Gob-side entry retaining method for underground deep and shallow hole blasting top cutting in cooperation with flexible formwork supporting
Through the downhole deep and shallow hole blasting top-cutting collaborative soft mold support technology, the problem of poor stability and control effect of downhole deep and shallow hole blasting top-cutting lanes in traditional technology is solved, and the tunnel stability and construction efficiency are improved are achieved. It has a wide range and has the coordinated benefits of resource mining and environmental protection.
Patent Information
- Application Number
- CN202411143294.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-22
AI Technical Summary
The traditional underground deep and shallow hole blasting top-cutting and tunneling technology has problems such as poor top cutting effect, poor stability of retaining tunnels and poor control effect, which limits the development of modern mine mining.
The method of tunnel along the air is adopted for downhole-deep and soft mold support of the downhole-deep and shallow holes are designed to lay down deep and shallow blasting holes, and the top is cut immediately during the working surface propulsion process. Protect the slag barrier protection by the lane, hysteresis temporary support and pour the support wall next to the soft molded lane to form a stable lane along the air.
It improves the stability of the remaining tunnels and the control effect of the remaining tunnels along the sky, shortens the construction cycle, reduces production costs, and achieves the coordinated development of resource mining and environmental protection.
Smart Images

Figure CN118997770A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and in particular relates to a method for retaining a lane along a well by underground deep and shallow hole blasting and top cutting in coordination with flexible formwork support. Background Art
[0002] As a coal-pillar-free mining technology, gob-side lane-retaining technology can not only reasonably develop coal resources, avoid the use of coal pillars, thereby improving the recovery rate of coal resources, increasing the coal recovery rate, reducing the loss of coal resources, and increasing the mining life of the mine, but also ease the contradiction of mine production succession due to the excavation of one less lane, reduce the transportation and installation time of comprehensive mechanized equipment on the working face, and effectively prevent the occurrence of spontaneous combustion of coal seams in the gob area. It is a lane-protecting technology that is beneficial to mine safety production and improves the technical and economic benefits of mines. However, the traditional lane-retaining method adopts a single-depth blasting hole top-cutting lane-retaining technology, which has poor top-cutting effect, poor stability of the reserved lane, and poor control effect of gob-side lane-retaining. With the advancement of science and technology and the improvement of mining level, the above method restricts the development of modern mine mining. In order to optimize the gob-side lane-retaining process and improve the control effect of gob-side lane-retaining, a gob-side lane-retaining method with simple process, high strength, good sealing, fast construction speed and wide application range is urgently needed. Summary of the invention
[0003] The purpose of the invention is to provide a method for retaining a lane along the goaf by using deep and shallow hole blasting and top cutting in cooperation with flexible formwork support, thereby increasing the stability of the retained lane and improving the control effect of retaining a lane along the goaf.
[0004] The technical solution adopted by the present invention is a method for retaining lanes along the goaf with underground deep and shallow hole blasting and top cutting in coordination with flexible mold support, comprising the following steps:
[0005] S1. Consider the mining pressure and surrounding rock deformation of the reserved tunnel according to the excavation of the working face, and design the height and width of the reserved tunnel;
[0006] S2. According to the requirements of the reserved tunnel height and width, deep blasting holes and shallow blasting holes are arranged in the advanced support pressure area of the working face to blast and cut the top;
[0007] S3. After the blasting and top cutting is completed, as the working face advances, the roadside rock protection, delayed temporary support, and casting of flexible mold roadside support walls are carried out immediately behind the working face;
[0008] S4. After the tunnel enters the stable zone of retained tunnel, the delayed temporary support is removed to form a staged retained tunnel along the gob;
[0009] S5. Repeat S2 to S4 to complete the construction of tunnel retention along the goaf.
[0010] The present invention is also characterized in that:
[0011] S2 specifically includes the following steps:
[0012] S2.1. Check whether the top plate of the blasting working face is stable and whether the support near the blasting working face is firm;
[0013] S2.2. According to the on-site implementation environment and the physical and mechanical properties of the rock formations, determine the arrangement of the deep blasting holes and shallow blasting holes on the roof of the blasting working face, the depth of the top cutting, the angle of the top cutting and the sealing length of the deep blasting holes and shallow blasting holes; the deep hole blasting adopts the deep hole pre-splitting blasting technology to make the basic top fracture and collapse, and the shallow hole blasting adopts the concentrated energy blasting to form a pre-splitting surface on the direct top cutting seam.
