the upper crossbeam support of the present application detects the load of the cylinder through a pressure sensor, and realizes the movement synchronization of the cylinder through the cylinder anchor sensor and the cylinder stroke sensor. The combined use of the above three sensors can realize the control strategy of load monitoring and position synchronization, and can monitor the posture of the upper crossbeam support in the air. The data transmitted back in real time by each group of sensors can clearly and intuitively show the posture of the crossbeam support during the lowering process, and timely confirm whether the lowering height of the lifting point position is synchronized during lowering, which greatly improves the stability of the crossbeam support during the lowering process. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0039] Figure 1 This is a transverse schematic diagram of the upper crossbeam support of the embodiment of the present application after the oil cylinder and the steel strand are installed;
[0040] Figure 2 for Figure 1 Left view of;
[0041] Figure 3 for Figure 1 A top view of
[0042] In the figure: 11, oil cylinder; 12, laser measuring point; 13, steel strand; 14, control center; 15, hydraulic pump station; 17, oil tank; 131, distribution beam; 20, bridge tower; 201, upper beam; 202, upper beam bracket; 203, corbel. DETAILED DESCRIPTION
[0043] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0044] like Figure 1 , Figure 2 and Figure 3 As shown, a method for integrally dismantling a large-span upper beam support of a bridge tower at high altitude comprises the following steps:
[0045] A plurality of steel strands 13 of equal length are cut and divided into four strands of steel strands, each strand of steel strand has an equal number of strands, and the four strands of steel strands 13 are respectively passed through the four oil cylinders 11 one by one.
[0046] The four oil cylinders 11 with the steel strands 13 inserted are hoisted and installed to the four corners of the top surface of the upper beam 201 respectively; the bottom end of the steel strand 13 passes through the upper beam 201 and is connected to the upper beam bracket 202.
[0047] The control center 14 and the hydraulic pump station 15 are installed, and the hydraulic pump station 15 is connected to all the cylinders 11 through hydraulic oil pipes. Specifically, the hydraulic pump station 15 provides hydraulic energy to the cylinders 11 by creating flowing liquid through the oil tank 17 on the outside or the top surface of the upper crossbeam 201, thereby providing the pressure required by the cylinders 11, thereby achieving the lowering of the steel strand. The control center 14 is connected to the hydraulic pump station 15 and the cylinders 11 through a signal line.
[0048] The control center 14 controls the steel strands 13 of the four oil cylinders 11 to be tightened synchronously through the hydraulic pump station 15, so as to transfer the force of the upper cross beam 201 from the corbel 203 to the steel strands 13;
[0049] Remove the corbel 203;
[0050] The control center controls the steel strands 13 of the four oil cylinders 11 through the hydraulic pump station 15 to synchronously lower the entire upper crossbeam support 202 .
[0051] Specifically, a high-pressure hose is used to interconnect the oil cylinder 11 and the hydraulic pump station 15. The hydraulic pump station 15 is an actuator that converts hydraulic energy into mechanical motion.
[0052] The overall removal method of the upper crossbeam support of the present application is to set four oil cylinders 11, and respectively pass steel strands 13, and also set a control center 14 and a hydraulic pump station 15 to provide power and control the oil cylinders 11. The control center 14 controls the steel strands 13 of the four oil cylinders 11 to be tightened synchronously through the hydraulic pump station 15, so as to convert the force of the upper crossbeam 201 from the bracket 203 to the steel strands 13; then remove the bracket 203, and the steel strands 13 are synchronously lowered to the entire upper crossbeam support 202;
[0053] Compared with the traditional scattered dismantling construction method, this application adopts the overall dismantling method of the upper beam support. The overall lowering can transform high-altitude construction into land construction, improve on-site construction efficiency, be safe and reliable, greatly reduce construction risks, and improve construction efficiency.
[0054] Specifically, the upper beam in the present application refers to the upper beam of the H-shaped bridge tower 20 .
[0055] In one embodiment, the oil cylinder 11 comprises a coaxially arranged oil cylinder body, an upper anchor and a lower anchor.
