Engineering decoration intelligent management system and method based on artificial intelligence
Through artificial intelligence technology, integrate heterogeneous data of engineering decoration projects, build a digital twin model, conduct risk prediction and dynamic adjustment, and combine machine vision and the Internet of Things to solve data silos, risk prediction and quality and safety supervision in traditional engineering decoration project management. Problems improve the efficiency and safety of the project.
Patent Information
- Application Number
- CN202411004408.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-22
AI Technical Summary
Traditional engineering decoration project management faces problems such as data silos, difficult construction risks, insufficient flexibility in construction planning and resource allocation, and difficulty in supervising construction quality and safety, which affects the project progress, cost and quality.
Adopt an engineering decoration intelligent management system based on artificial intelligence, integrate heterogeneous data through data fusion algorithm, build a digital twin model, use machine learning to predict risks, and dynamically adjust plans and resources through construction scheduling and intelligent allocation algorithms, combining machine vision and The Internet of Things conducts quality inspection and safety monitoring.
It has achieved comprehensive integration of data and risk prediction, improved the flexibility of construction plans and resource utilization, timely discovered and dealt with quality and safety issues, and reduced risks and costs.
Smart Images

Figure CN119005886A_ABST
Abstract
Description
Technical Field
[0001] The invention proposes an intelligent management system and method for engineering decoration based on artificial intelligence, belonging to the technical field of artificial intelligence and engineering decoration. Background Art
[0002] In the traditional engineering decoration industry, project management faces many challenges, including but not limited to serious data silos, unpredictable construction risks, insufficient flexibility in construction planning and resource allocation, and difficulty in supervising construction quality and safety. These problems not only affect the progress and cost control of the project, but may also pose a potential threat to the final quality and safety of the project.
[0003] First, the data island phenomenon is one of the key factors that restrict the improvement of engineering decoration project management efficiency. During the project execution process, the data generated by multiple links such as design, procurement, and construction are often stored in different systems with different formats, which makes it difficult to effectively integrate and share. This leads to the lack of comprehensive and accurate data support for project managers when making decisions, making it difficult to make timely and scientific decisions.
[0004] Secondly, the prediction and prevention of construction risks is also a major problem in the management of traditional engineering decoration projects. Due to the complex and changeable construction site environment, there are many risk factors in the construction process that are difficult to quantify. Traditional risk management methods often rely on experience and judgment, making it difficult to achieve accurate prediction and effective prevention and control.
[0005] In addition, the lack of flexibility in construction planning and resource allocation is also an important factor that restricts project efficiency. In traditional project management, construction plans are often immutable and difficult to dynamically adjust according to the actual progress of the project and unexpected situations. At the same time, the allocation of construction resources often relies on manual experience, making it difficult to achieve optimal allocation and efficient use of resources.
[0006] Finally, the difficulty of construction quality and safety supervision is also an urgent problem to be solved in traditional engineering decoration project management. Due to the complex environment and large number of people on the construction site, traditional supervision methods often cannot achieve comprehensive, real-time and effective monitoring. This makes it difficult to discover and deal with quality and safety problems in the construction process in a timely manner, which brings potential risks to the smooth progress of the project. Summary of the invention
[0007] The present invention provides an engineering decoration intelligent management system and method based on artificial intelligence to solve the problems mentioned in the above background technology:
[0008] The present invention proposes an intelligent management method for engineering decoration based on artificial intelligence, the method comprising:
[0009] S1. Based on the data fusion algorithm, the multi-source data from multiple heterogeneous data sources are fused and converted into a unified data format, and the fused multi-source data is transmitted to the edge device for pre-processing;
[0010] S2. Build a digital twin model of the decoration site based on the preprocessed data, train the digital twin model through a machine learning algorithm, and predict the decoration risk based on the trained digital twin model;
[0011] S3. Through the construction scheduling algorithm, the construction plan is dynamically adjusted according to the project progress, risk prediction results and resource status, and based on the intelligent allocation algorithm, the construction resources are automatically adjusted according to real-time needs;
[0012] S4. Automatically inspect construction quality through machine vision, identify potential quality issues, and use IoT devices to monitor the safety status of the construction site in real time.
[0013] Furthermore, the S1 includes:
[0014] S11. Determine data collection requirements, formulate data collection plans based on data collection requirements, and connect various heterogeneous data sources through data collection interfaces;
[0015] S12. Based on the data quality monitoring system, the quality of the collected data is monitored through real-time data verification and anomaly detection algorithms;
[0016] S13. Preliminary classification and screening of data based on business needs and data characteristics, and elimination of irrelevant or low-value data;
[0017] S14. Build a data fusion framework and use data fusion algorithms to deeply fuse heterogeneous data at the semantic level;
[0018] S15. According to the time series characteristics and spatial distribution characteristics of the data, time series alignment and spatial matching are performed during the data fusion process, and the quality of the fused data is evaluated through the data quality evaluation mechanism;
[0019] S16. Through the data processing engine deployed on edge devices and edge computing algorithms, feature extraction, data compression and preliminary analysis of real-time data are performed.
[0020] Furthermore, the S12 includes:
[0021] Receive data from each collection point in real time through the data capture mechanism, and temporarily store the data in a high-performance cache system;
[0022] Perform preliminary format conversion and standardization on the received heterogeneous data, check whether the data is complete, and verify the consistency of the internal logic of the data through the set data range and business rules;
[0023] Determine the timeliness of data based on its timestamp and business requirements, and use the correlation and contextual information between data to perform verification;
[0024] Detect outliers in data through statistical methods and perform anomaly detection on complex multivariate data based on machine learning models;
[0025] In the case of unlabeled data, unsupervised learning methods are used to discover potential abnormal groups or patterns in the data. Combined with business rules and historical experience, an abnormal identification rule library is built to automatically match and identify abnormal data through the rule engine.
[0026] The detected abnormal data is marked and causal analysis is used to obtain the root cause of the abnormal data.
[0027] Furthermore, the S15 includes:
[0028] Preprocess the data with time series characteristics to ensure the comparability of different data sources in the time dimension, and use dynamic time warping and the longest common subsequence algorithm to align the time series data;
[0029] For data with spatial distribution characteristics, coordinate system uniform conversion is performed to convert geographic coordinates in different coordinate systems into a unified WGS-84 coordinate system;
[0030] Use spatial index and spatial interpolation to match and fuse spatial data, build a data quality assessment index system, and evaluate the quality of the fused data;
[0031] By integrating existing data quality monitoring tools, data quality assessment tasks are automatically performed, and machine learning models are introduced to learn from historical data quality assessment results and predict the quality status of future data; potential quality issues can be discovered in advance;
[0032] Establish a data quality feedback mechanism to provide feedback on data quality issues during data use, thus forming a closed-loop data quality management process;
[0033] In response to the data quality issues reported, we use causal analysis to find the root causes of the problems and continuously optimize the data fusion strategy based on the quality assessment results and feedback;
[0034] Establish a continuous data quality monitoring mechanism, conduct quality assessments on the fused data regularly or in real time, and continuously iterate and optimize the data fusion framework and process based on the assessment results.
[0035] Furthermore, the S2 includes:
[0036] S21. Based on BIM and GIS, build a three-dimensional model of the decoration site, integrate the physical simulation engine, and simulate the physical environment and dynamic change process of the decoration site;
[0037] S22, map multi-source data into the digital twin model, and update and dynamically display the data in real time;
[0038] S23. Select a machine learning framework and algorithm library, and use cross-validation and grid search to perform hyperparameter tuning and performance evaluation on the digital twin model through training data sets;
[0039] S24. Based on the trained digital twin model, the risk status of the decoration site is predicted in real time, and the risk warning threshold is set, and warning information is automatically generated according to the prediction results;
[0040] S25. Use the early warning notification mechanism to notify relevant personnel in multiple ways, track and manage early warning information, and record the processing process and results.
[0041] Furthermore, the S24 includes:
[0042] Extract multi-dimensional features from the digital twin model and construct a comprehensive risk prediction input vector based on the extracted multi-dimensional features;
[0043] Principal component analysis is used to select features and reduce dimensionality. For time series data, sliding windows are used for feature processing to capture the time dependency and dynamic change patterns in the data.
