Waste heat boiler system for fluidized bed coal gasifier

By designing a series of medium- and low-pressure waste heat boiler systems in a fluidized bed gasification furnace, combining shell-and-tube and snake-shaped tube heat exchangers, the synthesis gas flow rate and steam temperature are controlled, and ash accumulation and acid accumulation caused by high ash is solved. Point corrosion problem improves the service life and efficiency of the boiler.

CN118959975APending Publication Date: 2024-11-15HARBIN BOILER CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411234662.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The ash content in the synthesis gas produced by the fluidized bed gasification furnace is high, which leads to ash accumulation and wear of the waste heat boiler. The complex synthesis gas components cause acid point corrosion, shortening its service life.

Method used

Design a waste heat boiler system for fluidized bed gasification furnaces, using medium-pressure waste heat boiler and low-pressure waste heat boiler in series, combining shell and tube heat exchanger and snake tube heat exchanger to control the synthesis gas flow rate and steam temperature to avoid Ash accumulation and acid-spot corrosion.

Benefits of technology

It improves heat exchange efficiency, prevents ash accumulation and wear, extends the service life of the boiler, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959975A_ABST
    Figure CN118959975A_ABST
Patent Text Reader

Abstract

A waste heat boiler system for a fluidized bed coal gasifier belongs to the technical field of waste heat recovery of fluidized bed gasifiers. The problem that an existing waste heat boiler system for the fluidized bed gasification furnace is prone to abrasion and corrosion is solved. The system comprises a medium-pressure waste heat boiler, a low-pressure waste heat boiler, a medium-pressure steam drum and a low-pressure steam drum, the medium-pressure waste heat boiler and the low-pressure waste heat boiler are connected in series and are connected through a pipeline, the low-pressure waste heat boiler and the low-pressure steam drum are connected through a pipeline, and synthesis gas sequentially flows through the medium-pressure waste heat boiler and the low-pressure waste heat boiler and then flows through the medium-pressure steam drum and the low-pressure steam drum. A steam-water mixture generated by the medium-pressure waste heat boiler flows to a medium-pressure steam pocket to be subjected to steam-water separation, and saturated steam is generated at the same time; a steam-water mixture generated by the low-pressure waste heat boiler flows to the low-pressure steam pocket for steam-water separation, and meanwhile saturated steam is generated. The device is mainly used for waste heat recovery of the fluidized bed coal gasifier.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of waste heat recovery of fluidized bed gasifiers, and in particular relates to a waste heat boiler system for fluidized bed coal gasifiers. Background Art

[0002] Fluidized bed gasification is a mature gasification process. This process can directly use 0-6mm crushed coal as raw material. The gasifying agent also serves as the fluidizing medium. The gasification temperature in the furnace is uniform, but the gasification temperature is low, which leads to incomplete carbon reaction and high ash content in the synthesis gas, which can reach 30-60g / Nm 3 , which easily leads to dust accumulation and wear of the waste heat boiler. In addition, the components of the syngas are complex, which causes acid point corrosion to the waste heat boiler, reducing the service life of the waste heat boiler. Summary of the invention

[0003] In view of this, the present invention provides a waste heat boiler system for a fluidized bed coal gasification furnace.

[0004] The technical solution adopted by the present invention to solve the above technical problems is:

[0005] A waste heat boiler system for a fluidized bed coal gasifier comprises a medium-pressure waste heat boiler, a low-pressure waste heat boiler, a medium-pressure steam drum and a low-pressure steam drum, wherein the medium-pressure waste heat boiler and the low-pressure steam drum are connected in series, the medium-pressure waste heat boiler and the medium-pressure steam drum are connected via a pipeline, and the low-pressure waste heat boiler and the low-pressure steam drum are connected via a pipeline, synthesis gas flows through the medium-pressure waste heat boiler and the low-pressure waste heat boiler in sequence, and exchanges heat with water in the medium-pressure waste heat boiler and water in the low-pressure waste heat boiler in sequence, a steam-water mixture generated by the medium-pressure waste heat boiler flows to the medium-pressure steam drum for steam-water separation and generates saturated steam while generating saturated steam; a steam-water mixture generated by the low-pressure waste heat boiler flows to the low-pressure steam drum for steam-water separation and generates saturated steam while generating saturated steam.

[0006] Furthermore, the medium-pressure waste heat boiler includes a high-temperature evaporation section and a low-temperature evaporation section which are sequentially connected from top to bottom. The high-temperature evaporation section and the low-temperature evaporation section are both shell and tube heat exchangers. The synthesis gas flows through the tube side of the high-temperature evaporation section and the tube side of the low-temperature evaporation section in sequence, and simultaneously exchanges heat with the water in the shell side of the high-temperature evaporation section and the water in the shell side of the low-temperature evaporation section to achieve the production of a steam-water mixture.

