Fabricated shear wall, mold for pouring shear wall unit and pouring method
By adopting a combination design of prefabricated wall panels, overlapping wall panels and reinforced frames in the shear wall unit, combined with the settings of specific through holes and reinforced frames, the problem of cracking and low strength of prefabricated shear walls during the production process is solved. , achieving efficient connection and stability improvement of the structure.
Patent Information
- Application Number
- CN202411224302.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-15
AI Technical Summary
Existing prefabricated shear walls are prone to cracking and have low strength during production, and are prone to mass defects such as mold swelling and grouting sleeve cavity blockage during construction and pouring.
Designed with shear wall unit including prefabricated wall panels, overlapping wall panels and reinforced frames, connecting steel bars and joints, replacing grout sleeve connections, and specific through holes and reinforced frames are provided inside the wall panel to improve structural symmetry Sex and strength.
It effectively avoids cracking and mold-raising phenomena of shear wall units, improves the strength and rigidity of the structure, reduces production costs, meets the needs of rapid construction, and ensures structural performance.
Smart Images

Figure CN118958545A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of prefabricated buildings, and in particular to a prefabricated shear wall, a mold for casting a shear wall unit, and a casting method. Background Art
[0002] Prefabricated shear walls refer to shear wall components that are prefabricated in factories and assembled into an integral structure at the construction site through hoisting, assembly and other methods combined with high-strength connection methods, such as grouting sleeves, to achieve the rigidity and stability of the overall building structure.
[0003] At present, the widely used prefabricated shear walls in the market mainly include prefabricated integral shear walls and composite shear walls. Among them, prefabricated integral shear walls are mainly connected by grouting sleeves, but during the construction process, it is easy to cause defects such as blockage of the inner cavity of the grouting sleeve and difficulty in aligning the steel bars; and the composite shear wall needs to be flipped many times during the production process. During the multiple flipping processes, the shear wall blades are prone to cracking and other quality defects, and the mold is easy to expand during the construction and pouring process, and the strength is low, which is difficult to avoid affecting the overall structure of the building. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a prefabricated shear wall, a mold for casting a shear wall unit and a casting method, which solves the technical problems of the existing prefabricated shear wall being prone to cracking and having low strength during the production process.
[0006] (II) Technical solution
[0007] In order to achieve the above object, the main technical solutions adopted by the present invention include:
[0008] In the first aspect, the present invention provides an assembled partition wall, comprising at least two shear wall units aligned vertically, wherein a plurality of connecting steel bars are vertically inserted on the shear wall units; the shear wall units comprise prefabricated wall panels, composite wall panels and steel bar skeletons, wherein the composite wall panels are connected to one end of the prefabricated wall panels, the steel bar skeletons are arranged inside the prefabricated wall panels and the composite wall panels, and both ends of the steel bar skeletons pass through the side walls of the prefabricated wall panels and the composite wall panels; for each two adjacent shear wall units in the upper and lower parts: the bottoms or facing ends or back ends of the prefabricated wall panels of the two shear wall units are connected to the composite wall panels, and the plurality of connecting steel bars of the two shear wall units correspond one to another in the upper and lower parts, and the relative ends are fixedly connected by connecting joints.
[0009] Preferably, the interior of the prefabricated wall panel is respectively provided with two first through holes and a plurality of second through holes which are vertically arranged, and the vertical midlines of the two first through holes and the plurality of second through holes are parallel to each other; the two first through holes are close to the side walls of the prefabricated wall panel on both sides, and the plurality of second through holes are located between the two first through holes, and the intervals between the plurality of second through holes are the same, and the center points of the first through holes and the second through holes are placed on the same straight line; the plurality of connecting steel bars are all passed through the two first through holes and the plurality of second through holes; the steel bar skeleton is provided with two layers, and the two layers of the steel bar skeleton are located on both sides of the first through hole and the second through hole and are mirror-symmetrical with respect to the line connecting the first through hole and the second through hole.
[0010] Preferably, the first through hole includes a transverse long hole and a plurality of blind holes, the plurality of blind holes are distributed at intervals on both sides of the transverse long hole and are all connected to the transverse long hole, and the plurality of connecting steel bars placed in the first through hole are respectively clamped in the blind holes.
[0011] Preferably, the composite wall panel comprises an inner leaf panel and an outer leaf panel; the prefabricated wall panel is provided with a support plate at one end opposite to the composite wall panel; the ends of the inner leaf panel and the outer leaf panel are both connected to one end of the prefabricated wall panel, the inner wall of the inner leaf panel and the outer wall of the outer leaf panel are flush with the inner wall and the outer wall of the prefabricated wall panel respectively, and there is a gap between the inner leaf panel and the outer leaf panel; the height of the inner leaf panel protruding from the prefabricated wall panel is less than the height of the outer leaf panel protruding from the prefabricated wall panel; one end of the support plate is connected to one end of the prefabricated wall panel relative to the inner leaf panel and the outer leaf panel, the inner wall of the support plate is flush with the inner wall of the prefabricated wall panel, and the thickness of the support plate is the same as the thickness of the inner leaf panel; the height of the support plate protruding from the prefabricated wall panel is the same as the height of the outer leaf panel protruding from the inner leaf panel; parts of the two layers of the steel skeleton are respectively located in the inner leaf panel and the outer leaf panel.
[0012] Preferably, the steel bar skeleton includes a plurality of horizontal steel bars, a plurality of vertical steel bars, a plurality of stirrups and a plurality of tension bars; the plurality of horizontal steel bars, the plurality of vertical steel bars, the plurality of stirrups and the plurality of tension bars are all located in the prefabricated wall panels and the composite wall panels, the plurality of horizontal steel bars are spaced at the same intervals, the plurality of vertical steel bars are spaced at the same intervals, both ends of the plurality of horizontal steel bars pass through the side walls of the prefabricated wall panels and the composite wall panels, and the plurality of horizontal steel bars are fitted with the plurality of vertical steel bars; the plurality of stirrups are sleeved on the outer walls of the two layers of the plurality of vertical steel bars around the two first through holes, and the plurality of stirrups are spaced at the same intervals in the vertical direction; the plurality of tension bars are vertically staggered and horizontally arranged, and the tops and bottoms of the plurality of tension bars are clamped with the intersections of the corresponding two layers of the plurality of horizontal steel bars and the plurality of vertical steel bars.
[0013] In the second aspect, the present invention provides a casting mold for casting prefabricated shear wall units, which is used for casting the above-mentioned prefabricated shear wall units, as well as a casting platform, a front formwork, a first rear formwork and two first side formworks; the front formwork, the first rear formwork and the two first side formworks together form a rectangular structure, the same end of the two first side formworks are respectively connected to the two sides of the front formwork, and the other ends are provided with a clamping space, the first rear formwork is placed in the clamping space, and the horizontal center lines of the front formwork, the two first side formworks and the first rear formwork are located in the same horizontal plane; there is a gap between the first rear formwork and the casting platform; the front formwork is L-shaped and the angle of the L-shape is facing the outside of the rectangular structure, and the horizontal section of the L-shape is provided with a cavity; the front formwork, the two first side formworks and the first rear formwork are used to cast the prefabricated wall panels.
