Earth-rock foundation pit tamping equipment

By adopting a combination structure of vibrating disk, plug-in sleeve, limit pin, round cavity, ventilating pipe and breathable sponge block in the earth and rock foundation pit filling equipment, the negative pressure resistance problem caused by earth and rock with high humidity is solved, and the negative pressure resistance problem is improved. Stability and energy efficiency are achieved, energy consumption is reduced, and dust can prevent air circulation.

CN118958267AInactive Publication Date: 2024-11-15HENAN XINSHENGDING CONSTRUCTION LABOR SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411138680.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When filling the earth and rocks in the foundation pit, the earth and rocks with high humidity will cause negative pressure resistance to form between the vibrating plate and the foundation pit, increasing the load of the vibrating plate components and the energy consumption of the excavator, affecting stability and efficiency.

Method used

A kind of earth and stone foundation pit filling equipment was designed, using a combination structure of vibrating tray, plug sleeve, limit pin, round cavity, ventilating pipe and breathable sponge block. The design of elastic parts and ventilating pipes can reduce vibrating The negative pressure resistance between the disk and the earth and stone is filtered through the air permeable sponge block to prevent dust from entering.

Benefits of technology

It effectively reduces the negative pressure resistance between the vibrating disk and the earth and rocks with high humidity, improves the stability of the vibrating disk and the energy efficiency of the excavator, reduces energy consumption, and prevents dust from affecting air circulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958267A_ABST
    Figure CN118958267A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of foundation pit construction, in particular to earthwork foundation pit tamping equipment which comprises a jolt ramming disc, an inserting sleeve is fixedly connected to the middle of the upper surface of the jolt ramming disc, a drill rod used for being installed in an excavator breaking hammer is inserted into the inserting sleeve, and two limiting pins are symmetrically installed on the outer surface of the lower end of the drill rod; two vertically-arranged long round openings are symmetrically formed in the outer surface of the inserting sleeve, a base plate is fixedly connected to the lower end of the jolt ramming disc, a plurality of vertical holes are evenly formed in the upper surface of the base plate, blind holes with the same number as the vertical holes are evenly formed in the upper surface of the base plate, and the blind holes communicate with the vertical holes through strip-shaped grooves. A circular groove is formed in the upper portion of the base, a disc is arranged in the circular groove, a plurality of column rods used for blocking the vertical holes are evenly installed on the lower surface of the disc, and the disc is connected with the vibration compaction disc through a connecting piece, and the vibration compaction disc has the following beneficial effect that negative pressure resistance formed between the vibration compaction disc and earthwork with large humidity in a foundation pit is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to earth and stone foundation pit filling equipment, belonging to the technical field of foundation pit construction. Background Art

[0002] After a layer of earth and stone is filled in the foundation pit, it is necessary to vibrate the earth and stone. A vibrating plate is installed at the end of the drill rod of the excavation breaker hammer. After the vibrating plate contacts the earth and stone in the foundation pit, the excavation breaker hammer is used to drive the vibrating plate on the drill rod to vibrate, so that the earth and stone in the foundation pit become compacted under the action of vibration. Under the action of vibration, the vibrating plate will fit the earth and stone in the foundation pit more closely. When the humidity of the earth and stone in the foundation pit is relatively high, after the vibrating plate vibrates the earth and stone in the foundation pit, there is no air between the vibrating plate and the earth and stone in the foundation pit. When the vibrating plate is lifted to separate the vibrating plate from the earth and stone in the foundation pit, the excavator needs to overcome the negative pressure resistance formed between the vibrating plate and the earth and stone in the foundation pit. On the one hand, it brings a large load to the connecting parts of the vibrating plate and other components, affecting the stability of the connecting parts of the vibrating plate and other components. On the other hand, it increases the energy consumption of the excavator. Therefore, it is necessary to design an earth and stone foundation pit filling equipment that reduces the negative pressure resistance formed between the vibrating plate and the earth and stone with high humidity in the foundation pit. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention aims to provide an earth and stone foundation pit filling device to solve the problems raised in the above-mentioned background technology.