[0007] Furthermore, the shell side of the high-temperature evaporation section is connected to the medium-pressure drum by a circulation pipeline one, the shell side of the low-temperature evaporation section is connected to the medium-pressure drum by a circulation pipeline two, the boiler feed water is injected into the shell side of the high-temperature evaporation section via the medium-pressure drum and the circulation pipeline one, and the boiler feed water is injected into the shell side of the low-temperature evaporation section via the medium-pressure drum and the circulation pipeline two.

[0008] Furthermore, the medium-pressure waste heat boiler also includes a superheating section, which is arranged between the high-temperature evaporation section and the low-temperature evaporation section, and a serpentine tube heat exchanger is provided in the superheating section; the saturated steam outlet of the medium-pressure drum is connected to the inlet of the serpentine tube heat exchanger in the superheating section, and the synthesis gas flow passes through the shell side of the hot section to achieve the generation of superheated steam.

[0009] Furthermore, the low-pressure waste heat boiler is a shell and tube heat exchanger, the synthesis gas flows through the tube side of the low-pressure waste heat boiler and is discharged, the shell side of the low-pressure waste heat boiler is connected to the low-pressure steam drum via the circulation pipeline three, and the boiler feed water is injected into the shell side of the low-pressure waste heat boiler via the low-pressure steam drum and the circulation pipeline three.

[0010] Furthermore, the shell and tube heat exchanger adopts a flexible tube sheet fire tube shell and tube heat exchanger.

[0011] Compared with the prior art, the present invention has the following beneficial effects:

[0012] The shell and tube heat exchanger of the present application adopts a flexible tube sheet fire tube shell and tube heat exchanger. The reasonable tube bundle arrangement can not only ensure high heat exchange efficiency, but also control the flow rate of the synthesis gas at the inlet of the tube bundle. The flow rate of the synthesis gas through the tube bundle is maintained at 6-8m / s, avoiding the wear of the tube bundle due to a high flow rate, and avoiding the accumulation of dust in the tube bundle due to too low a flow rate. The superheating section adopts a serpentine tube bundle water tube heat exchanger structure, which can effectively control the outlet temperature of the superheated steam and prevent the superheated steam from overheating. By setting a low-pressure evaporation section at the outlet of the medium-pressure waste heat boiler, the problem of acid point corrosion of the low-pressure evaporation section tube bundle by the synthesis gas can be avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The accompanying drawings are incorporated as part of this application and are used to provide a further understanding of the present invention.

[0014] Figure 1 The present invention is a schematic structural diagram of a waste heat boiler system for a fluidized bed coal gasifier.

[0015] Explanation of the reference numerals in the accompanying drawings: 1-medium-pressure waste heat boiler; 11-high-temperature evaporation section; 12-superheating section; 121-serpentine tube heat exchanger; 13-low-temperature evaporation section; 2-low-pressure waste heat boiler; 3-medium-pressure steam drum; 4-low-pressure steam drum; 5-circulation pipeline one; 6-circulation pipeline two; 7-circulation pipeline three. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention but are not used to limit the scope of the present invention.

[0017] The existing waste heat boiler system for fluidized bed gasifier is generally composed of fire tube high-temperature evaporation, water tube superheating section, water tube low-temperature evaporation and water tube economizer. This arrangement makes the tube bundle flow rate of synthesis gas in the fire tube high-temperature evaporation section be 8-10m / s. When the ash content in the synthesis gas is high, both the fire tube high-temperature evaporation section and the water tube low-temperature evaporation section have serious wear problems. In addition, the components of the synthesis gas are complex, including H2, CO, H2S, etc., which makes the outlet tube bundle of the terminal economizer prone to dew point corrosion, which requires special materials to avoid, resulting in increased cost of the waste heat boiler.

