Offshore photovoltaic support structure and installation method thereof

By designing offshore photovoltaic support structures, including grid frames, operation and maintenance channels and climbing frames, the problems of medium and high-voltage cable layout and maintenance of offshore photovoltaic power generation projects have been solved, and the neat installation and efficient maintenance of cables have been achieved, and the quality and safety of maintenance have been improved. .

CN118984124APending Publication Date: 2024-11-19ZHEJIANG ZHONGNAN CONSTR GRP STEEL STRUCTURE CO LTD
View PDF 0 Cites 10 Cited by

Patent Information

Application Number
CN202411137801.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In offshore photovoltaic power generation projects, the layout and support system of high-voltage cables have problems such as large space, large weight, and low maintenance quality, especially in complex terrain and marine environments, which are difficult to achieve efficient installation and maintenance.

Method used

A offshore photovoltaic bracket structure was designed, including photovoltaic panels, support systems, operation and maintenance channels and climbing frames. It is fixed by welding and fixing of bolt balls and rods to form a grid frame, combining ladders and horse paths to ensure that the photovoltaic cables are installed neatly and orderly, and Maintenance is achieved through climbing frames and operation and maintenance channels, reducing the difficulty of maintenance.

Benefits of technology

The neat and orderly installation and efficient maintenance of offshore photovoltaic cables have been achieved, which reduces the difficulty of maintenance and maintenance, improves quality, and completes key steps on site to avoid safety risks and operational difficulties of offshore construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118984124A_ABST
    Figure CN118984124A_ABST
Patent Text Reader

Abstract

The invention discloses an offshore photovoltaic support structure and an installation method thereof, the structure comprises a photovoltaic panel and a support system, and the support system comprises a pipe pile, a net rack, an operation and maintenance channel and a climbing frame. The net rack comprises bolt balls and rod pieces, the upper bolt ball is provided with a purlin support, the purlin support is provided with a primary purlin, the primary purlin is provided with a secondary purlin, the photovoltaic panel is fixedly connected with the secondary purlin through a pressing block, the lower bolt ball is fixed to the top of the pipe pile through a ball support, the operation and maintenance channel is fixed to the net rack, and the climbing frame is fixed to the operation and maintenance channel. And the offshore photovoltaic cable is limited on the climbing frame. Stand columns are fixed to the bolt balls, riding tracks are fixed to the stand columns and connected with the operation and maintenance channel, and crawling ladders are installed on the pipe piles and connected with the riding tracks. According to the invention, the offshore photovoltaic cable can be neatly and orderly installed on the operation and maintenance channel, an operator reaches the operation and maintenance channel through the crawling ladder and the riding track to overhaul and maintain the offshore photovoltaic cable, the overhaul and maintenance difficulty is reduced, and the overhaul and maintenance quality of the offshore photovoltaic cable is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electric power engineering construction, and in particular relates to an offshore photovoltaic support structure and an installation method thereof. Background Art

[0002] With the national "dual carbon" strategic goal, my country has begun to accelerate the construction of a "new power system with new energy as the main body", and the new energy photovoltaic industry has achieved a new round of rapid development. However, with the tightening of national land policies, the land that can be developed for photovoltaics has gradually shifted from flat land with convenient transportation and construction to mountainous areas with complex terrain, and has also gradually expanded to coastal areas and offshore waters.

[0003] In offshore photovoltaic power generation projects, the layout of cables at all levels and the design and installation of the support system are one of the main tasks of the project. For the high-voltage cable bundle from the box-type transformer platform to the offshore booster station, its layout and support system have always been one of the key difficulties in the implementation of the project because of its large space occupation, heavy weight and low maintenance quality. Summary of the invention

[0004] The purpose of the present invention is to solve the above-mentioned technical problems existing in the prior art, and to provide an offshore photovoltaic support structure and an installation method thereof, which can neatly and orderly install the offshore photovoltaic cables on the operation and maintenance channel. When the offshore photovoltaic cables need to be inspected and maintained, the operators reach the operation and maintenance channel through ladders and horseways to inspect and maintain the offshore photovoltaic cables, thereby reducing the difficulty of inspection and maintenance and improving the quality of inspection and maintenance of the offshore photovoltaic cables.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] An offshore photovoltaic support structure includes a photovoltaic panel and a support system. The photovoltaic panel is installed on the support system. The feature of the support system is that the support system includes pipe piles, a grid, an operation and maintenance channel and a climbing frame.

[0007] The grid frame includes bolt balls and rods, and the rods and the bolt balls are welded and fixed.

[0008] The bolt ball at the top is provided with a purlin support, the purlin support is provided with a main purlin, the main purlin is provided with a secondary purlin, and the photovoltaic panel is fixedly connected through a pressing block and the secondary purlin.

[0009] The bolt ball at the bottom is fixed on the top of the pipe pile through a ball support. There is a height difference between the front and rear pipe piles, so that the photovoltaic panel and the grid have a slope.

[0010] The operation and maintenance channel is fixed on the grid, and the operation and maintenance channel is used to install and repair offshore photovoltaic cables. The climbing frame is fixed on the operation and maintenance channel, and the offshore photovoltaic cables are limited on the climbing frame.

[0011] The bolt ball is fixed with a column, the column is fixed with a horseway, the horseway is set along the slope of the grid, the horseway is connected to the operation and maintenance channel, a ladder is installed on the pipe pile, the ladder is connected to the horseway, and the operator reaches the operation and maintenance channel through the ladder and the horseway.

