Through the construction method of circulating pumped water and silting steel sheet pile cofferdam in deep water environment, the problems of structural stability and construction efficiency of steel sheet pile cofferdam in deep water environment are solved, construction safety and cost control are achieved, and the structure service life is extended.
Patent Information
- Application Number
- CN202411441292.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In deep water environment, the stability of the steel sheet pile cofferdam structure is challenged by water pressure and flow rate, resulting in increased construction complexity and risks, and it is difficult for the existing technology to effectively ensure the stability and construction efficiency of the structure.
The construction method of circulating pumped silting steel sheet piles is adopted to accurately insert steel sheet piles through guide beams and limit frames, build support structures, monitor deformation and stress conditions, carry out reinforcement treatment, and circulating pumping and underwater Concrete pouring ensures structural stability and construction quality.
It improves construction safety and efficiency, reduces risks, ensures the firmness and integrity of the cofferdam structure, extends the service life, and controls costs and resource waste.
Smart Images

Figure CN118958338A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge and underwater structure construction, and in particular to a steel sheet pile cofferdam for circulating water pumping and desilting of a thick overburden layer and a construction method thereof. Background Art
[0002] At present, fields such as water conservancy, bridges, ports and marine engineering face challenges when constructing in deep water or complex geological conditions. Many large-scale infrastructure projects, such as bridges, dams, docks and offshore wind power facilities, need to be constructed underwater or near water areas. Steel cofferdams are an ideal choice for solving these challenges due to their high strength, good sealing and adaptability. In these environments, the construction of underwater foundations is a key link in the entire project, and steel cofferdams, as an effective water retaining structure, are widely used in underwater construction to create a dry working environment and facilitate foundation construction.
[0003] In the actual construction process, the construction site of the steel cofferdam often faces the challenges of complex hydrogeological conditions, including deep water, strong current, silt layer, rock layer and seismic zone, etc. These conditions put forward extremely high requirements on the structural strength, sealing and stability of the cofferdam. At the same time, with the increasing awareness of environmental protection in society, the impact on water bodies and surrounding ecological environment during construction has received more and more attention.
[0004] Steel cofferdams can effectively control the construction area and reduce pollution to surrounding waters. At the same time, by recycling water resources, they can achieve the purpose of saving resources and protecting the environment. In large-scale engineering projects, construction efficiency and cost control are crucial. The use of steel cofferdams can significantly shorten the construction period, reduce the input of manpower and material resources, and reduce construction costs. At the same time, by optimizing the design and construction process, work efficiency and economic benefits can be further improved. With the continuous advancement of technology, the application prospects of steel cofferdams will be broader, and their role in infrastructure construction will become increasingly prominent.
[0005] Based on the above advantages, steel sheet pile cofferdam is one of the common construction methods in infrastructure construction in underwater or deep water areas. However, when constructing steel sheet pile cofferdam in deep water areas such as rivers, lakes, and oceans, factors such as high water pressure and fast flow rate increase the complexity and risk of construction, posing a great challenge to the stability of the steel sheet pile cofferdam structure. Therefore, how to ensure the stability of the steel sheet pile cofferdam structure in deep water environments has become an urgent problem to be solved. Summary of the invention
[0006] The purpose of the present invention is to solve the deficiencies in the prior art and provide a steel sheet pile cofferdam for circulating pumping and desilting of a thick overburden layer and a construction method thereof.
[0007] The object of the present invention is achieved through the following technical scheme: A construction method for a steel sheet pile cofferdam for circulating pumping and desilting a thick overburden layer comprises the following specific steps: Step 1: Make steel sheet piles; Step 2: Install positioning piles in water, install guide beams on the positioning piles; install a limit frame for guiding the steel sheet piles on the guide beams; Step 3: Build the first layer of support structure between the positioning piles and the guide beam; Step 4: vertically drive the steel sheet piles in sequence and drive the lower end of the steel sheet piles through the covering layer and into the rock layer; after all the steel sheet piles are driven, the steel sheet piles are enclosed to form a cofferdam structure; Step 5: Pump water from the cofferdam structure and make the water level reach the first height; then build a second layer of support structure on the positioning column; after the second layer of support structure is built, inject water into the cofferdam structure to keep the water levels inside and outside the cofferdam structure consistent; Step 6: excavate the bottom earthwork inside the outer wall of the cofferdam, then arrange the guide tube, and pour underwater concrete on the bottom inside the outer wall of the cofferdam by vertical pipe method; after the underwater concrete pouring is completed, remove the guide tube; Step 7: When the concrete poured in step 6 reaches the preset strength, the cofferdam structure is emptied and then the third layer of support structure is built on the positioning columns; Step 8: Monitor the deformation and stress conditions of the cofferdam structure. When the detection value exceeds the threshold, reinforce the cofferdam structure.
[0008] Preferably, the steel sheet pile has a U-shaped structure, a deformation groove is provided in the middle of the steel sheet pile, locking holes are provided at both ends of the steel sheet pile, and adjacent steel sheet piles are connected by the locking holes; a sealing strip is provided on the locking holes.
