Method and device for updating mine geological survey model based on cloud GIS (Geographic Information System) platform
Through the cloud GIS platform-based method, the problem of untimely update of ground measurement models in coal mines is solved, realizing real-time dynamic update of data and model collaboration work, simplifying the process, ensuring the timeliness, accuracy and completeness of data.
Patent Information
- Application Number
- CN202411080067.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-22
AI Technical Summary
In the prior art, different software products are used for collection, transmission, management, construction and display of coal mine ground measurement model data, resulting in inconsistent data and inability to upload and share instantly, resulting in untimely update of ground measurement model and inability to share in time and inability to share in time. Reuse is complicated in the process and it is difficult to provide timely, accurate and complete basic information.
Using a cloud GIS platform-based method, the mobile terminal collects the coordinates of the wire point, the cloud data center performs data preprocessing, and the cloud server performs data matching and updates, realizing real-time dynamic updates of the ground measurement model, and sending the updated model to the target Application, realize collaborative work and synchronous updates of different software products.
Realize real-time dynamic update of the ground measurement model, solve the problem of inconsistent data and out-of-synchronization of software work, improve data sharing and reusability, simplify processes, and ensure the timeliness, accuracy and completeness of the model.
Smart Images

Figure CN119002961A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data updating, and in particular to a mine geodetic model updating method, device, computer-readable storage medium and mining area geological detection system based on a cloud GIS platform. Background Art
[0002] Based on development needs, the coal industry is transforming towards mechanization, automation, intelligence, and less manpower, realizing intelligent mining and building intelligent coal mines. Among them, the transparent geological support system is an important foundation for the intelligent construction of coal mines, and the construction of a geodetic model that can be updated in real time and dynamically is the key to the construction of a transparent geological support system.
[0003] At present, when most coal mining enterprises in my country collect geodetic data underground, most of the observation instruments use relatively advanced equipment, which can also save relevant data and wait until they reach the ground to calculate, organize and display the data. Although some relatively advanced mines use a variety of software to manage, build and display geodetic model data, most of them have the following problems: the collection, transmission, management, construction and display of geodetic model data are different software products, which cannot work together in an integrated manner; the standard observation data cannot be uploaded and shared in real time, which easily leads to slow feedback of first-hand observation data, untimely update of geodetic model data, and inability to share and reuse geodetic model data in a timely manner; the image data of underground observation points cannot be associated and recorded, which is not convenient for the analysis and verification of geodetic model data. In short, the traditional mine geodetic model construction work method is complicated, time-consuming and labor-intensive. From geodetic model data collection to mapping and modeling, it is impossible to operate and manage systematically, and it is difficult to provide timely, accurate, complete and standardized basic data and geodetic model data for mine production. Summary of the invention
[0004] The main purpose of this application is to provide a mine geodetic model updating method, device, computer-readable storage medium and mining area geological detection system based on a cloud GIS platform, so as to at least solve the problem of using multiple software to collaboratively manage, construct and display geodetic model data in the prior art, and the complicated process caused by inconsistent data and asynchronous software operation.
[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for updating a mine geodetic model based on a cloud GIS platform is provided, wherein the cloud GIS platform includes a mobile terminal, a cloud data center, a cloud service terminal and an application terminal, and the mobile terminal, the cloud data center, the cloud service terminal and the application terminal are communicated with each other, including: collecting the coordinates of the first conductor point through the mobile terminal, wherein the first conductor point at least includes the conductor point name, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths and the tunnel shape, wherein the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid; inputting the first conductor point into the cloud data center, and updating the coordinates of the first conductor point through the mobile terminal; The cloud data center preprocesses the first traverse point to obtain geodetic model update data, wherein the preprocessing includes at least data cleaning and traverse calculation, and the geodetic model update data includes at least bilinear coordinates of the left and right sides of the lane; the geodetic model update data is input into the cloud service end, and the cloud service end matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform; and the second geodetic model is sent to a target application through the cloud service end, and the target application is an application that subscribes to the lane model.
[0006] Optionally, the first conductor point is preprocessed by the cloud data center to obtain geodetic model update data, including: data cleaning of the first conductor point to obtain a second conductor point, the data cleaning at least including integrity check, missing value processing, outlier processing and duplicate value processing; based on the conductor point coordinates in the second conductor point, the left and right side widths, the tunnel morphology and the bottom plate elevation, the left side and right side of the tunnel are modeled respectively to obtain the corresponding bilinear coordinates, and first identification information is added to the bilinear coordinates to obtain the geodetic model update data, the bilinear coordinates are used to represent the left side and the right side in the form of line segments, and the first identification information is used to represent branch data to which the first conductor point belongs, and the branch data includes one or more of mine branch data, horizontal branch data, mining area branch data, working face branch data and tunnel branch data.
[0007] Optionally, matching is performed with the first geodetic model based on the geodetic model update data through the cloud service end, including: matching based on the first identification information and the second identification information, generating a first matching result when the first identification information and the second identification information are inconsistent, the second identification information being the first identification information in the target model update data corresponding to the first geodetic model, and the target model update data being the geodetic model update data input for the last update of the first geodetic model; matching based on the geodetic model update data and the corresponding target model update data when the first identification information is consistent with any one of the second identification information, generating a second matching result when the geodetic model update data and the corresponding target model update data are consistent; generating a third matching result when the geodetic model update data and the corresponding target model update data are inconsistent.
[0008] Optionally, updating the first geodetic model based on the matching result to obtain the second geodetic model includes: when the matching result is the first matching result, constructing the tunnel model based on the geodetic model update data to obtain the second geodetic model; when the matching result is the third matching result, updating the corresponding first geodetic model based on the geodetic model data to obtain the second geodetic model.
[0009] Optionally, constructing the tunnel model based on the geodetic model update data includes: constructing a three-dimensional simulation model of the tunnel by simulation modeling according to the bilinear coordinates, the roof elevation, the tunnel height and the tunnel morphology to obtain the tunnel model.
[0010] Optionally, matching the geodesic model update data with the corresponding target model update data includes: performing consistency matching based on the bilinear coordinates in the geodesic model update data and the bilinear coordinates in the target model update data.
[0011] Optionally, before inputting the first conductor point into the cloud data center, the method also includes: obtaining third identification information, the third identification information including account information of the mobile terminal corresponding to the first conductor point, the account information including user ID, user password and user role; matching based on the third identification information with a preset user information database, and if the match succeeds, determining that the first conductor point is legal; if the match fails, issuing a first alarm message, the first alarm message being used to prompt that the first conductor point is illegal.