[0004] In order to achieve the above-mentioned purpose, the present invention is realized through the following technical scheme: a kind of earthwork foundation pit filling equipment, including a vibration plate, a plug sleeve is connected and fixed at the middle position of the upper surface of the vibration plate, a drill rod for being installed in the excavator breaker hammer is inserted in the plug sleeve, two limit pins are symmetrically installed on the outer surface of the lower end of the drill rod, and two vertically arranged long circular openings are symmetrically opened on the outer surface of the plug sleeve, and the limit pins are inserted in the long circular opening. The lower surface of the vibration plate is recessed upward to form a circular cavity, and a chassis is connected and fixed to the lower end of the vibration plate, and a plurality of vertical holes are evenly opened on the upper surface of the chassis, and blind holes with the same number as the vertical holes are evenly opened on the upper surface of the chassis, and the blind holes and the vertical holes are connected through strip grooves, and the depth of the strip grooves is the same as the depth of the blind holes, and a disc is arranged in the circular groove, and the outer diameter of the disc is smaller than the inner diameter of the circular cavity, and a plurality of column rods for blocking the vertical holes are evenly installed on the lower surface of the disc, and the disc is connected to the vibration plate through a connecting piece, and there is a gap between the disc and the chassis.

[0005] The top end of the support leg is connected with the support rod, and the bottom end of the support leg is connected with the support rod at the bottom end.

[0006] Specifically, the elastic member includes a partition plate, which is slidably installed in the middle position of the straight cylinder, and the partition plate is sleeved on the vertical rod and fixedly connected to the vertical rod. A spring is provided on the upper side of the partition plate, and the spring is arranged in the straight cylinder and sleeved on the vertical rod. A through hole is opened on one side of the upper surface of the partition plate, and the ventilation pipe passes through the through hole and the ventilation pipe is in sliding contact with the partition plate.

[0007] Specifically, the outer surface of the upper end of the ventilation pipe is processed with a first external thread, the portion of the ventilation pipe processed with the first external thread is threadedly connected with an internal thread sleeve, the upper end of the internal thread sleeve is processed with an inclined surface, and a breathable sponge block is glued to the inclined surface by glue.

[0008] Specifically, two positioning holes are symmetrically opened on the upper surface of the vibration plate, the positioning holes are arranged in the straight tube, the lower end of the ventilation pipe is installed in the positioning holes, and a through hole aligned with the positioning hole is opened on the upper surface of the straight tube, and the ventilation pipe passes through the through hole.

[0009] Specifically, a connecting ring is connected and fixed to the lower end of the straight tube, the connecting ring and the straight tube are an integrally formed structure, and the connecting ring is connected and fixed to the vibration plate through a plurality of screws.

[0010] Specifically, the vertical rod and the horizontal rod are an integrally formed structure, the horizontal rod and the top rod are an integrally formed structure, the vertical rod and the horizontal rod are arranged perpendicular to each other, and the horizontal rod and the top rod are arranged perpendicular to each other.

[0011] Specifically, two screw holes are symmetrically provided on the outer surface of the lower end of the drill rod, a second external thread is processed on the outer surface of one end of the limit pin, one end of the limit pin processed with the second external thread is threadedly connected in the screw hole, and the middle part of the side of the limit pin away from the second external thread is recessed to form a hexagonal hole for matching with a hexagonal wrench.

[0012] Beneficial effects of the present invention: 1. When the compacting plate is pressed on the surface of earth and stone in the foundation pit, the lower end of the drill rod contacts the bottom of the plug sleeve, the limit pin is in the lower position of the long round mouth and the limit pin does not contact the bottom of the long round mouth. At this time, under the action of the spring rebound force, the vertical rod has a tendency to move downward, and then the vertical rod makes the disc have a tendency to move downward in the circular cavity, so that the lower end of the column rod is flush with the lower surface of the chassis, thereby realizing the blocking of the vertical hole, preventing the earth and stone in the foundation pit from entering the vertical hole during the compacting process of the compacting plate.

[0013] 2. The drill rod moves upward under the drive of the excavator's breaker hammer. At this time, the limit pin moves upward in the long circular mouth. At this time, the vibrating plate is temporarily not separated from the earth and stone in the foundation pit. When the limit pin continues to move upward, it squeezes the push rod, so that the push rod moves upward along the small hole. The push rod drives the vertical rod upward through the cross bar. At this time, the partition plate moves upward in the straight tube. The partition plate and the straight tube work together to squeeze the spring, causing the spring to produce elastic deformation. During the upward movement of the vertical rod along the guide hole, the disc is driven to move upward in the circular cavity, so that the disc drives the column rod to move upward in the vertical hole. Until the lower end of the column is higher than the lower end of the strip groove, at this time, the channel formed by the vertical hole, strip groove, blind hole, circular cavity and ventilation pipe is connected to the outside world, so that when the drill rod drives the compaction plate to move upward, the outside air flows into the space under the compaction plate through the channel formed by the ventilation pipe, circular cavity, blind hole, strip groove and vertical hole, reducing the negative pressure resistance between the compaction plate and the earth and stone with high humidity in the foundation pit, reducing the influence of the negative pressure resistance between the compaction plate and the earth and stone with high humidity in the foundation pit on the stability of the connection parts of the compaction plate and other components, which is beneficial to reduce the energy consumption of the excavator.