[0056] Cut a number of steel strands 13 of equal length and divide them into four strands, and insert the four strands 13 into four oil cylinders 11 one by one, including:
[0057] According to the lowering height, the length of the steel strand 13 is calculated in advance, and a number of steel strands 13 of the first set length are cut; specifically, the steel strands 13 are required to be chamfered at both ends and not loose. After cutting, the multiple steel strands 13 are laid flat on the ground at intervals and straightened out one by one.
[0058] Marking the threading position at the second set length of the bottom end of all the steel strands 13;
[0059] The steel strands 13 pass through the compressed cylinder body, upper anchor and lower anchor, and the insertion position mark of each steel strand 13 is just located on the lower surface of the cylinder body, so that all the steel strands 13 reach the same state before the lowering movement and can be lowered synchronously later.
[0060] Specifically, the steel strands 13 are passed through the oil cylinder body, the upper anchor and the lower anchor. The upper anchor and the lower anchor are kept consistent from top to bottom, that is, the steel strands 13 passing through the upper anchor and the lower anchor at the same time cannot be twisted. There are 7 steel strands in each oil cylinder. Before passing the steel strands 13, the oil cylinder body, the upper anchor and the lower anchor are pressed. According to the passing position mark at the lower end of the steel strand 13, the steel strands are installed to keep all the steel strands in a uniform state.
[0061] The overall dismantling method of the upper crossbeam support of the present application is to mark according to the threading position mark, so that all the steel strands 13 are initially kept in the same threading state, laying the foundation for the subsequent synchronous lowering, which is safe and reliable and reduces the construction risk.
[0062] In one embodiment, the control center 14 and the hydraulic pump station 15 are installed together with:
[0063] The cylinder anchor sensor, cylinder stroke sensor and oil pressure sensor are installed, and all sensors are connected to the control center 14 through signal lines; the oil pressure sensor is installed on the large cavity side of the cylinder to detect the oil pressure in the large cavity of the cylinder; the cylinder stroke sensor is installed on the piston rod end of the main cylinder to detect the displacement value within a single stroke of the lifting cylinder; the cylinder anchor sensor is installed on the two anchors of the cylinder to detect the clamping or loosening state of the upper anchor and the lower anchor.
[0064] Specifically, the working principle of the oil cylinder 11 is: the upper anchor is loosened, the lower anchor is clamped, and the oil cylinder body is raised, moving the steel strand downward.
[0065] The overall removal method of the upper crossbeam support of the present application detects the load of the cylinder through a pressure sensor, and realizes the movement synchronization of the cylinder through the cylinder anchor sensor and the cylinder stroke sensor. The combined use of the above three sensors can realize the control strategy of load monitoring and position synchronization, and can monitor the posture of the upper crossbeam support in the air. The data transmitted back in real time by each group of sensors can clearly and intuitively show the posture of the crossbeam support during the lowering process, and timely confirm whether the lowering height of the lifting point position is synchronized during lowering, which greatly improves the stability of the crossbeam support during the lowering process.
[0066] In one embodiment, a hydraulic lock is installed inside the oil cylinder body, and the hydraulic lock is used to lock the oil pressure of the oil cylinder body to ensure that there will be no rapid decline due to oil leakage in the oil pipe, thereby further improving safety performance.
[0067] In one embodiment, a combined valve block is installed inside the cylinder body, and the combined valve block includes a speed limiting valve for preventing the cylinder body from rapidly sliding down, a load limiting valve for preventing the cylinder body from being subjected to excessive load, a throttle valve for reducing the flow rate of the liquid oil and controlling the cylinder power, and a load limiting valve for unloading when the cylinder body is subjected to excessive load.
[0068] Combined valve block: During the lowering process of the beam support, the center of gravity distribution will lead to different lowering loads. If there is a position deviation during the lowering process, the load difference at the hanging point will be too large. The installation of a combined valve block can achieve the functions of pressure maintenance, load limiting and throttling speed regulation, and realize the balanced control of the lowering load.