[0012] According to another aspect of the present application, there is provided a device for updating a geodetic model based on a cloud GIS platform, wherein the cloud GIS platform comprises a mobile terminal, a cloud data center, a cloud service terminal and an application terminal, wherein the mobile terminal, the cloud data center, the application terminal and the cloud service terminal are communicatively connected, and the device comprises: a collection unit for collecting guide points through the mobile terminal to obtain a first guide point, wherein the first guide point at least comprises a guide point name, a top plate elevation, a bottom plate elevation, a lane height, a left and right side width and a lane shape, wherein the lane shape at least comprises a trapezoid, a semi-arc, a full arc, a rectangle and a right-angled trapezoid; a first input unit for inputting the first guide point into the cloud data center through the cloud data center The first traverse point is preprocessed to obtain geodetic model update data, wherein the preprocessing includes at least data cleaning and traverse calculation, and the geodetic model update data includes at least bilinear coordinates of the left and right sides of the lane; a second input unit is used to input the geodetic model update data into the cloud server, and the cloud server matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform; a sending unit is used to send the second geodetic model to a target application through the cloud server, and the target application is an application that subscribes to the lane model.
[0013] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute any one of the methods described.
[0014] According to another aspect of the present application, a mining geological detection system is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of the methods described.
[0015] By applying the technical solution of the present application, in the above-mentioned mine geodetic model updating method based on the cloud GIS platform, first, the coordinates of the first guide point are obtained by collecting the guide point coordinates through the mobile terminal, and the first guide point at least includes the guide point name, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths and the tunnel shape, and the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid; then, the first guide point is input into the cloud data center, and the first guide point is pre-processed by the cloud data center to obtain the geodetic model update data, and the pre-processing at least includes Including data cleaning and wire calculation, the geodetic model update data at least includes the bilinear coordinates of the left and right sides of the lane; after that, the geodetic model update data is input into the cloud server, and the cloud server matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain the second geodetic model, and the first geodetic model includes the lane model stored in the cloud GIS platform; finally, the second geodetic model is sent to the target application through the cloud server, and the target application is the application that subscribes to the lane model. The present application sets up the deployment of the lane model update on the cloud GIS platform, and completes the unification of the collected data based on the cloud storage, cloud management and cloud computing functions of the cloud GIS platform, realizes the collaborative work of different software products, and realizes the synchronous update of all subscribed applications based on the cloud GIS platform to ensure the reuse of the model. This method solves the problem that the prior art uses multiple software to collaboratively manage, construct and display geodetic model data, and the process is complicated due to the inconsistent data and asynchronous software work. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A hardware structure block diagram of a mobile terminal according to a mine geodetic model updating method based on a cloud GIS platform provided in an embodiment of the present application is shown;
[0017] Figure 2 A schematic diagram of a process of updating a mine geodetic model based on a cloud GIS platform according to an embodiment of the present application is shown;
[0018] Figure 3 A structural block diagram of a geodetic model updating device based on a cloud GIS platform provided according to an embodiment of the present application is shown.
[0019] The above drawings include the following reference numerals:
[0020] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION
[0021] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0022] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0024] As introduced in the background technology, in the prior art, after collecting data through observation instruments and saving the data, the data is calculated and sorted on the ground, and the geodetic model data is updated and displayed through various instruments and systems. Due to different software products, there are large differences in data, which makes it difficult to work together. In order to solve the problem that the prior art uses multiple software to collaboratively manage, construct and display geodetic model data, and the process is complicated due to inconsistent data and asynchronous software operation, the embodiments of the present application provide a mine geodetic model update method, device, computer-readable storage medium and mining area geological detection system based on a cloud GIS platform.
[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0026] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a mine geodetic model updating method based on a cloud GIS platform according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.
[0027] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the display method of device information in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0028] In this embodiment, a mine geodetic model updating method based on a cloud GIS platform that runs on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0029] Figure 2 1 is a flow chart of a mine geodetic model updating method based on a cloud GIS platform according to an embodiment of the present application. Figure 2As shown, the method comprises the following steps:
[0030] Step S201, collecting the coordinates of the guide point through the mobile terminal to obtain the coordinates of the first guide point, the first guide point at least includes the guide point name, the top plate elevation, the bottom plate elevation, the lane height, the left and right side widths and the lane shape, the lane shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid;
[0031] Specifically, the present application is configured to enter the geodetic model source data collected at the designated location (traverse point, i.e., the measurement point used to determine the coordinates) through the cloud GIS mobile terminal, and upload it to the cloud GIS cloud data center. The above source data at least includes the top plate elevation (or bottom plate elevation), the tunnel height, and the left and right side widths. In addition, in order to facilitate modeling, the present application is also configured to collect the tunnel shape, and the above tunnel shape at least includes trapezoid, semi-arc, full arc, rectangle and right-angled trapezoid.
[0032] In the specific implementation, based on the mobile terminal connected to the cloud data center, real-time data transmission between the underground and the ground is realized, avoiding the need to go to the ground to complete data interaction after the data collection at the wire point is completed in the existing technology, which generates a large number of complex operations. The data is stored on the cloud GIS platform to facilitate data reuse, and based on the communication connection, the ground can extract the collected data at any time for analysis and calculation.
[0033] It can be understood that the data type included in the coordinates of the above-mentioned first wire point depends on the geodetic model to be updated. In another embodiment, the above-mentioned geodetic model can be a coal seam model, a fault model, a goaf model, a waterlogged area model or a collapse column model, etc. When corresponding to different models, the corresponding collected data are different.
[0034] Step S202, inputting the first traverse point into the cloud data center, and preprocessing the first traverse point through the cloud data center to obtain geodetic model update data, wherein the preprocessing at least includes data cleaning and traverse calculation, and the geodetic model update data at least includes bilinear coordinates of the left and right sides of the lane;
[0035] Specifically, after the cloud GIS cloud data center obtains the above-mentioned first guide wire point data, it analyzes and calculates the guide wire point data to obtain the geodetic model update data. The analysis mainly includes analyzing the integrity of the data, that is, determining whether the lane name (unique identifier) is included according to the received data, and whether each guide wire point data includes: guide wire point name, bottom plate elevation, top plate elevation, lane shape, left and right side widths and lane height and other types of basic data. When the basic data is complete, these data are calculated and organized into geodetic model update data within the annotation. When the target object of the geodetic model data is a lane, at least the above-mentioned coordinates are converted into two-dimensional coordinates through guide wire calculation, with bilinear coordinates corresponding to the left and right side shapes, and the relative position of the lane on the two-dimensional plane is determined based on the bilinear coordinates.
