Soft foundation efficient treatment method for gas lift combined discrete material pile composite foundation
By setting up flower pipes in the piles of bulk materials and using gas lifting technology to drain water, the problems of long construction cycle and low drainage efficiency of soft soil foundation treatment in traditional methods are solved, and composite foundation of gas lifting combined bulk material piles is realized The efficient treatment improves the foundation's consolidation efficiency and bearing capacity.
Patent Information
- Application Number
- CN202411453504.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-10-17
AI Technical Summary
Traditional soft soil foundation treatment methods have problems such as long construction cycle, high cost and low drainage efficiency. Especially in extremely low permeability soft soil, it is difficult to effectively utilize the drainage channels of the piles of bulk material, resulting in the foundation treatment efficiency and range of the area. limit.
The composite foundation treatment method of gas lifting combined bulk material piles is adopted. By setting flower tubes in the bulk material piles, using gas lifting technology to periodically drain water, combined with positive pressure gas to drive the water body to discharge, forming gas lifting combined bulk material Processing method of composite foundation of piles.
It has achieved efficient consolidation and improved bearing capacity of soft soil foundations, simplified equipment requirements and construction steps, and is suitable for large-area soft soil foundation treatment, reducing construction costs and time.
Smart Images

Figure CN118958263A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of geotechnical engineering, and in particular relates to a soft foundation high-efficiency treatment method of an air lift combined with bulk material pile composite foundation. Background Art
[0002] Soft soil is widely found in the southeastern coastal areas of China. It has the properties of high water content, low permeability and low shear strength. Before the project is used, foundation treatment must be carried out to improve its bearing capacity and engineering stability.
[0003] Traditional soft soil foundation treatment methods often require a long construction period, high costs and complex construction equipment, which makes soft soil foundations face many challenges in geotechnical engineering construction and land use. At present, the pile loading (vacuum) preloading drainage consolidation method (CN112962573B) is a relatively effective soft foundation treatment method and is widely used in soft foundation treatment projects, but it also has certain limitations, that is, the water that penetrates through the vertical drainage body is difficult to be discharged outside the site, resulting in construction time often taking several months or even longer. In addition, due to well resistance, smearing effect, etc., the dissipation of excess pore water pressure is further delayed, the foundation construction period is extended, and the construction cost is increased. Therefore, it is of great significance to develop a treatment method to accelerate the drainage of soft soil foundations.
[0004] Gas lift is often used in mining and dredging projects to lift solids and liquids vertically, such as Chinese patents CN110630226A and CN105775752A. The gas lift method is to inject compressed air at the bottom of the lifting channel to reduce the fluid density at the inlet, and drive the target (for example, slag or sludge) to move vertically upward under the action of the pressure difference. The top outlet of the conventional gas lift lifting channel is generally at atmospheric pressure, and only the high-pressure gas injected at the bottom of the lifting channel forms a pressure difference to complete the lifting of a large amount of solids and liquids.
[0005] Bulk material pile refers to a method of setting bulk materials (such as gravel, sand, etc.) in the natural foundation to form a reinforced pile body to improve the bearing capacity of the foundation and control post-construction settlement. Bulk material pile method is widely used in soft soil foundation reinforcement. When the soft soil pore water infiltrates into the bulk material pile, hydrostatic pressure will be generated in the pile, and its size will continue to increase as the water level in the pile rises. When the pores of the bulk material pile are saturated, the hydrostatic pressure in the pile will be equal to the pore water pressure outside the pile, the pore water of the soft soil foundation will stop infiltrating, and the water in the pile cannot be automatically discharged along the pile to the surface. Therefore, under the action of deadweight stress alone, the pile body can only play a water collection role and cannot continuously drain water. In order to drive the water in the pile to drain, engineering often piles on the surface to form additional stress. For example, the Chinese patent CN 112962573 B mentions the use of pile preloading combined with vacuum preloading to reinforce the soft soil foundation. Vacuum preloading is carried out by pre-installing plastic drainage boards and laying sealing membranes. However, due to the extremely low permeability coefficient of soft soil foundation (10-8 m / s level), the drainage rate after applying additional stress is extremely low, and the bulk material pile cannot fully play its role as a drainage channel. Moreover, the method of pile loading and pressurization is only applicable to soft soil foundations with a certain bearing capacity. For high-water content soft soil with extremely poor engineering properties and almost no bearing capacity, it is almost impossible to pile load on it, so the application scope of this method is limited.