[0069] The speed limiting valve is mainly used to prevent the cylinder body from sliding down rapidly during the descent process. The main function of the load limiting valve is to prevent the cylinder body from being subjected to excessive loads, which may cause damage to the seal or mechanical structure. The throttle valve controls the power of the cylinder body by limiting the cross-sectional area of the oil flowing through the valve, thereby reducing the flow rate of the oil. The overflow valve is used to open the valve when the pressure exceeds the set value, allowing the liquid to flow out of the system. Protect the hydraulic system from overload.
[0070] The overall removal method of the upper crossbeam support of the present application is equipped with a combined valve block, which can achieve the functions of pressure maintenance, load limitation and throttling speed regulation, realize the balanced control of the lowered load, and further improve the safety performance.
[0071] Preferably, a single strand of steel strands consists of 14 strands. The steel strand has a strength of 1860MPa, a single strand length of 144m, and a single bundle consists of 7 left-twisted strands and 7 right-twisted strands.
[0072] In one embodiment, cutting a plurality of first set lengths of the steel strands 13 according to the lowering height comprises:
[0073] Arrange laser measuring points 12 at the four corners of the upper crossbeam support 202;
[0074] The distance from the laser measuring point 12 to the ground is collected by a laser rangefinder, and then the first set length is calculated based on the known height of the upper crossbeam support to ensure that the steel strand 13 meets the lowering requirements.
[0075] In one embodiment, four oil cylinders 11 with steel strands 13 inserted are hoisted and installed to the four corners of the top surface of the upper beam 201, including:
[0076] The four oil cylinders 11 with the steel strands 13 inserted therein are hoisted and installed to the top surface of the upper crossbeam 201 by a crane.
[0077] In one embodiment, the bottom end of the steel strand 13 is passed through the upper beam 201 and connected to the upper beam support 202, including:
[0078] Pass the bottom end of the steel strand 13 downward through the upper crossbeam 201 and the upper crossbeam support 202 in sequence;
[0079] A distribution beam 131 is provided at the bottom end of the steel strand 13 , and the distribution beam 131 is welded to the upper crossbeam support 202 .
[0080] Furthermore, before removing the corbel 203, the following steps are also included:
[0081] Use a cutting knife to cut off the multiple pads between the corbel 203 and the upper beam support 202 from top to bottom, so that the upper beam support 202 can be gradually lowered to avoid a single drop, which can further prevent accidents. After ensuring safety and no accidents, remove the corbel 203.
[0082] Furthermore, before removing the corbel 203, fire-fighting facilities should be installed and a cordon should be set at the bottom.
[0083] Furthermore, before the upper crossbeam support 202 is lowered as a whole, the following steps are also included:
[0084] Check the equipment, start the oil cylinder and pump station, and begin lowering. The single lowering stroke is 25cm, the lowering speed is 5m / h, and the lowering is cyclic.
[0085] In one embodiment, after the entire upper beam support 202 is synchronously lowered, the method further includes:
[0086] When the upper crossbeam support 202 is lowered to 2 m from the ground, the top surface flatness of the previously prepared pad pile cap is checked to avoid overturning due to an unstable pad.
[0087] After verification, the upper beam support 202 is slowly lowered onto the pile cap;
[0088] Two 25t truck cranes are used to dismantle the upper crossbeam support. The dismantling is done piece by piece, following the principle of dismantling those installed first last and those installed later first.
[0089] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0090] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0091] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A method for integrally dismantling a large-span upper beam support of a bridge tower at high altitude, characterized in that: The following steps are involved: Cut a plurality of steel strands (13) of equal length and divide them into four strands of steel strands, and insert the four strands of steel strands (13) into four oil cylinders (11) one by one; The four oil cylinders (11) through which the steel strands (13) are passed are hoisted and installed to the four corners of the top surface of the upper crossbeam (201) respectively; the bottom ends of the steel strands (13) are passed through the upper crossbeam (201) and fixedly connected to the upper crossbeam bracket (202); A control center (14) and a hydraulic pump station (15) are installed, wherein the hydraulic pump station (15) is connected to all cylinders (11) via hydraulic oil pipes; the control center (14) is connected to the hydraulic pump station (15) and the cylinders (11) via signal lines; The control center (14) controls the steel strands (13) of the four oil cylinders (11) to be tightened synchronously through the hydraulic pump station (15), so as to transfer the force of the upper crossbeam (201) from the corbel (203) to the steel strands (13); Remove the corbel (203); The control center controls the steel strands (13) of the four oil cylinders (11) through the hydraulic pump station (15) to synchronously lower the entire upper crossbeam support (202).