[0036] In the above embodiment, taking the lane model as an example, bilinear coordinates are used to represent the left and right sides of the lane, and when constructing the model, three-dimensional rendering is performed in the form of contour coordinates.
[0037] In another embodiment, taking the coal seam model as an example, bilinear coordinates are not used but triangulated coordinates corresponding to the coal seam model, and three-dimensional rendering is performed in the form of facets and thickness when constructing the model.
[0038] Step S203, inputting the geodetic model update data into the server, matching the geodetic model update data with the first geodetic model through the server, and updating the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform;
[0039] Specifically, the cloud GIS server updates data based on the above-mentioned geodetic model, matches the model parameters of the existing geodetic model stored in the above-mentioned cloud GIS platform, that is, the first geodetic model, and updates the stored geodetic model in the absence of consistent parameters to obtain the above-mentioned second geodetic model.
[0040] Step S204: sending the second geodetic model to a target application through the server, where the target application is an application that subscribes to the tunnel model.
[0041] Specifically, the server sends the updated second geodetic model to the subscribed two or three-dimensional application, and then the two or three-dimensional application updates the display of the geodetic model.
[0042] According to this embodiment, first, the coordinates of the first conductor point are obtained by collecting the coordinates of the conductor point through the mobile terminal, and the first conductor point at least includes the conductor point name, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths and the tunnel shape, and the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angled trapezoid; then, the first conductor point is input into the cloud data center, and the first conductor point is pre-processed by the cloud data center to obtain the geodetic model update data, and the pre-processing at least includes data cleaning and conductor calculation, and the geodetic model update data at least includes the bilinear coordinates of the left and right sides of the tunnel; then, the geodetic model update data is input into the cloud service end, and the cloud service end matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain the second geodetic model, and the first geodetic model includes the tunnel model stored in the cloud GIS platform; finally, the second geodetic model is sent to the target application through the cloud service end, and the target application is an application that subscribes to the tunnel model. This application sets up the deployment of tunnel model updates on the cloud GIS platform, and based on the cloud storage, cloud management and cloud computing functions of the cloud GIS platform, completes the unification of collected data, realizes the collaborative work of different software products, and realizes the synchronous update of all subscribed applications based on the cloud GIS platform to ensure the reuse of the model. This method solves the problem of complicated processes caused by the use of multiple software to collaborate in the management, construction and display of geodetic model data in the prior art, due to inconsistent data and asynchronous software operation.
[0043] In order to obtain the above-mentioned geodetic model update data, in an optional implementation, the above-mentioned step S202 includes:
[0044] Step S2021, performing data cleaning on the first conductor point to obtain a second conductor point, wherein the data cleaning at least includes integrity check, missing value processing, abnormal value processing, and duplicate value processing;
[0045] Specifically, in order to ensure the accuracy of the updated data of the above-mentioned geodetic model, the present application is configured to clean the data of the above-mentioned first guide wire point, first perform an integrity check, trigger a supplementary recording operation when the data is incomplete, and then perform missing value processing, modify the missing values, and process outliers, that is, delete the updated data that is obviously abnormal, and merge duplicate values.
[0046] Step S2022, based on the left and right side widths in the second guide point, the tunnel morphology and the bottom plate elevation, the left side and right side of the tunnel are modeled respectively to obtain the corresponding bilinear coordinates, and the first identification information is added to the bilinear coordinates to obtain the geodetic model update data. The bilinear coordinates are used to represent the left side and the right side in the form of line segments, and the first identification information is used to represent the branch data to which the first guide point belongs. The branch data includes one or more of mine branch data, horizontal branch data, mining area branch data, working face branch data and tunnel branch data.
[0047] Specifically, after the analysis of the first guide point data is completed, calculations are performed based on the first guide point, and modeling is performed to convert the first guide point data into continuous bilinear coordinates. Specifically, the left and right sides of the lane are modeled based on the left and right side widths, the lane shape, and the floor elevation in the second guide point to obtain corresponding bilinear coordinates. Furthermore, in order to facilitate updating, a unique identifier is added to the geodetic model update data, namely, the first identifier information, which is used to distinguish the location of the lane.
[0048] In order to complete the update object corresponding to the above-mentioned geodetic model update data, in an optional implementation manner, the above-mentioned step S203 includes:
[0049] Step S2031, matching the first identification information with the second identification information, generating a first matching result when the first identification information and the second identification information are inconsistent, the second identification information being the first identification information in the target model update data corresponding to the first geodetic model, and the target model update data being the geodetic model update data input for the last update of the first geodetic model;
[0050] Specifically, target object matching is performed based on the unique identifier corresponding to the above-mentioned geodetic model and the above-mentioned unique identifier corresponding to the above-mentioned first geodetic model. When the above-mentioned first identification information is inconsistent with the above-mentioned second identification information, it is determined that the currently stored above-mentioned first geodetic model does not include the lane corresponding to the above-mentioned geodetic model update data, and a new geodetic model needs to be generated to obtain the above-mentioned first matching result.
[0051] Step S2032, when the first identification information is consistent with any one of the second identification information, matching is performed based on the geodesic model update data and the corresponding target model update data, and when the geodesic model update data is consistent with the corresponding target model update data, generating a second matching result;
[0052] Specifically, target object matching is performed based on the unique identifier corresponding to the above-mentioned geodetic model and the unique identifier corresponding to the above-mentioned first geodetic model. When the above-mentioned first identification information is consistent with any one of the above-mentioned second identification information, the above-mentioned first geodetic model corresponding to the above-mentioned second identification information is taken as the target object, and further parameter matching is performed. When the above-mentioned geodetic model update data is consistent with the corresponding above-mentioned target model update data, it is determined that the above-mentioned first geodetic model does not need to be updated, and the above-mentioned second matching result is generated.
[0053] Step S2033: When the above-mentioned geodetic model update data is inconsistent with the corresponding above-mentioned target model update data, a third matching result is generated.