[0044] Combine multiple machine learning algorithms for integrated learning, use recurrent neural networks to process real-time data streams through real-time data processing modules, and dynamically predict risk status based on the processing results;
[0045] Quantify the uncertainty of the prediction results through Bayesian methods or Monte Carlo simulation, and evaluate the confidence interval of the prediction results;
[0046] According to business needs and security standards, the prediction results are divided into different risk levels, and corresponding warning thresholds are set. Differentiated warning rules are formulated for different risk levels;
[0047] Establish a dynamic adjustment mechanism for risk warnings, and adjust warning strategies and thresholds in a timely manner based on historical warning effects, business changes, and environmental changes; automatically generate warning information based on prediction results and warning rules.
[0048] Furthermore, the S3 includes:
[0049] S31. Collect project progress data in real time and dynamically adjust and optimize the construction plan based on risk prediction results;
[0050] S32. Based on external factors, formulate emergency plans and alternative plans, build resource demand forecasting models, and forecast resource demand by combining historical data and current project status;
[0051] S33, optimally allocate resources through intelligent allocation algorithms, and automate resource request, approval and allocation processes through resource scheduling systems;
[0052] S34. Establish a dynamic resource adjustment mechanism to dynamically adjust the resource allocation plan according to project progress and real-time needs, and use resource monitoring and reporting tools to track resource usage in real time and generate resource usage reports.
[0053] Furthermore, the S33 includes:
[0054] Construct a resource allocation algorithm framework based on multi-objective optimization, determine the optimization goals, and prioritize resource allocation based on multiple factors through the project priority evaluation model;
[0055] Build a cost-benefit analysis module to evaluate the impact of different resource allocation plans on the total cost, revenue and ROI (return on investment) of the project;
[0056] Analyze each process, build the overall architecture and process logic of the automation system based on the analysis results, integrate the intelligent allocation algorithm into the resource scheduling system, and develop interfaces with other systems, including ERP and CRM, for data sharing and process docking;
[0057] Through AI-assisted approval, the rationality of resource requests can be automatically judged based on historical data and current situations. The Internet of Things and big data can be used to monitor project progress and resource usage in real time and collect real-time data.
[0058] Based on real-time data and intelligent analysis, formulate dynamic resource adjustment strategies and use simulation technology to simulate different adjustment plans;
[0059] According to the preset report templates and user needs, resource usage reports are automatically generated, and the monitoring and reporting results are fed back to the intelligent allocation algorithm and resource scheduling system to continuously optimize the algorithm model and scheduling strategy to form a closed loop of continuous improvement.
[0060] Furthermore, the S4 includes:
[0061] S41. Use the machine vision system deployed at the decoration site to collect image data in real time, and use the image recognition algorithm based on deep learning to automatically identify quality problems in construction;
[0062] S42. Label and classify the identified quality problems, generate a test report, automatically push it to relevant personnel, and locate the quality problems to specific construction sites and components in combination with the BIM model;
[0063] S43. Through the quality traceability system, key information and data in the construction process are recorded to support the traceability and analysis of quality issues;
[0064] S44. Cover the safety risk points of the decoration site through IoT devices, and collect on-site data in real time through IoT devices;
[0065] S45. Receive and process on-site data in real time through the security monitoring platform, and conduct security risk assessment and early warning based on the processing results.
[0066] The system for realizing the intelligent management method of engineering decoration based on artificial intelligence proposed by the present invention comprises:
[0067] Data fusion module: Based on the data fusion algorithm, it fuses the multi-source data from multiple heterogeneous data sources, converts them into a unified data format, and transmits the fused multi-source data to the edge device for pre-processing;
[0068] Risk prediction module: construct a digital twin model of the decoration site based on the preprocessed data, train the digital twin model through a machine learning algorithm, and predict the decoration risk based on the trained digital twin model;
[0069] Automatic adjustment module: Through the construction scheduling algorithm, the construction plan is dynamically adjusted according to the project progress, risk prediction results and resource status, and the construction resources are automatically adjusted according to real-time needs based on the intelligent allocation algorithm;
[0070] Problem identification module: Automatically detect construction quality through machine vision, identify potential quality problems, and use IoT devices to monitor the safety status of the construction site in real time.
[0071] The invention has the following beneficial effects: by integrating multiple heterogeneous data sources, more comprehensive on-site information can be obtained, and the availability and value of data can be improved; data preprocessing ensures the quality and consistency of data, reduces the impact of errors and anomalies, and improves the accuracy of subsequent analysis; the digital twin model can reflect the status of the decoration site in real time, which helps to quickly identify potential risks and problems; using machine learning for risk prediction, measures can be taken in advance to avoid or mitigate risks and reduce the probability of accidents; dynamically adjust construction plans and resource allocation to make project management more flexible and efficient, reduce waste, and improve resource utilization; intelligent allocation algorithms and resource scheduling systems can achieve automation and optimization, reduce errors caused by human intervention, and improve the controllability of project progress. The application of machine vision and Internet of Things technology makes construction quality inspection and on-site safety monitoring more timely and accurate, reducing the occurrence of quality defects and safety accidents; real-time monitoring and early warning mechanisms can quickly respond to potential problems, ensure personnel safety and project quality; through data feedback and continuous quality monitoring, a closed loop of continuous improvement is formed to continuously improve the efficiency and effect of data processing and management; the iterative upgrade of optimization strategies ensures that the entire management system can adapt to the ever-changing environment and needs. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] Figure 1 It is a step diagram of the method of the present invention;
[0073] Figure 2 This is a system module diagram of the present invention. DETAILED DESCRIPTION
[0074] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0075] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. The embodiments described are only a part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0076] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0077] One embodiment of the present invention, as Figure 1 As shown, an intelligent management method for engineering decoration based on artificial intelligence, the method comprises:
[0078] S1. Based on the data fusion algorithm, the multi-source data from multiple heterogeneous data sources are fused and converted into a unified data format, and the fused multi-source data is transmitted to the edge device for pre-processing;
[0079] S2. Build a digital twin model of the decoration site based on the preprocessed data, train the digital twin model through a machine learning algorithm, and predict the decoration risk based on the trained digital twin model;
[0080] S3. Through the construction scheduling algorithm, the construction plan is dynamically adjusted according to the project progress, risk prediction results and resource status, and based on the intelligent allocation algorithm, the construction resources are automatically adjusted according to real-time needs;
[0081] S4. Automatically inspect construction quality through machine vision, identify potential quality issues, and use IoT devices to monitor the safety status of the construction site in real time.
[0082] The working principle of the above technical solution is as follows: first, the data from multiple heterogeneous data sources (such as design documents, construction logs, environmental sensors, surveillance videos, etc.) are integrated through a data fusion algorithm. These data sources may have different formats, structures and update frequencies. The task of the data fusion algorithm is to convert them into a unified data format for subsequent processing; the fused multi-source data is transmitted to edge devices (such as smart gateways, edge servers, etc.) for preprocessing. Preprocessing may include steps such as data cleaning (removing noise and erroneous data), data compression (reducing the amount of data transmission), and data conversion (converting to a form suitable for analysis) to improve the efficiency and accuracy of subsequent processing; based on the preprocessed data, a digital twin model of the decoration site is constructed. The digital twin model is a highly realistic virtual representation that can reflect the actual state, process and performance of the decoration site. The model integrates a variety of information such as physical space, sensor data, design information, etc., providing a basis for subsequent simulation, analysis and prediction; the digital twin model is trained using a machine learning algorithm to improve its ability to predict decoration risks. During the training process, the algorithm will learn the patterns, trends and associations in the historical data, so that it can predict the risks that may arise in the future (such as material shortages, construction delays, quality problems, etc.); based on the trained digital twin model, the potential risks in the decoration process are predicted in real time. These prediction results can help project managers take measures in advance to reduce the probability and impact of risks; dynamically adjust the construction plan through the construction scheduling algorithm according to the actual progress of the project, the risk prediction results and the current resource status. This includes rearranging the order of tasks, adjusting the construction period, optimizing resource allocation, etc., to ensure that the project can be completed on time, according to quality and quantity; based on real-time needs, the construction resources (including materials, manpower and equipment) are automatically adjusted using the intelligent allocation algorithm. The algorithm will consider factors such as resource availability, cost, efficiency, etc. to ensure that resources are optimally configured and improve construction efficiency and quality; the construction quality is automatically detected through machine vision technology. The machine vision system can identify quality problems (such as cracks, color difference, unevenness, etc.) during the construction process and provide real-time feedback to project managers. This helps to detect and correct problems in a timely manner to ensure that the construction quality meets the standards; combined with IoT devices, the safety status of the construction site is monitored in real time. IoT devices (such as sensors, cameras, etc.) can collect environmental data (such as temperature, humidity, noise, etc.) and personnel behavior data (such as wearing safety helmets, safety belts, etc.) at the construction site, evaluate the safety risks at the construction site through data analysis, and take corresponding preventive measures.