[0018] See also Figure 1An embodiment of the present application provides a waste heat boiler system for a fluidized bed gasifier, including a medium-pressure waste heat boiler 1, a low-pressure waste heat boiler 2, a medium-pressure steam drum 3 and a low-pressure steam drum 4, and the medium-pressure waste heat boiler 1 is connected in series with the low-pressure waste heat boiler 2. The medium-pressure waste heat boiler 1 comprises a high-temperature evaporation section 11, a superheating section 12 and a low-temperature evaporation section 13 which are connected in sequence from top to bottom. The high-temperature evaporation section 11, the low-temperature evaporation section 13 and the low-pressure waste heat boiler 2 are all provided with a shell and tube heat exchanger. The shell and tube heat exchanger comprises an upper tube sheet, a tube bundle and a lower tube sheet which are connected in sequence from top to bottom. The upper tube sheet, the lower tube sheet and the furnace wall form a heat exchange cavity. Boiler feed water for heat exchange with synthesis gas is injected into the heat exchange cavity. The synthesis gas flows through the tube side of the high-temperature evaporation section 11, the shell side of the superheating section 12, the tube side of the low-temperature evaporation section 13 and the tube side of the low-pressure waste heat boiler 2 in sequence and exchanges heat with the boiler feed water. The steam-water mixture generated by the medium-pressure waste heat boiler 1 enters the medium-pressure steam drum 3 for steam-water separation, and the steam-water mixture generated by the low-pressure waste heat boiler 2 enters the low-pressure steam drum 4 for steam-water separation. The medium-pressure waste heat boiler 1 is connected to the medium-pressure steam drum 3 via a pipeline, wherein the shell side of the high-temperature evaporation section 11 is connected to the medium-pressure steam drum 3 by a circulation pipeline 15, the water inlet of the circulation pipeline 15 is connected to the side of the high-temperature evaporation section 11 close to the upper tube plate, and the water outlet of the circulation pipeline 15 is connected to the side of the high-temperature evaporation section 11 close to the lower tube plate. The steam-water mixture generated by the heat exchange between the water in the shell side of the high-temperature evaporation section 11 and the synthesis gas enters the medium-pressure steam drum 3 through the circulation pipeline 15 for steam-water separation, and the separated water and boiler feed water flow back to the shell side of the high-temperature evaporation section 11 through the circulation pipeline 5, and the medium-pressure steam drum 3 generates saturated steam. The shell side of the low-temperature evaporation section 13 is connected to the medium-pressure drum 3 by a circulation pipeline 26. The water inlet of the circulation pipeline 26 is connected to the side of the low-temperature evaporation section 13 close to the upper tube sheet, and the water outlet of the circulation pipeline 26 is connected to the side of the low-temperature evaporation section 13 close to the lower tube sheet. The steam-water mixture generated by the heat exchange between the water in the shell side of the low-temperature evaporation section 13 and the synthesis gas enters the medium-pressure drum 3 through the circulation pipeline 26 for steam-water separation. The separated water and boiler feed water flow back to the shell side of the low-temperature evaporation section 13 through the circulation pipeline 26. At the same time, saturated steam is generated in the medium-pressure drum 3. A serpentine heat exchanger 121 is provided in the superheating section 12 of the medium-pressure waste heat boiler 1. The saturated steam outlet of the medium-pressure drum 3 is connected to the inlet of the serpentine heat exchanger 121 in the superheating section 12. When the synthesis gas flows through the shell side of the hot section 12, it exchanges heat with the saturated steam in the serpentine heat exchanger 121. The saturated steam in the serpentine heat exchanger 121 is heated to form superheated steam and is discharged.

[0019] The shell side of the low-pressure waste heat boiler 2 is connected to the low-pressure steam drum 4 via a circulation pipeline three 7, the water inlet of the circulation pipeline three 7 is connected to the side of the low-pressure waste heat boiler 2 close to the upper tube plate, and the water outlet of the circulation pipeline three 7 is connected to the side of the low-pressure waste heat boiler 2 close to the lower tube plate. The steam-water mixture generated by the heat exchange between the water in the shell side of the low-pressure waste heat boiler 2 and the synthesis gas enters the low-pressure steam drum 4 through the circulation pipeline three 7 for steam-water separation, and the separated water and boiler feed water flow back to the shell side of the low-pressure waste heat boiler 2 through the circulation pipeline three 7. At the same time, the low-pressure steam drum 4 generates saturated steam and discharges it.

[0020] In this embodiment, the inlet temperature of the synthesis gas in the high temperature evaporation section 11 is 900°. After flowing through the high temperature evaporation section 11, the superheating section 12 and the low temperature evaporation section 13, the outlet temperature of the low temperature evaporation section 13 is 350°. After the synthesis gas after heat exchange flows through the low pressure waste heat boiler 2, the outlet temperature is 230°, and the heat exchange efficiency of the synthesis gas is relatively high. The shell and tube heat exchanger described in this embodiment adopts a flexible tube sheet fire tube shell and tube heat exchanger. The reasonable tube bundle arrangement can not only ensure high heat exchange efficiency, but also control the flow rate of the synthesis gas at the inlet of the tube bundle. The flow rate of the synthesis gas through the tube bundle is maintained at 6-8m / s, avoiding the wear of the tube bundle due to a high flow rate, and also avoiding the accumulation of dust in the tube bundle due to too low flow rate. Among them, the high temperature evaporation section 11 of this embodiment adopts an angle design to make the steam-water mixture flow to the high point of the shell side better, thereby protecting the upper tube sheet and the end of the heat exchange tube. The superheating section 12 adopts a serpentine tube bundle water tube heat exchanger structure, which can effectively control the outlet temperature of the superheated steam and prevent the superheated steam from overheating. The superheated steam in this embodiment is 450°. By setting a low-pressure evaporation section at the outlet of the medium-pressure waste heat boiler 1, since acid dew point corrosion requires a temperature suitable for the generation of acid dew, the temperature of the synthesis gas in the end tube of the system is high. If the outside of the heat exchange tube is low-temperature feed water, then acid dew point corrosion is more likely to occur. If the outside of the heat exchange tube is in contact with relatively high-temperature evaporated water or steam, the generation of acid dew can be avoided. Therefore, the design of the low-pressure evaporation section can avoid the problem of acid point corrosion caused by synthesis gas on the low-pressure evaporation section tube bundle.