[0009] Preferably, in step 2, when installing the positioning piles and guide beams, the method is as follows: First determine the center line and boundary line of the cofferdam structure and set up reference points; drive positioning piles at the four corners of the cofferdam structure and the center of the boundary line, and insert the lower end of the positioning piles into the rock layer; install the corbels on the positioning piles, install the guide beam horizontally on the corbels and weld them to the corbels.
[0010] Preferably, in step three, the first layer of supporting structure includes an intermediate supporting steel pipe and an angle purlin. The intermediate supporting steel pipe is first welded and fixed between the positioning piles and between the guide beams; and the angle purlin is welded between adjacent guide beams.
[0011] Preferably, the specific method of step 4 is as follows: The limit frame is installed on the guide beam close to the upstream direction of the river. The first steel sheet pile is driven in first. The first steel sheet pile passes through the limit frame, and the steel sheet pile is guided by the limit frame and driven in by the pile driver. After the first steel sheet pile is driven in, the subsequent steel sheet piles are driven in sequence from both sides of the steel sheet pile until the steel sheet piles are enclosed to form a cofferdam structure. Adjacent steel sheet piles are connected and spliced by locking joints. During the driving process of steel sheet piles, water level sensors are installed on the positioning piles in the inner area of the cofferdam structure, and the water level height inside the cofferdam structure is monitored by the water level sensors; a pressure gauge is set on the outer side of the steel sheet piles, and the water level height of the outer area of the cofferdam structure is monitored by the pressure gauge; when the water level height inside the cofferdam structure is lower than the water level height outside the cofferdam structure and the height difference is greater than the water level difference threshold, water is injected into the cofferdam mechanism through the water injection device to keep the water levels inside and outside the cofferdam structure balanced.
[0012] Preferably, in step 5 and step 4, when inserting the steel sheet pile, the pressure of the pile driver on the steel sheet pile is calculated by the following formula: ; In the above formula, is the pressure of the pile driver on the steel sheet pile, H is the total thickness of the covering layer, is the passive earth pressure, is the end resistance of the steel sheet pile in the rock formation, is the friction resistance; Passive Earth Pressure The calculation formula is as follows: ; In the above formula, is the bulk density of the covering layer; is the internal friction angle of the overburden; End resistance The calculation formula is as follows: ; In the above formula, is the bulk density of the rock formation; A is the cross-sectional area of the steel sheet pile; h is the depth of the steel sheet pile driven into the rock formation. is the internal friction angle of the rock formation.
[0013] Frictional resistance The calculation formula is as follows: ; In the above formula, is the cohesion of the covering layer; S is the total length of the outer edge of the cross section of the steel sheet pile; is the empirical coefficient.
[0014] Preferably, in step five, the second layer support structure includes longitudinal I-beams, corner purlins, and support beams. The longitudinal I-beams are horizontally fixed on the corbels on the positioning piles, the corner purlins are welded between adjacent longitudinal I-beams, and the support beams are welded between the longitudinal I-beams.
[0015] Preferably, in step six, the covering layer at the bottom of the cofferdam structure is first excavated with water, the silt in the covering layer is cleaned, and the earthwork is excavated to the bottom elevation of the bottom concrete to form a foundation pit inside the cofferdam structure. During the excavation process, water is injected into the cofferdam structure to keep the water level inside and outside the cofferdam structure consistent; then the bottom of the foundation pit is leveled by a long-arm excavator; Then drill a hole at the bottom of the foundation pit to form a grouting hole at the bottom of the foundation pit, insert the lower end of the catheter vertically into the grouting hole, keep a distance of 0.3-0.5 meters between the lower end of the catheter and the bottom of the grouting hole, and the lower end of the catheter is 2-6 meters below the bottom of the foundation pit. The first batch of concrete is poured into the conduit, and the concrete fills the bottom of the conduit and forms a water stopper at the bottom of the conduit; then, concrete is continuously poured into the covering layer through the conduit until the concrete layer is poured to a set thickness and then stopped; during the concrete pouring process, the height of the lower end of the conduit gradually rises upward as the thickness of the concrete layer increases.
[0016] Preferably, in step eight, the displacement of the top of the steel sheet pile is monitored; the monitoring method is as follows: A laser line projector is installed on the top of the steel plate, and a monitoring board is set on the outside of the steel sheet pile. The laser mark emitted by the laser line projector is projected onto the monitoring board, an initial mark position is set on the monitoring board, and the distance between the laser mark and the initial mark position is recorded; when the distance between the laser mark and the initial mark position exceeds the displacement threshold, the position of the steel sheet pile is corrected; When monitoring the deformation of the cofferdam structure, the method is as follows: a number of target balls are set on the outside of the cofferdam structure, and the outside of the cofferdam structure is scanned by a three-dimensional laser scanner; during the scanning process, the target balls are scanned and identified by the three-dimensional laser scanner, and the positions of the target balls are tracked to obtain the deformation displacement at the positions of the target balls on the cofferdam structure; when the deformation displacement at any position of the target balls on the cofferdam structure exceeds the deformation threshold, an alarm signal is issued and the position is reinforced; When monitoring the stress condition of the cofferdam structure, the water pressure is monitored by a pressure gauge installed on the outside of the steel sheet pile. When the water pressure value detected by the pressure gauge exceeds the set safety value, an alarm signal is issued and the cofferdam structure is reinforced.