[0083] The effects of the above technical solution are as follows: through the data fusion algorithm, the data from multiple heterogeneous data sources are integrated into a unified format, which reduces the complexity and time cost of data processing and improves the efficiency of data processing; from data preprocessing, digital twin model construction to construction scheduling and resource allocation, the entire process is highly automated, reducing manual intervention and improving management efficiency; the digital twin model constructed based on the preprocessed data can simulate the actual conditions of the decoration site with a high degree of realism, providing a reliable basis for risk prediction; the digital twin model is trained through a machine learning algorithm so that it can learn the laws and trends in historical data, thereby achieving accurate prediction of decoration risks and helping project managers take measures in advance to reduce the probability and impact of risks; according to the project progress, risk prediction results and resource conditions, the construction plan is dynamically adjusted through the construction scheduling algorithm. Ensure the efficient progress of construction activities; based on real-time needs, use intelligent allocation algorithms to automatically adjust construction resources (materials, manpower, equipment) to achieve optimal resource allocation, reduce waste, and improve resource utilization; use machine vision technology to automatically detect construction quality, be able to promptly discover potential quality problems, and improve the controllability and stability of construction quality; use IoT devices to monitor the safety status of the construction site in real time, be able to promptly discover safety hazards, take preventive measures, and ensure the safety of construction personnel; through accurate risk prediction and intelligent resource allocation, reduce additional costs caused by material waste, construction delays and other problems; automated and intelligent management processes improve work efficiency and reduce labor and time costs; based on a large amount of real-time and accurate data, project managers can make more scientific and reasonable decisions and improve the quality and efficiency of decision-making.
[0084] In one embodiment of the present invention, the S1 includes:
[0085] S11. Determine data collection requirements and formulate a data collection plan based on the data collection requirements. The data collection technology includes data type, collection frequency, and collection point layout. Various heterogeneous data sources are connected through the data collection interface.
[0086] S12. Based on the data quality monitoring system, the quality of the collected data is monitored through real-time data verification and anomaly detection algorithms;
[0087] S13. Preliminary classification and screening of data based on business needs and data characteristics, and elimination of irrelevant or low-value data;
[0088] S14. Build a data fusion framework, including modules such as data cleaning, conversion, alignment and fusion, and deeply fuse heterogeneous data at the semantic level through data fusion algorithms (such as deep neural networks, federated learning, etc.);
[0089] S15. According to the time series characteristics and spatial distribution characteristics of the data, time series alignment and spatial matching are performed in the data fusion process, and the quality of the fused data is evaluated through the data quality evaluation mechanism; wherein the data quality is evaluated by the following formula:
[0090]
[0091] Among them, i represents the serial number of the evaluation data, P i represents the comprehensive data quality assessment value of the i-th group of evaluated data, is the optimal value of the j-th indicator.
[0092] S16. A lightweight data processing engine deployed on edge devices supports real-time data stream processing, and performs feature extraction, data compression and preliminary analysis on real-time data through edge computing algorithms.
[0093] The working principle of the above technical solution is: clarify what types of data need to be collected to support subsequent decoration project management.
[0094] Develop a data collection plan: Based on the collection requirements, develop a detailed data collection plan, including data types (such as sensor data, images, documents, audio recordings, etc.), collection frequency, and collection point layout; connect various heterogeneous data sources to the data collection system by designing or using existing data collection interfaces to ensure smooth data collection; use the data quality monitoring system to perform real-time verification of the collected data to ensure the accuracy and completeness of the data; apply anomaly detection algorithms to identify and mark abnormal data for subsequent processing; perform preliminary classification and screening of data based on business needs and data characteristics, eliminate irrelevant or low-value data, and reduce the amount of data to be processed later; design a data fusion framework that includes modules such as data cleaning, conversion, alignment, and fusion framework; through deep neural networks, federated learning and other advanced data fusion algorithms, heterogeneous data are deeply integrated at the semantic level to ensure data consistency and availability; according to the time series characteristics of the data, the data are time-series aligned to ensure data consistency on the time axis; considering the spatial distribution characteristics of the data, spatial matching is performed so that the data can correspond and relate to each other in space; through the data quality assessment mechanism, the quality of the fused data is comprehensively evaluated to ensure the reliability and validity of the data; a lightweight data processing engine is deployed on the edge device to support real-time data stream processing; the edge computing algorithm is used to extract features, compress data and conduct preliminary analysis on real-time data to reduce the burden on the central server and improve the real-time performance of data processing.
[0095] The effects of the above technical solutions are as follows: through the data quality monitoring system, the collected data is verified and anomaly detected in real time, which effectively reduces the impact of erroneous data and abnormal data on subsequent analysis and improves the accuracy and reliability of the data; in the data fusion framework, the original data is cleaned and formatted through the data cleaning and conversion module to ensure the consistency and availability of the data, providing a high-quality data foundation for subsequent analysis; according to business needs and data characteristics, the data is preliminarily classified and screened, and irrelevant or low-value data is eliminated, which reduces the amount of data processing and improves processing efficiency; through the lightweight data processing engine deployed on the edge device, it supports real-time data stream processing, reduces the burden on the central server, and improves data processing. The real-time and response speed of the edge computing algorithm are improved. Through the data acquisition interface, various heterogeneous data sources are connected to break the data island and realize the interconnection and interoperability of data. Advanced data fusion algorithms such as deep neural network and federated learning are used to deeply fuse heterogeneous data at the semantic level, which improves the comprehensive utilization value of data and provides more comprehensive data support for the subsequent decoration project management. In the process of data fusion, time series alignment and spatial matching are performed according to the time series characteristics and spatial distribution characteristics of the data, ensuring the consistency and coherence of the data in the time axis and spatial dimension, providing a basis for subsequent spatiotemporal analysis. The edge computing algorithm is used to process real-time data, reducing the security risks in the data transmission process and improving the security of data. At the same time, edge computing can also reduce the amount of data transmission and reduce the risk of data leakage. The high-quality data processed by the S1 step provides a solid foundation for the subsequent decoration project management and supports the formulation and implementation of intelligent decision-making. The edge device extracts features, compresses data and conducts preliminary analysis on real-time data, providing real-time data insights for project managers, which helps to find potential problems and take measures in time. The above formula provides a quantitative method to evaluate the quality of data, so that the quality of data has a clear measurement standard. By adjusting the weights, the formula can flexibly adapt to different business needs and data characteristics. Different business scenarios and data sets may have different quality requirements. By adjusting the weights, the importance of certain indicators can be emphasized or weakened, thereby more accurately reflecting the actual situation of data quality; due to the use of a unified evaluation formula, the quality evaluation results between different data sets are comparable. This helps to quickly identify and process low-quality data during the multi-source data fusion process to ensure the overall quality of the fused data; by evaluating data quality regularly or in real time, data quality problems can be discovered and resolved in a timely manner, thereby promoting continuous improvement of data quality. This helps to establish an efficient and reliable data management system to provide strong support for business decision-making; through data quality assessment, irrelevant or low-value data can be discovered and eliminated in a timely manner to improve the availability and value density of data.This makes subsequent data processing and analysis more efficient and accurate; based on the data quality assessment results, the resource allocation of data collection, storage and processing can be optimized. For example, for data sources with lower quality, the collection frequency can be reduced or the collection strategy can be adjusted to reduce the cost of data acquisition; high-quality data is an important basis for business decision-making. Through data quality assessment, it can be ensured that the data on which the decision depends is accurate and reliable, thereby improving the scientificity and accuracy of the decision; in the process of data sharing and collaboration between multiple departments or organizations, data quality assessment can be used as one of the standards for data exchange. By jointly complying with data quality assessment standards, effective data sharing and collaboration can be promoted, and overall work efficiency can be improved.
[0096] In one embodiment of the present invention, the S12 includes:
[0097] Receive data from various collection points in real time through data capture mechanisms (such as Kafka, RabbitMQ and other message queues), and temporarily store the data in a high-performance cache system, such as Redis or Memcached;
[0098] Perform preliminary format conversion and standardization on the received heterogeneous data, including unification of data types and normalization of timestamps, and check whether the data is complete. Verify the consistency of the internal logic of the data through the set data range and business rules, such as whether the temperature value is within a reasonable range and whether the date and time are logically correct;
[0099] Determine the timeliness of the data based on the data's timestamp and business requirements, and use the correlation and contextual information between the data to perform verification; for example, predict whether the current data is abnormal based on historical data trends.