[0012] Furthermore, the ball bearing includes a center axis, a fixed plate and an insert plate. The center axis and the bolt ball are welded and fixed, the center axis and the fixed plate are welded and fixed, a stiffening plate is welded between the center axis and the fixed plate, the insert plate is welded at the bottom of the fixed plate, the insert plate is inserted into the pipe hole of the pipe pile, the outer side of the insert plate and the inner side of the pipe pile are tightly attached, and the fixed plate and the pipe pile are welded and fixed, thereby improving the stability of the fixed plate and the pipe pile during welding and increasing the firmness of the connection between the fixed plate and the pipe pile.

[0013] Furthermore, the bridleway includes a bridleway component 1 and a bridleway component 2, the bridleway component 1 is fixed between two adjacent bridleway components 2, a bridleway component 3 is fixed between two adjacent bridleway components 1, a set distance is provided between two adjacent bridleway components 3, the bridleway component 1 and the bridleway component 3 form a connection unit 1, the connection unit 1 is used for operators to walk, the bridleway component 2 is fixedly connected to the column, a guardrail 1 is provided on the top of the bridleway component 1, the guardrail 1 is used to protect operators and improve the safety of operators on the bridleway. The bridleway of this structure can be connected to the bolt ball on the grid with a certain span, solving the technical problem of how to install the bridleway on the grid in a flat and firm manner.

[0014] Furthermore, a connecting bracket is provided between the horseway and the operation and maintenance channel, and the connecting bracket includes angle steel one and angle steel two. Angle steel one is fixed between the horseway and the operation and maintenance channel, and angle steel two is fixed between two adjacent angle steel ones, so that the horseway and the operation and maintenance channel are fixedly connected, and at the same time the safety of the operator walking from the horseway to the operation and maintenance channel is improved.

[0015] Furthermore, the operation and maintenance channel includes channel component 1 and channel component 2, channel component 2 is fixed between two sections of channel component 1, channel component 1 and channel component 2 form connection unit 2, connection unit 2 is used for operators to walk, connection unit 2 is fixed with a connector, the connector and the rod are fixedly connected, channel component 1 is fixed with guardrail 2, guardrail 2 is used to protect operators and improve the safety of operators on the operation and maintenance channel. The operation and maintenance channel of this structure can be installed on the outermost side of the grid, which is convenient for operators to install, inspect and maintain offshore photovoltaic cables.

[0016] Furthermore, the connecting member includes a supporting tube and a clamping unit, the clamping unit includes a clamping structure and a connecting rod, both ends of the connecting rod are fixed with clamping structures, the supporting tube is fixed on the connecting unit 2, one of the clamping structures is fixed on the supporting tube, and the other clamping structure is fixed on the rod member, a reinforcing rod 1 is fixed to the bottom of the channel member 2, and an inclined reinforcing rod 2 is fixed between the reinforcing rod 1 and the supporting tube to improve the force-bearing capacity of the connecting member.

[0017] Furthermore, guardrail two is provided with angle steel three, and the same offshore photovoltaic cable is laid on angle steel three in the same horizontal direction, which solves the technical problem of large space occupied by offshore photovoltaic cables.

[0018] Furthermore, the climbing frame includes a fixing frame and a supporting member, the supporting member includes a circular tube 1, the fixing frame includes a circular tube 2, the circular tube 2 is provided with a tube hole, the circular tube 1 is inserted into the tube hole, the circular tube 2 is provided with an end plate 1, the circular tube 1 is provided with an end plate 2, and the end plate 2 and the end plate 1 are fixedly connected by bolts. A bottom plate is welded to the circular tube 2, the cross-sectional area of ​​the bottom plate is larger than the cross-sectional area of ​​the circular tube 2, and the bottom plate is fixed on the operation and maintenance channel. Each circular tube 1 is provided with a clamping member, and four clamping members at the same height form a connecting unit 3. The clamping member forms a limit groove that runs through from top to bottom. The offshore photovoltaic cable passes through and is limited in the limit groove, which can lead the offshore photovoltaic cable downward from the channel and the box transformer platform, and limit the offshore photovoltaic cable to prevent the offshore photovoltaic cable led downward from being affected by strong winds.

[0019] A method for installing an offshore photovoltaic support structure, characterized in that it comprises the following steps:

[0020] S1. Piling is performed according to the drawings to obtain pipe piles. There is a height difference between the front and rear pipe piles. Then, ladders are installed on the corresponding pipe piles according to the drawings;

[0021] S2. Grid assembly:

[0022] (1) Lay out the lines according to the drawings and install the supporting frame;

[0023] (2) transport the loose parts to the site, weld the rods to the bolt balls on the ground to form a grid unit, then select the grid unit to be installed on the top, and install the purlin bracket on the bolt ball, and the threaded column of the purlin bracket is threaded into the threaded hole of the bolt ball;

[0024] (3) A crane is arranged outside the supporting frame, and the grid units are hoisted onto the supporting frame by the crane, and then the grid units are assembled into a grid;

[0025] S3. Purlin installation:

[0026] (1) Connect the main purlin and purlin bracket with bolts, and then connect the two main purlin sections spliced ​​together with splicing parts;

[0027] (2) Install the secondary purlin support on the main purlin, then install the secondary purlin on the main purlin, then fix the secondary purlin and the secondary purlin support together, and then install the tie rod between two adjacent sections of secondary purlins;

[0028] S4, repainting the grid;

[0029] S5. Install the photovoltaic panel: hang the photovoltaic panel on the secondary purlin, and then use the pressing block to fix the photovoltaic panel and the secondary purlin;