[0014] Preferably, the casting mold also includes two second side templates and a second rear template; one end of the two second side templates are respectively connected to the rear ends of the two first side templates, and the other ends are respectively connected to the two ends of the second rear template, and the two second side templates are perpendicular to the second rear template; the height of the second side template is the same as the interval between the first rear template and the casting platform.
[0015] Preferably, the casting mold further includes a plurality of sub-templates, a third rear template, a plurality of bolts and a plurality of nuts; the plurality of sub-templates are all concave-shaped and the openings of the concave-shaped templates face upwards, the plurality of sub-templates are horizontally laid along the length direction of the first side template, the side walls of the plurality of sub-templates are flush with the outer side walls of the two first side templates, and the top walls of the plurality of sub-templates are flush with the top walls of the first side templates; the plurality of sub-templates are respectively connected to one end of the two first side templates away from the front template through two connecting plates, the plurality of bolts and the plurality of nuts, and a plurality of circular holes are provided at the joint of each two adjacent sub-templates; the third rear template is installed on a side wall of the sub-template away from the first rear template, the third rear template, the plurality of sub-templates and the first rear template form a rectangular box body, the rectangular box body is connected to the rectangular structure, and the rectangular box body is located above the second side template and has a gap; the two second side templates, the second rear template, the plurality of sub-templates and the third rear template are used to cast the composite wallboard.
[0016] Preferably, the casting mold further comprises two first core rods and a plurality of second core rods; the front template is provided with two third through holes and a plurality of fourth through holes; the first rear template is provided with two first grooves and a plurality of second grooves on a side wall facing the front template, the plurality of second grooves are located between the two first grooves, the intervals between the plurality of second grooves are the same, and the depths of the two first grooves and the plurality of second grooves are one-half of the thickness of the first rear template; the two third through holes are the same as the inner contours of the two first grooves, the plurality of fourth through holes are the same as the inner contours of the plurality of second grooves, the two third through holes and the two first grooves, the plurality of fourth through holes and the plurality of second grooves correspond one-to-one; the outer contours of the first core rod and the second core rod are the same as the inner contours of the third through hole and the fourth through hole, respectively, and the same ends of the two first core rods and the plurality of second core rods can pass through the two third through holes and the plurality of fourth through holes one-to-one, respectively, and be inserted into the two first grooves and the plurality of second grooves one-to-one; the lengths of the two first core rods and the plurality of second core rods are greater than the length of the first side template.
[0017] In a third aspect, the present invention provides a method for casting an assembled shear wall, comprising the above-mentioned casting platform, the front formwork, the first rear formwork, the two first side formworks, the two second side formworks, the second rear formwork, the multiple sub-formworks, the third rear formwork, the multiple bolts and the multiple nuts, and comprising the following steps:
[0018] S1: Processing the front template, the first rear template, the two first side templates, the two second side templates, the second rear template, the multiple sub-templates and the third rear template. After the processing is completed, the front template, the first rear template, the two first side templates, the two second side templates, the second rear template, the multiple sub-templates and the third rear template are placed on the casting platform;
[0019] S2: Connecting the same end of the two first side templates to the two ends of the front template, placing the first rear template in the clamping space of the two first side templates, so that the front template, the first rear template and the two first side templates are connected to form the rectangular structure;
[0020] S3: connecting the two second side templates to the two first side templates correspondingly, and connecting the second rear template to the two second side templates;
[0021] S4: After the connection is completed, the steel bar skeleton is laid and tied in the rectangular structure and the two second side formworks and the second rear formwork;
[0022] S5: After the laying is completed, pouring concrete into the rectangular structure, the two second side formworks and the second rear formwork for the first time until the height of the concrete is the same as that of the second side formworks;
[0023] S6: Connecting the plurality of sub-templates and the third rear template to the two first side templates through the connecting plates, the plurality of bolts and the plurality of nuts to form a rectangular box body;
[0024] S7: After the connection is completed, the steel bar skeleton is laid and tied to the rectangular structure and the rectangular box;
[0025] S8: After the steel frame is laid and tied, concrete is poured into the rectangular structure and the rectangular box for the second time, and the pouring is stopped when the pouring height is flush with the top wall of the sub-formwork.
[0026] (III) Beneficial effects
[0027] The beneficial effects of the present invention are:
[0028] 1. The present invention provides a prefabricated shear wall, a mold for casting a shear wall unit, and a casting method. By integrating prefabricated wall panels and composite wall panels into one, and providing a steel skeleton inside the prefabricated wall panels and the composite wall panels, it is possible to improve the strength of the shear wall unit and avoid quality defects such as cracking of the finished shear wall unit. At the same time, by integrating the technology of prefabricated wall panels and composite wall panels, it is possible to avoid the mold expansion phenomenon during the construction and casting of the shear wall unit, which not only meets the requirements of rapid construction but also ensures the structural performance of the shear wall unit. By connecting the upper and lower shear wall units through connecting steel bars and connecting joints, it can replace the connection of the grouting sleeve, thereby avoiding defects such as blockage of the sleeve cavity and difficulty in aligning the steel bars caused by the connection of the grouting sleeve.
[0029] 2. The present invention provides a prefabricated shear wall, a mold for casting a shear wall unit, and a casting method. By setting a first through hole and a second through hole inside the prefabricated wall panel, and the vertical center lines of the first through hole and the second through hole are parallel to each other, it can ensure the structural symmetry and stability of the wall panel, and ensure that the connecting steel bars are arranged in the vertical direction, thereby improving the strength and rigidity of the overall structure after the shear wall unit is connected. By setting two layers of steel bar skeletons, it can further improve the strength and rigidity of the shear wall unit, and avoid quality problems such as cracking of the shear wall unit. In addition, by setting the two layers of steel bar skeletons in mirror symmetry, it also ensures that the wall panel can evenly disperse stress when subjected to external loads, reducing the risk of damage caused by local stress concentration. By setting the first through hole in the form of a transverse long hole and a plurality of blind holes, and the connecting steel bar is clamped in the blind hole, it can facilitate the effective connection of the upper and lower shear wall units, and can also position the connecting steel bars.