2. The overall removal method of a bridge tower high-altitude large-span upper beam support as claimed in claim 1 is characterized in that: The oil cylinder (11) comprises an oil cylinder body, an upper anchor and a lower anchor which are coaxially arranged; Cut a plurality of steel strands (13) of equal length and divide them into four strands of steel strands, and insert the four strands of steel strands (13) into four oil cylinders (11) one by one, including: Cutting a number of steel strands (13) of a first set length according to the lowering height; Marking the threading position at a second set length at the bottom end of all the steel strands (13); The steel strands (13) pass through the compressed oil cylinder body, the upper anchor and the lower anchor, and the threading position mark of each steel strand (13) is just located on the lower surface of the oil cylinder body.
3. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 2, characterized in that: When installing the control center (14) and the hydraulic pump station (15), it also includes: A cylinder anchor sensor, a cylinder stroke sensor and an oil pressure sensor are installed, and all sensors are connected to a control center (14) via signal lines; the oil pressure sensor is installed on the large cavity side of the cylinder to detect the oil pressure in the large cavity of the cylinder; the cylinder stroke sensor is installed on the piston rod end of the main cylinder to detect the displacement value within a single stroke of the lifting cylinder body; two cylinder anchor sensors are respectively installed on the two anchors of the cylinder to detect the clamping or loosening state of the upper anchor and the lower anchor.
4. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 2, characterized in that: A hydraulic lock is installed inside the oil cylinder body, and the hydraulic lock is used to lock the oil pressure of the oil cylinder body.
5. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 2, characterized in that: A combined valve block is installed inside the cylinder body, and the combined valve block includes a speed limiting valve for preventing the cylinder body from rapidly sliding down, a load limiting valve for preventing the cylinder body from being subjected to excessive load, a throttle valve for reducing the flow rate of the liquid oil and controlling the cylinder power, and a load limiting valve for unloading when the cylinder body is subjected to excessive load.
6. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 2, characterized in that: The method of cutting a plurality of steel strands (13) of a first set length according to the lowering height comprises: Arranging laser measuring points (12) at four corners of the upper crossbeam support (202); The distance from the laser measuring point (12) to the ground is collected by a laser rangefinder, and then the first set length is calculated based on the known height of the upper crossbeam support.
7. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 1, characterized in that: The four oil cylinders (11) with the steel strands (13) inserted are hoisted and installed at the four corners of the top surface of the upper beam (201), including: The four oil cylinders (11) with the steel strands (13) inserted therein are hoisted and installed on the top surface of the upper crossbeam (201) by a crane.
8. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 1, characterized in that: The bottom end of the steel strand (13) passes through the upper crossbeam (201) and is connected to the upper crossbeam support (202), including: Pass the bottom end of the steel strand (13) downward through the upper crossbeam (201) and the upper crossbeam support (202) in sequence; A distribution beam (131) is arranged at the bottom end of the steel strand (13), and the distribution beam (131) is welded to an upper crossbeam support (202).
9. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 1, characterized in that: Before removing the corbel (203), it also includes: Use a cutting knife to cut off the multiple pads between the corbel (203) and the upper crossbeam support (202) piece by piece from top to bottom.
10. The method for integrally dismantling a high-altitude large-span upper beam support of a bridge tower as claimed in claim 1, characterized in that: After the entire upper beam support (202) is lowered synchronously, it also includes: When the upper crossbeam support (202) is lowered to 2 m from the ground, the top surface flatness of the previously prepared pile cap is checked and tested; After the flatness meets the set requirements, the upper crossbeam support (202) slowly falls on the pile cap.