[0014] 3. Install an internal thread sleeve on the vent pipe, and adhere a breathable sponge block to the internal thread sleeve, so that fine dust can be prevented from entering the circular cavity with the air flow under the filtration of the breathable sponge block, and prevent the accumulation of dust in the circular cavity and affect the movement of the disc, column rod and other parts. Because the top of the internal thread sleeve is processed with a slope, the breathable sponge block is also inclined. When the drill rod is driven by the excavator's breaker hammer to vibrate the compaction plate, the breathable sponge block also vibrates, so that the dust attached to the breathable sponge block is separated from the breathable sponge block under the action of vibration, preventing the dust from adhering to the breathable sponge block and affecting the air circulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings: Figure 1 It is a structural schematic diagram of an earthwork foundation pit filling device of the present invention; Figure 2 It is a cross-sectional view of an earthwork foundation pit filling device of the present invention; Figure 3A three-dimensional diagram of a chassis in an earthwork foundation pit filling device of the present invention; Figure 4 It is a schematic diagram of the assembly of a plug-in sleeve and a vibrating plate in an earthwork foundation pit filling device of the present invention; Figure 5 It is a schematic assembly diagram of a plug-in sleeve and a vibrating plate in an earthwork foundation pit filling device of the present invention from another perspective; Figure 6 It is a schematic diagram of the assembly of a column rod, a disc, a vertical rod, a partition plate and a vent pipe in an earthwork foundation pit filling device of the present invention; Figure 7 It is a schematic diagram of the assembly of a top rod, a cross rod, a spring, a spacer and a vertical rod in an earthwork foundation pit filling device of the present invention; Figure 8 It is a three-dimensional diagram of a straight cylinder in a soil and stone foundation pit filling device of the present invention; Fig. 9 It is a schematic diagram of assembling a limit pin and a drill rod in an earthwork foundation pit filling device of the present invention; Fig.10 It is a schematic diagram of assembling a breathable sponge block and an internal threaded sleeve in an earthwork foundation pit filling device of the present invention; In the figure: 1, vibration plate, 2, chassis, 3, plug sleeve, 4, connecting ring, 5, straight cylinder, 6, ventilation pipe, 7, breathable sponge block, 8, internal threaded sleeve, 9, drill rod, 10, cross bar, 11, push rod, 12, vertical rod, 13, column rod, 14, disc, 15, spacer, 16, spring, 17, limit pin, 18, vertical hole, 19, strip groove, 20, blind hole, 21, small hole, 22, oblong mouth, 23, guide hole, 24, positioning hole, 25, round cavity, 26, through hole, 27, round hole, 28, through hole. DETAILED DESCRIPTION

[0016] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0017] See also Figure 1 , Figure 2 , Figure 4 , Figure 5 and Fig. 9The present invention provides a technical solution: an earthwork foundation pit filling device, comprising a vibrating plate 1, a plug sleeve 3 is connected and fixed at the middle position of the upper surface of the vibrating plate 1, a drill rod 9 for installation in an excavator breaker hammer is inserted in the plug sleeve 3, two limit pins 17 are symmetrically installed on the outer surface of the lower end of the drill rod 9, and two vertically arranged long round openings 22 are symmetrically opened on the outer surface of the plug sleeve 3, the limit pin 17 is inserted in the long round opening 22, and the limit pin 17 and the long round opening 22 cooperate with each other to realize the drill rod 9 For connection with the plug-in sleeve 3, two screw holes are symmetrically provided on the outer surface of the lower end of the drill rod 9, and a second external thread is processed on the outer surface of one end of the limit pin 17, so that the end of the limit pin 17 processed with the second external thread is threadedly connected in the screw hole, which is convenient for disassembly and assembly of the limit pin 17 and the drill rod 9. The middle part of the side of the limit pin 17 away from the second external thread is recessed to form an internal hexagonal hole for matching the internal hexagonal wrench, so that one end of the internal hexagonal wrench is inserted into the internal hexagonal hole, which is convenient for using the internal hexagonal wrench to twist the limit pin 17.