[0030] 3. The present invention provides a prefabricated shear wall, a mold for casting a shear wall unit, and a casting method. The inner blade and the outer blade are provided, and the inner wall of the inner blade and the outer wall of the outer blade are flush with the inner wall and the outer wall of the prefabricated wall panel, thereby ensuring the flatness of the shear wall unit. By making the height of the inner blade protruding from the prefabricated wall panel smaller than the height of the outer blade protruding from the prefabricated wall panel, and the height of the support plate protruding from the prefabricated wall panel being the same as the height of the outer blade plate protruding from the inner blade plate, it can ensure that when the upper and lower shear wall units are assembled, the inner blade and the outer blade and the support plate can form a joint, thereby increasing the shear resistance of the joint.
[0031] 4. The present invention provides an assembled shear wall, a mold for casting a shear wall unit, and a casting method. By bonding horizontal steel bars and vertical steel bars, a stable grid structure is formed, thereby enhancing the overall structural strength and bending resistance of the wall panel. By providing stirrups, the restraining force of the steel skeleton can be increased, which helps to improve the shear resistance and ductility of the shear wall unit under earthquake action. By providing tie bars and staggered arrangement of the tie bars, the continuity and stability of the steel skeleton can be strengthened, and the ability of the shear wall unit to resist lateral forces can be improved. By having both ends of the horizontal steel bars pass through the side walls of the prefabricated wall panels and the composite wall panels, it can be beneficial to connect two laterally adjacent shear wall units, thereby facilitating the formation of an effective connection.
[0032] 5. The present invention provides an assembled shear wall, a mold for casting a shear wall unit, and a casting method. By providing a casting platform, a front template, a first rear template, and two first side templates, it is possible to cast prefabricated wall panels, thereby improving the work efficiency during casting and reducing production costs. By setting the front template to be L-shaped, and providing a cavity in the horizontal section of the L-shape, it is possible to cast the support plate, so that the support plate and the prefabricated wall panel can be cast synchronously. The rectangular structure composed of the front template, the first rear template, and the two first side templates ensures the shape accuracy and dimensional consistency of the prefabricated wall panel. By providing a snap-in space on the first side template, it is possible to facilitate the installation of the first rear template and also to block excess concrete.
[0033] 6. The present invention provides a prefabricated shear wall, a mold for casting a shear wall unit, and a casting method. By setting two second side templates and a second rear template, the inner blade can be cast. Moreover, since the height of the second side template is the same as the interval between the first rear template and the casting platform, that is, the second side template and the second rear template are connected to the rectangular structure through the interval, the inner blade can be cast while casting the prefabricated wall panel, thereby improving work efficiency. By setting a plurality of sub-templates, and connecting the plurality of sub-templates in succession through connecting plates, a plurality of bolts and nuts, it is possible to ensure the effective connection of the plurality of sub-templates with the first side template. By providing a plurality of circular holes at the joints of each two adjacent sub-templates, it is possible to facilitate the installation of stirrups and tie bars, thereby preventing the stirrups and tie bars from being unable to pass through the sub-templates, thereby making the casting mold more complete. At the same time, since the plurality of sub-templates are connected to the prefabricated wall panels, the prefabricated wall panels and the outer blades can be cast at the same time when casting the prefabricated wall panels, thereby improving work efficiency.
[0034] 7. The present invention provides a prefabricated shear wall, a mold for casting a shear wall unit, and a casting method. By setting a first core rod and a second core rod, and respectively passing through two third through holes and a plurality of fourth through holes and respectively inserting into two first grooves and a plurality of second grooves in a one-to-one correspondence, after the shear wall unit is cast, the first core rod and the second core rod can be used as core-pulling tools, so that the first core rod and the second core rod can be subsequently pulled out to form the first through hole and the second through hole, thereby facilitating the connection between the connecting steel bars of the subsequent two shear wall units when connected. By setting the depth of the first groove and the second groove to half the thickness of the first rear template, it can facilitate the installation of the first core rod and the second core rod, ensuring that the first core rod and the second core rod can be stably inserted into the first groove and the second groove. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the overall three-dimensional structure of a shear wall unit of an assembled shear wall, a mold for casting a shear wall unit, and a casting method of the present invention;
[0036] Figure 2 A schematic diagram of a top view of a shear wall unit of an assembled shear wall, a mold for casting a shear wall unit, and a casting method of the present invention;
[0037] Figure 3 for Figure 2 Schematic diagram of the cross-section structure at AA in the middle;
[0038] Figure 4 for Figure 2 A schematic diagram of a cross-sectional structure at BB in the middle;
[0039] Figure 5 for Figure 2 Another cross-sectional structure schematic diagram at BB in the middle;
[0040] Figure 6 for Figure 2 Another cross-sectional structure schematic diagram at BB in the middle;
[0041] Figure 7 for Figure 2 Schematic diagram of the cross-section structure at CC;
[0042] Figure 8 It is a schematic diagram of the overall three-dimensional structure of an assembled shear wall, a mold for casting a shear wall unit, and a casting method of the casting mold of the present invention;
[0043] Fig. 9 It is a schematic diagram of the overall three-dimensional structure before the first pouring of an assembled shear wall, a mold for pouring a shear wall unit and a pouring method of the present invention;
[0044] Fig.10 It is a three-dimensional structural schematic diagram of an assembled shear wall, a mold for casting a shear wall unit, and a front template of a casting method of the present invention;
[0045] Fig.11 It is a three-dimensional structural schematic diagram of a first rear template of an assembled shear wall, a mold for casting a shear wall unit, and a casting method of the present invention;
[0046] Fig.12 It is a three-dimensional structural schematic diagram of a first side formwork of an assembled shear wall, a mold for casting a shear wall unit, and a casting method of the present invention;
[0047] Fig.13 for Figure 8 The enlarged structural diagram at A in the middle;
[0048] Fig.14 It is a three-dimensional structural schematic diagram of the first laying of a steel bar skeleton of an assembled shear wall, a mold for casting a shear wall unit and a casting method of the present invention;
[0049] Fig.15 It is a schematic diagram of the three-dimensional structure after the first pouring of an assembled shear wall, a mold for pouring a shear wall unit and a pouring method of the present invention;
[0050] Fig.16 It is a three-dimensional structural schematic diagram of the second laying of the steel bar skeleton of an assembled shear wall, a mold for casting a shear wall unit and a casting method of the present invention;
[0051] Fig.17 It is a schematic diagram of the three-dimensional structure after the second pouring of an assembled shear wall, a mold for pouring a shear wall unit and a pouring method of the present invention.
