Reservoir dispatching risk decision-making method for coupling numerical meteorological and hydrological ensemble forecast
By coupling numerical meteorological and hydrological ensemble forecasting methods, a hydrological model of the reservoir basin is established, and data stability is judged using historical and real-time data, which solves the problem of reservoir scheduling uncertainty caused by single meteorological forecasting, and achieves a more accurate and intelligent reservoir scheduling Early warning.
Patent Information
- Application Number
- CN202410960661.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-22
AI Technical Summary
The existing reservoir basin only uses a single meteorological forecast, which leads to uncertainty and error in reservoir scheduling decisions, and it is impossible to accurately determine the meteorological warning.
Coupled numerical meteorological hydrological ensemble forecasting method is adopted to obtain and establish historical and real-time data of the reservoir basin, a hydrological model is established, and a reservoir dispatch warning is determined based on the data stabilization model.
The accuracy and intelligence of reservoir scheduling decisions have been improved, and meteorological warnings have been conducted through multiple considerations, reducing scheduling errors.
Smart Images

Figure CN119005678A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydrological forecasting and reservoir scheduling, and in particular to a reservoir scheduling risk decision-making method coupled with numerical meteorological and hydrological ensemble forecasting. Background Art
[0002] The weather system is an extremely unstable nonlinear dynamic system. Small errors in its simulation process may be gradually magnified over time and eventually evolve into uncertainty in weather system forecasts. Affected by the underlying surface factors, the basin flood process is a more complex dynamic process. Its forecast involves many conceptualized hydrological models and parameters. These parameters and models will lead to uncertainty in hydrological forecasts at every stage of hydrological forecasts. The occurrence and development of basin flood processes are closely related to weather systems and underlying surface factors. As an important basis for reservoir scheduling decisions, basin meteorological and hydrological forecasts are both highly uncertain.
[0003] The existing technology has the following problems:
[0004] The existing reservoir basin only uses a single meteorological forecast to predict the results, but a single meteorological forecast cannot accurately determine the meteorological warning of the reservoir basin, resulting in mistakes or errors in reservoir scheduling decisions. Therefore, it is necessary to provide a reservoir scheduling risk decision-making method that couples numerical meteorological and hydrological ensemble forecasts. Summary of the invention
[0005] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide a reservoir scheduling risk decision-making method coupled with numerical meteorological and hydrological ensemble forecasts to solve the problems raised in the above-mentioned background technology.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a reservoir scheduling risk decision-making method coupled with numerical meteorological and hydrological ensemble forecast, which comprises the following steps:
[0007] Step 1: Obtain the air humidity, air temperature, reservoir water level, and reservoir flow data of a certain day in the history of the reservoir basin, and record them as historical air humidity value, historical air temperature value, historical reservoir water level value, and historical reservoir flow value;
[0008] Step 2: Establish a reservoir basin hydrological model based on the historical air humidity values, historical air temperature values, historical reservoir water level values, and historical reservoir flow values;
[0009] Step 3: Continue to obtain the air humidity, air temperature, reservoir water level, and reservoir flow data for the five days following the historical day, and input the data into the reservoir basin hydrological model;
[0010] Step 4: Establish a data stability model based on the calculated data obtained for five consecutive days;
[0011] Step 5: Obtain the air humidity, air temperature, reservoir water level, and reservoir flow data of the day in real time, record them as the current air humidity value, the current air temperature value, the current reservoir water level value, and the current reservoir flow value, and input the data into the reservoir basin hydrological model to determine whether the calculated data meets the data stability model. If so, output no warning, if not, output a reservoir scheduling warning.
[0012] Furthermore, step one specifically includes: using a humidity sensor to detect the air humidity value, recording the historical air humidity value as R0, using a temperature sensor to detect the air temperature value, recording the historical air temperature value as H0, using a liquid level meter to detect the reservoir water level, recording the historical reservoir water level value as Q0, and using a flow meter to detect the reservoir flow, recording the historical reservoir flow value as K0.