[0006] In addition, Chinese patent CN 118187029 A links the air lift method with the treatment of soft soil foundation, and introduces the jet technology. The jet cuts the soil layer to form a horizontal drainage channel with a certain depth and width in the soft soil layer. After the soft soil foundation is pretreated, a drainage board will be laid in the soil. The pore water sucked out by the vacuum pressure in the soil will be collected in the drainage board and pumped upward along the drainage board. However, the above method also requires the pre-laying of drainage boards, which is costly and has complicated construction steps. Summary of the invention
[0007] In order to solve the technical problem of limited seepage consolidation when treating soft soil foundation with existing bulk material piles, the present invention provides an efficient soft soil foundation treatment method of air lift combined with bulk material pile composite foundation. During the entire treatment period of the bulk material pile composite foundation, the present invention can periodically perform air lift to continuously drain the water in the bulk material pile (in the flower tube), thereby giving full play to the drainage channel function of the bulk material pile. Compared with other methods, the patent of the present invention has low requirements on equipment and soil to be treated, is simple and feasible to operate, can achieve efficient consolidation of soft soil foundation, and can be applied to large-area soft soil foundation treatment projects.
[0008] The technical solution adopted by the present invention is:
[0009] A method for efficiently treating soft foundation of an air lift combined with bulk material pile composite foundation, characterized by comprising the following implementation steps:
[0010] Step 1) Level the site, remove the humus soil on the surface, and lay a sand cushion layer to form a construction surface for bulk material piles;
[0011] Step 2) Prepare vertical flower pipes according to the range of soil to be consolidated to form a gas lift channel;
[0012] Step 3) Pre-drilling a hole in the foundation soil, with the outer casing following during the drilling process;
[0013] Step 4) The bottom of the flower pipe is connected to the pneumatic pipe beside the flower pipe through the air lift joint, the top drainage pipe interface is connected to the drainage pipe, and the pneumatic pipe interface is connected to the pneumatic pipe, and then lowered into the borehole to start filling;
[0014] Step 5) After the filling is completed for a certain period, compaction begins. During the compaction process, the outer tube casing needs to be pulled out. When it reaches the surface of the soil layer, the entire pile is completed;
[0015] Step 6) Repeat the above steps 3 to 5 to complete the installation of bulk material piles within the soft soil foundation treatment range, and multiple bulk material piles are arranged in multiple rows and columns within the foundation treatment range;
[0016] Step 7) After the bulk material pile group is completed, the pneumatic pipe is connected to form an air injection pipeline and connected to the air compressor, and the drainage pipe is connected to form a drainage pipeline and leads to the water collection area;
[0017] Step 8) As the pore water enters the flower tube, the air compressor is periodically turned on for air lift. The water stored in the flower tube enters the water collection area through the drainage pipe, completing the application of the air lift method in bulk material piles.
[0018] Furthermore, in step 8, after the flower tube is full, positive pressure gas with a certain pressure and flow rate is introduced to the bottom of the flower tube. After the positive pressure gas is reversed through the gas lift joint at the bottom of the flower tube, the water stored in the flower tube is pushed out upward at one time.
[0019] Furthermore, a turning U-shaped tube is provided at the gas lift joint at the bottom of the flower tube to change the direction of the injected gas.
[0020] Furthermore, the selection of the time interval for gas lift is related to the rising speed of the water level in the flower tube, the permeability coefficient of the soft soil, and the change of the pore water pressure of the soft soil.
[0021] Furthermore, the time interval of the gas lift is selected to be 6 hours / time to 48 hours / time.
[0022] Further, in step 8, the duration and working gas pressure of a single gas lift are adjusted according to site conditions.
[0023] Furthermore, for a pile with a length of 10 m, pressurized gas of 100-150 kPa may be introduced for 3 minutes or more until no more liquid is discharged from the flower tube, so as to achieve the effect of emptying the flower tube.
[0024] Furthermore, the air lift period is determined by the pile length and soil drainage rate, and is generally selected in the range of 2-12h.
[0025] Furthermore, the pressure of the injected gas is changed by controlling the output pressure of the air compressor.
[0026] Furthermore, plug-in tubes are arranged on both sides of the upper end surface of the gas lift joint, and the plug-in tubes are inserted into the pneumatic tube.