[0052] [Description of Reference Numerals]
[0053] 1: shear wall unit; 11: prefabricated wall panel; 111: first through hole; 1111: transverse long hole; 1112: blind hole; 112: second through hole; 113: support plate; 113a: inner wall of support plate; 11a: inner wall of prefabricated wall panel; 11b: outer wall of prefabricated wall panel; 12: composite wall panel; 121: inner leaf plate; 121a: inner wall of inner leaf plate; 122: outer leaf plate; 122a: outer wall of outer leaf plate; 13: steel bar skeleton; 131: horizontal steel bar; 132: vertical steel bar; 133 : stirrups; 134: tension bars; 2: connecting steel bars; 3: connecting joints; 4: casting platform; 5: casting mold; 51: front template; 511: third through hole; 512: fourth through hole; 52: first rear template; 521: first groove; 522: second groove; 53: first side template; 531: clamping space; 532: hole; 54: second side template; 55: second rear template; 56: sub-template; 57: third rear template; 58: bolt rod; 59: nut; 6: first core rod; 7: second core rod. DETAILED DESCRIPTION
[0054] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0055] Embodiment 1
[0056] like Figure 1-Figure 7 As shown, this embodiment provides a prefabricated partition wall, comprising at least two shear wall units 1 aligned vertically, and a plurality of connecting steel bars 2 are vertically inserted through the shear wall units 1.
[0057] Specifically, Figure 1 As shown, the shear wall unit 1 includes a prefabricated wall panel 11, a composite wall panel 12 and a steel skeleton 13. The composite wall panel 12 is connected to one end of the prefabricated wall panel 11. The steel skeleton 13 is arranged inside the prefabricated wall panel 11 and the composite wall panel 12, and both ends of the steel skeleton 13 pass through the side walls of the prefabricated wall panel 11 and the composite wall panel 12. By integrating the prefabricated wall panel 11 and the composite wall panel 12 into one, and arranging the steel skeleton 13 inside the prefabricated wall panel 11 and the composite wall panel 12, it is possible to improve the strength of the shear wall unit 1 and avoid quality defects such as cracking of the finished shear wall unit 1. At the same time, by integrating the technology of the prefabricated wall panel 11 and the composite wall panel 12, it is possible to avoid the mold expansion phenomenon during the construction and casting of the shear wall unit 1, which meets the requirements of rapid construction while ensuring the structural performance of the shear wall unit 1. Figure 3-Figure 6As shown, for each two adjacent shear wall units 1, the bottoms or facing ends or opposite ends of the prefabricated wall panels 11 of the two shear wall units 1 are connected to the composite wall panels 12. It should be noted that the facing ends refer to one composite wall panel 12 connected to the bottom of the upper prefabricated wall panel 11 and the other composite wall panel 12 connected to the top of the lower prefabricated wall panel 11; the opposite ends refer to one composite wall panel connected to the top of the upper prefabricated wall panel 11 and the other composite wall panel 12 connected to the bottom of the lower prefabricated wall panel 11. The multiple connecting steel bars 2 of the two shear wall units 1 correspond one by one and the opposite ends are fixedly connected by the connecting joints 3. By connecting the upper and lower shear wall units 1 through the connecting steel bars 2 and the connecting joints 3, it can replace the connection of the grouting sleeve, thereby avoiding defects such as the blockage of the sleeve cavity and the difficulty of steel bar alignment caused by the connection of the grouting sleeve.
[0058] Among them, for low-rise shear wall buildings, that is, when three or less shear wall units 1 are installed vertically, during the installation process of two adjacent shear wall units 1, the same end, the opposite end, and the opposite end of the prefabricated wall panel 11 can be connected to the composite wall panel 12. For high-rise buildings, that is, when more than three shear wall units 1 are installed vertically, since the cast high-rise building is subjected to a large shear force, it is preferred to install the composite wall panel 12 at the same end of the prefabricated wall panel 11, which can be more stable. Moreover, since the construction of high-rise buildings involves the hoisting of the shear wall units 1, once multiple hooks are embedded in the composite wall panel 12, the composite wall panel 12 will crack due to the thin thickness of the composite wall panel 12, which will cause water seepage during casting. Therefore, it is preferred to embed the hooks in the prefabricated wall panel 11 so that it is more stable during hoisting. Meanwhile, for high-rise buildings, when the facing ends or the back ends of the prefabricated wall panels 11 are connected to the composite wall panels 12, they need to be hoisted and turned over, and the operation method is relatively complicated.
[0059] Furthermore, if Figure 2 and Figure 7As shown, two first through holes 111 and a plurality of second through holes 112 are respectively arranged vertically inside the prefabricated wall panel 11, and the vertical center lines of the two first through holes 111 and the plurality of second through holes 112 are parallel to each other. The two first through holes 111 are close to the two side walls of the prefabricated wall panel 11, and the plurality of second through holes 112 are located between the two first through holes 111, and the intervals between the plurality of second through holes 112 are the same, and the center points of the first through holes 111 and the second through holes 112 are placed on the same straight line. The plurality of connecting steel bars 2 are all penetrated in the two first through holes 111 and the plurality of second through holes 112. By arranging the first through holes 111 and the second through holes 112 inside the prefabricated wall panel 11, and the vertical center lines of the first through holes 111 and the second through holes 112 are parallel to each other, it can ensure the structural symmetry and stability of the prefabricated wall panel 11, and ensure that the connecting steel bars 2 are arranged in the vertical direction, thereby improving the strength and rigidity of the overall structure after the shear wall unit 1 is connected. The steel skeleton 13 is provided with two layers, which can further improve the strength and rigidity of the shear wall unit 1 and avoid quality problems such as cracking of the shear wall unit 1. The two layers of the steel skeleton 13 are located on both sides of the first through hole 111 and the second through hole 112 and are mirror-symmetrical with the line connecting the first through hole 111 and the second through hole 112, which ensures that the prefabricated wall panel 11 can evenly disperse stress when subjected to external loads, and reduces the risk of damage caused by local stress concentration. It should be explained here that the connecting steel bar 2 placed in the first through hole 111 is a through steel bar, which can improve the rigidity and stability of the two adjacent shear wall units 1 after connection, and prevent the structure from being locally damaged by external forces such as earthquakes. The connecting steel bar 2 placed at the second through hole 112 is an ordinary steel bar, wherein the connecting steel bar 2 placed at the second through hole 112 has three forms, such as Figure 4-Figure 6 As shown, they are respectively in the shape of "11", "U", and "0", which is conducive to increasing the shear resistance of the two adjacent shear wall units 1 when subjected to force and the pull-out resistance between the steel skeleton 13 and the concrete, and the effect is gradually enhanced. The first through hole 111 and the second through hole 112 both avoid the steel skeleton 13.
[0060] Furthermore, if Figure 2 As shown, the first through hole 111 includes a transverse long hole 1111 and a plurality of blind holes 1112, the plurality of blind holes 1112 are distributed at intervals on both sides of the transverse long hole 1111 and are all connected to the transverse long hole 1111, and the plurality of connecting steel bars 2 placed in the first through hole 111 are correspondingly clamped in the blind holes 1112, which can facilitate the effective connection of the upper and lower shear wall units 1, and can also position the connecting steel bars 2. Among them, the first through hole 111 can be in the form of "Wang-shaped", "Feng-shaped", "I-shaped", etc., and the connecting steel bars 2 are placed at the end points.