[0021] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments and that other arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the various dependent claims and features described herein may be combined in a manner different from that described in the original claims. It should also be understood that features described in conjunction with individual embodiments may be used in other described embodiments.

Claims

1. A waste heat boiler system for a fluidized bed coal gasifier, characterized in that: It includes a medium-pressure waste heat boiler, a low-pressure waste heat boiler, a medium-pressure steam drum and a low-pressure steam drum. The medium-pressure waste heat boiler and the low-pressure waste heat boiler are connected in series. The medium-pressure waste heat boiler and the medium-pressure steam drum are connected via a pipeline, and the low-pressure waste heat boiler and the low-pressure steam drum are connected via a pipeline. The synthesis gas flows through the medium-pressure waste heat boiler and the low-pressure waste heat boiler in turn, and exchanges heat with the water in the medium-pressure waste heat boiler and the water in the low-pressure waste heat boiler in turn. The steam-water mixture generated by the medium-pressure waste heat boiler flows to the medium-pressure steam drum for steam-water separation and generates saturated steam while generating saturated steam; the steam-water mixture generated by the low-pressure waste heat boiler flows to the low-pressure steam drum for steam-water separation and generates saturated steam while generating saturated steam.

2. The waste heat boiler system for a fluidized bed coal gasifier according to claim 1, characterized in that: The medium-pressure waste heat boiler comprises a high-temperature evaporation section and a low-temperature evaporation section which are sequentially connected from top to bottom. Both the high-temperature evaporation section and the low-temperature evaporation section are shell and tube heat exchangers. The synthesis gas flows through the tube side of the high-temperature evaporation section and the tube side of the low-temperature evaporation section in sequence, and simultaneously exchanges heat with the water in the shell side of the high-temperature evaporation section and the water in the shell side of the low-temperature evaporation section to achieve the generation of a steam-water mixture.

3. The waste heat boiler system for a fluidized bed coal gasifier according to claim 2, characterized in that: The shell side of the high-temperature evaporation section is connected to the medium-pressure drum by circulation pipeline one, and the shell side of the low-temperature evaporation section is connected to the medium-pressure drum by circulation pipeline two. The boiler feed water is injected into the shell side of the high-temperature evaporation section through the medium-pressure drum and circulation pipeline one, and the boiler feed water is injected into the shell side of the low-temperature evaporation section through the medium-pressure drum and circulation pipeline two.

4. The waste heat boiler system for a fluidized bed coal gasifier according to claim 2, characterized in that: The medium-pressure waste heat boiler also includes a superheating section, which is arranged between the high-temperature evaporation section and the low-temperature evaporation section. A serpentine tube heat exchanger is provided in the superheating section. The saturated steam outlet of the medium-pressure drum is connected to the inlet of the serpentine tube heat exchanger in the superheating section, and the synthesis gas flow passes through the shell side of the hot section to generate superheated steam.

5. The waste heat boiler system for a fluidized bed coal gasifier according to claim 1, characterized in that: The low-pressure waste heat boiler is a shell and tube heat exchanger, the synthesis gas flows through the tube side of the low-pressure waste heat boiler and is discharged, the shell side of the low-pressure waste heat boiler is connected to the low-pressure steam drum via the circulation pipeline three, and the boiler feed water is injected into the shell side of the low-pressure waste heat boiler via the low-pressure steam drum and the circulation pipeline three.

6. A waste heat boiler system for a fluidized bed coal gasifier according to claim 2 or 5, characterized in that: The shell and tube heat exchanger adopts a flexible tube plate fire tube shell and tube heat exchanger.

Citation Information

Cited By

  • Passive cooling sandwich structure of flexible tube plate of waste heat boiler and boiler system based on passive cooling sandwich structure

    CN119665212A