[0017] The invention discloses a steel sheet pile cofferdam for circulating water pumping and desilting in a thick overburden layer, which is obtained by constructing a steel sheet pile cofferdam for circulating water pumping and desilting in a thick overburden layer using a construction method.
[0018] The beneficial effects of the present invention are: 1. The present invention adopts the steel sheet pile cofferdam technology of cofferdam dewatering and supporting composite support, which ensures the firmness of the cofferdam structure during the whole construction process, improves the construction safety and reduces the risk.
[0019] 2. The present invention adopts the steel cofferdam circulating pumping technology, which improves the construction efficiency and speeds up the construction speed.
[0020] 3. The present invention adopts the guide beam steel sheet pile positioning technology to achieve accurate insertion of steel sheet piles, eliminating the work of later adjustment and speeding up the construction progress.
[0021] 4. The present invention adopts the control technology of the thickness of the poured underwater concrete to ensure the construction quality of the bottom base, provide a good waterproof barrier for the cofferdam, and ensure the integrity and stability of the cofferdam structure. At the same time, it realizes cost control and reduces resource waste.
[0022] 5. The present invention adopts intelligent monitoring of steel sheet pile cofferdams. During and after the construction, continuous intelligent monitoring of various data of the steel sheet pile cofferdams is carried out, which prevents the occurrence of dangerous accidents and improves the construction efficiency during the construction period.
[0023] 6. The present invention adopts the technology of utilizing the internal and external water balance of the steel sheet pile cofferdam, and utilizes the balanced control of the internal and external water pressure to reduce the load on the steel sheet piles, improve the safety of the project, and extend the service life of the construction structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the steel sheet pile cofferdam construction; Figure 2 It is a schematic diagram of the cofferdam support structure; Figure 3 It is a schematic diagram of the steel sheet pile structure; Figure 4 This is a schematic diagram of the fixation of the corbel and the positioning pile; Figure 5 It is the layout diagram of the intelligent monitoring points of the cofferdam; Figure 6 It is a schematic diagram of electromagnetic detection of underwater cover; Figure 7 It is the construction flow chart of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden; In the figure: 1-pile driver; 2-water pump; 3-conduit; 4-first layer support structure; 5-water injection device; 6-crane; 7-water level sensor; 8-positioning pile; 9-second layer support structure; 10-third layer support structure; 11-steel sheet pile; 12-guide beam; 13-support steel pipe; 14-limiting frame; 15-corbel; 16-support beam; 17-I-beam; 18-corner purlin; 19-locking mouth; 20-deformation groove; 21-sealing strip; 22-pressure gauge; 23-positioning bolt; 24-water level monitoring point; 25-steel sheet pile displacement monitoring point; 26-scanning point; 27-bottom sealing concrete; 28-rock layer; 29-adjusting groove; 30-fixing bolt; 31-anchor head; 32-support foot; 33-very low frequency electromagnetic transmitter; 34-receiving antenna; 35-high density resistivity detector; 36-covering layer. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.
[0026] Those skilled in the art should understand that, in the disclosure of the present invention, the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.
[0027] It is to be understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.
[0028] like Figures 1 to 7 As shown, a construction method for steel sheet pile cofferdam for circulating pumping and desilting of thick overburden layer includes the following specific steps: Step 1: Making steel sheet piles 11.
[0029] In this step, intelligent digital design software is used to design and simulate the stress of the steel sheet pile 11, a CNC machine tool is used to accurately process the steel sheet pile 11, and the outer surface of the processed steel sheet pile 11 is subjected to anti-corrosion treatment.
[0030] The steel sheet pile 11 is in a U-shaped structure, a deformation groove 20 is provided in the middle of the steel sheet pile 11 , locking openings 19 are provided at both ends of the steel sheet pile 11 , and adjacent steel sheet piles 11 are connected via the locking openings 19 ; a sealing strip 21 is provided on the locking openings 19 .
[0031] The steel sheet pile 11 adopts a U-shaped design, which makes its cross-section moment of inertia larger, the bending resistance stronger, and can withstand greater lateral pressure, ensuring the stability and safety of the cofferdam structure. A deformation groove 20 is provided in the middle of the steel sheet pile 11, which has the effect of buffering deformation when encountering water flow impact. Locking mouths 19 are respectively provided at both ends of the steel sheet pile 11. The locking mouth 19 is a U-shaped structure and is used to connect two adjacent steel sheet piles 11. When two steel sheet piles 11 are connected through the locking mouth 19, the locking mouths 19 bite each other. In order to improve the sealing between two adjacent steel sheet piles 11, a sealing strip 21 is provided on the locking mouth 19. When the locking mouths 19 on the two steel sheet piles 11 bite each other, the sealing strips 21 are in close contact, and a sealed connection is achieved through the sealing strip 21, thereby reducing water infiltration. The material of the sealing strip 21 can be made of rubber.