[0061] Furthermore, if Figure 7As shown, the composite wall panel 12 includes an inner blade panel 121 and an outer blade panel 122 .
[0062] Specifically, a support plate 113 is provided at one end of the prefabricated wall panel 11 opposite to the composite wall panel 12. The ends of the inner blade plate 121 and the outer blade plate 122 are both connected to one end of the prefabricated wall panel 11, so that the shear wall unit 1 can effectively improve the stability. The inner side wall 121a of the inner blade plate 121 and the outer side wall 122a of the outer blade plate 122 are flush with the inner side wall 11a and the outer side wall 11b of the prefabricated wall panel 11, respectively, which ensures the flatness of the shear wall unit 1. There is a gap between the inner blade plate 121 and the outer blade plate 122, and a cavity is formed. The first through hole 111 and the second through hole 112 are both connected to the cavity, so as to facilitate the connection between two vertically adjacent walls through the connecting steel bar 2 and the connecting joint 3. The inner blade plate 121 and the outer blade plate 122 have the same thickness, and the height of the inner blade plate 121 protruding from the prefabricated wall panel 11 is less than the height of the outer blade plate 122 protruding from the prefabricated wall panel 11. One end of the support plate 113 is connected to one end of the prefabricated wall panel 11 relative to the inner blade plate 121 and the outer blade plate 122, the inner side wall 113a of the support plate 113 is flush with the inner side wall 11a of the prefabricated wall panel 11, and the thickness of the support plate 113 is the same as the thickness of the inner blade plate 121. The height of the support plate 113 protruding from the prefabricated wall panel 11 is the same as the height of the outer blade plate 122 protruding from the inner blade plate 121. Parts of the two-layer steel bar skeleton 13 are respectively located in the inner blade plate 121 and the outer blade plate 122, thereby improving the stability and rigidity of the composite wall panel 12 and preventing the inner blade plate 121 and the outer blade plate 122 from cracking. By making the height of the inner blade 121 protruding from the prefabricated wall panel 11 smaller than the height of the outer blade 122 protruding from the prefabricated wall panel 11, and the height of the support plate 113 protruding from the prefabricated wall panel 11 being the same as the height of the outer blade 122 protruding from the inner blade 121, it can ensure that when the upper and lower shear wall units 1 are assembled, the inner blade 121, the outer blade 122 and the support plate 113 can form a joint, thereby increasing the shear resistance of the joint, and when hoisting relative to a high-rise building, it can also form a joint with the inner blade 121 and the outer blade 122, and the hook can be pre-buried in the prefabricated wall panel 11, so that it can be more stable during hoisting. Among them, the connection joint 3 is far away from the joint position to prevent the shear force at the joint from being too large and causing the connection performance to be weakened. Moreover, by providing the support plate 121, it is also possible to prevent a shear through-surface from being formed between two adjacent shear wall units 1 in a high-rise building, that is, to prevent the gaps between the inner blade plate 121, the outer blade plate 122 and the support plate 113 from being horizontal through-slits, that is, to prevent the inner blade plate 121 and the outer blade plate 122 from being flush in length and not providing the support plate 113, so that they move relative to each other, thereby avoiding an unstable connection between two adjacent shear wall units 1 during pouring, resulting in insufficient strength of the two adjacent shear wall units 1 after pouring, and avoiding collapse.
[0063] Furthermore, if Figure 7As shown, the steel bar skeleton 13 includes a plurality of horizontal steel bars 131, a plurality of vertical steel bars 132, a plurality of stirrups 133 and a plurality of tie bars 134. The plurality of horizontal steel bars 131, the plurality of vertical steel bars 132, the plurality of stirrups 133 and the plurality of tie bars 134 are all located in the prefabricated wall panel 11 and the composite wall panel 12. The intervals between the plurality of horizontal steel bars 131 are the same, the intervals between the plurality of vertical steel bars 132 are the same, and both ends of the plurality of horizontal steel bars 131 pass through the side walls of the prefabricated wall panel 11 and the composite wall panel 12, which can facilitate the connection of two laterally adjacent shear wall units 1, thereby facilitating the formation of an effective connection. The plurality of horizontal steel bars 131 fit the plurality of vertical steel bars 132, forming a stable grid structure, which enhances the overall structural strength and bending resistance of the wall panel. A plurality of stirrups 133 are sleeved on the outer wall of the two layers of multiple vertical steel bars 132 around the two first through holes 111. The plurality of stirrups 133 are spaced at the same interval in the vertical direction, which can increase the restraining force of the steel skeleton 13, and help improve the shear resistance and ductility of the shear wall unit 1 under earthquake action. A plurality of tie bars 134 are arranged vertically and staggered, and a plurality of tie bars 134 are arranged horizontally. The top and bottom of the plurality of tie bars 134 are clamped with the intersection of the corresponding two layers of multiple horizontal steel bars 131 and multiple vertical steel bars 132, which can strengthen the continuity and stability of the steel skeleton 13, and improve the ability of the shear wall unit 1 to resist lateral forces.
[0064] Embodiment 2
[0065] This embodiment provides a casting mold 5 for casting an assembled shear wall unit 1, which is used to cast the assembled shear wall unit 1 in the first embodiment, as well as a casting platform 4, a front template 51, a first rear template 52 and two first side templates 53.
[0066] Specifically, Figure 8-Figure 12 As shown, the front formwork 51, the first rear formwork 52 and the two first side formworks 53 together form a rectangular structure, which ensures the shape accuracy and size consistency of the prefabricated wall panel 11. The same end of the two first side formworks 53 is respectively connected to the two sides of the front formwork 51, and the other end is provided with a clamping space 531. The first rear formwork 52 is placed in the clamping space 531, which can facilitate the installation of the first rear formwork 52 and can also block excess concrete. The horizontal center lines of the front formwork 51, the two first side formworks 53 and the first rear formwork 52 are located in the same horizontal plane. There is a gap between the first rear formwork 52 and the casting platform 4. By setting the casting platform 4, the front formwork 51, the first rear formwork 52 and the two first side formworks 53, it is possible to cast the prefabricated wall panel 11, improve the work efficiency during casting, and reduce the production cost. As shown Fig.10As shown, the front template 51 is L-shaped and the angle of the L-shape faces the outside of the rectangular structure. The horizontal section of the L-shape is provided with a cavity, which can realize the casting of the support plate 113, so that the support plate 113 and the prefabricated wall panel 11 can be cast synchronously. The front template 51, the two first side templates 53 and the first rear template 52 are used to cast the prefabricated wall panel 11. Preferably, as Fig.12 As shown, a plurality of holes 532 are provided on the two first side templates 53, which enable the horizontal steel bars 131 to pass through the holes 532, so that the multiple horizontally adjacent shear wall units 1 can be easily assembled. At the same time, a plurality of ribs are provided on the side walls facing outwards of the front template 51 and the two first side templates 53, which are used to improve the strength of the front template 51 and the two first side templates 53, avoid deformation of the front template 51 and the two first side templates 53 during the pouring process, and provide support for maintaining the pouring of concrete and vibrating. A hoisting hole is provided on each rib, which is used to facilitate hoisting. Since the mold is large, a crane is required to hoist the processed front template 51 and the first side template 53 and place them on the pouring platform 4.