[0027] The principle of the gas lift method is: compressed air is injected into the bottom of the lifting channel to reduce the fluid density at the inlet, and under the action of the pressure difference, the target (for example, slag or silt) is driven to move vertically upward. Using the gas lift principle, a flower tube with a ventilation pipeline can be built into the bulk material pile. During the seepage consolidation process, the water in the pores of the bulk material seeps into the tube through the wall of the flower tube. After the flower tube is full, positive pressure gas with a certain pressure and flow rate is introduced through the ventilation pipeline to the bottom of the flower tube. After the positive pressure gas is reversed through the gas lift joint at the bottom of the flower tube, the water stored in the flower tube is pushed out at one time, thereby forming a composite foundation treatment method of gas lift combined with bulk material piles. After one gas lift (i.e., positive pressure gas empties the water stored in the tube), the hydrostatic pressure of the water stored in the flower tube disappears, increasing the water head difference between the flower tube and the soil, which can effectively accelerate the drainage and consolidation of soft soil. In addition, positive pressure gas can also penetrate the bulk material into the surrounding soft soil and introduce splitting cracks into the soft soil to form new drainage channels, further shortening the soft soil seepage path and increasing the infiltration consolidation rate.
[0028] The present invention applies the air lift method to bulk material piles. The main mechanism of the combination of the two to improve the foundation strength is: (1) Bulk material piles have high water permeability. After pile formation, the pile body can be used as a drainage channel to guide the pore water of the soft soil foundation to seep into the pile body. Air lift can lift the water in the pile body to the surface, promoting the seepage consolidation of the soft soil; (2) Bulk material piles replace part of the soil to form a composite foundation. The pile body and the soil between the piles are subjected to synergistic force, thereby improving the bearing capacity in the form of a composite foundation.
[0029] Compared with the prior art, the present invention has the following beneficial effects:
[0030] 1. The present invention applies the gas lift method to bulk material piles, providing a new method for reinforcing soft soil foundations. The beneficial effects in promoting soft soil consolidation are mainly: 1) Promoting drainage: innovatively combining the flower tube into the bulk material pile to provide an implementation channel for gas lift; through the lifting effect of the positive pressure gas at the bottom of the flower tube, the positive pressure gas carries the water stored in the tube and flows upward along the flower tube, accelerating the speed of discharging the stored water; 2) Improving the consolidation efficiency of the soft soil foundation: after the stored water is discharged, the seepage gradient from the soft soil to the pile increases, promoting the active gathering of pore water into the pile, effectively promoting seepage consolidation, and achieving the purpose of improving the bearing capacity of the foundation.
[0031] 2. Compared with the traditional method of using pile loading to provide consolidation driving force, the method of the present invention realizes active seepage of pore water, and the cost of new equipment is low, the construction steps are simple and feasible, and there is no requirement for bearing capacity of the treated foundation, which is conducive to promotion in engineering practice. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the engineering site layout of the present invention;
[0033] Figure 2 It is a schematic diagram of the gas lift flower tube structure;
[0034] Figure 3 It is a cross-sectional view of the gas lift joint;
[0035] Figure 4a It is a schematic diagram of the arrangement of flower tubes in bulk material piles;
[0036] Figure 4b It is a schematic diagram of pressure before and after gas lift.
[0037] In the figure: 1. air compressor; 2. drainage pipeline; 3. water collection area; 4. air injection pipeline; 5. flower pipe; 6. bulk material pile; 7. air lift head; 8. drainage pipe interface; 9. pneumatic pipe interface; 10. flower pipe wall; 11. pneumatic pipe; 12. air lift joint; 13. pneumatic pipe interface; 14. steering U-shaped pipe. DETAILED DESCRIPTION
[0038] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] refer to Figures 1 to 4b The present invention provides a method for efficiently treating soft foundation of an air lift combined with a bulk material pile composite foundation, comprising the following implementation steps:
[0042] Step 1) Level the site, remove the humus soil on the surface, and lay a sand cushion layer to form a construction surface for bulk material piles;
[0043] Step 2) Prepare vertical flower pipes according to the range of soil to be consolidated to form a gas lift channel;
[0044] Step 3) Pre-drilling a hole in the foundation soil, with the outer casing following during the drilling process;
[0045] Step 4) The bottom of the flower tube 5 is connected to the pneumatic tube 11 beside the flower tube through the air lift joint 12, the top drainage pipe interface 8 is connected to the drainage pipe 2, and the pneumatic pipe interface 13 is connected to the pneumatic tube 11, and then lowered into the borehole to start filling;
[0046] Specifically, the filler is gravel or crushed stone, and the selection of parameters such as gradation needs to meet the strength and design requirements of the bulk material pile, so that it can not only increase the bearing capacity of the soft soil foundation to a certain extent, but also provide radial drainage channels for the deep soft soil to meet the drainage function.