[0014] The deep blasting holes and the shallow blasting holes are arranged in such a way that the deep blasting holes and the shallow blasting holes are arranged alternately, and two shallow blasting holes are arranged between every two deep blasting holes.
[0015] The depth of the top cut is determined by formula (1):
[0016]
[0017] Where M is the thickness of the coal seam, unit: m; K1, K2 and K m are the rock expansion coefficients of the first, second and mth layers respectively; H1, H2 and H m are the thickness of the first, second and mth layers, respectively, in m; K p is the average expansion coefficient of the rock formation, K p Usually 1.2 to 1.5.
[0018] The cutting angle is determined by formula (2):
[0019]
[0020] in, is the friction angle between rock blocks, unit: °; h is the thickness of the basic top, unit: m; ΔS is the sinking amount of rock block B, unit: m; L is the length of the basic top rock block, unit: m.
[0021] The sealing length of deep blasting holes and shallow blasting holes shall not be less than 1 / 3 of the depth of the corresponding deep blasting holes and shallow blasting holes.
[0022] The specific content of the rock retaining protection beside the S3 middle tunnel is as follows: in order to prevent the dynamic pressure impact behind the frame and the rock collapse from the goaf from rushing into the tunnel, a combined rock retaining support system consisting of metal mesh, hydraulic support and retractable rock retaining U-shaped steel is arranged within the range of 0m to 100m behind the working face support to create a safe working space for the casting of the flexible mold tunnel side support wall; among them, the rock retaining plate is arranged near the goaf side, the welding ring at the front end of the rock retaining plate is connected to the end bracket, and the moving frame of the end bracket drives the rock retaining plate to slide forward.
[0023] The specific content of the delayed temporary support in S3 is: the tunnel is temporarily supported by unit supports and single hydraulic props. The unit supports are arranged in advance on the auxiliary side. During mining, the unit supports automatically change from advanced support to delayed support. The existence of unit supports increases the support strength in the tunnel, reduces the width of the remaining tunnel, and alleviates the pressure of the remaining tunnel.
[0024] The specific process of pouring the flexible formwork lane side support wall in S3 is as follows:
[0025] S3.1. Select a flexible formwork with a height of 3.3m, a length of 3m and a thickness of 1m, reserve grouting holes on the top of the flexible formwork, fix the flexible formwork in a pulling manner through anchor bolts and W-shaped steel strips, and build a flexible formwork laneside support frame to form a pouring space;
[0026] S3.2. Fix the flexible formwork tunnel side support frame through delayed temporary support, arrange the slurry delivery pipeline on the flexible formwork tunnel side support frame through the grouting holes, and inject slurry into the pouring space through the slurry delivery pipeline until the pouring operation is completed to form the flexible formwork tunnel side support wall.
[0027] The flexible mold tunnel side support wall in S3 is located in the tunnel, and the outer side of the flexible mold tunnel side support wall is close to the top cutting line. Observation holes and nitrogen injection holes are reserved on the flexible mold tunnel side support wall to monitor the temperature and CO concentration of the goaf in real time, so as to achieve fire source control and precise fire prevention and extinguishing.
[0028] The beneficial effects of the present invention are:
[0029] The method of underground deep and shallow hole blasting and top cutting in coordination with flexible formwork support for goaf-retaining lanes provided by the present invention can effectively increase the stability of the reserved lanes and improve their service life without affecting the normal production of the coal mine, reduce the complexity of the filling and retaining lanes process, and reduce the labor load and production costs of personnel. In terms of advanced top cutting and pressure relief on the working face, the method adopts deep and shallow hole directional pre-splitting blasting technology, optimizes the advanced top cutting angle and depth, reasonably adjusts the deep and shallow hole layout, designs deep and shallow hole blasting structures, realizes precise cutting of the roof, and improves the degree of crushing and expansion of the basic top rock layer, which has a better filling effect on the goaf; in terms of the rapid casting process of the flexible formwork wall, the method adopts flexible formwork materials with good water filtration performance and excellent self-stabilizing structure with temporary support measures, which can quickly form a laneside support body, improve the overall stability of the flexible formwork support body, and has the characteristics of light weight, high strength, and convenient construction. In addition, compared with the traditional blasting and top cutting and gob-side tunneling technology, this method can effectively shorten the construction period and improve the degree of roof crushing. At the same time, the tunnel side support can absorb solid waste such as gangue, achieving the coordinated development of resource exploitation and environmental protection. It is of great significance to the comprehensive utilization of bulk solid waste and improve the economic and ecological benefits of mines. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 This is a schematic plan view of a gob-side lane retaining according to the present invention;
[0031] Figure 2 yes Figure 1 Middle AA section view.