[0032] In the embodiment, the steel sheet pile 11 is made of HSLA steel and is hot-dip galvanized. This material has high yield strength and tensile strength, which means that at the same thickness, it can withstand a larger load, allowing the design of a lighter and thinner structure, saving materials and costs; at the same time, the material also has good weldability and can be processed by various welding methods, which simplifies the manufacturing process and reduces the need for subsequent processing; and the material also has excellent corrosion resistance, which can extend its service life and is particularly suitable for corrosive environments.
[0033] During the design phase of the steel sheet pile 11, computer-aided design (CAD) and computer-aided manufacturing (CAM) software can be used for auxiliary design and manufacturing. Engineers can use three-dimensional modeling to optimize the geometric shape of the steel sheet pile 11 to ensure the precise fit of the lock 19 and the mechanical properties of the overall structure. Finite element analysis (FEA) is used to perform mechanical analysis on the three-dimensional model of the steel sheet pile 11 to evaluate the stress, strain and stability of the steel sheet pile 11 cofferdam under different working conditions to ensure that the design meets safety and durability requirements. Finally, after comparing the finite element results, the optimal wave height and wave width of the steel sheet pile 11 are determined. A water tank scale test is carried out in the laboratory to ensure that the designed steel sheet pile 11 can effectively resist underwater water pressure and has good anti-permeability.
[0034] The lower part of the steel sheet pile 11 is edge-processed to make it sharp, so that it can be better inserted into the deep underwater cover layer 36 and rock layer 28 when inserted. Building information modeling technology (BIM) is used for virtual assembly to discover and solve interference, misalignment and other problems that may occur during the assembly process in advance. After determining the overall size and structural details of the steel sheet pile 11, it is processed using a CNC machine tool, and laser cutting and welding are used. Laser cutting technology provides high precision and high speed, while laser welding can ensure high-quality connection between the lock 19 and other parts of the steel sheet pile 11, enhancing the structural strength and water tightness of the steel sheet pile 11; finally, the manufactured steel sheet pile 11 is hot-dip galvanized to improve its surface corrosion resistance.
[0035] Before the project is constructed, the deep underwater covering layer 36 is first detected. In the present invention, the thickness and properties of the deep underwater covering layer 36 are detected by an electromagnetic detection method. The principle of this method is to analyze the propagation characteristics and response differences of electromagnetic waves in different media to obtain the desired analysis results.
[0036] like Figure 6 As shown, a very low frequency electromagnetic transmitter 33, a receiving antenna 34, and a high-density resistivity detector 35 are required in the detection process. The very low frequency electromagnetic transmitter 33 and the high-density resistivity detector 35 are installed on the detection ship, and the receiving antenna 34 is fixed on the shore. The detection ship travels above the covering layer 36, and the high-density resistivity detector 35 is used to detect the resistivity distribution of the covering layer 36, which indirectly reflects the properties of the covering layer 36. The very low frequency electromagnetic transmitter 33 transmits low-frequency electromagnetic waves of a specific frequency to the covering layer 36, and the receiving antenna 34 is used to receive the electromagnetic wave signals reflected from different depths of the covering layer 36, and the received signal strength and time delay data are recorded. The collected data is preprocessed to remove noise interference. The data is inverted and analyzed through a mathematical model to extract useful information. A cross-sectional view or a three-dimensional model of the covering layer 36 is constructed according to the analysis results, and the thickness of the covering layer 36 is determined by analyzing the change of the signal. According to the response characteristics of the electromagnetic wave, the physical properties of the covering layer 36, such as strength and fluidity, are analyzed.
[0037] The design of the steel sheet pile 11 can be guided according to the collected physical property data of the cover layer 36 .
[0038] Step 2: Install the positioning pile 8 in water, and install the guide beam 12 on the positioning pile 8; and install the limit frame 14 for guiding the steel sheet pile 11 on the guide beam 12.
[0039] Wherein, when installing the positioning pile 8 and the guide beam 12, the method is as follows: First, determine the center line and boundary line of the cofferdam structure and set up reference points; drive positioning piles 8 at the four corners of the cofferdam structure and the center of the boundary line, and insert the lower end of the positioning pile 8 into the rock layer 28; install the corbel 15 on the positioning pile 8, and install the guide beam 12 horizontally on the corbel 15 and weld it to the corbel 15.