[0013] Furthermore, in step 2, based on the acquired historical air humidity values, historical air temperature values, historical reservoir water level values, and historical reservoir flow values, a specific calculation formula for establishing a reservoir basin hydrological model is as follows:
[0014] Y=R0W1+H0W2+Q0W3+K0W4
[0015] Among them, R0 is the historical air humidity value, W1 is the weight of the air humidity value, H0 is the historical air temperature value, W2 is the weight of the air temperature value, Q0 is the historical reservoir water level value, W3 is the weight of the reservoir water level value, K0 is the historical reservoir flow value, and W4 is the weight of the reservoir flow value.
[0016] Furthermore, the step three specifically includes: inputting the air humidity value, air temperature value, reservoir water level value, and reservoir flow value of each day in the following five days into the reservoir basin hydrological model, respectively, and obtaining the hydrological data value of each day in the following five days, respectively, recorded as Y1, Y2, Y3, Y4, and Y5.
[0017] Furthermore, the step 4 specifically includes:
[0018] Calculate the error value between the hydrological data values between consecutive days. The specific calculation formula is:
[0019]
[0020] Where η i is the error value between the i-th day and the i+1-th day, Y i is the hydrological data value of the i-th day, Y i+1 is the hydrological data value of the i+1th day;
[0021] Get the maximum value of the hydrological data error between consecutive days as the error threshold, denoted as MAXη i .
[0022] Furthermore, the step five specifically includes:
[0023] Input the current air humidity value, current air temperature value, current reservoir water level value, and current reservoir flow value into the reservoir basin hydrological model to calculate the current hydrological data value;
[0024] Input the current hydrological data value and the hydrological data value of the previous day into the data stability model and calculate the error value;
[0025] Determine whether the error value is less than the error threshold MAXη i If yes, then output no warning, if no, then output reservoir dispatch warning.
[0026] Beneficial effects of the present invention:
[0027] 1. The present invention obtains the air humidity, air temperature, reservoir water level and reservoir flow data of a certain historical day around the reservoir basin, and establishes a reservoir basin hydrological model based on the acquired data values. It can consider multiple factors to provide meteorological warnings around the reservoir basin and ensure the accuracy of reservoir scheduling decisions.
[0028] 2. The present invention establishes a reservoir basin hydrological model, calculates hydrological data values based on five consecutive days of air humidity, air temperature, reservoir water level, and reservoir flow data, and uses continuous hydrological data values to establish a data stationary model. Based on the real-time collection of the day's data values, it is determined whether the data values meet the data stationary model, which facilitates the determination of whether reservoir scheduling warning is needed, and intelligently improves the accuracy of scheduling. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the flow chart of the reservoir scheduling risk decision-making method of the present invention. DETAILED DESCRIPTION
[0030] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0031] Example 1: Figure 1 As shown, the present invention provides a reservoir operation risk decision method coupled with numerical meteorological and hydrological ensemble forecasts, and the reservoir operation risk decision method coupled with numerical meteorological and hydrological ensemble forecasts comprises the following steps:
[0032] Step 1: Obtain the air humidity, air temperature, reservoir water level, and reservoir flow data of a certain day in the history of the reservoir basin, and record them as historical air humidity value, historical air temperature value, historical reservoir water level value, and historical reservoir flow value;
[0033] Step 2: Establish a reservoir basin hydrological model based on the historical air humidity values, historical air temperature values, historical reservoir water level values, and historical reservoir flow values;
[0034] Step 3: Continue to obtain the air humidity, air temperature, reservoir water level, and reservoir flow data for the five days following the historical day, and input the data into the reservoir basin hydrological model;
[0035] Step 4: Establish a data stability model based on the calculated data obtained for five consecutive days;
[0036] Step 5: Obtain the air humidity, air temperature, reservoir water level, and reservoir flow data of the day in real time, record them as the current air humidity value, the current air temperature value, the current reservoir water level value, and the current reservoir flow value, and input the data into the reservoir basin hydrological model to determine whether the calculated data meets the data stability model. If so, output no warning, if not, output a reservoir scheduling warning.