[0018] See also Figure 1 , Figure 2 , Figure 3 , Figure 5 and Figure 6 The lower surface of the vibration plate 1 is recessed upward to form a circular cavity 25, and the lower end of the vibration plate 1 is connected and fixed with a chassis 2. A plurality of vertical holes 18 are evenly provided on the upper surface of the chassis 2, and a blind hole 20 with the same number as the vertical holes 18 is evenly provided on the upper surface of the chassis 2. The blind holes 20 and the vertical holes 18 are connected through a strip groove 19, and the depth of the strip groove 19 is the same as the depth of the blind hole 20. A disc 14 is provided in the circular groove, and the outer diameter of the disc 14 is smaller than the inner diameter of the circular cavity 25. A plurality of posts 13 for blocking the vertical holes 18 are evenly installed on the lower surface of the disc 14, and the posts 13 are in the vertical holes 18. There is a gap between the disc 14 and the chassis 2, and by changing the position of the posts 13 in the vertical holes 18, it is possible to control whether the circular cavity 25 is connected to the space on the lower side of the chassis 2.

[0019] See also Figure 2 , Figure 4 , Figure 5 , Figure 6 and Figure 8 Two vertical rods 12 are symmetrically installed on the upper surface of the disc 14, and two guide holes 23 matching the vertical rods 12 are symmetrically opened on the upper surface of the compacting plate 1. The upper end of the vertical rod 12 passes through the guide hole 23, and a straight cylinder 5 concentrically arranged with the guide hole 23 is provided on the upper side of the guide hole 23. The lower end of the straight cylinder 5 is open and connected and fixed to the compacting plate 1, wherein the lower end of the straight cylinder 5 is connected and fixed with a connecting ring 4, and the connecting ring 4 and the straight cylinder 5 are an integrally formed structure, so that the connecting ring 4 is connected and fixed to the compacting plate 1 by multiple screws, which is convenient for the disassembly and assembly of the straight cylinder 5 and the compacting plate 1.

[0020] See also Figure 1-Figure 8A circular hole 27 is provided in the middle of the upper surface of the straight tube 5, the upper end of the vertical rod 12 passes through the circular hole 27, the upper end of the vertical rod 12 is connected and fixed with a cross rod 10, and the end of the cross rod 10 away from the vertical rod 12 is connected and fixed with a top rod 11, the vertical rod 12 and the cross rod 10 are an integrally formed structure, the cross rod 10 and the top rod 11 are an integrally formed structure, the vertical rod 12 and the cross rod 10 are arranged perpendicular to each other, and the cross rod 10 and the top rod 11 are arranged perpendicular to each other, and two small holes 21 are symmetrically provided on the upper surface of the plug sleeve 3, the small holes 21 are connected to the long round mouth 22, the lower end of the top rod 11 passes through the small hole 21 and extends into the long round mouth 22, and a partition plate 15 is slidably installed in the middle position of the straight tube 5, and the partition plate 15 is sleeved on the vertical rod 12 and connected and fixed to the vertical rod 12 A spring 16 is provided on the upper side of the partition plate 15, and the spring 16 is arranged in the straight cylinder 5 and the spring 16 is sleeved on the vertical rod 12. When the compaction plate 1 is pressed on the surface of the earth and stone in the foundation pit, the lower end of the drill rod 9 contacts the bottom of the plug sleeve 3, and the limit pin 17 is in the lower position of the oblong opening 22 and the limit pin 17 does not contact the bottom of the oblong opening 22. At this time, under the action of the rebound force of the spring 16, the vertical rod 12 has a tendency to move downward, and then the vertical rod 12 makes the disc 14 have a tendency to move downward in the circular cavity 25, so that the lower end of the column rod 13 is flush with the lower surface of the chassis 2, thereby realizing the blocking of the vertical hole 18, preventing the earth and stone in the foundation pit from entering the vertical hole 18 during the compaction of the earth and stone in the foundation pit by the compaction plate 1.