[0030] S6. Ball bearing installation: Weld and fix the finished ball bearing and the bolt ball;

[0031] S7. Fix the assembled operation and maintenance channel on the grid;

[0032] S8. Bridleway installation: Fix the columns on the bolt balls, then fix the assembled bridleway on the columns, connect the ladder and bridleway to form the upper structure;

[0033] S9, transport superstructure;

[0034] S10. Fix the upper structure and pipe piles:

[0035] (1) Hoist the superstructure above the pipe piles and align the grid and pipe piles up and down;

[0036] (2) Connect the ball bearing of the grid to the top of the pipe pile, and then spot weld the connection between the ball bearing and the pipe pile. After the spot welding is completed, continue with the overall welding;

[0037] S11. Fix the climbing frame on the operation and maintenance channel, lay the offshore photovoltaic cable on the operation and maintenance channel, and then use the climbing frame to limit the offshore photovoltaic cable.

[0038] Further, in step S9, a fixing structure is installed on the ship, the fixing structure includes a fixing column, a clamping structure, a limit plate and a fastening structure, the fixing column is fixed on the ship, the clamping structure includes a clamping plate 1 and a clamping plate 2 fixed by welding, the clamping plate 1 and the clamping plate 2 form a limit groove, a connecting portion is provided at the bottom of the clamping plate 2, the connecting portion is fixed with a limit block by a limit bolt, the limit block is limited on the limit plate, the limit plate is provided with a notch, the fastening structure includes a fastening plate 1 and a fastening plate 2, a fixing bolt is provided between the fastening plate 1 and the fastening plate 2, and the fixing bolt is threadedly connected with a fixing nut.

[0039] The steps for transporting the superstructure are as follows:

[0040] (1) Weld the fixing column to the ship, and then hoist the ball bearing of the superstructure to the top of the fixing column;

[0041] (2) Clamp the limiting groove formed by the clamping plate 1 and the clamping plate 2 to the fixed plate of the ball support, and install two clamping structures on each fixed column;

[0042] (3) Attach the limit plate to the outer side of the fixed column, and move the limit plate upward to support the clamping plate 2. At this time, the connection part at the bottom of the clamping plate 2 passes through the notch of the limit plate, and then fix the limit block on the connection part through the limit bolt. The limit block is limited on the limit plate. The clamping plate 2 is provided with a baffle, which is arranged on one side of the limit bolt;

[0043] (4) Hold the fastening plate 1 and the fastening plate 2 tightly against the outer side of the fixing column, and at the same time, hold the fastening plate 1 and the fastening plate 2 tightly against the limit plate, then insert the fixing bolt between the fastening plate 1 and the fastening plate 2, and then screw the fixing nut into the fixing bolt and tighten the fixing nut;

[0044] (5) A support block is inserted into the through hole of the limiting plate, and the two support blocks support the fastening plate 1 and the fastening plate 2 respectively.

[0045] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0046] (1) The present invention installs the offshore photovoltaic cables neatly and orderly on the operation and maintenance channel. When the offshore photovoltaic cables need to be inspected and maintained, operators reach the operation and maintenance channel through ladders and walkways to inspect and maintain the offshore photovoltaic cables, thereby reducing the difficulty of inspection and maintenance and improving the quality of inspection and maintenance of the offshore photovoltaic cables.

[0047] (2) During the installation of the present invention, the steps of assembling the grid, installing the purlins, repainting the grid, installing the photovoltaic panels, installing the ball bearings, fixing the assembled operation and maintenance channel on the grid, and installing the horseway are all completed on the ground at the site, thus avoiding the safety risks and operational difficulties caused by offshore construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The present invention will be further described below in conjunction with the accompanying drawings:

[0049] Figure 1 It is a structural schematic diagram of an offshore photovoltaic support structure in the present invention;

[0050] Figure 2 It is a structural schematic diagram of the connection between the grid and the pipe piles in the present invention;

[0051] Figure 3 for Figure 2 A schematic diagram of the structure enlargement at the center A;

[0052] Figure 4 It is a schematic diagram of the structure of the present invention when the grid is assembled;

[0053] Figure 5 It is a structural schematic diagram of the bridleway in the present invention;

[0054] Figure 6 It is a structural schematic diagram of the connection between the ball bearing and the pipe pile in the present invention;

[0055] Figure 7 It is a schematic diagram of the structure of the connection between the bolt ball and the ball support in the present invention;

[0056] Figure 8 It is a structural schematic diagram of the operation and maintenance channel in the present invention;

[0057] Fig. 9 for Figure 8 A schematic diagram of the structure enlarged at B in the middle;

[0058] Fig.10 It is a structural schematic diagram of the fixed structure in the present invention;

[0059] Fig.11 for Fig.10 The main view;

[0060] Fig.12 It is a schematic diagram of the structure in which the limiting block is limited on the limiting plate in the present invention;

[0061] Fig.13 It is a structural schematic diagram of the limiting plate in the present invention;

[0062] Fig.14 It is a structural schematic diagram of the clamping structure in the present invention;

[0063] Fig.15 It is a schematic diagram of the structure of the limit block in the present invention;

[0064] Fig.16 It is a structural schematic diagram of the support block in the present invention;

[0065] Fig.17 It is a structural schematic diagram of the fastening structure in the present invention;

[0066] Fig.18 This is a schematic diagram of the structure of the connection between the climbing frame and the operation and maintenance channel in the present invention;

[0067] Fig.19 It is a plan view of the connection between the fixing frame and the supporting member in the present invention;

[0068] Fig. 20 It is a structural schematic diagram of the connection unit in the present invention;

[0069] Fig.21 It is a structural schematic diagram of the clamp member in the present invention;

[0070] Fig. 22 A three-dimensional diagram showing the connection between the fixing frame and the supporting member in the present invention;

[0071] Fig.23 Schematic diagram of the structure of angle steel 4 in the present invention;

[0072] Fig.24This is a schematic diagram of the structure of the present invention after installation;

[0073] Fig.25 It is a schematic diagram of the structure of the pressing block in the present invention.