[0037] Wherein step 1, obtaining the air humidity, air temperature, reservoir water level, and reservoir flow data of a certain day in the history around the reservoir basin, and recording them as historical air humidity values, historical air temperature values, historical reservoir water level values, and historical reservoir flow values, comprises: using a humidity sensor to detect the air humidity value, and recording the historical air humidity value as R0; using a temperature sensor to detect the air temperature value, and recording the historical air temperature value as H0; using a liquid level meter to detect the reservoir water level, and recording the historical reservoir water level value as Q0; using a flow meter to detect the reservoir flow, and recording the historical reservoir flow value as K0;
[0038] In step 2, based on the historical air humidity values, historical air temperature values, historical reservoir water level values, and historical reservoir flow values, the specific calculation formula for establishing the reservoir basin hydrological model is:
[0039] Y=R0W1+H0W2+Q0W3+K0W4
[0040] Among them, R0 is the historical air humidity value, W1 is the weight of the air humidity value, H0 is the historical air temperature value, W2 is the weight of the air temperature value, Q0 is the historical reservoir water level value, W3 is the weight of the reservoir water level value, K0 is the historical reservoir flow value, and W4 is the weight of the reservoir flow value;
[0041] By obtaining the air humidity, air temperature, reservoir water level, and reservoir flow data of a certain day in the history of the reservoir basin, and establishing a reservoir basin hydrological model based on the obtained data values, it is possible to consider multiple factors to provide meteorological warnings around the reservoir basin and ensure the accuracy of reservoir scheduling decisions.
[0042] Step 3, continuing to obtain the air humidity, air temperature, reservoir water level, and reservoir flow data for the five days following the historical day, and inputting the data into the reservoir basin hydrological model specifically includes: inputting the air humidity value, air temperature value, reservoir water level value, and reservoir flow value of each of the five subsequent days into the reservoir basin hydrological model, and obtaining the hydrological data values of each of the five subsequent days, recorded as Y1, Y2, Y3, Y4, and Y5;
[0043] Step 4, based on the calculated data obtained for five consecutive days, establishes a data stability model including:
[0044] Calculate the error value between the hydrological data values between consecutive days. The specific calculation formula is:
[0045]
[0046] Where η i is the error value between the i-th day and the i+1-th day, Y i is the hydrological data value of the i-th day, Y i+1 is the hydrological data value of the i+1th day;
[0047] Get the maximum value of the hydrological data error between consecutive days as the error threshold, denoted as MAXη i ;
[0048] By establishing a reservoir basin hydrological model, the hydrological data values are calculated based on five consecutive days of air humidity, air temperature, reservoir water level, and reservoir flow data. The continuous hydrological data values are used to establish a data stability model. Based on the real-time data values collected on the day, it is determined whether the data values meet the data stability model, which facilitates the judgment of whether reservoir scheduling warning is needed, and the accuracy of scheduling is improved intelligently.
[0049] Step 5: obtain the air humidity, air temperature, reservoir water level and reservoir flow data of the day in real time, record them as the current air humidity value, current air temperature value, current reservoir water level value and current reservoir flow value, and input the data into the reservoir basin hydrological model to determine whether the calculated data meets the data stability model. If so, output no warning, if not, output reservoir dispatch warning. Specifically, it includes:
[0050] Input the current air humidity value, current air temperature value, current reservoir water level value, and current reservoir flow value into the reservoir basin hydrological model to calculate the current hydrological data value;
[0051] Input the current hydrological data value and the hydrological data value of the previous day into the data stability model and calculate the error value;
[0052] Determine whether the error value is less than the error threshold MAXη iIf yes, then output no warning, if no, then output reservoir dispatch warning.
[0053] The effect of the present invention is that by acquiring the air humidity, air temperature, reservoir water level and reservoir flow data of a certain historical day around the reservoir basin, and establishing a reservoir basin hydrological model based on the acquired data values, it is possible to consider multiple factors to give a meteorological warning around the reservoir basin, thereby ensuring the accuracy of reservoir dispatching decisions. The established reservoir basin hydrological model is used to calculate the hydrological data values based on the air humidity, air temperature, reservoir water level and reservoir flow data for five consecutive days, and a data stationary model is established using the continuous hydrological data values. Based on the real-time data values collected on the day, it is determined whether the data values meet the data stationary model, thereby facilitating the determination of whether a reservoir dispatching warning is required, and intelligently improving the dispatching accuracy.