[0032] In the figure, 1. single hydraulic prop, 2. cutting top line, 3. unit support, 4. flexible formwork tunnel side support wall, 5. goaf, 6. reserved tunnel, 7. deep blasting hole, 8. shallow blasting hole, 9. metal mesh, 10. flexible formwork, 11. hydraulic support, 12. rock retaining plate, 13. retractable rock retaining U-shaped steel, 14. slurry conveying pipeline, 15. nitrogen injection hole, 16. observation hole, 17. grouting hole, 18. W-shaped steel belt, 19. anchor bolt. DETAILED DESCRIPTION
[0033] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0034] Example 1
[0035] The method of underground deep and shallow hole blasting and top cutting with flexible mold support along the gob retaining lane proposed in this embodiment is as follows: Figure 1 As shown, the following steps are included:
[0036] S1. Consider the mining pressure and surrounding rock deformation of the reserved tunnel 6 during the trenching of the working face, and design the height and width of the reserved tunnel 6;
[0037] S2. According to the height and width requirements of the reserved tunnel 6, deep blasting holes 7 and shallow blasting holes 8 are arranged in the advanced support pressure area of the working face to blast and cut the top;
[0038] S3. After the blasting and top cutting is completed, as the working face advances, the roadside rock protection, delayed temporary support, and casting of flexible mold roadside support walls are carried out immediately behind the working face;
[0039] S4. After the tunnel enters the stable zone of retained tunnel, the delayed temporary support is removed to form a staged retained tunnel along the gob;
[0040] S5. Repeat S2 to S4 to complete the construction of tunnel retention along the goaf.
[0041] Example 2
[0042] The method of underground deep and shallow hole blasting and top cutting with flexible mold support along the gob retaining lane proposed in this embodiment is as follows: Figure 1 As shown, the following steps are included:
[0043] S1. Consider the mining pressure and surrounding rock deformation of the reserved tunnel 6 during the trenching of the working face, and design the height and width of the reserved tunnel 6;
[0044] S2. According to the height and width requirements of the reserved tunnel 6, deep blasting holes 7 and shallow blasting holes 8 are arranged in the advanced support pressure area of the working face to blast and cut the top;
[0045] S2 specifically includes the following steps:
[0046] S2.1. Check whether the top plate of the blasting working face is stable and whether the support near the blasting working face is firm;
[0047] S2.2. According to the on-site implementation environment and the physical and mechanical properties of the rock formation, determine the arrangement of the deep blasting holes 7 and the shallow blasting holes 8 on the roof of the blasting working face, the depth of the top cutting, the angle of the top cutting and the sealing length of the deep blasting holes 7 and the shallow blasting holes 8; the deep hole blasting adopts the deep hole pre-splitting blasting technology to make the basic top fracture and collapse, and the shallow hole blasting adopts the concentrated energy blasting to form a pre-splitting surface on the direct top cutting seam;
[0048] The deep blasting holes 7 and the shallow blasting holes 8 are arranged in such a manner that the deep blasting holes 7 and the shallow blasting holes 8 are arranged alternately, and two shallow blasting holes 8 are arranged between every two deep blasting holes 7;
[0049] The depth of the top cut is determined by formula (1):
[0050]
[0051] Where M is the thickness of the coal seam, unit: m; K1, K2 and K m are the rock expansion coefficients of the first, second and mth layers respectively; H1, H2 and H m are the thickness of the first, second and mth layers, respectively, in m; K p is the average expansion coefficient of the rock formation, K p Usually 1.2 to 1.5;
[0052] The cutting angle is determined by formula (2):
[0053]
[0054] in, is the friction angle between rock blocks, unit: °; h is the thickness of the basic top, unit: m; ΔS is the sinking amount of rock block B, unit: m; L is the length of the basic top rock block, unit: m;
[0055] The sealing length of the deep blasting hole 7 and the shallow blasting hole 8 shall not be less than 1 / 3 of the corresponding hole depth of the deep blasting hole 7 and the shallow blasting hole 8;
[0056] S3. After the blasting and top cutting is completed, as the working face advances, the roadside rock protection, delayed temporary support, and casting of flexible mold roadside support walls are carried out immediately behind the working face;
[0057] S4. After the tunnel enters the stable zone of retained tunnel, the delayed temporary support is removed to form a staged retained tunnel along the gob;
[0058] S5. Repeat S2 to S4 to complete the construction of tunnel retention along the goaf.