[0100] Detect outliers in data through statistical methods (such as Z-Score, IQR, etc.), and perform anomaly detection on complex multivariate data based on machine learning models (such as isolation forest, autoencoder, LSTM, etc.);
[0101] In the case of unlabeled data, unsupervised learning methods (such as cluster analysis) are used to discover potential abnormal groups or patterns in the data. Combined with business rules and historical experience, an abnormal identification rule library is built to automatically match and identify abnormal data through the rule engine.
[0102] The detected abnormal data is marked, and detailed abnormal information, detection time, detection method, etc. are recorded. Causal analysis is used to obtain the root cause of the abnormal data, such as equipment failure, network delay, etc.
[0103] The working principle of the above technical solution is: using message queues such as Kafka and RabbitMQ as data capture mechanisms to receive data from various data collection points in real time and efficiently. These message queues can handle high-concurrency data streams to ensure the real-time and integrity of data; temporarily store the captured data in high-performance cache systems such as Redis or Memcached. These cache systems provide fast data access capabilities and can support high-throughput data processing requirements while reducing the pressure on the back-end database; perform preliminary format conversion and standardization on the received heterogeneous data, including the unification of data types and the normalization of timestamps. This step ensures the consistency and comparability of the data and lays the foundation for subsequent data processing and analysis; check whether the data is complete, such as whether key fields are missing and whether the dependencies are complete (such as whether the order and payment records match). Through the set data range and business rules, verify the consistency of the internal logic of the data, such as whether the temperature value is within a reasonable range and whether the date and time are logically correct; judge the timeliness of the data based on the timestamp of the data and business requirements. Data verification is performed using the correlation and contextual information between data, such as predicting whether the current data is abnormal based on historical data trends; detecting outliers in the data through statistical methods (such as Z-Score, IQR, etc.). These methods are based on the statistical distribution characteristics of the data and can identify data points that deviate from the normal range; for complex multivariate data, machine learning models (such as isolation forests, autoencoders, LSTM, etc.) are used for anomaly detection. These models can learn the normal patterns of data and identify abnormal data that does not conform to the normal patterns; in the case of unlabeled data, unsupervised learning methods (such as cluster analysis) are used to discover potential abnormal groups or patterns in the data. Combined with business rules and historical experience, an anomaly identification rule library is built, and abnormal data is automatically matched and identified through the rule engine; the detected abnormal data is marked, and detailed abnormal information, detection time, detection method, etc. are recorded. This information is crucial for subsequent problem tracking and cause analysis; causal analysis technology is used to obtain the root cause of the abnormal data. This may involve multiple factors such as equipment failure, network delay, and human error. By deeply analyzing the contextual information and associated data of abnormal data, the root cause of the problem can be more accurately located.
[0104] The effects of the above technical solutions are as follows: through message queues such as Kafka and RabbitMQ, data from various collection points can be received in real time, ensuring the timeliness and update of the data. This is crucial for data-intensive applications that require fast responses; temporarily storing data in high-performance cache systems such as Redis or Memcached can greatly improve data access speed, reduce data access delays, and improve the overall processing efficiency of the system; preliminary format conversion and standardization of heterogeneous data ensures data consistency and comparability, providing a solid foundation for subsequent data processing and analysis; by checking whether the data is complete, such as whether key fields are missing, whether dependencies are complete, etc., it can effectively prevent erroneous analysis or decision-making caused by incomplete data; by setting data ranges and business rules, the consistency of the internal logic of the data is verified, such as whether the temperature value is within a reasonable range, whether the date and time are logically correct, etc., further improving the quality of the data; combining statistical methods and machine learning models to perform multi-level anomaly detection on the data, it can accurately identify abnormal values or abnormal patterns in the data, which will provide a solid foundation for subsequent It provides strong support for exception handling; in the case of unlabeled data, it uses unsupervised learning methods to discover potential abnormal groups or patterns in the data, expands the scope of application of anomaly detection, and improves the intelligence level of the system; marking the detected abnormal data and recording detailed information helps to quickly locate the root cause of the problem and carry out targeted repairs and improvements; using causal analysis technology to obtain the root cause of the abnormal data, such as equipment failure, network delay, etc., provides a clear direction for problem solving; combined with detailed abnormal information and detection methods, it can track the occurrence process of the problem and provide a basis for subsequent prevention and improvement measures; through the processing of this step, it ensures that the data relied on by subsequent business analysis, model training, etc. are of high quality, high reliability and high timeliness, providing solid data support for business decision-making; based on high-quality data analysis results, it can make more accurate and scientific business decisions, optimize resource allocation, and improve business efficiency and benefits.
[0105] In one embodiment of the present invention, the S14 includes:
[0106] Identify and process missing values in the data through filling methods, and identify and remove noise in the data, such as random errors and outliers, through machine learning models;
[0107] Convert data of different dimensions and scales into a unified format through Z-Score standardization, and convert non-numeric data (such as text, date, etc.) into numeric data;
[0108] Build a data integration framework, including data pipelines, data warehouses, data lakes, etc., and build domain ontology to define concepts, relationships, attributes, etc. in the data, provide a basis for semantic layer data fusion, and use semantic similarity calculation and natural language processing to map similar concepts or entities in different data sources; align at the semantic level;
[0109] According to data characteristics and business needs, select data fusion algorithms (such as deep neural networks, federated learning, knowledge graph fusion, etc.) to deeply fuse heterogeneous data at the semantic level; for example, use deep neural networks to learn the complex relationships between different data sources, or use federated learning to perform distributed data fusion while protecting data privacy.
[0110] The quality of the fused data is evaluated through evaluation indicators (such as accuracy, recall rate, F1 score, etc.). During and after the fusion process, the data is checked for consistency, and it is checked whether the fused data fully covers all necessary business scenarios and data dimensions.
[0111] The working principle of the above technical solution is: identify and process missing values in the data. Common methods include filling methods (such as mean filling, mode filling, interpolation, etc.) to reduce the impact of missing values on data quality. Use machine learning models to identify and remove noise in the data, such as random errors, outliers, etc., to improve the purity and accuracy of the data. Through methods such as Z-Score standardization, data of different dimensions and scales are converted into a unified format to eliminate the impact of dimension differences on data fusion. Convert non-numeric data (such as text, date, etc.) into numerical data for numerical calculation and fusion. Build a data integration framework including data pipelines, data warehouses, data lakes, etc. to achieve centralized management and unified access to data. Build a domain ontology to define concepts, relationships, attributes, etc. in the data, providing a basis for semantic layer data fusion. Domain ontology helps understand the meaning and context of data and promotes understanding and communication between different data sources. Use semantic similarity calculation and natural language processing technology to map and align similar concepts or entities in different data sources. This helps eliminate semantic ambiguity and conflicts between data and improve the accuracy and reliability of data fusion. According to data characteristics and business requirements, select appropriate data fusion algorithms for deep fusion of heterogeneous data. These algorithms may include deep neural networks, federated learning, knowledge graph fusion, etc. Deep neural networks can learn complex relationships between different data sources, extract deep features and fuse them; federated learning can perform distributed data fusion under the premise of protecting data privacy, which is suitable for scenarios where multiple data sources are stored in a decentralized manner and privacy needs to be protected. Deeply fuse heterogeneous data at the semantic level to form a unified and coherent data view. This helps eliminate data silos and achieve comprehensive integration and efficient use of data. Evaluate the quality of the fused data through evaluation indicators (such as accuracy, recall, F1 score, etc.) to ensure that the fused data meets business requirements and quality standards. The evaluation process may include comparing the data quality before and after fusion, analyzing errors and deviations in the fusion process, etc. During and after the fusion process, perform consistency checks on the data to ensure that the fused data is logically consistent and conflict-free. Check whether the fused data fully covers all necessary business scenarios and data dimensions to ensure the comprehensiveness and integrity of the data.