[0074] In the figure, 1-photovoltaic panel; 2-pile; 3-grid; 4-operation and maintenance channel; 5-climbing frame; 6-bolt ball; 7-rod; 8-ball support; 9-central axis; 10-fixed plate; 11-insertion plate; 12-purlin support; 13-main purlin; 14-secondary purlin; 15-horseway component one; 16-guardrail one; 17-horseway component three; 18-horseway component two; 19-angle steel one; 20-angle steel two; 21-pull bar; 22-channel component one; 23-channel component two; 24-support pipe; 25-hoop structure; 26-connecting rod; 27-reinforcement rod two; 28-reinforcement rod one; 29-angle steel three; 30-guardrail two; 31-fixed column; 32-clamping structure; 33-limiting plate; 34-fastening structure; 35-clamping plate one; 36-clamping plate two; 3 7-baffle; 38-connecting part; 39-limiting groove; 40-limiting block; 41-limiting bolt; 42-support block; 43-through hole; 44-notch; 451-fastening plate one; 452-fastening plate two; 46-fixing bolt; 47-fixing nut; 48-fixing frame; 49-support member; 50-pressing block; 51-hoop member; 52-round tube one; 53-round tube two; 54-end plate two; 55-end plate one; 56-bottom plate; 57-connecting plate; 58-stiffening plate; 59-angle steel four; 60-hoop plate one; 61-hoop plate two; 62-limiting groove; 63-ear plate; 64-connecting column; 65-mounting plate; 66-metal parts; 67-stiffening plate; 68-supporting frame; 69-ladder; 70-horseway; a-offshore photovoltaic cable; b-box transformer platform. DETAILED DESCRIPTION

[0075] like Figures 1 to 25 As shown, an offshore photovoltaic support structure of the present invention includes a photovoltaic panel 1 and a support system. The photovoltaic panel 1 is installed on the support system. The support system includes pipe piles 2, a grid 3, an operation and maintenance channel 4 and a climbing frame 5.

[0076] The grid 3 includes bolt balls 6 and rods 7 , and one bolt ball 6 is welded to a plurality of rods 7 .

[0077] The bolt ball 6 at the top is provided with a purlin support 12 , the purlin support 12 is provided with a main purlin 13 , the main purlin 13 is provided with a secondary purlin 14 , the photovoltaic panel 1 is fixedly connected to the secondary purlin 14 through the pressing block 50 , and the two metal parts 66 at the bottom of the pressing block 50 are limited on the secondary purlin 14 .

[0078] The bolt ball 6 at the bottom is fixed on the top of the pipe pile 2 through the ball support 8. There is a height difference between the front and rear pipe piles 2, so that the photovoltaic panel 1 and the grid 3 have a slope. The ball support 8 includes a central axis 9, a fixed plate 10 and an insert plate 11. The central axis 9 and the bolt ball 6 are welded and fixed, and the central axis 9 and the fixed plate 10 are welded and fixed. A stiffening plate 67 is welded between the central axis 9 and the fixed plate 10, and the stiffening plate 67 and the bolt ball 6 are welded and fixed. The insert plate 11 is welded at the bottom of the fixed plate 10, and the insert plate 11 is inserted into the pipe hole of the pipe pile 2. The outer side of the insert plate 11 and the inner side of the pipe pile 2 are tightly attached. The fixed plate 10 and the pipe pile 2 are welded and fixed, which improves the stability of the fixed plate 10 and the pipe pile 2 when welding, and increases the firmness of the connection between the fixed plate 10 and the pipe pile 2.

[0079] The operation and maintenance channel 4 includes a channel component 1 22 and a channel component 2 23. The channel component 2 23 is fixed between two sections of the channel component 1 22. The channel component 1 22 and the channel component 2 23 form a connection unit 2, and the connection unit 2 is used for operators to walk. The connection unit 2 is fixed with a connector, and the connector is fixedly connected to the rod 7, so that the operation and maintenance channel 4 is fixed on the grid 3. The channel component 1 22 is fixed with a guardrail 2 30, and the guardrail 2 30 is used to protect the operator and improve the safety of the operator on the operation and maintenance channel 4. The operation and maintenance channel 4 of this structure can be installed on the outermost side of the grid 3, which is convenient for operators to install, inspect and maintain offshore photovoltaic cables.

[0080] The connecting piece includes a support tube 24 and a clamping unit, the clamping unit includes a clamping structure 25 and a connecting rod 26, both ends of the connecting rod 26 are fixed with clamping structures 25, the support tube 24 is fixed on the connecting unit 2, one clamping structure 25 is fixed on the support tube 24, and the other clamping structure 25 is fixed on the rod 7. A reinforcing rod 1 28 is fixed to the bottom of the channel component 23, and an inclined reinforcing rod 27 is fixed between the reinforcing rod 1 28 and the support tube 24 to improve the force bearing capacity of the connecting piece.