[0067] Furthermore, if Fig. 9 As shown, the casting mold 5 also includes two second side templates 54 and a second rear template 55. One end of the two second side templates 54 is respectively connected to the rear ends of the two first side templates 53, and the other end is respectively connected to the two ends of the second rear template 55, and the two second side templates 54 are perpendicular to the second rear template 55. The height of the second side template 54 is the same as the interval between the first rear template 52 and the casting platform 4. By setting the two second side templates 54 and the second rear template 55, it is possible to achieve the molding and casting of the inner blade 121. Moreover, since the height of the second side template 54 is the same as the interval between the first rear template 52 and the casting platform 4, that is, the second side template 54 and the second rear template 55 are connected to the rectangular structure through the interval, the inner blade 121 can be cast while the prefabricated wall panel 11 is cast, so that the inner blade 121 is made integrally with the prefabricated wall panel 11, thereby improving the work efficiency.
[0068] Furthermore, if Figure 8 and Fig.13As shown, the casting mold 5 also includes a plurality of sub-templates 56, a third rear template 57, a plurality of bolts 58 and a plurality of nuts 59. The plurality of sub-templates 56 are all concave-shaped and the openings of the concave-shaped are facing upwards. The plurality of sub-templates 56 are horizontally laid along the length direction of the first side template 53. The side walls of the plurality of sub-templates 56 are flush with the outer side walls of the two first side templates 53, and the top walls of the plurality of sub-templates 56 are flush with the top walls of the first side templates 53. The plurality of sub-templates 56 are respectively connected to the ends of the two first side templates 53 away from the front template 51 through two connecting plates, a plurality of bolts 58 and a plurality of nuts 59, which can ensure the effective connection between the plurality of sub-templates 56 and the first side template 53. A plurality of circular holes are provided at the joints of each two adjacent sub-templates 56, which can facilitate the installation of stirrups 133 and tie bars 134, prevent the stirrups 133 and tie bars 134 from being unable to pass through the sub-templates 56, and make the casting mold 5 more complete. At the same time, the joints are bonded by thin adhesive strips. The third rear template 57 is installed on a side wall of the sub-template 56 away from the first rear template 52. The third rear template 57, multiple sub-templates 56 and the first rear template 52 form a rectangular box body to cast the outer blade 122. The rectangular box body is connected to the rectangular structure, and when casting the prefabricated wall panel 11, the prefabricated wall panel 11 and the outer blade 122 can be cast at the same time, thereby improving work efficiency. The rectangular box body is located above the second side template 54 and has a gap. The two second side templates 54, the second rear template 55, multiple sub-templates 56 and the third rear template 57 are used to cast the composite wall panel 12, which can be cast synchronously with the prefabricated wall panel 11 and the support plate 113, thereby improving work efficiency and making casting more convenient.
[0069] Furthermore, if Fig.14As shown, the casting mold 5 also includes two first core rods 6 and multiple second core rods 7. Two third through holes 511 and multiple fourth through holes 512 are provided on the front template 51. Two first grooves 521 and multiple second grooves 522 are provided on the side wall of the first rear template 52 facing the front template 51. The multiple second grooves 522 are located between the two first grooves 521. The intervals between the multiple second grooves 522 are the same. The depths of the two first grooves 521 and the multiple second grooves 522 are half of the thickness of the first rear template 52, which can facilitate the installation of the first core rod 6 and the second core rod 7, and ensure that the first core rod and the second core rod can be stably inserted into the first groove and the second groove. If the depth of the first groove 521 and the second groove 522 is less than half the thickness of the first rear template 52, the first core rod 6 and the second core rod 7 cannot be stably installed in the first groove 521 and the second groove 522; if the depth of the first groove 521 and the second groove 522 is greater than half the thickness of the first rear template 52, it is very likely that the first rear template 52 will be deformed during the pouring process; if the first groove 521 and the second groove 522 are set as through holes, it is easy to cause the first core rod 6 and the second core rod 7 to move and dislocate under the action of vibration after concrete pouring and vibration. The third through hole 511 has the same inner contour as the first through hole 111, the fourth through hole 512 has the same inner contour as the second through hole 112, the two third through holes 511 have the same inner contour as the two first grooves 521, the multiple fourth through holes 512 have the same inner contour as the multiple second grooves 522, and the two third through holes 511 and the two first grooves 521, the multiple fourth through holes 512 and the multiple second grooves 522 correspond one to one. The outer contours of the first core rod 6 and the second core rod 7 are respectively the same as the inner contours of the third through hole 511 and the fourth through hole 512. The same end of the two first core rods 6 and the multiple second core rods 7 can pass through the two third through holes 511 and the multiple fourth through holes 512 respectively and one by one, and are respectively inserted into the two first grooves 521 and the multiple second grooves 522 respectively. After the shear wall unit 1 is cast, the first core rod 6 and the second core rod 7 can be used as core pulling tools, so that the first core rod 6 and the second core rod 7 can be pulled out to form the first through hole 111 and the second through hole 112, thereby facilitating the connection between the connecting steel bars 2 when the two shear wall units 1 are connected. The lengths of the two first core rods 6 and the multiple second core rods 7 are greater than the length of the first side template 53, and operating rods are provided at both ends of the first core rod 6 and the second core rod 7. The operating rods are round rods, and correspondingly, circular sockets are opened at the centers of the first groove 521 and the second groove 522 so that the operating rods can pass through the circular sockets, thereby making the first core rod 6 and the second core rod 7 more stable when installed in the first groove 521 and the second groove 522, and the operating rods can also facilitate the operator to install and pull the first core rod 6 and the second core rod 7.