[0040] The guide beam 12 is made of I-beam, which is processed in the factory in advance and transported to the construction site after processing. An anchor head 31 is arranged at the bottom of the positioning pile 8. The anchor head 31 is sharp, which can make the positioning pile 8 pass through the deep cover layer 36 under the water more quickly and insert into the rock layer 28. The anchor head 31 is provided with a support leg 32, which is opened to the outside of the anchor head 31. The support leg 32 can fix the positioning pile 8 in the rock layer 28 to prevent the positioning pile 8 from shifting during subsequent construction.
[0041] When installing the corbel 15 on the positioning pile 8, the corbel 15 is first connected to the adjustment slot 29 on the positioning pile 8 through the fixing bolt 30, and after ensuring the horizontal position of each corbel 15 by the laser measuring instrument, the corbel 15 is fixed to the positioning pile 8 by the positioning bolt 23, and finally the corbel 15 is permanently fixed to the positioning pile 8 by welding. When installing the guide beam 12, the installation of the guide beam 12 is assisted by measuring tools such as theodolite, so that its horizontality and verticality meet the installation requirements.
[0042] The limit frame 14 is fixedly mounted on the guide beam 12 by welding; when the first steel sheet pile 11 is driven, the first steel sheet pile 11 is guided by the limit frame 14 to ensure that the first steel sheet pile 11 can be vertically driven into the overburden 36 and the rock layer 28. The inner diameter of the limit frame 14 should be 1-2 cm larger than the outer diameter of the steel sheet pile 11 to allow the steel sheet pile 11 to have a certain amount of movement space in the limit frame 14.
[0043] Step three: build the first layer of support structure 4 between the positioning piles 8 and the guide beams 12 .
[0044] In this step, the first layer support structure 4 includes an intermediate support steel pipe 13 and an angle purlin 18 . The intermediate support steel pipe 13 is first welded and fixed between the positioning piles 8 and between the guide beams 12 ; and the angle purlin 18 is welded between adjacent guide beams 12 .
[0045] Step 4: The steel sheet piles 11 are vertically driven in sequence, and the lower ends of the steel sheet piles 11 are driven through the covering layer 36 and then into the rock layer 28; after all the steel sheet piles 11 are driven, the steel sheet piles 11 are enclosed to form a cofferdam structure.
[0046] In this step, when the steel sheet pile 11 is inserted and driven, the specific method is as follows: The limit frame 14 is installed on the guide beam 12 close to the upstream direction of the river. The first steel sheet pile 11 is driven first. The first steel sheet pile 11 passes through the limit frame 14, and the steel sheet pile 11 is guided by the limit frame 14, and the steel sheet pile 11 is driven by the pile driver 1; after the first steel sheet pile 11 is driven, the subsequent steel sheet piles 11 are driven in sequence from both sides of the steel sheet pile 11 until the steel sheet piles 11 are enclosed to form a cofferdam structure; adjacent steel sheet piles 11 are connected and spliced by locks 19; During the driving process of the steel sheet piles 11, a water level sensor 7 is installed on the positioning piles 8 in the inner area of the cofferdam structure, and the water level height inside the cofferdam structure is monitored by the water level sensor 7; a pressure gauge 22 is arranged on the outer side of the steel sheet piles 11, and the water level height of the outer area of the cofferdam structure is monitored by the pressure gauge 22; when the water level height inside the cofferdam structure is lower than the water level height outside the cofferdam structure and the height difference is greater than the water level difference threshold, water is injected into the cofferdam mechanism through the water injection device 5 to keep the water levels inside and outside the cofferdam structure balanced.
[0047] The steel sheet pile 11 can be suspended and placed by the crane 1 .
[0048] Furthermore, when inserting and driving the steel sheet pile, the pressure of the pile driver on the steel sheet pile is calculated by the following formula: ; In the above formula, is the pressure of the pile driver on the steel sheet pile, H is the total thickness of the covering layer, is the passive earth pressure, is the end resistance of the steel sheet pile in the rock formation, is the friction resistance; Passive Earth Pressure The calculation formula is as follows: ; In the above formula, is the bulk density of the covering layer, in kN / m³; is the internal friction angle of the overburden; End resistance The calculation formula is as follows: ; In the above formula, is the bulk density of the rock formation, in kN / m³; A is the cross-sectional area of the steel sheet pile; h is the depth of the steel sheet pile driven into the rock formation, is the internal friction angle of the rock formation.
[0049] Frictional resistance The calculation formula is as follows: ; In the above formula, is the cohesion of the covering layer, which represents the force of attraction between soil particles in the covering layer, and its unit is kPa; it is worth mentioning that the soil of the covering layer in the present invention is silt; S is the total length of the outer edge of the cross section of the steel sheet pile; It is an empirical coefficient. This parameter is a dimensionless value. It reflects the friction effect between the steel sheet pile and the soil and can be measured by experimental methods.
[0050] In the process of inserting the steel sheet pile 11, if it is difficult to insert, the following methods can be used: Method 1): First, the steel sheet pile 11 is hoisted to a certain height, and then the pile hoisting rope is quickly loosened, and the steel sheet pile 11 is rapidly inserted downward by virtue of its own weight.