[0081] The guardrail 2 30 is provided with an angle steel 3 29, and the same offshore photovoltaic cable a is laid on the angle steel 3 29 in the same horizontal direction. When multiple offshore photovoltaic cables a need to be laid, multiple angle steels 3 29 can be arranged longitudinally, which solves the technical problem of the large space occupied by the offshore photovoltaic cable a.

[0082] The bolt ball 6 is fixed with a column, and the column is fixed with a horseway 70. The horseway 70 is set along the slope of the grid 3, and the horseway 70 is connected to the operation and maintenance channel 4. A ladder 69 is installed on the pipe pile 2, and the ladder 69 is connected to the horseway 70. The operator reaches the operation and maintenance channel 4 through the ladder 69 and the horseway 70.

[0083] The bridle 70 includes a bridle component 15 and a bridle component 2 18. The bridle component 15 is fixed between two adjacent bridle components 2 18. A bridle component 3 17 is fixed between two adjacent bridle components 15. There is a set distance between two adjacent bridle components 3 17. The bridle component 15 and the bridle component 3 17 form a connection unit 1, which is used for operators to walk. The bridle component 2 18 is fixedly connected to the column. A guardrail 16 is provided on the top of the bridle component 15. The guardrail 16 is used to protect the operators and improve the safety of the operators on the bridle 70. The bridle 70 of this structure can be connected with the bolt ball 6 on the grid 3 of a certain span, which solves the technical problem of how to install the bridle 70 on the grid 3 in a flat and firm manner.

[0084] A connecting bracket is provided between the horseway 70 and the operation and maintenance channel 4, and the connecting bracket includes an angle steel 19 and an angle steel 20. The angle steel 19 is fixed between the horseway 70 and the operation and maintenance channel 4, and the angle steel 20 is fixed between two adjacent angle steels 19, so that the horseway 70 and the operation and maintenance channel 4 are fixedly connected, and at the same time the safety of the operator walking from the horseway 70 to the operation and maintenance channel 4 is improved.

[0085] The climbing frame 5 is fixed on the operation and maintenance channel 4, and the offshore photovoltaic cable a is limited on the climbing frame 5. The climbing frame 5 includes a box transformer platform b, a fixing frame 48 and a support member 49. The two support members 49 are distributed up and down below the fixing frame 48, and can limit the offshore photovoltaic cable a of a certain length.

[0086] The support member 49 includes a circular tube 1 52, and the fixing frame 48 includes a circular tube 2 53. The circular tube 2 53 is provided with a tube hole, and the circular tube 1 52 is inserted into the tube hole; the circular tube 2 53 is provided with an end plate 1 55, and the circular tube 1 52 of the support member 49 at the top is provided with an end plate 2 54. The end plate 2 54 and the end plate 1 55 are fixedly connected by bolts, so that the support member 49 at the top can be detachably connected to the fixing frame 48, and the circular tube 1 52 and the circular tube 2 53 are embeddedly connected, which improves the stability of the connection between the support member 49 and the fixing frame 48. The fixing frame 48 can be first fixed on the channel component 2 23 of the operation and maintenance channel 4, and then the support member 49 and the fixing frame 48 are connected to realize segmented construction and installation, thereby improving safety. A mounting plate 65 is welded to the bottom end of the circular tube 52 on the lowest support member 49. The cross-sectional area of ​​the mounting plate 65 is larger than the cross-sectional area of ​​the circular tube 52. The mounting plate 65 is fixed on the box-type transformer platform b. The mounting plate 65 can increase the cross-sectional area of ​​the bottom end of the circular tube 52, so that the lowest support member 49 is firmly fixed on the box-type transformer platform b.

[0087] The circular tube 53 is cylindrical, and there is a gap between it and the channel component 23, so the fixing frame 48 cannot be installed. To address this technical problem, the circular tube 53 of the present invention is welded with a bottom plate 56, and the cross-sectional area of ​​the bottom plate 56 is larger than the cross-sectional area of ​​the circular tube 53. An angle steel 4 59 is welded between the bottom plate 56 and the channel component 23, so that the bottom plate 56 and the channel component 23 are firmly connected, so that the fixing frame 48 is fixed on the channel component 23 of the operation and maintenance channel 4. The bottom plate 56 can increase the connection area between the circular tube 53 and the channel component 23, and improve the firmness of the connection between the circular tube 53 and the channel component 23.

[0088] A connecting plate 57 is welded to the top of the second circular tube 53, and a stiffening plate 6758 is welded between the connecting plate 57 and the bottom plate 56. At the same time, the stiffening plate 6758 is welded to the second circular tube 53 to increase the strength of the second circular tube 53 and the bottom plate 56 and improve the overall force bearing capacity.

[0089] Each support member 49 is provided with a clamping member 51. Four clamping members 51 at the same height form a connecting unit three. The four clamping members 51 are evenly distributed on the surface of the circular tube 1 52 in the circumferential direction. The clamping members 51 form a limiting groove 62 that passes through the upper and lower parts. The offshore photovoltaic cable a passes through and is limited in the limiting groove 62.

[0090] The hoop member 51 includes a connected hoop plate 1 60 and a hoop plate 2 61, the hoop plate 1 60 and the hoop plate 2 61 are arc plates, the hoop plate 1 60 and the hoop plate 2 61 form a limit groove 62, and a connecting column 64 is welded between the hoop plate 1 60 and the round tube 1 52, so that the limit grooves 62 on the hoop members 51 distributed up and down are aligned, so that the hoop members 51 can hold the offshore photovoltaic cable a led downward, and each hoop member 51 can leave a deformation margin of 1m for three offshore photovoltaic cables a and the offshore photovoltaic cables a between the two support members 49 distributed up and down. The structure of the hoop structure 25 is the same as that of the hoop member 51.