[0112] The effects of the above technical solutions are: missing values are processed by filling methods, and noise such as random errors and outliers are removed by machine learning models, which significantly improves the integrity and accuracy of the data. This helps to reduce analytical biases and wrong decisions caused by data quality issues; Z-Score standardization converts data of different dimensions and scales into a unified format, eliminating analytical barriers caused by dimensional differences. At the same time, non-numeric data is converted into numerical data, so that more types of data can participate in the subsequent analysis and fusion process, increasing the availability and diversity of data; by building a data integration framework including data pipelines, data warehouses, data lakes, etc., centralized management and unified access to data are achieved. This helps to simplify the process of data processing and improve the efficiency of data processing; domain ontology and semantic similarity calculation technology are used to achieve mapping and alignment of similar concepts or entities in different data sources. This helps to eliminate semantic ambiguity and conflicts between data and improve the accuracy and reliability of data fusion. At the same time, selecting appropriate data fusion algorithms for deep fusion based on data characteristics and business needs further improves the effect of data fusion; in the process of data fusion, the use of federated learning technology can be used to perform distributed data fusion under the premise of protecting data privacy. This helps solve the data sharing problems caused by data privacy and security issues, and promotes data cooperation and sharing among different organizations; the quality of the fused data is evaluated through evaluation indicators, and consistency verification and integrity checks are performed during and after the fusion process to ensure the quality and integrity of the fused data. This helps avoid analytical deviations and wrong decisions caused by data quality issues, and improves the accuracy and reliability of data analysis; by checking whether the fused data fully covers all necessary business scenarios and data dimensions, the comprehensiveness and integrity of the data are ensured. This helps companies understand the business situation more comprehensively and make more scientific decisions and strategies; high-quality fused data provides strong support for subsequent advanced applications such as data analysis, data mining, and machine learning. Companies can use this data to conduct deeper business insights and predictive analysis to improve business operation efficiency and competitiveness.
[0113] In one embodiment of the present invention, the S15 includes:
[0114] Preprocess the data with time series characteristics, including standardization of timestamps and uniform adjustment of time intervals, to ensure the comparability of different data sources in the time dimension. Use dynamic time warping (DTW) and longest common subsequence (LCS) algorithms to align time series data to eliminate data differences caused by time offset or asynchrony.
[0115] For data with spatial distribution characteristics, coordinate system uniform conversion is performed to convert geographic coordinates in different coordinate systems into a unified WGS-84 coordinate system;
[0116] Use spatial index and spatial interpolation to match and fuse spatial data, build a data quality assessment index system, and evaluate the quality of the fused data;
[0117] By integrating existing data quality monitoring tools, data quality assessment tasks are automatically performed, and machine learning models (such as random forests, gradient boosting trees, etc.) are introduced to learn from historical data quality assessment results and predict the quality status of future data; potential quality issues are discovered in advance;
[0118] Establish a data quality feedback mechanism so that business personnel can provide feedback on data quality issues during data use, thus forming a closed-loop data quality management process;
[0119] In response to the feedback of data quality issues, we use causal analysis to find the root cause of the problem, and continuously optimize the data fusion strategy based on the quality assessment results and feedback, including adjusting the fusion algorithm parameters, improving the data preprocessing process, etc.
[0120] Establish a continuous data quality monitoring mechanism, conduct quality assessments on the fused data regularly or in real time, and continuously iterate and optimize the data fusion framework and process based on the assessment results.
[0121] The working principle of the above technical solution is as follows: First, preprocess the data with time series characteristics, including the standardization of timestamps (such as unified time zone, format, etc.) and the unified adjustment of time intervals (such as converting data of different frequencies to a unified frequency) to ensure the comparability of different data sources in the time dimension; use algorithms such as dynamic time warping (DTW) and longest common subsequence (LCS) to align time series data. These algorithms can identify and match similar patterns in time series, even if there is a time offset or asynchrony between them, thereby eliminating data inconsistencies caused by time differences; for data with spatial distribution characteristics, perform a unified conversion of the coordinate system. Convert geographic coordinates in different coordinate systems into a unified WGS-84 coordinate system to ensure the consistency and comparability of spatial data; use spatial indexes (such as R-trees, quadtrees, etc.) to accelerate the retrieval and matching process of spatial data, and use spatial interpolation methods (such as inverse distance weighted interpolation, Kriging interpolation, etc.) to supplement and fuse missing or sparse spatial data to build a more complete and continuous spatial data set; build a data quality assessment indicator system, including multiple dimensions such as accuracy, completeness, consistency, timeliness, and interpretability, to comprehensively evaluate the quality of the fused data; integrate existing data quality monitoring tools to automatically perform data quality assessment tasks. At the same time, introduce machine learning models (such as random forests, gradient boosting trees, etc.) to learn the historical data quality assessment results, predict the quality status of future data, and realize the early discovery of potential quality problems; establish a data quality feedback mechanism to allow business personnel to provide feedback on data quality issues during the use of data. These feedback opinions will serve as an important basis for optimizing data fusion strategies; use causal analysis to find the root causes of data quality problems, and continuously optimize data fusion strategies based on quality assessment results and feedback opinions. This may include adjusting fusion algorithm parameters, improving data preprocessing processes, etc.; establishing a continuous data quality monitoring mechanism to regularly or in real time evaluate the quality of fused data. This helps to promptly identify new data quality issues and take corresponding optimization measures; based on the evaluation results, continuously iterate and optimize the data fusion framework and process to ensure continuous improvement of data quality and meet business needs.
[0122] The effect of the above technical solution is: by standardizing timestamps and uniformly adjusting time intervals, the differences between different data sources in the time dimension are eliminated, making these data more consistent and comparable during comparison and analysis. At the same time, the DTW and LCS algorithms are used to align time series data, further eliminating data differences caused by time offset or asynchrony, and improving data accuracy and reliability; the geographic coordinates in different coordinate systems are converted into a unified WGS-84 coordinate system, solving the integration problem of spatial data caused by inconsistent coordinate systems, and providing convenience for subsequent data analysis and application; the spatial index and spatial interpolation technology are used to achieve accurate matching and effective fusion of spatial data, build a more complete, continuous and accurate spatial data set, and provide strong support for geospatial analysis; a data quality assessment indicator system including multiple dimensions such as accuracy, completeness, consistency, timeliness and interpretability is constructed, and the quality of the fused data is comprehensively evaluated to ensure the high quality and availability of the data; by integrating existing data quality monitoring tools and introducing machine learning models, automatic assessment and prediction of data quality are realized, potential quality problems can be discovered in time and measures can be taken in advance to intervene, reducing data quality risks; a data quality feedback mechanism is established to allow business personnel to provide feedback on data quality issues during the use of data, forming a closed-loop data quality management process. This mechanism helps to find problems in time and respond quickly, promoting the continuous improvement and enhancement of data quality. In response to the feedback of data quality problems, causal analysis is used to find the root cause of the problem, and the data fusion strategy is continuously optimized based on the quality assessment results and feedback. This includes adjusting the fusion algorithm parameters, improving the data preprocessing process, etc., to improve the efficiency and accuracy of data fusion; a continuous data quality monitoring mechanism is established to conduct quality assessment of the fused data regularly or in real time. This mechanism helps to ensure the stability and sustainability of data quality, providing a strong guarantee for the data-driven decision-making of enterprises.
[0123] In one embodiment of the present invention, the S2 includes:
[0124] S21. Based on BIM and GIS, build a three-dimensional model of the decoration site, integrate the physical simulation engine, and simulate the physical environment and dynamic change process of the decoration site;
[0125] S22, map multi-source data into the digital twin model, and update and dynamically display the data in real time;
[0126] S23. Select machine learning frameworks and algorithm libraries, such as TensorFlow and PyTorch, and use cross-validation and grid search to perform hyperparameter tuning and performance evaluation on the digital twin model through training data sets, including historical data, simulated data, and real-time data;
[0127] S24. Based on the trained digital twin model, the risk status of the decoration site is predicted in real time, and the risk warning threshold is set, and warning information is automatically generated according to the prediction results;
[0128] S25. Through the early warning notification mechanism, relevant personnel are notified through multiple means, such as SMS, email, and APP push, and the early warning information is tracked and managed, and the processing process and results are recorded.