[0070] Embodiment 3
[0071] The present embodiment provides a method for casting an assembled shear wall, comprising the above-mentioned casting platform 4, a front template 51, a first rear template 52, two first side templates 53, two second side templates 54, a second rear template 55, a plurality of sub-templates 56, a third rear template 57, a plurality of bolts 58 and a plurality of nuts 59, and the following steps:
[0072] S1: Process the front template 51, the first rear template 52, the two first side templates 53, the two second side templates 54, the second rear template 55, the multiple sub-templates 56 and the third rear template 57. After the processing is completed, the front template 51, the first rear template 52, the two first side templates 53, the two second side templates 54, the second rear template 55, the multiple sub-templates 56 and the third rear template 57 are placed on the casting platform 4;
[0073] S2: Fig. 9 As shown, the same end of the two first side templates 53 is connected to the two ends of the front template 51, and the first rear template 52 is placed in the clamping space 531 of the two first side templates 53, so that the front template 51, the first rear template 52 and the two first side templates 53 are connected to form a rectangular structure;
[0074] S3: Fig. 9 As shown, the two second side templates 54 are connected to the two first side templates 53 correspondingly, and the second rear template 55 is connected to the two second side templates 54;
[0075] S4: After the connection is completed, Fig.14 As shown, the horizontal steel bars 131 and the vertical steel bars 132 are laid in the rectangular structure and the two second side templates 54 and the second rear template 55, and the horizontal steel bars 131 and the vertical steel bars 132 are tied by staggered arrangement using the tie bars 134. The multiple vertical steel bars 132 corresponding to the two through holes are tied by multiple stirrups 133, and the horizontal steel bars 131 pass through the corresponding holes 532 on the two first side templates 53.
[0076] S5: After the laying and lashing is completed, Fig.14 As shown, two first core rods 6 and multiple second core rods 7 are respectively passed through two third through holes 511 and multiple fourth through holes 512, and are respectively installed in two first grooves 521 and multiple second grooves 522, and the operating rods at both ends of the first core rod 6 and the second core rod 7 are passed through the circular plug holes on the first groove 521 and the second groove 522, so as to complete the installation of the first core rod 6 and the second core rod 7;
[0077] S6: Fig.15 As shown, concrete is poured into the rectangular structure, the two second side templates 54 and the second rear template 55 for the first time until the height of the concrete pouring is the same as the height of the second side template 54, and the first pouring is completed;
[0078] S7: Connect the plurality of sub-templates 56 and the third rear template 57 to the two first side templates 53 through the connecting plates, the plurality of bolts 58 and the plurality of nuts 59 to form a rectangular box body. The stirrups 133 and the tie bars 134 are passed through the circular holes at the joints of the sub-templates 56. The joints are bonded with thin adhesive strips.
[0079] S8: After the connection is completed, Fig.16 As shown, the horizontal steel bars 131 and the vertical steel bars 132 are laid in the rectangular structure and the rectangular box body. The horizontal steel bars 131 of this layer also pass through the holes 532 on the corresponding two first side templates 53. The stirrups 133 and the tension bars 134 fix the horizontal steel bars 131 and the vertical steel bars 132 of the upper and lower layers.
[0080] S9: After the laying and lashing is completed, Fig.17 As shown, the second pouring of concrete into the rectangular structure and the rectangular box body, when the pouring height is flush with the top wall of the sub-form 56, the pouring is stopped, and the second pouring of concrete is completed;
[0081] S10: After all the pouring is completed, the prefabricated wall panels 11 and the composite wall panels 12 are waited to dry. After drying, the operator holds the operating rod and takes out the two first core rods 6 and the plurality of second core rods 7, thereby forming two first through holes 111 and the plurality of second through holes 112.
[0082] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0083] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0084] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.
[0085] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0086] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. An assembled shear wall, comprising at least two shear wall units (1) aligned vertically, characterized in that: A plurality of connecting steel bars (2) are vertically inserted into the shear wall unit (1); The shear wall unit (1) comprises a prefabricated wall panel (11), a composite wall panel (12) and a steel frame (13), wherein the composite wall panel (12) is connected to one end of the prefabricated wall panel (11), the steel frame (13) is arranged inside the prefabricated wall panel (11) and the composite wall panel (12), and both ends of the steel frame (13) pass through the side walls of the prefabricated wall panel (11) and the composite wall panel (12); For each two upper and lower adjacent shear wall units (1), the bottoms or the facing ends or the opposite ends of the prefabricated wall panels (11) of the two shear wall units (1) are connected to the composite wall panel (12), and the multiple connecting steel bars (2) of the two shear wall units (1) correspond one to another and the opposite ends are fixedly connected via a connecting joint (3).
2. The assembled shear wall according to claim 1, characterized in that: The prefabricated wall panel (11) is provided with two first through holes (111) and a plurality of second through holes (112) arranged vertically, respectively, and the vertical midlines of the two first through holes (111) and the plurality of second through holes (112) are parallel to each other; The two first through holes (111) are close to the side walls of the prefabricated wallboard (11), the plurality of second through holes (112) are located between the two first through holes (111), and the intervals between the plurality of second through holes (112) are the same; The plurality of connecting steel bars (2) are all inserted into the two first through holes (111) and the plurality of second through holes (112); The steel reinforcement skeleton (13) is provided with two layers, and the two layers of the steel reinforcement skeleton (13) are located on both sides of the first through hole (111) and the second through hole (112) and are mirror-symmetrical with respect to a line connecting the first through hole (111) and the second through hole (112).
3. The assembled shear wall according to claim 2, characterized in that: The first through hole (111) comprises a transverse long hole (1111) and a plurality of blind holes (1112), wherein the plurality of blind holes (1112) are distributed at intervals on both sides of the transverse long hole (1111) and are all connected to the transverse long hole (1111), and the plurality of connecting steel bars (2) disposed in the first through hole (111) are clamped in the blind holes (1112) one by one.
4. The assembled shear wall according to claim 2, characterized in that: The composite wall panel (12) comprises an inner blade panel (121) and an outer blade panel (122); The prefabricated wall panel (11) is provided with a support plate (113) at one end opposite to the composite wall panel (12); The ends of the inner blade plate (121) and the outer blade plate (122) are both connected to one end of the prefabricated wall panel (11); the inner side wall (121a) of the inner blade plate (121) and the outer side wall (122a) of the outer blade plate (122) are respectively flush with the inner side wall (11a) and the outer side wall (11b) of the prefabricated wall panel (11); and there is a gap between the inner blade plate (121) and the outer blade plate (122); The height of the inner blade plate (121) protruding from the prefabricated wall panel (11) is less than the height of the outer blade plate (122) protruding from the prefabricated wall panel (11); One end of the support plate (113) is connected to one end of the prefabricated wall panel (11) relative to the inner blade plate (121) and the outer blade plate (122); the inner side wall (113a) of the support plate (113) is flush with the inner side wall (11a) of the prefabricated wall panel (11); and the thickness of the support plate (113) is the same as that of the inner blade plate (121); The height of the support plate (113) protruding from the prefabricated wall panel (11) is the same as the height of the outer blade plate (122) protruding from the inner blade plate (121); Portions of the two layers of the steel reinforcement skeleton (13) are located in the inner blade plate (121) and the outer blade plate (122) respectively.