[0091] Both the hoop plate 1 60 and the hoop plate 2 61 are provided with ear plates 63, and the ear plates 63 on the hoop plate 1 60 and the ear plates 63 on the hoop plate 2 61 are connected by bolts, so that the hoop plate 1 60 and the hoop plate 2 61 can be detachably connected, and the bolts can be installed on site. The welding operation between the hoop plate 1 60 and the round tube 1 52 can be completed before leaving the factory, which is convenient for limiting the offshore photovoltaic cable a.

[0092] A method for installing an offshore photovoltaic support structure comprises the following steps:

[0093] S1. Piling is performed according to the drawings to obtain pipe piles 2. There is a height difference between the pipe piles 2 distributed in the front and rear, and then a ladder 69 is installed on the corresponding pipe piles 2 according to the drawings.

[0094] S2, grid 3 assembly:

[0095] (1) Lay out the lines according to the drawings and install the support frame 68.

[0096] (2) The loose parts are transported to the site, and then the rods 7 are welded to the bolt balls 6 on the ground to form a grid unit. Then, the grid unit to be installed on the top is selected, and the purlin brackets 12 are installed on the bolt balls 6. The threaded columns of the purlin brackets 12 are threadedly connected to the threaded holes of the bolt balls 6.

[0097] (3) A crane is arranged outside the support frame 68, and the crane is used to lift the grid unit onto the support frame 68, and then the grid units are assembled into a grid 3, and the grid units are assembled from the inside to the outside and from the middle to the two sides.

[0098] S3. Purlin installation:

[0099] (1) The main purlin 13 and the purlin support 12 are connected by bolts, and then the two sections of the main purlin 13 that are spliced ​​to each other are connected by splicing parts. When the operator tightens the bolts, the ladder is fixed to the rod of the grid with a rope, and then the operation is carried out.

[0100] (2) Install the secondary purlin support on the main purlin 13, then install the secondary purlin 14 on the main purlin 13, and then fix the secondary purlin 14 and the secondary purlin support together. Then install the brace 21 between two adjacent sections of the secondary purlin 14 to provide a support point outside the plane, prevent the purlin from lateral bending or instability, and improve the wind resistance of the structure.

[0101] S4, performing a repainting process on the grid frame 3 to increase the anti-corrosion ability of the grid frame 3.

[0102] S5, installing the photovoltaic panel 1: hanging the photovoltaic panel 1 on the secondary purlin 14, and then using the pressing block 50 to fix the photovoltaic panel 1 and the secondary purlin 14 together.

[0103] S6. Installation of ball bearing 8: Weld and fix the finished ball bearing 8 and bolt ball 6.

[0104] S7, fixing the assembled operation and maintenance channel 4 on the grid 3.

[0105] S8, installation of the bridleway 70: fix the upright posts on the bolt balls 6, then fix the assembled bridleway 70 on the upright posts, connect the ladder 69 and the bridleway 70 to form an upper structure.

[0106] S9. Transport superstructure:

[0107] A fixing structure is installed on the ship, the fixing structure includes a fixing column 31, a clamping structure 32, a limit plate 33 and a fastening structure 34. The fixing column 31 is fixed on the ship. The clamping structure 32 includes a clamping plate 1 35 and a clamping plate 2 36 fixed by welding. The clamping plate 1 35 and the clamping plate 2 36 form a limit groove 39. A connecting portion 38 is provided at the bottom of the clamping plate 2 36. The connecting portion 38 is fixed to a limit block 40 by a limit bolt 41. The limit block 40 is limited on the limit plate 33. The limit plate 33 is provided with a notch 44. The fastening structure 34 includes a fastening plate 1 451 and a fastening plate 2 452. A fixing bolt 46 is provided between the fastening plate 1 451 and the fastening plate 2 452. The fixing bolt 46 is threadedly connected with a fixing nut 47.

[0108] The steps for transporting the superstructure are as follows:

[0109] (1) The fixing column 31 is welded to the ship, and then the ball support 8 of the upper structure is hoisted to the top of the fixing column 31.

[0110] (2) The limiting groove 39 formed by the clamping plate 1 35 and the clamping plate 2 36 is clamped on the fixing plate 10 of the ball support 8 , and each fixing column 31 is equipped with two clamping structures 32 .

[0111] (3) Attach the limit plate 33 to the outer side of the fixing column 31, and move the limit plate 33 upward, so that the limit plate 33 supports the clamping plate 2 36. At this time, the connecting portion 38 at the bottom of the clamping plate 2 36 passes through the slot 44 of the limit plate 33, and then fix the limit block 40 on the connecting portion 38 by the limiting bolt 41. The limit block 40 is limited on the limit plate 33. The clamping plate 2 36 is provided with a baffle 37, and the baffle 37 is provided on one side of the limiting bolt 41.

[0112] (4) Hold the fastening plate 1 451 and the fastening plate 2 452 tightly against the outer side of the fixing column 31, and at the same time, hold the fastening plate 1 451 and the fastening plate 2 452 tightly against the limiting plate 33, then insert the fixing bolt 46 between the fastening plate 1 451 and the fastening plate 2 452, and then screw the fixing nut 47 onto the fixing bolt 46, and tighten the fixing nut 47.

[0113] (5) The support block 42 is inserted into the through hole 43 of the limiting plate 33. The two support blocks 42 support the fastening plate 1 451 and the fastening plate 2 452 respectively to prevent the fastening structure 34 from sliding off the limiting plate 33 and ensure that the fastening structure 34 clamps the limiting plate 33 and the fixing column 31.