[0021] See also Figure 1-Figure 9A vertically arranged vent pipe 6 is installed in the straight cylinder 5, the lower end of the vent pipe 6 is connected and fixed to the vibration plate 1 and the vent pipe 6 is communicated with the circular cavity 25, the upper end of the vent pipe 6 passes through the straight cylinder 5 and extends to the outside of the straight cylinder 5, wherein the upper surface of the vibration plate 1 is symmetrically provided with two positioning holes 24, the positioning holes 24 are arranged in the straight cylinder 5, the lower end of the vent pipe 6 is installed in the positioning hole 24, the upper surface of the straight cylinder 5 is provided with a through hole 28 aligned with the positioning hole 24, the vent pipe 6 passes through the through hole 28, the through hole 28 and the positioning hole 24 are the vent pipe 6 The installation space is provided, a through hole 26 is opened on one side of the upper surface of the partition plate 15, the vent pipe 6 passes through the through hole 26 and the vent pipe 6 is in sliding contact with the partition plate 15, so that the vent pipe 6 passes through the through hole 26, so that the movement of the partition plate 15 and the vent pipe 6 do not interfere with each other, the drill rod 9 moves upward under the drive of the excavator breaker, and the limit pin 17 moves upward in the oblong opening 22. At this time, the vibration plate 1 is temporarily not separated from the earth and stone in the foundation pit, and the limit pin 17 continues to move upward to squeeze the push rod 11, so that the push rod 11 moves upward along the small hole 21 The top rod 11 drives the vertical rod 12 to move upward through the cross rod 10. At this time, the spacer 15 moves upward in the straight tube 5. The spacer 15 and the straight tube 5 work together to squeeze the spring 16, so that the spring 16 produces elastic deformation. The vertical rod 12 moves upward along the guide hole 23 and drives the disc 14 to move upward in the circular cavity 25, so that the disc 14 drives the column 13 to move upward in the vertical hole 18 until the lower end of the column 13 is higher than the lower end of the strip groove 19. At this time, the vertical hole 18, the strip groove 19, the blind hole 20, and the round hole 25 are all in the same position. The channel formed by the cavity 25 and the vent pipe 6 is connected to the outside world, so when the drill rod 9 drives the compaction plate 1 to move upward, the outside air flows into the space on the lower side of the compaction plate 1 through the channel formed by the vent pipe 6, the circular cavity 25, the blind hole 20, the strip groove 19 and the vertical hole 18, thereby reducing the negative pressure resistance between the compaction plate 1 and the earth and stone with high humidity in the foundation pit, and reducing the influence of the negative pressure resistance between the compaction plate 1 and the earth and stone with high humidity in the foundation pit on the stability of the connection parts of the compaction plate 1 and other components, which is beneficial to reduce the energy consumption of the excavator.

[0022] See also Figure 1 , Figure 2 and Fig.10The outer surface of the upper end of the vent pipe 6 is processed with a first external thread, and the part of the vent pipe 6 where the first external thread is processed is threadedly connected with an internal thread sleeve 8. The upper end of the internal thread sleeve 8 is processed with an inclined surface, and a breathable sponge block 7 is glued on the inclined surface. The internal thread sleeve 8 is installed on the vent pipe 6, and the breathable sponge block 7 is adhered to the internal thread sleeve 8, and then under the filtration of the breathable sponge block 7, fine dust is prevented from entering the circular cavity 25 with the air flow, and more dust is prevented from accumulating in the circular cavity 25 and affecting the movement of the disc 14, the column rod 13 and other components. Because the top of the internal thread sleeve 8 is processed with an inclined surface, the breathable sponge block 7 is also inclined. When the drill rod 9 vibrates the compacting disk 1 under the drive of the excavator breaker, the breathable sponge block 7 also vibrates, so that the dust attached to the breathable sponge block 7 is separated from the breathable sponge block 7 under the action of vibration, so as to prevent the dust from adhering to the breathable sponge block 7 and affecting the circulation of air.

[0023] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. An earthwork foundation pit filling device, comprising a vibrating plate (1), characterized in that: A plug sleeve (3) is connected and fixed to the middle of the upper surface of the vibration plate (1), a drill rod (9) for installation in an excavator breaker hammer is inserted in the plug sleeve (3), two limit pins (17) are symmetrically installed on the outer surface of the lower end of the drill rod (9), the outer surface of the plug sleeve (3) is symmetrically provided with two vertically arranged long round openings (22), the limit pins (17) are inserted in the long round openings (22), the lower surface of the vibration plate (1) is recessed upward to form a circular cavity (25), the lower end of the vibration plate (1) is connected and fixed to a chassis (2), and a plurality of vertical holes (18) are evenly provided on the upper surface of the chassis (2), The upper surface of the chassis (2) is uniformly provided with blind holes (20) having the same number as the vertical holes (18); the blind holes (20) are connected to the vertical holes (18) via strip grooves (19); the depth of the strip grooves (19) is the same as the depth of the blind holes (20); a circular disc (14) is provided in the circular groove; the outer diameter of the circular disc (14) is smaller than the inner diameter of the circular cavity (25); a plurality of columns (13) for blocking the vertical holes (18) are uniformly installed on the lower surface of the circular disc (14); the circular disc (14) is connected to the vibration plate (1) via a connecting piece; and a gap exists between the circular disc (14) and the chassis (2).