5. The assembled shear wall according to claim 2, characterized in that: The steel bar skeleton (13) comprises a plurality of horizontal steel bars (131), a plurality of vertical steel bars (132), a plurality of stirrups (133) and a plurality of tension bars (134); The multiple horizontal steel bars (131), the multiple vertical steel bars (132), the multiple stirrups (133) and the multiple tension bars (134) are all located in the prefabricated wall panel (11) and the composite wall panel (12); the multiple horizontal steel bars (131) are spaced at the same intervals; the multiple vertical steel bars (132) are spaced at the same intervals; both ends of the multiple horizontal steel bars (131) pass through the side walls of the prefabricated wall panel (11) and the composite wall panel (12); and the multiple horizontal steel bars (131) are in close contact with the multiple vertical steel bars (132); The plurality of stirrups (133) are sleeved on the outer walls of the two layers of the plurality of vertical steel bars (132) around the two first through holes (111), and the plurality of stirrups (133) are spaced at the same interval in the vertical direction; The plurality of tie bars (134) are vertically staggered and horizontally arranged, and the tops and bottoms of the plurality of tie bars (134) are both clamped with the intersections of the corresponding two layers of the plurality of horizontal steel bars (131) and the plurality of vertical steel bars (132).
6. A casting mold for casting an assembled shear wall unit, used for casting the assembled shear wall unit according to any one of claims 1 to 5, characterized in that: It also includes a casting platform (4), a front template (51), a first rear template (52) and two first side templates (53); The front template (51), the first rear template (52) and the two first side templates (53) together form a rectangular structure; the same end of the two first side templates (53) is respectively connected to the two sides of the front template (51); the other end is provided with a clamping space (531); the first rear template (52) is placed in the clamping space (531); the horizontal midlines of the front template (51), the two first side templates (53) and the first rear template (52) are located in the same horizontal plane; There is a gap between the first rear template (52) and the pouring platform (4); The front template (51) is L-shaped, and the angle of the L-shape faces the outside of the rectangular structure, and a cavity is provided in the horizontal section of the L-shape; The front formwork (51), the two first side formworks (53) and the first rear formwork (52) are used for casting the prefabricated wall panel (11).
7. A casting mold for casting assembled shear wall units according to claim 6, characterized in that: The casting mold (5) further comprises two second side molds (54) and a second rear mold (55); One end of the two second side templates (54) is respectively connected to the rear ends of the two first side templates (53), and the other end is respectively connected to the two ends of the second rear template (55), and the two second side templates (54) are perpendicular to the second rear template (55); The height of the second side formwork (54) is the same as the distance between the first rear formwork (52) and the pouring platform (4).
8. A casting mold for casting assembled shear wall units according to claim 7, characterized in that: The casting mold (5) further comprises a plurality of sub-molds (56), a third rear mold (57), a plurality of bolt rods (58) and a plurality of nuts (59); The multiple sub-templates (56) are all in a concave shape with the openings of the concave shapes facing upwards; the multiple sub-templates (56) are horizontally laid along the length direction of the first side template (53); the side walls of the multiple sub-templates (56) are flush with the outer side walls of the two first side templates (53); and the top walls of the multiple sub-templates (56) are flush with the top wall of the first side template (53); The plurality of sub-templates (56) are respectively connected to one end of the two first side templates (53) away from the front template (51) through two connecting plates, the plurality of bolt rods (58) and the plurality of nuts (59), and a plurality of circular holes are provided at the joint between each two adjacent sub-templates (56); The third rear template (57) is installed on a side wall of a sub-template (56) away from the first rear template (52); the third rear template (57), the plurality of sub-templates (56) and the first rear template (52) form a rectangular box body, the rectangular box body is connected to the rectangular structure, and the rectangular box body is located above the second side template (54) and has a gap; The two second side templates (54), the second rear template (55), the plurality of sub-templates (56) and the third rear template (57) are used for casting the composite wall panel (12).
9. A casting mold for casting assembled shear wall units according to claim 6, characterized in that: The casting mold (5) further comprises two first core rods (6) and a plurality of second core rods (7); The front template (51) is provided with two third through holes (511) and a plurality of fourth through holes (512); Two first grooves (521) and a plurality of second grooves (522) are provided on a side wall of the first rear template (52) facing the front template (51); the plurality of second grooves (522) are located between the two first grooves (521); the plurality of second grooves (522) are spaced the same from one another; and the depths of the two first grooves (521) and the plurality of second grooves (522) are half the thickness of the first rear template (52); The two third through holes (511) have the same inner contour as the two first grooves (521), the plurality of fourth through holes (512) have the same inner contour as the plurality of second grooves (522), and the two third through holes (511) and the two first grooves (521), and the plurality of fourth through holes (512) and the plurality of second grooves (522) correspond one to one; The outer contours of the first core rod (6) and the second core rod (7) are respectively the same as the inner contours of the third through hole (511) and the fourth through hole (512); the same ends of the two first core rods (6) and the plurality of second core rods (7) can respectively and one-to-one pass through the two third through holes (511) and the plurality of fourth through holes (512), and respectively and one-to-one insert into the two first grooves (521) and the plurality of second grooves (522); The lengths of the two first core rods (6) and the plurality of second core rods (7) are greater than the length of the first side template (53).
10. A method for casting an assembled shear wall, comprising the casting platform (4) of claim 8, the front template (51), the first rear template (52), the two first side templates (53), the two second side templates (54), the second rear template (55), the plurality of sub-templates (56), the third rear template (57), the plurality of bolts (58) and the plurality of nuts (59), characterized in that: The following steps are involved: S1: Processing the front template (51), the first rear template (52), the two first side templates (53), the two second side templates (54), the second rear template (55), the multiple sub-templates (56) and the third rear template (57); after the processing is completed, placing the front template (51), the first rear template (52), the two first side templates (53), the two second side templates (54), the second rear template (55), the multiple sub-templates (56) and the third rear template (57) on the casting platform (4); S2: connecting the same end of the two first side templates (53) to the two ends of the front template (51), and placing the first rear template (52) in the clamping space (531) of the two first side templates (53), so that the front template (51), the first rear template (52) and the two first side templates (53) are connected to form the rectangular structure; S3: connecting the two second side templates (54) to the two first side templates (53) correspondingly, and connecting the second rear template (55) to the two second side templates (54); S4: After the connection is completed, the steel bar skeleton (13) is laid and tied inside the rectangular structure and the two second side formworks (54) and the second rear formwork (55); S5: After the laying is completed, pouring concrete into the rectangular structure, the two second side templates (54) and the second rear template (55) for the first time until the concrete is at the same height as the second side template (54); S6: Connecting the plurality of sub-templates (56) and the third rear template (57) to the two first side templates (53) via the connecting plates, the plurality of bolt rods (58) and the plurality of nuts (59) to form a rectangular box body; S7: After the connection is completed, the steel bar skeleton (13) is laid and tied to the rectangular structure and the rectangular box; S8: After the steel frame (13) is laid and tied, concrete is poured into the rectangular structure and the rectangular box body for the second time. When the pouring height is flush with the top wall of the sub-form (56), the pouring is stopped.