[0054] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A reservoir operation risk decision-making method coupled with numerical meteorological and hydrological ensemble forecast, characterized by: It includes the following steps: Step 1: Obtain the air humidity, air temperature, reservoir water level, and reservoir flow data of a certain day in the history of the reservoir basin, and record them as historical air humidity value, historical air temperature value, historical reservoir water level value, and historical reservoir flow value; Step 2: Establish a reservoir basin hydrological model based on the historical air humidity values, historical air temperature values, historical reservoir water level values, and historical reservoir flow values; Step 3: Continue to obtain the air humidity, air temperature, reservoir water level, and reservoir flow data for the five days following the historical day, and input the data into the reservoir basin hydrological model; Step 4: Establish a data stability model based on the calculated data obtained for five consecutive days; Step 5: Obtain the air humidity, air temperature, reservoir water level, and reservoir flow data of the day in real time, record them as the current air humidity value, the current air temperature value, the current reservoir water level value, and the current reservoir flow value, and input the data into the reservoir basin hydrological model to determine whether the calculated data meets the data stability model. If so, output no warning, if not, output a reservoir scheduling warning.
2. A reservoir dispatching risk decision-making method coupled with numerical meteorological and hydrological ensemble forecast according to claim 1, characterized in that: The step one specifically includes: using a humidity sensor to detect the air humidity value, recording the historical air humidity value as R0, using a temperature sensor to detect the air temperature value, recording the historical air temperature value as H0, using a liquid level meter to detect the reservoir water level, recording the historical reservoir water level value as Q0, and using a flow meter to detect the reservoir flow, recording the historical reservoir flow value as K0.
3. A reservoir dispatching risk decision-making method coupled with numerical meteorological and hydrological ensemble forecast according to claim 2, characterized in that: In the second step, based on the historical air humidity values, historical air temperature values, historical reservoir water level values, and historical reservoir flow values, a specific calculation formula for establishing a reservoir basin hydrological model is as follows: Y=R0W1+H0W2+Q0W3+K0W4 Among them, R0 is the historical air humidity value, W1 is the weight of the air humidity value, H0 is the historical air temperature value, W2 is the weight of the air temperature value, Q0 is the historical reservoir water level value, W3 is the weight of the reservoir water level value, K0 is the historical reservoir flow value, and W4 is the weight of the reservoir flow value.
4. A reservoir dispatching risk decision-making method coupled with numerical meteorological and hydrological ensemble forecast according to claim 3, characterized in that: The step three specifically includes: inputting the air humidity value, air temperature value, reservoir water level value, and reservoir flow value of each day in the following five days into the reservoir basin hydrological model, and obtaining the hydrological data values of each day in the following five days, recorded as Y1, Y2, Y3, Y4, and Y5.
5. A reservoir operation risk decision-making method coupled with numerical meteorological and hydrological ensemble forecast according to claim 4, characterized in that: The step 4 specifically includes: Calculate the error value between the hydrological data values between consecutive days. The specific calculation formula is: Where η i is the error value between the i-th day and the i+1-th day, Y i is the hydrological data value of the i-th day, Y i+1 is the hydrological data value of the i+1th day; Get the maximum value of the hydrological data error between consecutive days as the error threshold, denoted as MAXη i .
6. A reservoir operation risk decision-making method coupled with numerical meteorological and hydrological ensemble forecast according to claim 5, characterized in that: The step five specifically includes: Input the current air humidity value, current air temperature value, current reservoir water level value, and current reservoir flow value into the reservoir basin hydrological model to calculate the current hydrological data value; Input the current hydrological data value and the hydrological data value of the previous day into the data stability model and calculate the error value; Determine whether the error value is less than the error threshold MAXη i If yes, then output no warning, if no, then output reservoir dispatch warning.
Citation Information
Patent Citations
Back-fitting algorithm-based flood forecast real-time correction method
CN106384002A
Coupled numerical meteorological and hydrological aggregate forecasting reservoir scheduling risk decision method
CN108764515A
Reservoir scheduling early warning method based on meteorological numerical forecasting
CN110991688A
Waterlogging prevention early warning method, system and equipment for monitoring water level stability
CN111354163A
Reservoir level prediction and scheduling method based on multiple linear regression and meteorological data
CN114254833A