[0114] In this step, the upper structure can be firmly fixed on the fixed column 31, and the upper structure can be transported. At the same time, the clamping structure 32, the limit plate 33 and the fastening structure 34 are set to improve the force bearing capacity of the ball support 8. The upper structure can act evenly on the fixed column 31, increasing the stability of the upper structure. In addition, the limit bolt 41 is hidden to prevent the limit bolt 41 from being corroded by seawater and causing the limit bolt 41 to be unable to be screwed out. There is no need to weld a steel plate on the fixed column 31 to avoid welding operations that affect the force bearing capacity of the fixed column 31. The fixed structure is detachably connected to the fixed column 31, which is convenient for removing the ball support 8 from the fixed column 31, and the fixed structure can be recycled.

[0115] When transporting the superstructure, the grid and the deck on the ship are fixed by hinges to prevent the superstructure from tipping over during transportation.

[0116] S10, fixing the upper structure and the pipe pile 2:

[0117] (1) The superstructure is hoisted above the pipe piles 2, and the grid 3 and the pipe piles 2 are aligned vertically.

[0118] (2) The ball support 8 of the grid 3 is docked to the top of the pipe pile 2, and then the connection between the ball support 8 and the pipe pile 2 is spot welded. After the spot welding is completed, the overall welding is continued.

[0119] S11. Fix the climbing frame 5 on the operation and maintenance channel 4, then lay the offshore photovoltaic cable a on the operation and maintenance channel 4, and then use the climbing frame 5 to limit the offshore photovoltaic cable a.

[0120] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. An offshore photovoltaic support structure, comprising a photovoltaic panel and a support system, wherein the photovoltaic panel is mounted on the support system, and characterized in that: The support system includes pipe piles, grids, operation and maintenance channels and climbing frames; The grid frame comprises a bolt ball and a rod, and the rod and the bolt ball are welded and fixed; The bolt ball at the top is provided with a purlin support, the purlin support is provided with a main purlin, the main purlin is provided with a secondary purlin, and the photovoltaic panel is fixedly connected to the secondary purlin through a pressing block; The bolt ball at the bottom is fixed on the top of the pipe pile through a ball support, and there is a height difference between the pipe piles distributed front and back, so that the photovoltaic panel and the grid have a slope; The operation and maintenance channel is fixed on the grid, the operation and maintenance channel is used to install and repair the offshore photovoltaic cable, the climbing frame is fixed on the operation and maintenance channel, and the offshore photovoltaic cable is limited on the climbing frame; The bolt ball is fixed with a column, the column is fixed with a horseway, the horseway is set along the slope of the grid, the horseway is connected to the operation and maintenance channel, a ladder is installed on the pipe pile, the ladder is connected to the horseway, and the operator can reach the operation and maintenance channel through the ladder and the horseway.

2. An offshore photovoltaic support structure according to claim 1, characterized in that: The ball support includes a center axis, a fixing plate and an insert plate. The center axis and the bolt ball are fixed by welding, the center axis and the fixing plate are fixed by welding, a stiffening plate is welded between the center axis and the fixing plate, the insert plate is welded at the bottom of the fixing plate, the insert plate is inserted into the pipe hole of the pipe pile, the outer side of the insert plate is tightly attached to the inner side of the pipe pile, and the fixing plate and the pipe pile are fixed by welding.

3. An offshore photovoltaic support structure according to claim 1, characterized in that: The horseway includes a horseway component 1 and a horseway component 2, the horseway component 1 is fixed between two adjacent horseway components 2, a horseway component 3 is fixed between two adjacent horseway components 1, and there is a set distance between two adjacent horseway components 3. The horseway component 1 and the horseway component 3 form a connecting unit 1, and the connecting unit 1 is used for operators to walk. The horseway component 2 is fixedly connected to the column, and a guardrail 1 is provided on the top of the horseway component 1, and the guardrail 1 is used to protect the operator.

4. The offshore photovoltaic support structure according to claim 1, characterized in that: A connecting bracket is provided between the horseway and the operation and maintenance channel, and the connecting bracket comprises angle steel 1 and angle steel 2. The angle steel 1 is fixed between the horseway and the operation and maintenance channel, and the angle steel 2 is fixed between two adjacent angle steels 1.

5. The offshore photovoltaic support structure according to claim 1, characterized in that: The operation and maintenance channel includes channel component one and channel component two, wherein the channel component two is fixed between two sections of the channel component one, the channel component one and the channel component two form a connecting unit two, and the connecting unit two is used for operators to walk. A connecting piece is fixed to the connecting unit two, and the connecting piece is fixedly connected to the rod member. The channel component one is fixed with a guardrail two, and the guardrail two is used to protect operators.

6. An offshore photovoltaic support structure according to claim 5, characterized in that: The connecting member includes a supporting tube and a clamping unit, the clamping unit includes a clamping structure and a connecting rod, the clamping structures are fixed at both ends of the connecting rod, the supporting tube is fixed on the connecting unit 2, one of the clamping structures is fixed on the supporting tube, and the other clamping structure is fixed on the rod member, a reinforcing rod 1 is fixed on the bottom of the channel member 2, and an inclined reinforcing rod 2 is fixed between the reinforcing rod 1 and the supporting tube.

7. An offshore photovoltaic support structure according to claim 5, characterized in that: The guardrail 2 is provided with an angle steel 3, and the same offshore photovoltaic cable is laid on the angle steel 3 in the same horizontal direction.