[0059] Example 3
[0060] The method of underground deep and shallow hole blasting and top cutting with flexible mold support along the gob retaining lane proposed in this embodiment is as follows: Figure 1 As shown, the following steps are included:
[0061] S1. Consider the mining pressure and surrounding rock deformation of the reserved tunnel 6 during the trenching of the working face, and design the height and width of the reserved tunnel 6;
[0062] S2. According to the height and width requirements of the reserved tunnel 6, deep blasting holes 7 and shallow blasting holes 8 are arranged in the advanced support pressure area of the working face to blast and cut the top;
[0063] S2 specifically includes the following steps:
[0064] S2.1. Check whether the top plate of the blasting working face is stable and whether the support near the blasting working face is firm;
[0065] S2.2. According to the on-site implementation environment and the physical and mechanical properties of the rock formation, determine the arrangement of the deep blasting holes 7 and the shallow blasting holes 8 on the roof of the blasting working face, the depth of the top cutting, the angle of the top cutting and the sealing length of the deep blasting holes 7 and the shallow blasting holes 8; the deep hole blasting adopts the deep hole pre-splitting blasting technology to make the basic top fracture and collapse, and the shallow hole blasting adopts the concentrated energy blasting to form a pre-splitting surface on the direct top cutting seam;
[0066] The deep blasting holes 7 and the shallow blasting holes 8 are arranged in such a manner that the deep blasting holes 7 and the shallow blasting holes 8 are arranged alternately, and two shallow blasting holes 8 are arranged between every two deep blasting holes 7;
[0067] The depth of the top cut is determined by formula (1):
[0068]
[0069] Where M is the thickness of the coal seam, unit: m; K1, K2 and K m are the rock expansion coefficients of the first, second and mth layers respectively; H1, H2 and H m are the thickness of the first, second and mth layers, respectively, in m; K p is the average expansion coefficient of the rock formation, K p Usually 1.2 to 1.5;
[0070] The cutting angle is determined by formula (2):
[0071]
[0072] in, is the friction angle between rock blocks, unit: °; h is the thickness of the basic top, unit: m; ΔS is the sinking amount of rock block B, unit: m; L is the length of the basic top rock block, unit: m;
[0073] The sealing length of the deep blasting hole 7 and the shallow blasting hole 8 shall not be less than 1 / 3 of the corresponding hole depth of the deep blasting hole 7 and the shallow blasting hole 8;
[0074] S3. After the blasting and top cutting is completed, as the working face advances, the roadside rock protection, delayed temporary support, and casting of flexible mold roadside support walls are carried out immediately behind the working face;
[0075] The specific content of the side rock retaining protection of the S3 middle roadway is as follows: in order to prevent the dynamic pressure impact behind the frame and the rock collapse in the goaf 5 from rushing into the roadway, a combined rock retaining support system consisting of a metal mesh 9, a hydraulic support 11 and a retractable rock retaining U-shaped steel 13 is arranged within the range of 0m to 100m behind the working face support to create a safe working space for the pouring of the flexible mold roadside support wall 4; among them, a rock retaining plate 12 is arranged near the goaf 5 side, and the welding ring at the front end of the rock retaining plate 12 is connected to the end support, and the moving frame of the end support drives the rock retaining plate 12 to slide forward;
[0076] The specific content of the delayed temporary support in S3 is: the tunnel is temporarily supported by unit support 3 and single hydraulic support 1. The unit support 3 is arranged in advance on the auxiliary side. During mining, the unit support 3 automatically changes from advanced support to delayed support. The existence of unit support 3 increases the support strength in the tunnel, reduces the width of the remaining tunnel, and alleviates the pressure of the remaining tunnel.
[0077] The specific process of pouring the flexible formwork tunnel side support wall in S3 is as follows: Figure 2 As shown:
[0078] S3.1. Select a flexible template 10 with a height of 3.3m, a length of 3m and a thickness of 1m, reserve a grouting hole 17 on the top of the flexible template 10, fix the flexible template 10 in a tensioning manner through anchor bolts 19 and W-shaped steel strips 18, and build a flexible template laneside support frame to form a pouring space;
[0079] The flexible template 10 is made of woven filament fiber cloth. Thanks to the mechanical properties and water permeability of the fiber cloth, the flexible template 10 has filtering, reinforcement and protection functions in engineering applications.