[0054] Specifically, when the above-mentioned geodetic model update data is inconsistent with the corresponding above-mentioned target model update data, it is determined that the above-mentioned first geodetic model needs to be updated, and the above-mentioned third matching result is generated.
[0055] In order to complete the update of the first geodetic model, in an optional implementation, the step S203 further includes:
[0056] Step S2034, when the matching result is the first matching result, constructing the tunnel model based on the geodetic model update data to obtain the second geodetic model;
[0057] Specifically, when it is determined that a new model needs to be created, simulation modeling is performed based on bilinear coordinates to determine the contour coordinates of the tunnel and obtain the above-mentioned second geodetic model.
[0058] Step S2035: When the matching result is the third matching result, the corresponding first geodetic model is updated based on the geodetic model data to obtain the second geodetic model.
[0059] Specifically, when it is determined that the model needs to be updated, the contour coordinates of the first geodetic model are updated based on the tunnel morphology to obtain the second geodetic model.
[0060] In order to construct the second geodetic model, in an optional implementation, the step S2034 includes:
[0061] Step S20341, constructing a three-dimensional simulation model of the tunnel by simulation modeling based on the above-mentioned bilinear coordinates, the above-mentioned roof elevation, tunnel height and tunnel shape, and obtaining the above-mentioned tunnel model.
[0062] Specifically, at least based on the above-mentioned bilinear coordinates, simulation modeling is performed in combination with the above-mentioned roof elevation, tunnel height and tunnel shape, and displayed in a hollow three-dimensional tubular shape.
[0063] In the specific implementation, in order to ensure the accuracy of three-dimensional modeling, the data provided by the above-mentioned guide points include but are not limited to the guide control point name, the forward guide control point name, the horizontal angle, the forward inclination angle, the forward oblique length, the forward instrument height, the forward point height, the forward to the bottom, the total height of the tunnel, the left side distance, the right side distance, the tunnel section type, the photo taken at the current position, the recorded image of the current position, and the observation time.
[0064] In order to complete the matching of the first geodetic model, in an optional implementation, the step S2032 includes:
[0065] Step S20321, performing consistency matching based on the bilinear coordinates in the geodetic model update data and the bilinear coordinates in the target model update data.
[0066] Specifically, based on the bilinear coordinates in the above-mentioned geodetic model update data, such as [{type:"left",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])},{type:"right",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])}], they are compared with the bilinear coordinates in the above-mentioned target model update data, [{pname:"P1",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])},{p name:"Pn",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])}], if they are consistent, it is determined that the geodetic model update data matches the corresponding first geodetic model, otherwise, there is no matching model.
[0067] In order to verify the legitimacy of the data transmitted by the first conductor point, in an optional implementation manner, before the first conductor point is input into the cloud data center, the method further includes:
[0068] Step S301, obtaining third identification information, the third identification information including account information of the mobile terminal corresponding to the first guide wire point, the account information including user ID, user password and user role;
[0069] Specifically, after receiving the above-mentioned first guide wire point, the collector carried in the data, as well as the corresponding user ID, user password and user role are obtained to obtain the above-mentioned third identification information.
[0070] Step S302, matching the third identification information with a preset user information database, and determining that the first wire point is legal if the match succeeds;
[0071] Specifically, based on the third identification information, a comparison is performed with the preset user information database of the predicted user information in the cloud data center to determine whether the uploader of the data is legitimate. If a match is successful, the first conductor point is determined to be legitimate.
[0072] Step S303: If the matching fails, a first alarm message is issued, wherein the first alarm message is used to indicate that the first conductor point is illegal.
[0073] Specifically, when the match fails, it is determined that the uploader of the data is illegal, and then a first alarm message is issued to prompt the staff to re-upload.
[0074] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0075] The embodiment of the present application also provides a geodesic model updating device based on a cloud GIS platform. It should be noted that the geodesic model updating device based on a cloud GIS platform in the embodiment of the present application can be used to execute the mine geodesic model updating method based on a cloud GIS platform provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been explained will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0076] The following introduces the updating device of the geodetic model based on the cloud GIS platform provided in the embodiment of the present application.
[0077] Figure 3 : is a structural block diagram of a device for updating a geodetic model based on a cloud GIS platform according to an embodiment of the present application. Figure 3 As shown, the device comprises:
[0078] The collecting unit 10 is used to collect the coordinates of the guide point through the mobile terminal to obtain the coordinates of the first guide point, wherein the first guide point at least includes the guide point name, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths and the tunnel shape, and the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid;
[0079] Specifically, the present application is configured to enter the geodetic model source data collected at the designated location (traverse point, i.e., the measurement point used to determine the coordinates) through the cloud GIS mobile terminal, and upload it to the cloud GIS cloud data center. The above-mentioned tunnel source data at least includes the name of the trace point, the top plate elevation (or the bottom plate elevation), the tunnel height, and the left and right side widths. In addition, in order to facilitate modeling, the present application is also configured to collect the tunnel shape, and the above-mentioned tunnel shape at least includes trapezoid, semi-arc, full arc, rectangle and right-angled trapezoid.
[0080] A first input unit 20 is used to input the first traverse point into the cloud data center, and pre-process the first traverse point through the cloud data center to obtain geodetic model update data, wherein the pre-processing includes at least data cleaning and traverse calculation, and the geodetic model update data includes at least bilinear coordinates of the left and right sides of the lane;
[0081] Specifically, after the cloud GIS cloud data center obtains the above-mentioned first conductor point data, it analyzes and calculates the conductor point data to obtain the geodetic model update data. The analysis mainly includes analyzing the integrity of the data, that is, determining whether the tunnel name (unique identifier) is included according to the received data, and whether each conductor point data includes: basic data such as bottom plate coordinates, top plate coordinates, tunnel morphology, left and right side widths and tunnel heights. If the basic data is complete, these data are calculated and organized into geodetic model update data within the annotation. When the target object of the geodetic model data is a tunnel, at least the above-mentioned coordinates are converted into two-dimensional coordinates to correspond to the bilinear coordinates of the left and right side shapes, and the relative position of the tunnel on the two-dimensional plane is determined based on the bilinear coordinates.