[0129] The working principle of the above technical solution is as follows: First, based on the building information model (BIM) and geographic information system (GIS) technology, a three-dimensional model of the decoration site is constructed. This model not only contains the static structural information of the decoration site (such as room layout, wall materials, etc.), but also can simulate the physical environment and dynamic change process of the decoration site (such as light changes, temperature changes, material aging, etc.) through the integrated physical simulation engine. Such a model provides a basis for subsequent data mapping and simulation analysis; Next, multi-source data (such as sensor data, images, documents, etc.) are mapped to the constructed digital twin model. These data sources provide real-time and historical operating status information of the decoration site. Through data interfaces and data processing technologies, these data are updated in real time to the digital twin model to ensure that the model is highly consistent with the actual situation. At the same time, through dynamic display technology, the updated data is presented to relevant personnel in a visual form; in order to improve the prediction ability and accuracy of the digital twin model, a suitable machine learning framework (such as TensorFlow, PyTorch, etc.) and algorithm library are selected, and the model is trained using training data sets (including historical data, simulation data, and real-time data, etc.). During the training process, the cross-validation method is used to evaluate the generalization ability of the model, and the hyperparameters of the model are tuned through optimization algorithms such as grid search to achieve the best performance; based on the trained digital twin model and machine learning algorithm, the risk status of the decoration site is predicted in real time. According to the preset risk warning threshold, when the prediction result exceeds the threshold, the warning information is automatically generated. These warning information can include the type, degree, location and possible impact range of the risk, etc., to provide timely risk reminders for relevant personnel; finally, through the warning notification mechanism, the generated warning information is notified to relevant personnel in various ways (such as SMS, email, APP push, etc.). These personnel can respond quickly according to the warning information and take corresponding measures to reduce risks or eliminate hidden dangers. At the same time, the system also supports the tracking and management of warning information, and records the processing process and results for subsequent analysis and summary.
[0130] The effect of the above technical solution is: the three-dimensional model constructed by BIM and GIS technology not only provides an intuitive visual display of the decoration site, but also integrates a physical simulation engine that can simulate the physical environment and dynamic change process. This enables managers to understand the on-site situation more clearly and make more accurate decisions; multi-source data such as sensor data, images, and documents are mapped to the digital twin model to achieve real-time update and dynamic display of data. This real-time performance ensures that managers can keep abreast of the latest situation on the site, discover problems in a timely manner and take measures; advanced machine learning frameworks and algorithm libraries such as TensorFlow and PyTorch are used to perform hyperparameter tuning and performance evaluation on the digital twin model through training data sets. This greatly improves the prediction accuracy and reliability of the model, making the prediction of the risk status of the decoration site more accurate; based on the trained digital twin model, the risk status of the decoration site is predicted in real time, and the risk warning threshold is set. Once the prediction result exceeds the threshold, the system automatically generates warning information and notifies relevant personnel in various ways. This early warning mechanism enables managers to respond quickly and take effective measures to reduce risks or eliminate hidden dangers; through the warning notification mechanism, managers can understand the warning information in a timely manner and record the processing process and results. This process-based management method improves work efficiency and reduces human errors and omissions. At the same time, through early warning and rapid response, losses and increased costs caused by risk events can be avoided; the digital twin model integrates multi-source data and conducts comprehensive analysis through machine learning algorithms. This provides managers with rich data support, helping them to understand the on-site situation more comprehensively and make more scientific decisions.
[0131] In one embodiment of the present invention, the S24 includes:
[0132] Extract multi-dimensional features from the digital twin model, including physical environment parameters (such as temperature, humidity, and light), equipment status (such as operating status and fault records), personnel activities (such as location and action), and material status (such as inventory and loss rate), and build a comprehensive risk prediction input vector based on the extracted multi-dimensional features;
[0133] Principal component analysis (PCA) is used to select features and reduce dimensionality. For time series data, sliding windows are used for feature processing to capture the time dependency and dynamic change patterns in the data.
[0134] Combine multiple machine learning algorithms (such as random forest, gradient boosting tree, deep learning model, etc.) for integrated learning. Through the real-time data processing module, use LSTM, GRU and other recurrent neural networks to process real-time data streams, and dynamically predict risk status based on the processing results;
[0135] Quantify the uncertainty of the prediction results through Bayesian methods or Monte Carlo simulation, and evaluate the confidence interval of the prediction results;
[0136] According to business needs and security standards, the prediction results are divided into different risk levels (such as low risk, medium risk, and high risk), and corresponding warning thresholds are set. Differentiated warning rules are formulated for different risk levels, including the triggering conditions, content format, and sending frequency of the warning information.
[0137] Establish a dynamic adjustment mechanism for risk warnings, and adjust warning strategies and thresholds in a timely manner based on historical warning effects, business changes, and environmental changes; automatically generate warning information based on prediction results and warning rules. The warning information includes risk level, specific location, impact range, and recommended measures;
[0138] The working principle of the above technical solution is to extract multi-dimensional features from the constructed digital twin model. These features cover various information such as physical environment parameters (such as temperature, humidity, and light), equipment status (such as operating status and fault records), personnel activities (such as location and action), and material status (such as inventory and loss rate). These features together constitute a comprehensive risk prediction input vector, providing a rich data basis for subsequent risk prediction. In order to improve the prediction efficiency and accuracy, the extracted features are selected and reduced in dimension using methods such as principal component analysis (PCA). PCA maps multi-dimensional features to low-dimensional space through linear transformation while retaining the main information of the original data as much as possible. For time series data, sliding window technology is used for feature processing to capture the time dependency and dynamic change rules in the data. Combined learning with a variety of machine learning algorithms (such as random forests, gradient boosting trees, deep learning models, etc.) can improve the generalization ability and robustness of the prediction model. Through the real-time data processing module, recurrent neural networks such as LSTM (long short-term memory network) and GRU (gated recurrent unit) are used to process real-time data streams. These network structures are particularly suitable for processing time series data, can capture long-term dependencies in the data, and dynamically predict risk status based on the processing results. In order to evaluate the reliability of the prediction results, Bayesian methods or Monte Carlo simulations are used to quantify the uncertainty of the prediction results. These methods can estimate the confidence interval of the prediction results and provide decision makers with additional information about the reliability of the prediction results. According to business needs and safety standards, the prediction results are divided into different risk levels (such as low risk, medium risk, and high risk), and corresponding warning thresholds are set. Differentiated warning rules are formulated for different risk levels, including the triggering conditions, content format, and sending frequency of warning information. These rules ensure the accuracy and timeliness of warning information and help to take timely response measures. A dynamic adjustment mechanism for risk warning is established to adjust the warning strategy and threshold in a timely manner according to historical warning effects, business changes, and environmental changes. This mechanism ensures the flexibility and adaptability of the warning system and can cope with complex and changing field environments. Warning information is automatically generated based on the prediction results and warning rules. The warning information contains key information such as risk level, specific location, scope of impact, and recommended measures, which helps relevant personnel quickly understand the risk situation and take corresponding response measures. Early warning information is sent to relevant personnel through multiple means (such as SMS, email, APP push, etc.) to ensure timely communication of information.
[0139] The effect of the above technical solution is: by extracting multi-dimensional features from the digital twin model and constructing a comprehensive risk prediction input vector, the technical solution can achieve comprehensive perception of the physical environment, equipment status, personnel activities, and material status of the decoration site. This comprehensive risk perception capability makes the prediction results more accurate and comprehensive, which helps to discover potential risks in advance. The use of principal component analysis (PCA) to select and reduce the dimensions of features not only reduces the redundancy and computational complexity of the data, but also improves the efficiency of the prediction model. For time series data, the sliding window is used for feature processing, which effectively captures the time dependency and dynamic change rules in the data, further improving the accuracy of the prediction. Combining multiple machine learning algorithms for integrated learning can make full use of the advantages of different algorithms and improve the generalization ability and robustness of the prediction model. The real-time data stream is processed by real-time data processing modules and recurrent neural networks (such as LSTM, GRU) to realize dynamic prediction of risk status. This real-time prediction capability enables managers to understand the on-site situation in a timely manner and respond quickly. The uncertainty of the prediction results is quantified by Bayesian method or Monte Carlo simulation, providing a confidence interval evaluation for the prediction results. This uncertainty quantification helps managers understand the reliability range of the forecast results and make more scientific decisions. Differentiated warning rules are formulated according to business needs and safety standards, including the trigger conditions, content format, and sending frequency of warning information, to ensure the pertinence and effectiveness of warning information. At the same time, a dynamic adjustment mechanism for risk warning is established to adjust the warning strategy and threshold in a timely manner according to historical warning effects, business changes, and environmental changes, maintaining the flexibility and adaptability of the warning system. Warning information is automatically generated based on the forecast results and warning rules, and is promptly communicated to relevant personnel through multiple methods (such as SMS, email, APP push, etc.). This automated warning information generation and communication mechanism ensures the timeliness and accuracy of information, and helps relevant personnel quickly understand the risk situation and take corresponding countermeasures.