[0047] Step 5) After the filling is completed for a certain period, compaction begins. During the compaction process, the outer tube casing needs to be pulled out. When it reaches the surface of the soil layer, the entire pile is completed;
[0048] Step 6) Repeat the above steps 3 to 5 to complete the installation of bulk material piles within the soft soil foundation treatment range, wherein a plurality of bulk material piles 6 are arranged in multiple rows and columns within the foundation treatment range;
[0049] Step 7) After the bulk material pile group is completed, the pneumatic pipe is connected to form an air injection pipeline 4 and connected to the air compressor 1, and the drainage pipe is connected to form a drainage pipeline 2 and leads to the water collection area 3;
[0050] Step 8) As the pore water enters the flower tube, the air compressor 1 is periodically opened to perform air lift, and the water stored in the flower tube 5 enters the water collection area 3 through the drainage pipe, completing the application of the air lift method in the bulk material pile.
[0051] Specifically, after the flower tube 5 is full, positive pressure gas with a certain pressure and flow rate is introduced until the bottom of the flower tube. After the positive pressure gas is changed through the gas lift joint 12 at the bottom of the flower tube, the water stored in the flower tube is pushed out upward at one time.
[0052] Specifically, the duration of a single gas lift and the working gas pressure are adjusted according to site conditions.
[0053] Specifically, the time interval of gas lift is related to the rising speed of water level in the flower tube, the permeability coefficient of soft soil, and the change of pore water pressure of soft soil. Preferably, the time interval of gas lift is selected from 6 hours / time to 48 hours / time.
[0054] In one embodiment, a turning U-shaped pipe 14 is provided at the gas lift joint 12 at the bottom of the flower tube to change the direction of the injected gas.
[0055] In one embodiment, for a pile with a length of 10m, pressurized gas of 100-150kPa can be introduced for 3 minutes or more until no more liquid is discharged from the flower tube to achieve the effect of emptying the flower tube. In order to produce air pressure splitting cracks in the soil and promote soil seepage, the air pressure can be appropriately adjusted to a larger value.
[0056] In one embodiment, the air lift period is determined according to the pile length and soil drainage rate, and is generally selected in the range of 2-12 hours.
[0057] In one embodiment, the pressure of the injected gas is changed by controlling the output pressure of the air compressor 1 .
[0058] In one embodiment, plug-in tubes are provided on both sides of the upper end surface of the gas lift joint, and the plug-in tubes are inserted into the pneumatic tube.
[0059] The principle of the gas lift method is: compressed air is injected into the bottom of the lifting channel to reduce the fluid density at the inlet, and under the action of the pressure difference, the target (for example, slag or silt) is driven to move vertically upward. Using the gas lift principle, a flower tube with a ventilation pipeline can be built into the bulk material pile. During the seepage consolidation process, the water in the pores of the bulk material seeps into the tube through the flower tube wall 10. After the flower tube is full, positive pressure gas with a certain pressure and flow rate is introduced through the ventilation pipeline to the bottom of the flower tube. After the positive pressure gas is reversed through the gas lift joint at the bottom of the flower tube, the water stored in the flower tube is pushed out at one time, thereby forming a composite foundation treatment method of gas lift combined with bulk material piles. After one gas lift (i.e., positive pressure gas empties the water stored in the tube), the hydrostatic pressure of the water stored in the flower tube disappears, increasing the water head difference between the flower tube and the soil, which can effectively accelerate the drainage and consolidation of soft soil. In addition, positive pressure gas can also penetrate the bulk material into the surrounding soft soil and introduce splitting cracks into the soft soil to form new drainage channels, further shortening the soft soil seepage path and increasing the infiltration consolidation rate.
[0060] The present invention uses the gas injection pipeline to perform gas lift operation multiple times to promote the discharge of water stored in the flower tube. The time interval of gas lift is related to the rising speed of water level in the flower tube, the permeability coefficient of soft soil, and the change of pore water pressure of soft soil.
[0061] High-pressure air enters the top of the flower tube through the air injection pipeline 4—pneumatic tube interface 9—pneumatic tube 11—pneumatic tube interface 13—turning U-shaped tube, plays the role of air lifting to empty the flower tube 5, and the water in the flower tube enters the water collection area 3 through the drainage pipe 2, completing the application of the air lift method in bulk material piles.
[0062] Figure 4a and 4bThe pressure changes before and after gas lift are shown. When the pipe is full of water, the hydrostatic pressure in the pipe is the same as the pressure in the surrounding soil, and both increase linearly with depth. When the pipe is emptied, its hydrostatic pressure returns to 0, forming a pressure difference with the soil, which creates a driving force for the water in the soil to seep into the pipe, which can effectively accelerate the drainage and consolidation process of the foundation.