2. The earthwork foundation pit filling equipment according to claim 1, characterized in that: The connecting member comprises a vertical rod (12), two vertical rods (12) are symmetrically mounted on the upper surface of the circular disk (14), two guide holes (23) cooperating with the vertical rods (12) are symmetrically provided on the upper surface of the vibration disk (1), the upper end of the vertical rod (12) passes through the guide hole (23), a straight cylinder (5) arranged concentrically with the guide hole (23) is provided on the upper side of the guide hole (23), the lower end of the straight cylinder (5) is open and is connected and fixed to the vibration disk (1), a circular hole (27) is provided in the middle of the upper surface of the straight cylinder (5), the upper end of the vertical rod (12) passes through the circular hole (27), the upper end of the vertical rod (12) is connected and fixed to a cross rod (10), and the cross rod (10) The end away from the vertical rod (12) is connected and fixed with a push rod (11), the upper surface of the plug sleeve (3) is symmetrically provided with two small holes (21), the small holes (21) are communicated with the long round mouth (22), the lower end of the push rod (11) passes through the small holes (21) and extends into the long round mouth (22), an elastic member for making the lower end of the column rod (13) flush with the lower surface of the chassis (2) is installed in the straight tube (5), a vertically arranged ventilation pipe (6) is installed in the straight tube (5), the lower end of the ventilation pipe (6) is connected and fixed with the vibration plate (1) and the ventilation pipe (6) is communicated with the circular cavity (25), and the upper end of the ventilation pipe (6) passes through the straight tube (5) and extends to the outside of the straight tube (5).

3. The earthwork foundation pit filling equipment according to claim 2, characterized in that: The elastic member comprises a partition plate (15), the partition plate (15) is slidably mounted in the middle of the straight tube (5), the partition plate (15) is sleeved on the vertical rod (12) and is fixedly connected to the vertical rod (12), a spring (16) is provided on the upper side of the partition plate (15), the spring (16) is arranged in the straight tube (5) and the spring (16) is sleeved on the vertical rod (12), a through hole (26) is opened on one side of the upper surface of the partition plate (15), the ventilation pipe (6) passes through the through hole (26), and the ventilation pipe (6) is in sliding contact with the partition plate (15).

4. The earthwork foundation pit filling equipment according to claim 2, characterized in that: The outer surface of the upper end of the ventilation pipe (6) is processed with a first external thread, and the portion of the ventilation pipe (6) where the first external thread is processed is threadedly connected to an internal thread sleeve (8), and the upper end of the internal thread sleeve (8) is processed with an inclined surface, and a breathable sponge block (7) is glued to the inclined surface.

5. The earthwork foundation pit filling equipment according to claim 2, characterized in that: The upper surface of the vibration plate (1) is symmetrically provided with two positioning holes (24), the positioning holes (24) are arranged in the straight cylinder (5), the lower end of the ventilation pipe (6) is installed in the positioning hole (24), the upper surface of the straight cylinder (5) is provided with a through hole (28) aligned with the positioning hole (24), and the ventilation pipe (6) passes through the through hole (28).

6. The earthwork foundation pit filling equipment according to claim 2, characterized in that: A connecting ring (4) is connected and fixed to the lower end of the straight cylinder (5); the connecting ring (4) and the straight cylinder (5) are an integrally formed structure; the connecting ring (4) is connected and fixed to the vibration plate (1) via a plurality of screws.

7. The earthwork foundation pit filling equipment according to claim 2, characterized in that: The vertical rod (12) and the horizontal rod (10) are an integrally formed structure, the horizontal rod (10) and the top rod (11) are an integrally formed structure, the vertical rod (12) and the horizontal rod (10) are arranged perpendicularly to each other, and the horizontal rod (10) and the top rod (11) are arranged perpendicularly to each other.

8. The earthwork foundation pit filling equipment according to claim 1, characterized in that: Two screw holes are symmetrically formed on the outer surface of the lower end of the drill rod (9); a second external thread is processed on the outer surface of one end of the limit pin (17); the end of the limit pin (17) processed with the second external thread is threadedly connected in the screw hole; and a middle portion of a side of the limit pin (17) away from the second external thread is recessed to form an internal hexagonal hole for matching an internal hexagonal wrench.