[0051] Method 2): The steel sheet pile 11 is inserted downward by hammering. During the hammering process, the verticality of the steel sheet pile 11 needs to be adjusted to ensure that the steel sheet pile 11 is inserted vertically.
[0052] Step 5: Pump water from the cofferdam structure and make the water level reach the first height; then build a second layer of support structure 9 on the positioning columns; after the second layer of support structure 9 is built, inject water into the cofferdam structure to keep the water levels inside and outside the cofferdam structure consistent.
[0053] In this step, the second layer support structure 9 includes a longitudinal I-beam 17, an angle purlin 18, and a support beam 16. The longitudinal I-beam 17 is horizontally fixed on the corbel 15 on the positioning pile 8, the angle purlin 18 is welded between adjacent longitudinal I-beams 17, and the support beam 16 is welded between the longitudinal I-beams 17.
[0054] The water pump 2 is used to pump water from inside the cofferdam structure. During the pumping process, when the water level sensor 7 reaches a first height, the water pump 2 stops working, and then the second layer of the supporting structure 9 is started to be built.
[0055] During the construction of the support structure, the water level difference inside and outside the cofferdam structure is monitored at all times. When the water level inside the cofferdam structure is too low, causing the water level difference between the inside and outside to exceed the set safety range, the water injection device 5 is used to inject water into the cofferdam structure to reduce the water level difference and reduce the stress on the steel sheet piles 11. After the support structure is completed, water is injected again to make the water levels inside and outside the cofferdam consistent, so as to keep the water pressure on both sides of the steel sheet piles 11 balanced, thereby reducing the stress on the steel sheet piles 11.
[0056] Step 6: excavate the bottom earthwork inside the outer wall of the cofferdam, then arrange the conduit 3, and pour underwater concrete on the bottom inside the outer wall of the cofferdam by using the vertical pipe method; after the underwater concrete pouring is completed, remove the conduit 3.
[0057] In this step, the covering layer 36 at the bottom of the cofferdam structure is first excavated with water, the silt of the covering layer 36 is cleaned, and the earthwork is excavated to the bottom elevation of the bottom sealing concrete 27 to form a foundation pit inside the cofferdam structure. During the excavation process, water is injected into the cofferdam structure to keep the water level inside and outside the cofferdam structure consistent; then the bottom of the foundation pit is leveled by a long-arm excavator; Then, a hole is drilled at the bottom of the foundation pit to form a grouting hole at the bottom of the foundation pit, and the lower end of the catheter 3 is vertically inserted into the grouting hole. The distance between the lower end of the catheter 3 and the bottom of the grouting hole is maintained at 0.3-0.5 meters, and the lower end of the catheter 3 is 2-6 meters lower than the bottom of the foundation pit. The first batch of concrete is poured into the conduit 3, and the concrete fills the bottom of the conduit 3 and forms a water stopper at the bottom of the conduit 3; then, concrete is continuously poured into the covering layer 36 through the conduit 3 until the concrete layer is poured to a set thickness and then stopped; during the concrete pouring process, the height of the lower end of the conduit 3 gradually rises upward as the thickness of the concrete layer increases.
[0058] After the concrete pouring is completed, concrete curing is carried out to promote the hardening and strength growth of the concrete. After the curing is completed, the bottom sealing concrete 27 is obtained. The density and quality of the concrete are checked by ultrasonic testing, core sampling testing, etc. to see if they meet the requirements.
[0059] Step 7: When the concrete poured in step 6 reaches the preset strength, the cofferdam structure is emptied, and then the third layer of support structure 10 is built on the positioning columns.
[0060] After the water inside the cofferdam structure is slowly and evenly pumped out by the pump 2, the mud and sand at the bottom of the cofferdam are cleaned and the surface of the bottom concrete 27 is made flat; the construction personnel enter the cofferdam structure to check whether the bottoms of the positioning piles 8 and the steel sheet piles 11 are firmly fixed in the bottom concrete 27.
[0061] The specific structure and construction method of the third-layer supporting structure 10 are the same as those of the second-layer supporting structure 9 .
[0062] Step 8: Monitor the deformation and stress conditions of the cofferdam structure. When the detection value exceeds the threshold, reinforce the cofferdam structure.
[0063] In this step, the displacement of the top of the steel sheet pile 11 is monitored, and the monitoring method is as follows: A laser line projector is installed on the top of the steel plate, and a monitoring board is set on the outside of the steel sheet pile 11. The laser mark emitted by the laser line projector is projected onto the monitoring board, an initial mark position is set on the monitoring board, and the distance between the laser mark and the initial mark position is recorded; when the distance between the laser mark and the initial mark position exceeds the displacement threshold, the position of the steel sheet pile 11 is corrected; When monitoring the deformation of the cofferdam structure, the method is as follows: a number of target balls are set on the outside of the cofferdam structure, and the outside of the cofferdam structure is scanned by a three-dimensional laser scanner; during the scanning process, the target balls are scanned and identified by the three-dimensional laser scanner, and the positions of the target balls are tracked to obtain the deformation displacement at the positions of the target balls on the cofferdam structure; when the deformation displacement at any position of the target balls on the cofferdam structure exceeds the deformation threshold, an alarm signal is issued and the position is reinforced; When monitoring the stress condition of the cofferdam structure, the water pressure is monitored by a pressure gauge 22 arranged on the outside of the steel sheet pile 11. When the water pressure value detected by the pressure gauge 22 exceeds the set safety value, an alarm signal is issued and the cofferdam structure is reinforced.