[0063] The contents described in the embodiments of this specification are merely an enumeration of the implementation forms of the inventive concept. The protection scope of the present invention should not be regarded as limited to the specific forms described in the embodiments. The protection scope of the present invention also includes equivalent technical means that can be thought of by those skilled in the art based on the inventive concept.
Claims
1. A method for efficiently treating soft foundation of composite foundation of air lift combined with bulk material piles, characterized in that: The implementation steps include: Step 1) Level the site, remove the humus soil on the surface, and lay a sand cushion layer to form a construction surface for bulk material piles; Step 2) Prepare vertical flower pipes according to the range of soil to be consolidated to form a gas lift channel; Step 3) Pre-drilling a hole in the foundation soil, and the outer casing follows during the drilling process; Step 4) The bottom of the flower pipe is connected to the pneumatic pipe beside the flower pipe through the air lift joint, the top drainage pipe interface is connected to the drainage pipe, and the pneumatic pipe interface is connected to the pneumatic pipe, and then lowered into the borehole to start filling; Step 5) After the filling is completed for a certain period, compaction begins. During the compaction process, the outer tube casing needs to be pulled out. When it reaches the surface of the soil layer, the entire pile is completed; Step 6) Repeat the above steps 3 to 5 to complete the installation of bulk material piles within the soft soil foundation treatment range, and multiple bulk material piles are arranged in multiple rows and columns within the foundation treatment range; Step 7) After the bulk material pile group is completed, the pneumatic pipe is connected to form an air injection pipeline and connected to the air compressor, and the drainage pipe is connected to form a drainage pipeline and leads to the water collection area; Step 8) As the pore water enters the flower tube, the air compressor is periodically turned on for air lift. The water stored in the flower tube enters the water collection area through the drainage pipe, completing the application of the air lift method in bulk material piles.
2. The method for efficiently treating soft foundation of an air lift combined with bulk material pile composite foundation according to claim 1 is characterized in that: In step 8, after the flower tube is full, positive pressure gas with a certain pressure and flow rate is introduced to the bottom of the flower tube. After the positive pressure gas is reversed through the gas lift joint at the bottom of the flower tube, the water stored in the flower tube is pushed out upward at one time.
3. The method for efficiently treating soft foundation of an air lift combined with bulk material pile composite foundation according to claim 1 is characterized in that: A turning U-shaped tube is arranged at the gas lift joint at the bottom of the flower tube to change the direction of the injected gas.
4. The method for efficiently treating soft foundation of an air lift combined with bulk material pile composite foundation according to claim 1, characterized in that: The selection of the time interval for gas lift is related to the rising speed of the water level in the flower tube, the permeability coefficient of the soft soil, and the change of the pore water pressure of the soft soil.
5. The method for efficiently treating soft foundation of composite foundation of air lift combined with bulk material piles as claimed in claim 4, characterized in that: The time interval for gas lift is selected from 6 hours / time to 48 hours / time.
6. The method for efficiently treating soft foundation of composite foundation of air lift combined with bulk material piles according to claim 1, characterized in that: In step 8, the duration and working gas pressure of the single gas lift are adjusted according to the site conditions.
7. The method for efficiently treating soft foundation of composite foundation of air lift combined with bulk material piles as claimed in claim 6, characterized in that: For a pile with a length of 10m, pressurized gas of 100-150kPa can be introduced for 3 minutes or more until no more liquid is discharged from the flower tube, so as to achieve the purpose of emptying the flower tube.
8. The method for efficiently treating soft foundation of an air lift combined with bulk material pile composite foundation according to claim 1, characterized in that: The air lift cycle is determined by the pile length and soil drainage rate, and is generally selected in the range of 2-12 hours.
9. The method for efficiently treating soft foundation of composite foundation of air lift combined with bulk material piles according to claim 1, characterized in that: The pressure of the injected gas is changed by controlling the output pressure of the air compressor.
10. The method for efficiently treating soft foundation of composite foundation of air lift combined with bulk material piles according to claim 1, characterized in that: Plug-in tubes are arranged on both sides of the upper end surface of the gas lift joint, and the plug-in tubes are inserted into the pneumatic tube.
Citation Information
Patent Citations
Permeable pipe pile system capable of accelerating consolidation and construction method thereof
CN106638552A
Soft foundation treatment construction method by combining sand piles with high-vacuum-compaction method
CN108978625A
Multistage negative pressure gas lift type downcast tube well
CN114215086A
Drainage plate connector device applied to gas lift type drainage preloading foundation treatment
CN118110155A
Water-permeable pipe pile system capable of accelerating soil consolidation and method of using the same