8. The offshore photovoltaic support structure according to claim 1, characterized in that: The climbing frame includes a fixing frame and a supporting member, the supporting member includes a circular tube 1, the fixing frame includes a circular tube 2, the circular tube 2 is provided with a tube hole, the circular tube 1 is inserted into the tube hole, the circular tube 2 is provided with an end plate 1, the circular tube 1 is provided with an end plate 2, and the end plate 2 and the end plate 1 are fixedly connected by bolts; The second circular tube is welded with a bottom plate, the cross-sectional area of ​​the bottom plate is larger than the cross-sectional area of ​​the second circular tube, and the bottom plate is fixed on the operation and maintenance channel; Each of the circular tubes is provided with a clamping member, and four clamping members at the same height form a connecting unit three. The clamping member forms a limiting groove that passes through the upper and lower parts, and the offshore photovoltaic cable passes through and is limited in the limiting groove.

9. A method for installing an offshore photovoltaic support structure according to claim 1, characterized in that: The steps include: S1. Piling is performed according to the drawings to obtain pipe piles. There is a height difference between the front and rear pipe piles. Then, ladders are installed on the corresponding pipe piles according to the drawings; S2. Grid assembly: (1) Lay out the lines according to the drawings and install the supporting frame; (2) transport the loose parts to the site, weld the rods to the bolt balls on the ground to form a grid unit, then select the grid unit to be installed on the top, and install the purlin bracket on the bolt ball, and the threaded column of the purlin bracket is threaded into the threaded hole of the bolt ball; (3) A crane is arranged outside the supporting frame, and the grid units are hoisted onto the supporting frame by the crane, and then the grid units are assembled into a grid; S3. Purlin installation: (1) Connect the main purlin and purlin bracket with bolts, and then connect the two main purlin sections spliced ​​together with splicing parts; (2) Install the secondary purlin support on the main purlin, then install the secondary purlin on the main purlin, then fix the secondary purlin and the secondary purlin support together, and then install the tie rod between two adjacent sections of secondary purlins; S4, repainting the grid; S5. Install the photovoltaic panel: hang the photovoltaic panel on the secondary purlin, and then use the pressing block to fix the photovoltaic panel and the secondary purlin; S6. Ball bearing installation: Weld and fix the finished ball bearing and the bolt ball; S7. Fix the assembled operation and maintenance channel on the grid; S8. Bridleway installation: fix the posts on the bolt balls, then fix the assembled bridleway on the posts, connect the ladder and bridleway to form the upper structure; S9, transport superstructure; S10. Fix the upper structure and pipe piles: (1) Hoist the superstructure above the pipe piles and align the grid and pipe piles up and down; (2) Connect the ball bearing of the grid to the top of the pipe pile, and then spot weld the connection between the ball bearing and the pipe pile. After the spot welding is completed, continue with the overall welding; S11. Fix the climbing frame on the operation and maintenance channel, lay the offshore photovoltaic cable on the operation and maintenance channel, and then use the climbing frame to limit the offshore photovoltaic cable.

10. The method for installing an offshore photovoltaic support structure according to claim 9, characterized in that: In step S9, a fixing structure is installed on the ship, the fixing structure comprising a fixing column, a clamping structure, a limiting plate and a fastening structure, the fixing column is fixed on the ship, the clamping structure comprises a clamping plate 1 and a clamping plate 2 fixed by welding, the clamping plate 1 and the clamping plate 2 form a limiting groove, the bottom of the clamping plate 2 is provided with a connecting portion, the connecting portion is fixed to a limiting block by a limiting bolt, the limiting block is limited on the limiting plate, the limiting plate is provided with a notch, the fastening structure comprises a fastening plate 1 and a fastening plate 2, a fixing bolt is provided between the fastening plate 1 and the fastening plate 2, and the fixing bolt is threadedly connected with a fixing nut; The steps for transporting the superstructure are as follows: (1) Weld the fixing column to the ship, and then hoist the ball bearing of the superstructure to the top of the fixing column; (2) Clamp the limiting groove formed by the clamping plate 1 and the clamping plate 2 to the fixed plate of the ball support, and install two clamping structures on each fixed column; (3) Attach the limit plate to the outer side of the fixed column, and move the limit plate upward to support the clamping plate 2. At this time, the connection part at the bottom of the clamping plate 2 passes through the notch of the limit plate, and then fix the limit block on the connection part through the limit bolt. The limit block is limited on the limit plate. The clamping plate 2 is provided with a baffle, which is arranged on one side of the limit bolt; (4) Hold the fastening plate 1 and the fastening plate 2 tightly against the outer side of the fixing column, and at the same time, hold the fastening plate 1 and the fastening plate 2 tightly against the limit plate, then insert the fixing bolt between the fastening plate 1 and the fastening plate 2, and then screw the fixing nut into the fixing bolt and tighten the fixing nut; (5) A support block is inserted into the through hole of the limiting plate, and the two support blocks support the fastening plate 1 and the fastening plate 2 respectively.

Citation Information

Cited By

  • Operation and maintenance platform for cable intermediate joint of offshore photovoltaic current collection line

    CN119297862A

  • An offshore photovoltaic power collection line cable intermediate joint operation and maintenance platform

    CN119297862B

  • Offshore photovoltaic submarine cable laying system

    CN119448114A

  • Submarine Cable Laying System for Offshore Photovoltaic

    CN119448114B

  • Offshore photovoltaic cable climbing frame fixing system

    CN119787219A