[0082] The second input unit 30 is used to input the geodetic model update data into the server, and the server matches the geodetic model update data with the first geodetic model, and updates the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform;
[0083] Specifically, the cloud GIS server updates data based on the above-mentioned geodetic model, matches the model parameters of the existing geodetic model stored in the above-mentioned cloud GIS platform, that is, the first geodetic model, and updates the stored geodetic model in the absence of consistent parameters to obtain the above-mentioned second geodetic model.
[0084] The sending unit 40 is used to send the second geodetic model to a target application through the server, where the target application is an application that subscribes to the lane model.
[0085] Specifically, the server sends the updated second geodetic model to the subscribed two or three-dimensional application, and then the two or three-dimensional application updates the display of the geodetic model.
[0086] Through this embodiment, the acquisition unit acquires the coordinates of the first conductor point through the mobile terminal, wherein the first conductor point at least includes the conductor point name, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths and the tunnel shape, wherein the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid; the first input unit inputs the first conductor point into the cloud data center, and pre-processes the first conductor point through the cloud data center to obtain the geodetic model update data, wherein the pre-processing at least includes data cleaning and conductor calculation, and the geodetic model update data at least includes the bilinear coordinates of the left and right sides of the tunnel; the second input unit is used to input the geodetic model update data into the cloud service end, and the cloud service end matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain the second geodetic model, wherein the first geodetic model includes the tunnel model stored in the cloud GIS platform; the sending unit sends the second geodetic model to the target application through the cloud service end, and the target application is an application that subscribes to the tunnel model. This application sets up the deployment of tunnel model updates on the cloud GIS platform, and based on the cloud storage, cloud management and cloud computing functions of the cloud GIS platform, completes the unification of collected data, realizes the collaborative work of different software products, and realizes the synchronous update of all subscribed applications based on the cloud GIS platform to ensure the reuse of the model. This method solves the problem of complicated processes caused by the use of multiple software to collaborate in the management, construction and display of geodetic model data in the prior art, due to inconsistent data and asynchronous software operation.
[0087] In order to obtain the above-mentioned geodetic model update data, in an optional implementation manner, the above-mentioned first input unit includes:
[0088] A first processing module, configured to clean the data of the first conductor point to obtain a second conductor point, wherein the data cleaning at least includes integrity check, missing value processing, abnormal value processing, and duplicate value processing;
[0089] Specifically, in order to ensure the accuracy of the updated data of the above-mentioned geodetic model, the present application is configured to clean the data of the above-mentioned first guide wire point, first perform an integrity check, trigger a supplementary recording operation when the data is incomplete, and then perform missing value processing, modify the missing values, and process outliers, that is, delete the updated data that is obviously abnormal, and merge duplicate values.
[0090] The second processing module is used to model the left side and the right side of the tunnel respectively based on the left and right side widths, the tunnel morphology and the bottom plate elevation in the second guide point, obtain the corresponding bilinear coordinates, add the first identification information to the bilinear coordinates, and obtain the geodetic model update data. The bilinear coordinates are used to represent the left side and the right side in the form of line segments, and the first identification information is used to represent the branch data belonging to the first guide point. The branch data includes one or more of mine branch data, horizontal branch data, mining area branch data, working face branch data and tunnel branch data.
[0091] Specifically, after the analysis of the first guide point data is completed, calculations are performed based on the first guide point, and modeling is performed to convert the first guide point data into continuous bilinear coordinates. Specifically, the left and right sides of the lane are modeled based on the left and right side widths, the lane shape, and the floor elevation in the second guide point to obtain corresponding bilinear coordinates. Furthermore, in order to facilitate updating, a unique identifier is added to the geodetic model update data, namely, the first identifier information, which is used to distinguish the location of the lane.
[0092] In order to complete the update object corresponding to the above-mentioned geodetic model update data, in an optional implementation manner, the above-mentioned second input unit includes:
[0093] A first generating module is configured to perform matching based on the first identification information and the second identification information, and to generate a first matching result when the first identification information and the second identification information are inconsistent, wherein the second identification information is the first identification information in the target model update data corresponding to the first geodetic model, and the target model update data is the geodetic model update data inputted in the last update of the first geodetic model;
[0094] Specifically, target object matching is performed based on the unique identifier corresponding to the above-mentioned geodetic model and the above-mentioned unique identifier corresponding to the above-mentioned first geodetic model. When the above-mentioned first identification information is inconsistent with the above-mentioned second identification information, it is determined that the currently stored above-mentioned first geodetic model does not include the lane corresponding to the above-mentioned geodetic model update data, and a new geodetic model needs to be generated to obtain the above-mentioned first matching result.
[0095] A second generating module is used for matching the geodesic model update data with the corresponding target model update data when the first identification information is consistent with any one of the second identification information, and generating a second matching result when the geodesic model update data is consistent with the corresponding target model update data;
[0096] Specifically, target object matching is performed based on the unique identifier corresponding to the above-mentioned geodetic model and the unique identifier corresponding to the above-mentioned first geodetic model. When the above-mentioned first identification information is consistent with any one of the above-mentioned second identification information, the above-mentioned first geodetic model corresponding to the above-mentioned second identification information is taken as the target object, and further parameter matching is performed. When the above-mentioned geodetic model update data is consistent with the corresponding above-mentioned target model update data, it is determined that the above-mentioned first geodetic model does not need to be updated, and the above-mentioned second matching result is generated.
[0097] The third generating module is used to generate a third matching result when the above-mentioned geodetic model update data is inconsistent with the corresponding above-mentioned target model update data.
[0098] Specifically, when the above-mentioned geodetic model update data is inconsistent with the corresponding above-mentioned target model update data, it is determined that the above-mentioned first geodetic model needs to be updated, and the above-mentioned third matching result is generated.
[0099] In order to complete the update of the first geodetic model, in an optional implementation, the second input unit further includes:
[0100] A first updating module, configured to construct the lane model based on the geodetic model update data to obtain the second geodetic model when the matching result is the first matching result;
[0101] Specifically, when it is determined that a new model needs to be created, simulation modeling is performed based on bilinear coordinates to determine the contour coordinates of the tunnel and obtain the above-mentioned second geodetic model.
[0102] The second updating module is used to update the corresponding first geodetic model based on the geodetic model data to obtain the second geodetic model when the matching result is the third matching result.
[0103] Specifically, when it is determined that the model needs to be updated, the contour coordinates of the first geodetic model are updated based on the tunnel morphology to obtain the second geodetic model.