[0080] S3.2, fix the flexible mold lane side support frame through delayed temporary support, arrange the slurry delivery pipeline 14 on the flexible mold lane side support frame through the grouting hole 17, and inject slurry into the pouring space through the slurry delivery pipeline 14 until the pouring operation is completed, so as to form the flexible mold lane side support wall;
[0081] The flexible mold side support wall in S3 is located in the tunnel, and the outer side of the flexible mold side support wall is close to the top cutting line 2. Observation holes 16 and nitrogen injection holes 15 are reserved on the flexible mold side support wall to monitor the temperature and CO concentration of the goaf in real time, so as to achieve fire source control and precise fire prevention and extinguishing.
[0082] S4. After the tunnel enters the stable zone of retained tunnel, the delayed temporary support is removed to form a staged retained tunnel along the gob;
[0083] S5. Repeat S2 to S4 to complete the construction of tunnel retention along the goaf.
[0084] Example 4
[0085] The method of underground deep and shallow hole blasting and top cutting with flexible formwork support along the goaf is proposed in this embodiment. Taking Xinji Coal Mine as an example, Figure 1 As shown, the following steps are included:
[0086] S1. Consider the mining pressure and surrounding rock deformation of reserved tunnel 6 during the tunneling of the working face, and design the height and width of reserved tunnel 6. The coal seam in the 3608 (6) mining area of Xinji No. 1 Mine is mined in a single wing. The coal seam in this mining area is in the non-outburst danger zone of the outburst coal seam. The average mineable strike of the 360606 working face is 506.7m, the average inclined length is 222.5m, the inclination angle is 12°, and the average coal thickness is 2.86m. The floor elevation of the ventilation tunnel is -645.1~-680.5m, and the floor elevation of the machine tunnel is -685.9~-736.1m.
[0087] S2. According to the height and width requirements of the reserved tunnel 6, deep blasting holes 7 and shallow blasting holes 8 are arranged in the advanced support pressure area of the working face to blast and cut the top;
[0088] S2 specifically includes the following steps:
[0089] S2.1. Check whether the top plate of the blasting working face is stable and whether the support near the blasting working face is firm;
[0090] S2.2. According to the on-site implementation environment and the physical and mechanical properties of the rock formation, determine the arrangement of the deep blasting holes 7 and the shallow blasting holes 8 on the roof of the blasting working face, the depth of the top cutting, the angle of the top cutting and the sealing length of the deep blasting holes 7 and the shallow blasting holes 8; the deep hole blasting adopts the deep hole pre-splitting blasting technology to make the basic top fracture and collapse, and the shallow hole blasting adopts the concentrated energy blasting to form a pre-splitting surface on the direct top cutting seam;
[0091] The deep blasting holes 7 and the shallow blasting holes 8 are arranged in such a manner that the deep blasting holes 7 and the shallow blasting holes 8 are arranged alternately, and two shallow blasting holes 8 are arranged between every two deep blasting holes 7;
[0092] The depth of the top cut is determined by formula (1):
[0093]
[0094] Where M is the thickness of the coal seam, unit: m; K1, K2 and K m are the rock expansion coefficients of the first, second and mth layers respectively; H1, H2 and H m are the thickness of the first, second and mth layers, respectively, in m; K p is the average expansion coefficient of the rock formation, K p Usually 1.2 to 1.5;
[0095] The cutting angle is determined by formula (2):
[0096]
[0097] in, is the friction angle between rock blocks, unit: °; h is the thickness of the basic top, unit: m; ΔS is the sinking amount of rock block B, unit: m; L is the length of the basic top rock block, unit: m;
[0098] The sealing length of the deep blasting hole 7 and the shallow blasting hole 8 shall not be less than 1 / 3 of the corresponding hole depth of the deep blasting hole 7 and the shallow blasting hole 8;
[0099] The work of retaining the tunnel along the air path will be carried out in the 360606 ventilation tunnel. The tunnel roof will be cut by deep and shallow hole directional blasting pre-splitting technology. According to the physical and mechanical parameters of the surrounding rock and the construction environment on site, the main technical parameters of the deep and shallow hole directional pre-splitting blasting technology are determined: the cutting angle is 23°, the depth is 20m; the spacing of deep blasting holes 7 is 3m, and the spacing of shallow blasting holes 8 is 1m, among which the shallow blasting hole 8 is arranged between the deep blasting holes 7, the diameter of deep blasting holes 7 is 94mm, and the diameter of shallow blasting holes 8 is 55mm; the charging length of deep blasting hole 7 is 13m, and the sealing length is 7m; the charging length of shallow blasting hole 8 is 4.5m, and the sealing length is 2.5m; the deep blasting hole 7 is arranged to destroy the integrity of the basic roof, and the shallow blasting hole 8 is arranged to destroy the direct roof. The purpose of pre-splitting the roof is achieved by arranging deep and shallow blasting holes;