[0140] In one embodiment of the present invention, S3 includes:
[0141] S31. Collect project progress data in real time, including completed and unfinished workload; dynamically adjust and optimize the construction plan based on risk prediction results;
[0142] S32. Develop contingency plans and alternative plans based on external factors, such as weather and supply chain, build resource demand forecasting models, and forecast resource demand based on historical data and current project status;
[0143] S33. Through intelligent allocation algorithms, resources are optimally allocated by comprehensively considering factors such as resource availability, cost-effectiveness, and project priority, and resource request, approval, and allocation processes are automated through the resource scheduling system;
[0144] S34. Establish a dynamic resource adjustment mechanism to dynamically adjust the resource allocation plan according to project progress and real-time needs, and use resource monitoring and reporting tools to track resource usage in real time and generate resource usage reports.
[0145] The working principle of the above technical solution is as follows: First, the system collects project progress data in real time, including key indicators such as completed workload and unfinished workload. These data are automatically collected and summarized into a central database through digital tools (such as project management software, sensors, etc.); at the same time, the system takes into account the prediction results of the risk prediction module (as described in S24). These prediction results are based on digital twin models and machine learning algorithms to identify and quantify potential risk factors; combined with project progress data and risk prediction results, the system dynamically adjusts and optimizes the construction plan. Through intelligent algorithm analysis, factors that may cause delays or cost overruns are identified, and the construction sequence, resource allocation, etc. are automatically adjusted to ensure that the project proceeds smoothly as planned; the system not only pays attention to internal project data, but also comprehensively considers external factors, such as weather changes and supply chain conditions. These factors may have a significant impact on the progress and resource requirements of the project; based on the prediction and evaluation of external factors, the system formulates emergency plans and alternative plans. These plans are designed to deal with possible emergencies, such as shutdowns caused by bad weather, material shortages caused by supply chain disruptions, etc.; combined with historical data and current project status, the system builds a resource demand prediction model. The model can predict the quantity and time points of various resources (such as human, material, and financial resources) required for the project in the future, and provide a basis for resource allocation. The system adopts an intelligent allocation algorithm to comprehensively consider multiple factors such as resource availability, cost-effectiveness, and project priority to optimally allocate resources. The algorithm ensures that resource allocation meets both project needs and economic benefits through complex calculations and optimization processes. The resource scheduling system automates the resource request, approval, and allocation processes. This system simplifies the traditional manual approval process and improves the efficiency and accuracy of resource scheduling. At the same time, the system also provides a real-time monitoring and feedback mechanism to ensure the smooth implementation of the resource allocation plan. According to the progress of the project and real-time needs, the system establishes a dynamic resource adjustment mechanism. This mechanism can promptly discover unreasonable aspects of resource allocation and automatically or manually adjust the resource allocation plan. Through continuous monitoring and adjustment, the effective use of project resources and the smooth progress of the project are ensured. The system is also equipped with resource monitoring and reporting tools. These tools can track resource usage in real time, including resource usage, remaining quantity, distribution, etc. At the same time, the system can also generate resource usage reports to provide decision support for project management. The report is detailed and intuitive, helping management to quickly understand the status of project resources and make corresponding decisions.
[0146] The effect of the above technical solution is: by collecting project progress data in real time and combining it with risk prediction results, the construction plan can be adjusted and optimized in a timely and dynamic manner. This enables the project management team to respond quickly to changes in the project and improve the flexibility and responsiveness of the project; risk prediction based on external factors and the formulation of emergency plans enable the project to prepare and respond to potential risk events in advance. This helps to reduce the impact of risk events on project progress and costs and enhance the risk management capabilities of the project; the optimal allocation of resources through intelligent allocation algorithms not only considers the availability of resources, but also takes into account cost-effectiveness and project priorities. This allocation method can ensure that resources are used reasonably, reduce resource waste, and improve resource utilization; the automated processing function of the resource scheduling system simplifies the process of resource request, approval and allocation, and improves work efficiency. At the same time, it reduces the possibility of human errors and ensures the accuracy and timeliness of resource allocation; establishes a dynamic resource adjustment mechanism, which can adjust the resource allocation plan in time according to project progress and real-time needs. This dynamic adjustment ensures the effective allocation of resources and the smooth progress of the project, and improves the execution efficiency of the project; through resource monitoring and reporting tools, real-time tracking of resource usage and generation of resource usage reports provide project management with a clear and intuitive project resource status. This helps management understand project progress and resource allocation in a timely manner and make more informed decisions; through the automated resource scheduling system and real-time data monitoring, project team members can work together to promote the smooth progress of the project. This collaborative working model improves the team's work efficiency and cohesion.
[0147] In one embodiment of the present invention, the S33 includes:
[0148] Construct a resource allocation algorithm framework based on multi-objective optimization and determine the optimization objectives, which include resource availability, cost-effectiveness, and project priority, while considering resource constraints and project requirements. Through the project priority evaluation model, prioritize resource allocation based on multiple factors, including project urgency, importance, and customer satisfaction;
[0149] Build a cost-benefit analysis module to evaluate the impact of different resource allocation plans on the total cost, revenue and ROI (return on investment) of the project;
[0150] Analyze each process, including resource request, approval, and allocation, build the overall architecture and process logic of the automation system based on the analysis results, integrate the intelligent allocation algorithm into the resource scheduling system, and develop interfaces with other systems, including ERP and CRM, for data sharing and process docking;
[0151] Through AI-assisted approval, the rationality of resource requests can be automatically judged based on historical data and current situations. The Internet of Things and big data can be used to monitor project progress and resource usage in real time and collect real-time data. Among them, resource usage is calculated using the following formula:
[0152]
[0153] Among them, Z use Indicates resource usage, N w (α) represents the number of waiting resources or unused resources for the αth project, N P (α) represents the number of resources being used by the αth project, and N(β) represents the total number of resources.
[0154] Based on real-time data and intelligent analysis, formulate dynamic resource adjustment strategies, including resource reallocation, priority adjustment, and emergency procurement, and use simulation technology to simulate different adjustment plans;
[0155] Based on preset report templates and user needs, resource usage reports are automatically generated, including resource allocation details, usage analysis, cost-benefit evaluation, etc. The monitoring and reporting results are fed back to the intelligent allocation algorithm and resource scheduling system to continuously optimize the algorithm model and scheduling strategy to form a closed loop of continuous improvement.
[0156] The working principle of the above technical solution is as follows: First, a resource allocation algorithm framework based on multi-objective optimization is constructed to clarify the optimization objectives, namely resource availability, cost-effectiveness and project priority. The framework formulates a resource allocation strategy by comprehensively considering these optimization objectives, as well as resource constraints and project requirements. In order to accurately evaluate the project priority, a project priority evaluation model is introduced, which scores projects based on multiple factors (such as project urgency, importance, and customer satisfaction), and then prioritizes resource allocation. A cost-benefit analysis module is constructed, which is used to evaluate the impact of different resource allocation schemes on the total cost, revenue and ROI (return on investment) of the project. A scientific basis is provided for decision-making by analyzing the economic effects of various resource allocation schemes in detail. An in-depth analysis is conducted on each process (resource request, approval, allocation), and the overall architecture and process logic of the automation system are constructed based on the analysis results. The intelligent allocation algorithm is integrated into the resource scheduling system to realize the intelligence and automation of resource allocation. At the same time, interfaces with other systems (such as ERP, CRM) are developed to realize data sharing and process docking, and enhance the collaborative working ability of the overall system. AI technology is used to judge the rationality of resource requests. By analyzing historical data and current situations, the AI system can automatically evaluate the rationality of resource requests, reducing the tediousness and errors of manual approval. At the same time, combined with the Internet of Things and big data technology, real-time monitoring of project progress and resource usage can be carried out to ensure the real-time and accuracy of data. Based on real-time data and intelligent analysis, dynamic resource adjustment strategies are formulated. These strategies include resource reallocation, priority adjustment, emergency procurement, etc. Using simulation technology, different adjustment plans are simulated to evaluate their impact on project progress, cost, risk, etc. By comparing the effects of different plans, the best plan is selected for implementation to ensure the most reasonable use of resources. Resource usage reports are automatically generated according to preset report templates and user needs. These reports include resource allocation details, usage analysis, cost-effectiveness evaluation, etc., providing comprehensive decision-making support for management. At the same time, the monitoring and reporting results are fed back to the intelligent allocation algorithm and resource scheduling system to continuously optimize the algorithm model and scheduling strategy. By forming a closed loop of continuous improvement, it is ensured that the system can continuously adapt to project changes and improve overall management efficiency.