[0104] In order to construct the second geodetic model, in an optional implementation, the first updating module includes:
[0105] The construction submodule is used to perform simulation modeling to construct a three-dimensional simulation model of the tunnel according to the above-mentioned bilinear coordinates, the above-mentioned roof elevation, tunnel height and tunnel morphology, and obtain the above-mentioned tunnel model.
[0106] Specifically, at least based on the above-mentioned bilinear coordinates, simulation modeling is performed in combination with the above-mentioned roof elevation, tunnel height and tunnel shape, and displayed in a hollow three-dimensional tubular shape.
[0107] In the specific implementation, in order to ensure the accuracy of three-dimensional modeling, the data provided by the above-mentioned guide points include but are not limited to the guide control point name, the forward guide control point name, the horizontal angle, the forward inclination angle, the forward oblique length, the forward instrument height, the forward point height, the forward to the bottom, the total height of the tunnel, the left side distance, the right side distance, the tunnel section type, the photo taken at the current position, the recorded image of the current position, and the observation time.
[0108] In order to complete the matching of the first geodetic model, in an optional implementation, the second generating module includes:
[0109] The matching submodule is used to perform consistency matching based on the bilinear coordinates in the geodetic model update data and the bilinear coordinates in the target model update data.
[0110] Specifically, based on the bilinear coordinates in the above-mentioned geodetic model update data, such as [{type:"left",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])},{type:"right",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])}], they are compared with the bilinear coordinates in the above-mentioned target model update data, [{pname:"P1",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])},{p name:"Pn",data:[(X1,Y1,Z1),...(Xn,Yn,Zn)])}], if they are consistent, it is determined that the geodetic model update data matches the corresponding first geodetic model, otherwise, there is no matching model.
[0111] In order to verify the legitimacy of the data transmitted by the first conductor point, in an optional implementation manner, the device further includes:
[0112] An acquisition unit, used for acquiring third identification information before inputting the first conductor point into the cloud data center, wherein the third identification information includes account information of the mobile terminal corresponding to the first conductor point, and the account information includes a user ID, a user password and a user role;
[0113] Specifically, after receiving the above-mentioned first guide wire point, the collector carried in the data, as well as the corresponding user ID, user password and user role are obtained to obtain the above-mentioned third identification information.
[0114] A matching unit, configured to match the third identification information with a preset user information database, and determine that the first wire point is legal if the match succeeds;
[0115] Specifically, based on the third identification information, a comparison is performed with the preset user information database of the predicted user information in the cloud data center to determine whether the uploader of the data is legitimate. If a match is successful, the first conductor point is determined to be legitimate.
[0116] The alarm unit is used to issue a first alarm message when the matching fails, and the first alarm message is used to prompt that the first conductor point is illegal.
[0117] Specifically, when the match fails, it is determined that the uploader of the data is illegal, and then a first alarm message is issued to prompt the staff to re-upload.
[0118] The above-mentioned updating device of the geodetic model based on the cloud GIS platform includes a processor and a memory, and the above-mentioned acquisition unit, the first input unit, the second input unit and the sending unit are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions. The above-mentioned modules are all located in the same processor; or, the above-mentioned modules are located in different processors in the form of any combination.
[0119] The processor contains a kernel, which calls the corresponding program unit from the memory. One or more kernels can be set, and the coordination between different systems, software and instruments can be achieved by adjusting the kernel parameters.
[0120] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0121] An embodiment of the present invention provides a computer-readable storage medium, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the mine geodetic model updating method based on the cloud GIS platform.
[0122] Specifically, the mine geodetic model update method based on the cloud GIS platform includes:
[0123] Step S201, collecting the coordinates of the guide point through the mobile terminal to obtain the coordinates of the first guide point, the first guide point at least includes the guide point name, the top plate elevation, the bottom plate elevation, the lane height, the left and right side widths and the lane shape, the lane shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid;
[0124] Specifically, the present application is configured to enter the geodetic model source data collected at the designated location (traverse point, i.e., the measurement point used to determine the coordinates) through the cloud GIS mobile terminal, and upload it to the cloud GIS cloud data center. The above-mentioned tunnel source data at least includes the name of the trace point, the top plate elevation (or the bottom plate elevation), the tunnel height, and the left and right side widths. In addition, in order to facilitate modeling, the present application is also configured to collect the tunnel shape, and the above-mentioned tunnel shape at least includes trapezoid, semi-arc, full arc, rectangle and right-angled trapezoid.
[0125] Step S202, inputting the first traverse point into the cloud data center, and preprocessing the first traverse point through the cloud data center to obtain geodetic model update data, wherein the preprocessing at least includes data cleaning and traverse calculation, and the geodetic model update data at least includes bilinear coordinates of the left and right sides of the lane;
[0126] Specifically, after the cloud GIS cloud data center obtains the above-mentioned first conductor point data, it analyzes and calculates the conductor point data to obtain the geodetic model update data. The analysis mainly includes analyzing the integrity of the data, that is, determining whether the lane name (unique identifier) is included according to the received data, and whether each conductor point data includes: conductor point name, bottom plate coordinates, top plate coordinates, lane shape, left and right side widths and lane height and other types of basic data. If the basic data is complete, these data are calculated and organized into geodetic model update data within the annotation. When the target object of the geodetic model data is a lane, at least the above coordinates are converted into two-dimensional coordinates to correspond to the bilinear coordinates of the left and right side shapes, and the relative position of the lane on the two-dimensional plane is determined based on the bilinear coordinates.
[0127] Step S203, inputting the geodetic model update data into the server, matching the geodetic model update data with the first geodetic model through the server, and updating the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform;
[0128] Specifically, the cloud GIS server updates data based on the above-mentioned geodetic model, matches the model parameters of the existing geodetic model stored in the above-mentioned cloud GIS platform, that is, the first geodetic model, and updates the stored geodetic model in the absence of consistent parameters to obtain the above-mentioned second geodetic model.
[0129] Step S204: sending the second geodetic model to a target application through the server, where the target application is an application that subscribes to the tunnel model.
[0130] Specifically, the server sends the updated second geodetic model to the subscribed two or three-dimensional application, and then the two or three-dimensional application updates the display of the geodetic model.
[0131] An embodiment of the present invention provides a processor, which is used to run a program, wherein the program executes the mine geodetic model updating method based on the cloud GIS platform when running.