[0064] Among them, the distribution positions of water level monitoring point 24, steel sheet pile displacement monitoring point 25, and scanning point 26 are as follows: Figure 5 As shown, A steel sheet pile cofferdam for circulating water pumping and desilting in thick overburden is obtained by the construction method of the steel sheet pile cofferdam for circulating water pumping and desilting in thick overburden.
[0065] The present invention is not limited to the above-mentioned optimal implementation mode. Anyone can derive other various forms of products under the inspiration of the present invention. However, no matter what changes are made in the shape or structure, all technical solutions that are the same or similar to those of the present application fall within the protection scope of the present invention.
Claims
1. A construction method for steel sheet pile cofferdam with circulating pumping and dredging of thick overburden, characterized in that: The specific steps include: Step 1: Making steel sheet piles (11); Step 2: installing a positioning pile (8) in water, and installing a guide beam (12) on the positioning pile (8); installing a limit frame (14) for guiding the steel sheet pile (11) on the guide beam (12); Step 3: constructing a first layer of support structure (4) between the positioning piles (8) and the guide beam (12); Step 4: vertically driving the steel sheet piles (11) in sequence, and driving the lower ends of the steel sheet piles (11) through the covering layer (36) and into the rock layer (28); after all the steel sheet piles (11) are driven, the steel sheet piles (11) are enclosed to form a cofferdam structure; Step 5: Pumping water from the cofferdam structure to a first height; then building a second layer of support structure (9) on the positioning column; after the second layer of support structure (9) is built, water is injected into the cofferdam structure to keep the water levels inside and outside the cofferdam structure consistent; Step 6: excavate the bottom earthwork inside the outer wall of the cofferdam, then arrange the guide tube (3), and cast underwater concrete on the bottom inside the outer wall of the cofferdam by using the vertical pipe method; after the underwater concrete casting is completed, remove the guide tube (3); Step 7: When the concrete poured in step 6 reaches the preset strength, the cofferdam structure is emptied, and then the third layer of support structure (10) is built on the positioning columns; Step 8: Monitor the deformation and stress conditions of the cofferdam structure. When the detection value exceeds the threshold, reinforce the cofferdam structure.
2. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden layer according to claim 1 is characterized in that: The steel sheet pile (11) has a U-shaped structure. A deformation groove (20) is provided in the middle of the steel sheet pile (11). Locking openings (19) are provided at both ends of the steel sheet pile (11). Adjacent steel sheet piles (11) are connected via the locking openings (19). A sealing strip (21) is provided on the locking openings (19).
3. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden according to claim 1 is characterized in that: In step 2, when installing the positioning pile (8) and the guide beam (12), the method is as follows: First, the center line and boundary line of the cofferdam structure are determined, and reference points are set; positioning piles (8) are driven at the four corners of the cofferdam structure and the center of the boundary line, and the lower ends of the positioning piles (8) are inserted into the rock layer (28); a bracket (15) is installed on the positioning pile (8), and a guide beam (12) is horizontally installed on the bracket (15) and fixed to the bracket (15) by welding.
4. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden according to claim 1 is characterized in that: In step three, the first layer of supporting structure (4) includes an intermediate supporting steel pipe (13) and an angle purlin (18). The intermediate supporting steel pipe (13) is first welded and fixed between the positioning piles (8) and between the guide beams (12); and the angle purlin (18) is welded between adjacent guide beams (12).
5. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden according to claim 2 is characterized in that: The specific method of step 4 is as follows: The limit frame (14) is installed on the guide beam (12) close to the upstream direction of the river, and the first steel sheet pile (11) is driven in first. The first steel sheet pile (11) passes through the limit frame (14), and the steel sheet pile (11) is guided by the limit frame (14), and the steel sheet pile (11) is driven in by the pile driver (1); after the first steel sheet pile (11) is driven in, subsequent steel sheet piles (11) are driven in sequence from both sides of the steel sheet pile (11) until the steel sheet piles (11) are enclosed to form a cofferdam structure; adjacent steel sheet piles (11) are connected and spliced by means of locks (19); During the driving of the steel sheet piles (11), a water level sensor (7) is installed on the positioning piles (8) in the inner area of the cofferdam structure, and the water level height inside the cofferdam structure is monitored by the water level sensor (7); a pressure gauge (22) is arranged on the outer side of the steel sheet piles (11), and the water level height of the outer area of the cofferdam structure is monitored by the pressure gauge (22); when the water level height inside the cofferdam structure is lower than the water level height outside the cofferdam structure and the height difference is greater than a water level difference threshold, water is injected into the cofferdam structure through the water injection device (5) so that the water levels inside and outside the cofferdam structure are kept balanced.
6. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden according to claim 5 is characterized in that: In step 4, when inserting the steel sheet pile, the pressure of the pile driver on the steel sheet pile is calculated by the following formula: ; In the above formula, is the pressure of the pile driver on the steel sheet pile, H is the total thickness of the covering layer, is the passive earth pressure, is the end resistance of the steel sheet pile in the rock formation, is the friction resistance; Passive Earth Pressure The calculation formula is as follows: ; In the above formula, is the bulk density of the covering layer; is the internal friction angle of the overburden; End resistance The calculation formula is as follows: ; In the above formula, is the bulk density of the rock formation; A is the cross-sectional area of the steel sheet pile; h is the depth of the steel sheet pile driven into the rock formation, is the internal friction angle of the rock formation; Frictional resistance The calculation formula is as follows: ; In the above formula, is the cohesion of the covering layer; S is the total length of the outer edge of the cross section of the steel sheet pile; is the empirical coefficient.
7. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden according to claim 1 is characterized in that: In step 5, the second layer support structure (9) includes a longitudinal I-beam (17), an angle purlin (18), and a support beam (16), wherein the longitudinal I-beam (17) is horizontally fixed on the upper bracket (15) of the positioning pile (8), the angle purlin (18) is welded between adjacent longitudinal I-beams (17), and the support beam (16) is welded between the longitudinal I-beams (17).
8. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden according to claim 1 is characterized in that: In step 6, the covering layer (36) at the bottom of the cofferdam structure is first excavated with water, the silt in the covering layer (36) is cleaned, and the earthwork is excavated to the bottom elevation of the bottom sealing concrete (27) to form a foundation pit inside the cofferdam structure. During the excavation process, water is injected into the cofferdam structure to keep the water level inside and outside the cofferdam structure consistent; then the bottom of the foundation pit is leveled by a long-arm excavator; Then, a hole is drilled at the bottom of the foundation pit to form a grouting hole at the bottom of the foundation pit, and the lower end of the conduit (3) is vertically inserted into the grouting hole, with the lower end of the conduit (3) being 0.3-0.5 meters away from the bottom of the grouting hole, and the lower end of the conduit (3) being 2-6 meters below the bottom of the foundation pit; The first batch of concrete is poured into the conduit (3), and the concrete fills the bottom of the conduit (3) and forms a water stopper at the bottom of the conduit (3); then, concrete is continuously poured into the covering layer (36) through the conduit (3) until the concrete layer is poured to a set thickness and then stopped; during the concrete pouring process, the height of the lower end of the conduit (3) gradually rises upward as the thickness of the concrete layer increases.
9. The construction method of steel sheet pile cofferdam for circulating pumping and desilting of thick overburden according to claim 5, characterized in that: In step eight, the displacement of the top of the steel sheet pile (11) is monitored; the monitoring method is as follows: A laser line projector is installed on the top of the steel plate, and a monitoring board is arranged on the outside of the steel sheet pile (11). A laser mark emitted by the laser line projector is projected onto the monitoring board, an initial mark position is set on the monitoring board, and the distance between the laser mark and the initial mark position is recorded; when the distance between the laser mark and the initial mark position exceeds a displacement threshold, the position of the steel sheet pile (11) is corrected; When monitoring the deformation of the cofferdam structure, the method is as follows: a number of target balls are set on the outside of the cofferdam structure, and the outside of the cofferdam structure is scanned by a three-dimensional laser scanner; during the scanning process, the target balls are scanned and identified by the three-dimensional laser scanner, and the positions of the target balls are tracked to obtain the deformation displacement at the positions of the target balls on the cofferdam structure; when the deformation displacement at any position of the target balls on the cofferdam structure exceeds the deformation threshold, an alarm signal is issued and the position is reinforced; When monitoring the stress condition of the cofferdam structure, the water pressure is monitored by a pressure gauge (22) arranged outside the steel sheet pile (11); when the water pressure value detected by the pressure gauge (22) exceeds a set safety value, an alarm signal is issued and the cofferdam structure is reinforced.
10. A steel sheet pile cofferdam for circulating pumping and dredging of thick overburden, characterized in that: The invention is obtained by the construction method of the steel sheet pile cofferdam for circulating pumping and desilting of thick overburden layer as described in any one of claims 1 to 9.
Citation Information
Patent Citations
Method for steel sheet pile cofferdam construction in deepwater thick-sludge-layer environment
CN108330995A
Cofferdam deformation monitoring method based on three-dimensional laser scanning technology
CN110763147A
Deep foundation pit supporting structure
CN218405463U
Cited By
Dredging and water intercepting device for closed conduit and construction method
CN119877576A
Bridge precast concrete stand column and bent cap socket construction platform and method
CN120425747A