[0100] S3. After the blasting and top cutting is completed, as the working face advances, the roadside rock protection, delayed temporary support, and casting of flexible mold roadside support walls are carried out immediately behind the working face;
[0101] The specific content of the side rock retaining protection of the S3 middle roadway is as follows: in order to prevent the dynamic pressure impact behind the frame and the rock collapse in the goaf 5 from rushing into the roadway, a combined rock retaining support system consisting of a metal mesh 9, a hydraulic support 11 and a retractable rock retaining U-shaped steel 13 is arranged within the range of 0m to 100m behind the working face support to create a safe working space for the pouring of the flexible mold roadside support wall 4; among them, a rock retaining plate 12 is arranged near the goaf 5 side, and the welding ring at the front end of the rock retaining plate 12 is connected to the end support, and the moving frame of the end support drives the rock retaining plate 12 to slide forward;
[0102] The specific content of the delayed temporary support in S3 is: the tunnel is temporarily supported by unit support 3 and single hydraulic support 1. The unit support 3 is arranged in advance on the auxiliary side. During mining, the unit support 3 automatically changes from advanced support to delayed support. The existence of unit support 3 increases the support strength in the tunnel, reduces the width of the remaining tunnel, and alleviates the pressure of the remaining tunnel.
[0103] The specific process of pouring the flexible formwork tunnel side support wall in S3 is as follows: Figure 2 As shown:
[0104] S3.1. Select a flexible template 10 with a height of 3.3m, a length of 3m and a thickness of 1m, reserve a grouting hole 17 on the top of the flexible template 10, fix the flexible template 10 in a tensioning manner through anchor bolts 19 and W-shaped steel strips 18, and build a flexible template laneside support frame to form a pouring space;
[0105] The flexible template 10 is made of woven filament fiber cloth. Thanks to the mechanical properties and water permeability of the fiber cloth, the flexible template 10 has filtering, reinforcement and protection functions in engineering applications.
[0106] S3.2, fix the flexible mold lane side support frame through delayed temporary support, arrange the slurry delivery pipeline 14 on the flexible mold lane side support frame through the grouting hole 17, and inject slurry into the pouring space through the slurry delivery pipeline 14 until the pouring operation is completed, so as to form the flexible mold lane side support wall;
[0107] The flexible mold side support wall in S3 is located in the tunnel, and the outer side of the flexible mold side support wall is close to the top cutting line 2. Observation holes 16 and nitrogen injection holes 15 are reserved on the flexible mold side support wall to monitor the temperature and CO concentration of the goaf in real time, so as to achieve fire source control and precise fire prevention and extinguishing.
[0108] S4. After the tunnel enters the stable zone of retained tunnel, the delayed temporary support is removed to form a staged retained tunnel along the gob;
[0109] S5. Repeat S2 to S4 to complete the construction of tunnel retention along the goaf.
[0110] This method has the characteristics of obvious cutting effect, high flexible formwork support strength, good sealing and wide application range.
Claims
1. A method for retaining lanes along the goaf with underground deep and shallow hole blasting and top cutting in coordination with flexible formwork support, characterized in that: The following steps are involved: S1. Consider the mining pressure and surrounding rock deformation of the reserved tunnel according to the excavation of the working face, and design the height and width of the reserved tunnel; S2. According to the requirements of the reserved tunnel height and width, deep blasting holes and shallow blasting holes are arranged in the advanced support pressure area of the working face to blast and cut the top; S3. After the blasting and top cutting is completed, as the working face advances, the roadside rock protection, delayed temporary support, and casting of flexible mold roadside support walls are carried out immediately behind the working face; S4. After the tunnel enters the stable zone of retained tunnel, the delayed temporary support is removed to form a staged retained tunnel along the gob; S5. Repeat S2 to S4 to complete the construction of tunnel retention along the goaf.
2. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 1 is characterized in that: The S2 specifically includes the following steps: S2.
1. Check whether the top plate of the blasting working face is stable and whether the support near the blasting working face is firm; S2.
2. According to the on-site implementation environment and the physical and mechanical properties of the rock formations, determine the arrangement of the deep blasting holes and shallow blasting holes on the roof of the blasting working face, the depth of the top cutting, the angle of the top cutting and the sealing length of the deep blasting holes and shallow blasting holes; the deep hole blasting adopts the deep hole pre-splitting blasting technology to make the basic top fracture and collapse, and the shallow hole blasting adopts the concentrated energy blasting to form a pre-splitting surface on the direct top cutting seam.
3. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 2 is characterized in that: The deep blasting holes and the shallow blasting holes are arranged in such a manner that the deep blasting holes and the shallow blasting holes are arranged alternately, and two shallow blasting holes are arranged between every two deep blasting holes.
4. The method for retaining lanes along the goaf with underground deep and shallow hole blasting and top cutting in coordination with flexible formwork support according to claim 2 is characterized in that: The depth of the top cutting is determined by formula (1): Where M is the thickness of the coal seam, unit: m; K1, K2 and K m are the rock expansion coefficients of the first, second and mth layers respectively; H1, H2 and H m are the thickness of the first, second and mth layers, respectively, in m; K p is the average expansion coefficient of the rock formation, K p Usually 1.2 to 1.
5.
5. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 2 is characterized in that: The angle of the top cut is determined by formula (2): in, is the friction angle between rock blocks, unit: °; h is the thickness of the basic top, unit: m; ΔS is the sinking amount of rock block B, unit: m; L is the length of the basic top rock block, unit: m.
6. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 2 is characterized in that: The sealing lengths of the deep blasting holes and the shallow blasting holes are not less than 1 / 3 of the corresponding hole depths of the deep blasting holes and the shallow blasting holes.
7. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 1 is characterized in that: The specific contents of the roadside rock retaining protection described in S3 are as follows: in order to prevent the dynamic pressure impact behind the frame and the rock collapse from the goaf from rushing into the roadway, a combined rock retaining support system consisting of a metal mesh, a hydraulic support and a retractable rock retaining U-shaped steel is arranged within the range of 0m to 100m behind the working face support to create a safe working space for the casting of the flexible mold roadside support wall; among them, a rock retaining plate is arranged on the side close to the goaf, and the welding ring at the front end of the rock retaining plate is connected to the end bracket, and the moving frame of the end bracket drives the rock retaining plate to slide forward.
8. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 1 is characterized in that: The specific content of the delayed temporary support described in S3 is: the tunnel is temporarily supported by unit supports and single hydraulic props. The unit supports are arranged in advance on the auxiliary side. During mining, the unit supports automatically change from advanced support to delayed support. The existence of the unit supports increases the support strength in the tunnel, reduces the width of the remaining tunnel, and alleviates the pressure of the remaining tunnel.
9. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 1, characterized in that: The specific process of pouring the flexible formwork tunnel side support wall described in S3 is: S3.
1. Select a flexible formwork with a height of 3.3m, a length of 3m and a thickness of 1m, reserve grouting holes on the top of the flexible formwork, fix the flexible formwork in a pulling manner through anchor bolts and W-shaped steel strips, and build a flexible formwork laneside support frame to form a pouring space; S3.
2. Fix the flexible formwork tunnel side support frame through delayed temporary support, arrange the slurry delivery pipeline on the flexible formwork tunnel side support frame through the grouting holes, and inject slurry into the pouring space through the slurry delivery pipeline until the pouring operation is completed to form the flexible formwork tunnel side support wall.
10. The underground deep and shallow hole blasting and top cutting coordinated with flexible formwork support method for gob-side entry retention according to claim 1, characterized in that: The flexible mold tunnel side support wall described in S3 is located in the tunnel, and the outer side of the flexible mold tunnel side support wall is close to the top cutting line. Observation holes and nitrogen injection holes are reserved on the flexible mold tunnel side support wall to monitor the temperature and CO concentration of the goaf in real time, so as to achieve fire source control and precise fire prevention and extinguishing.