[0132] Specifically, the mine geodetic model update method based on the cloud GIS platform includes:
[0133] Step S201, collecting the coordinates of the guide point through the mobile terminal to obtain the coordinates of the first guide point, the first guide point at least includes the guide point name, the top plate elevation, the bottom plate elevation, the lane height, the left and right side widths and the lane shape, the lane shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid;
[0134] Specifically, the present application is configured to enter the geodetic model source data collected at the designated location (traverse point, i.e., the measurement point used to determine the coordinates) through the cloud GIS mobile terminal, and upload it to the cloud GIS cloud data center. The above-mentioned tunnel source data at least includes the name of the trace point, the top plate elevation (or the bottom plate elevation), the tunnel height, and the left and right side widths. In addition, in order to facilitate modeling, the present application is also configured to collect the tunnel shape, and the above-mentioned tunnel shape at least includes trapezoid, semi-arc, full arc, rectangle and right-angled trapezoid.
[0135] Step S202, inputting the first traverse point into the cloud data center, and preprocessing the first traverse point through the cloud data center to obtain geodetic model update data, wherein the preprocessing at least includes data cleaning and traverse calculation, and the geodetic model update data at least includes bilinear coordinates of the left and right sides of the lane;
[0136] Specifically, after the cloud GIS cloud data center obtains the above-mentioned first conductor point data, it analyzes and calculates the conductor point data to obtain the geodetic model update data. The analysis mainly includes analyzing the integrity of the data, that is, determining whether the tunnel name (unique identifier) is included according to the received data, and whether each conductor point data includes: basic data such as bottom plate coordinates, top plate coordinates, tunnel morphology, left and right side widths and tunnel heights. If the basic data is complete, these data are calculated and organized into geodetic model update data within the annotation. When the target object of the geodetic model data is a tunnel, at least the above-mentioned coordinates are converted into two-dimensional coordinates to correspond to the bilinear coordinates of the left and right side shapes, and the relative position of the tunnel on the two-dimensional plane is determined based on the bilinear coordinates.
[0137] Step S203, inputting the geodetic model update data into the server, matching the geodetic model update data with the first geodetic model through the server, and updating the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform;
[0138] Specifically, the cloud GIS server updates data based on the above-mentioned geodetic model, matches the model parameters of the existing geodetic model stored in the above-mentioned cloud GIS platform, that is, the first geodetic model, and updates the stored geodetic model in the absence of consistent parameters to obtain the above-mentioned second geodetic model.
[0139] Step S204: sending the second geodetic model to a target application through the server, where the target application is an application that subscribes to the tunnel model.
[0140] Specifically, the server sends the updated second geodetic model to the subscribed two or three-dimensional application, and then the two or three-dimensional application updates the display of the geodetic model.
[0141] An embodiment of the present invention provides a communication system, the communication system includes a primary communication domain, a secondary communication domain processor, a memory, and a program stored in the memory and executable on the processor, and when the processor executes the program, at least the following steps are implemented:
[0142] Step S201, collecting the coordinates of the guide point through the mobile terminal to obtain the coordinates of the first guide point, the first guide point at least includes the guide point name, the top plate elevation, the bottom plate elevation, the lane height, the left and right side widths and the lane shape, the lane shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid;
[0143] Step S202, inputting the first traverse point into the cloud data center, and preprocessing the first traverse point through the cloud data center to obtain geodetic model update data, wherein the preprocessing at least includes data cleaning and traverse calculation, and the geodetic model update data at least includes bilinear coordinates of the left and right sides of the lane;
[0144] Step S203, inputting the geodetic model update data into the server, matching the geodetic model update data with the first geodetic model through the server, and updating the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform;
[0145] Step S204: sending the second geodetic model to a target application through the server, where the target application is an application that subscribes to the tunnel model.
[0146] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing at least the following method steps:
[0147] Step S201, collecting the coordinates of the guide point through the mobile terminal to obtain the coordinates of the first guide point, the first guide point at least includes the guide point name, the top plate elevation, the bottom plate elevation, the lane height, the left and right side widths and the lane shape, the lane shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid;
[0148] Step S202, inputting the first traverse point into the cloud data center, and preprocessing the first traverse point through the cloud data center to obtain geodetic model update data, wherein the preprocessing at least includes data cleaning and traverse calculation, and the geodetic model update data at least includes bilinear coordinates of the left and right sides of the lane;
[0149] Step S203, inputting the geodetic model update data into the server, matching the geodetic model update data with the first geodetic model through the server, and updating the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes the lane model stored in the cloud GIS platform;
[0150] Step S204: sending the second geodetic model to a target application through the server, where the target application is an application that subscribes to the tunnel model.
[0151] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0152] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0153] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0154] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0155] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0156] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0157] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0158] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tapes, disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0159] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0160] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0161] 1) The mine geodetic model updating method based on the cloud GIS platform of the present application, first, the coordinates of the first traverse point are obtained by collecting the coordinates of the traverse point through the mobile terminal, and the first traverse point at least includes the traverse point name, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths and the tunnel shape, and the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid; then, the first traverse point is input into the cloud data center, and the first traverse point is pre-processed by the cloud data center to obtain geodetic model update data, and the pre-processing at least includes data cleaning and traverse calculation, and the geodetic model update data at least includes the bilinear coordinates of the left and right sides of the tunnel; then, the geodetic model update data is input into the cloud service end, and the cloud service end matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain a second geodetic model, and the first geodetic model includes the tunnel model stored in the cloud GIS platform; finally, the second geodetic model is sent to the target application through the cloud service end, and the target application is an application that subscribes to the tunnel model. This application sets up the deployment of tunnel model updates on the cloud GIS platform, and based on the cloud storage, cloud management and cloud computing functions of the cloud GIS platform, completes the unification of collected data, realizes the collaborative work of different software products, and realizes the synchronous update of all subscribed applications based on the cloud GIS platform to ensure the reuse of the model. This method solves the problem of complicated processes caused by the use of multiple software to collaborate in the management, construction and display of geodetic model data in the prior art, due to inconsistent data and asynchronous software operation.
[0162] 2) The updating device of the geodetic model based on the cloud GIS platform of the present application, the collecting unit collects the coordinates of the guide wire point through the mobile terminal to obtain the coordinates of the first guide wire point, the first guide wire point at least includes the guide wire point name, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths and the tunnel shape, the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle and a right-angle trapezoid; the first input unit inputs the first guide wire point into the cloud data center, and pre-processes the first guide wire point through the cloud data center to obtain the geodetic model update data, the pre-processing at least includes data cleaning and guide wire calculation, and the geodetic model update data at least includes the bilinear coordinates of the left and right sides of the tunnel; the second input unit is used to input the geodetic model update data into the cloud service end, and the cloud service end matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain the second geodetic model, the first geodetic model includes the tunnel model stored in the cloud GIS platform; the sending unit sends the second geodetic model to the target application through the cloud service end, and the target application is the application that subscribes to the tunnel model. This application sets up the deployment of tunnel model updates on the cloud GIS platform, and based on the cloud storage, cloud management and cloud computing functions of the cloud GIS platform, completes the unification of collected data, realizes the collaborative work of different software products, and realizes the synchronous update of all subscribed applications based on the cloud GIS platform to ensure the reuse of the model. This method solves the problem of complicated processes caused by the use of multiple software to collaborate in the management, construction and display of geodetic model data in the prior art, due to inconsistent data and asynchronous software operation.
[0163] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A mine geodetic model updating method based on cloud GIS platform, characterized in that: The cloud GIS platform includes a mobile terminal, a cloud data center, a cloud service terminal and an application terminal. The communication connection between the mobile terminal, the cloud data center, the cloud service and the application terminal includes: The mobile terminal collects the coordinates of the conductor point to obtain the coordinates of the first conductor point, wherein the first conductor point at least includes the conductor point name, the conductor point coordinates, the top plate elevation, the bottom plate elevation, the tunnel height, the left and right side widths, and the tunnel shape, wherein the tunnel shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle, and a right-angle trapezoid; Inputting the first conductor point into the cloud data center, preprocessing the first conductor point through the cloud data center to obtain geodetic model update data, wherein the preprocessing includes at least data cleaning and conductor calculation, and the geodetic model update data includes at least bilinear coordinates of left and right sides of the lane; Inputting the geodetic model update data into the cloud server, matching the geodetic model update data with the first geodetic model through the cloud server, and updating the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes a lane model stored in the cloud GIS platform; The second geodetic model is sent to a target application through the cloud service end, and the target application is an application that subscribes to the lane model.
2. The method according to claim 1, characterized in that Preprocessing the first guide wire point by the cloud data center to obtain updated data of the geodetic model includes: Performing data cleaning on the first wire point to obtain a second wire point, wherein the data cleaning at least includes integrity checking, missing value processing, abnormal value processing, and duplicate value processing; Based on the coordinates of the second guide point, the left and right side widths, the tunnel morphology and the bottom plate elevation, the left side and right side of the tunnel are modeled respectively to obtain the corresponding bilinear coordinates, and the first identification information is added to the bilinear coordinates to obtain the geodetic model update data. The bilinear coordinates are used to represent the left side and the right side in the form of line segments, and the first identification information is used to represent the branch data to which the first guide point belongs. The branch data includes one or more of mine branch data, horizontal branch data, mining area branch data, working face branch data and tunnel branch data.
3. The method according to claim 2, characterized in that Matching the first geodetic model with the updated data of the geodetic model by the cloud service end includes: Based on matching the first identification information with the second identification information, generating a first matching result when the first identification information and the second identification information are inconsistent, the second identification information is the first identification information in the target model update data corresponding to the first geodetic model, and the target model update data is the geodetic model update data input when the first geodetic model was last updated; When the first identification information is consistent with any one of the second identification information, matching is performed based on the geodetic model update data and the corresponding target model update data, and when the geodetic model update data is consistent with the corresponding target model update data, generating a second matching result; When the geodetic model update data is inconsistent with the corresponding target model update data, a third matching result is generated.
4. The method according to claim 3, characterized in that Updating the first geodetic model based on the matching result to obtain a second geodetic model includes: When the matching result is the first matching result, constructing the lane model based on the geodetic model update data to obtain the second geodetic model; When the matching result is the third matching result, the corresponding first geodetic model is updated based on the geodetic model data to obtain the second geodetic model.
5. The method according to claim 4, characterized in that Constructing the tunnel model based on the geodetic model update data includes: A three-dimensional simulation model of the tunnel is constructed by simulation modeling according to the bilinear coordinates, the roof elevation, the tunnel height and the tunnel morphology to obtain the tunnel model.
6. The method according to claim 3, characterized in that Matching the updated data of the geodetic model with the corresponding updated data of the target model includes: A consistency match is performed based on the bilinear coordinates in the geodetic model update data and the bilinear coordinates in the target model update data.
7. The method according to claim 1, characterized in that Before inputting the first conductor point into the cloud data center, the method further includes: Acquire third identification information, the third identification information including account information of the mobile terminal corresponding to the first guide wire point, the account information including user ID, user password and user role; Matching the third identification information with a preset user information database, and determining that the first wire point is legal if the match succeeds; In the case where the matching fails, a first alarm message is issued, wherein the first alarm message is used to prompt that the first wire point is illegal.
8. A mine geodetic model updating device based on cloud GIS platform, characterized in that: The cloud GIS platform includes a mobile terminal, a cloud data center, a cloud service terminal and an application terminal. The mobile terminal, the cloud data center, the cloud service terminal and the application terminal are connected in communication. The device includes: A collection unit, used for collecting the guide points through the mobile terminal to obtain a first guide point, wherein the first guide point at least includes a guide point name, a guide point coordinate, a top plate elevation, a bottom plate elevation, a lane height, a left and right side widths, and a lane shape, wherein the lane shape at least includes a trapezoid, a semi-arc, a full arc, a rectangle, and a right-angle trapezoid; A first input unit is used to input the first conductor point into the cloud data center, and pre-process the first conductor point through the cloud data center to obtain geodetic model update data, wherein the pre-processing includes at least data cleaning and conductor calculation, and the geodetic model update data includes at least bilinear coordinates of left and right sides of the lane; A second input unit is used to input the geodetic model update data into the cloud server, and the cloud server matches the first geodetic model based on the geodetic model update data, and updates the first geodetic model based on the matching result to obtain a second geodetic model, wherein the first geodetic model includes a lane model stored in the cloud GIS platform; A sending unit is used to send the second geodetic model to a target application through the cloud service end, and the target application is an application that subscribes to the lane model.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method according to any one of claims 1 to 7.
10. A mining area geological detection system, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of claims 1 to 7.