[0157] The effects of the above technical solutions are as follows: by constructing a resource allocation algorithm framework based on multi-objective optimization, it is possible to comprehensively consider multiple factors such as resource availability, cost-effectiveness and project priority to achieve optimal resource allocation. This can not only improve the accuracy of resource allocation, but also ensure that resources are used most effectively; using the project priority evaluation model, priority sorting is performed based on multiple factors such as project urgency, importance and customer satisfaction, ensuring that key projects and urgent tasks can get priority resource support, improving the efficiency and success rate of project execution; this module can comprehensively evaluate the impact of different resource allocation schemes on the total cost, benefits and ROI of the project. This helps management weigh the pros and cons in the decision-making process, select the most cost-effective solution, and maximize the utilization of resources and the maximum benefits of the project; by analyzing processes such as resource request, approval and allocation, the overall architecture and process logic of the automation system are constructed to realize the automation and intelligence of resource scheduling. This can significantly reduce manual intervention and errors, improve work efficiency and accuracy; using AI technology to automatically judge the rationality of resource requests, it can quickly respond to and process resource requests, and improve approval efficiency. At the same time, the Internet of Things and big data technologies are combined to monitor project progress and resource usage in real time to ensure the real-time and accuracy of data; dynamic resource adjustment strategies are formulated based on real-time data and intelligent analysis to flexibly respond to changes and challenges in the project. Through measures such as resource reallocation, priority adjustment and emergency procurement, the project can be carried out smoothly as planned, reducing delays and cost overruns caused by insufficient or improper resource allocation; using simulation technology to simulate and evaluate different adjustment plans, it can predict and avoid potential risks in advance and select the best plan for implementation. This helps management make more informed and scientific decisions; resource usage reports are automatically generated according to preset report templates and user needs, including resource allocation details, usage analysis and cost-effectiveness evaluation. This helps management to understand the project resource status and cost-effectiveness in a timely manner and provide strong support for decision-making; the monitoring and reporting results are fed back to the intelligent allocation algorithm and resource scheduling system to continuously optimize the algorithm model and scheduling strategy. This closed-loop mechanism of continuous improvement can ensure that the system continues to adapt to project changes and management needs and improve overall management efficiency. The above formula can directly calculate and display the overall usage of current resources, and intuitively reflect the degree of resource tension or idle status through the proportion form (usage rate); the formula includes the number of waiting resources and the number of resources in use, which allows for a more detailed analysis of resource usage. For example, you can see which projects are using resources efficiently and which projects are waiting or wasting resources. By accumulating the resource usage of different projects and dividing it by the total number of resources, the formula can flexibly adapt to project portfolios of different sizes and complexities. Whether it is a single large project or multiple small projects in parallel, the overall resource usage can be accurately calculated.Real-time calculation of resource usage, combined with the Internet of Things and big data technology, can monitor project progress and dynamic changes in resources in real time. This provides timely and accurate data support for the formulation and adjustment of resource allocation strategies, which helps to achieve optimal allocation and efficient use of resources. Based on the calculation results of this formula, managers can formulate resource adjustment strategies more scientifically, such as resource reallocation, priority adjustment or emergency procurement. The formulation of these strategies will be more based on evidence, which will help reduce decision-making errors and resource waste. Integrating this formula into the resource scheduling system and processing resource request, approval and allocation processes in an automated and intelligent manner can significantly improve the efficiency and accuracy of resource scheduling. This helps shorten project cycles, reduce costs and improve customer satisfaction. By generating resource usage reports and feeding them back to the intelligent allocation algorithm and resource scheduling system, the algorithm model and scheduling strategy can be continuously optimized. This closed-loop mechanism of continuous improvement helps to improve the performance and effectiveness of the entire resource allocation system, thereby creating greater value for the enterprise.
[0158] In one embodiment of the present invention, the S4 includes:
[0159] S41. Use the machine vision system deployed at the decoration site to collect image data in real time, and use the image recognition algorithm based on deep learning to automatically identify quality problems in construction, such as cracks, color difference, and unevenness;
[0160] S42. Label and classify the identified quality problems, generate detailed inspection reports, automatically push them to relevant personnel, and locate the quality problems to specific construction sites and components in combination with the BIM model;
[0161] S43. Through the quality traceability system, key information and data in the construction process are recorded to support the traceability and analysis of quality issues.
[0162] S44. Cover the safety risk points of the decoration site through IoT devices, including safety monitoring sensors such as smoke alarms, temperature sensors, and vibration sensors, and collect on-site data in real time through IoT devices;
[0163] S45. Receive and process on-site data in real time through the security monitoring platform, and conduct security risk assessment and early warning based on the processing results.
[0164] The working principle of the above technical solution is as follows: the machine vision system deployed at the decoration site is responsible for real-time image data collection during the construction process. These image data cover every corner and key links of the construction site; the collected image data is processed by an image recognition algorithm based on deep learning. After a lot of training, the algorithm can automatically identify quality problems in construction, such as cracks, color difference, unevenness, etc. This automatic recognition capability greatly improves the efficiency and accuracy of quality inspection; for the identified quality problems, the system will automatically mark and classify them to ensure that each problem can be clearly recorded and described; the system will generate a detailed inspection report based on the marking and classification results. These reports not only contain descriptions of quality problems, but may also include pictures of the problems, location information, etc., so that relevant personnel can quickly understand the details of the problems; the generated inspection reports will be automatically pushed to relevant personnel, such as project managers, quality supervisors, etc., to ensure that they can obtain and deal with quality problems in a timely manner; combined with the BIM (Building Information Model) model, the system can locate quality problems to specific construction sites and components. This positioning capability enables relevant personnel to quickly find the source of the problem and take targeted measures to rectify it; the quality traceability system is responsible for recording key information and data during the construction process, such as material usage, construction process parameters, construction personnel information, etc. This information is crucial for the subsequent tracing and analysis of quality problems; when quality problems occur, the quality traceability system can support the tracing and analysis of the root causes of the problem. By consulting the recorded key information and data, relevant personnel can quickly locate the cause of the problem and formulate effective rectification measures; IoT devices are deployed at the decoration site, including safety monitoring sensors (such as smoke alarms, temperature sensors, vibration sensors, etc.) to achieve comprehensive coverage of safety risk points; IoT devices will collect on-site data in real time, such as smoke concentration, temperature, vibration, etc., which are important bases for assessing the safety status of the site; the safety monitoring platform will receive the on-site data collected by the IoT devices in real time, and process and analyze it; based on the processing results, the safety monitoring platform will conduct a safety risk assessment to determine whether the current safety status is within the normal range; once potential safety risks or abnormal conditions are found, the safety monitoring platform will immediately trigger the early warning mechanism and send early warning information to relevant personnel. This helps relevant personnel take timely measures to eliminate safety hazards and ensure the safety of the construction site.
[0165] The effect of the above technical solution is: through the machine vision system and deep learning algorithm, S4 can collect and analyze construction image data in real time, and automatically identify quality problems in construction, such as cracks, color difference, unevenness, etc. This real-time detection capability ensures that quality problems can be discovered and handled in a timely manner, avoiding the accumulation and expansion of quality problems; after marking and classifying the identified quality problems, the system can generate a detailed inspection report and automatically push it to relevant personnel. At the same time, combined with the BIM model, the system can locate quality problems to specific construction sites and components, providing precise guidance for problem rectification; the quality traceability system can comprehensively record key information and data in the construction process, such as material usage, construction process parameters, construction personnel information, etc. This information provides a solid foundation for the tracing and analysis of quality problems; when quality problems occur, the quality traceability system can support the rapid tracing and in-depth analysis of the root causes of the problems. By consulting the recorded key information and data, relevant personnel can quickly locate the cause of the problem and formulate effective rectification measures to avoid the recurrence of similar problems; through IoT devices and safety monitoring sensors, S4 can achieve comprehensive coverage of safety risk points on the decoration site. These devices can collect on-site data in real time, such as smoke concentration, temperature, vibration, etc., providing accurate data support for safety risk assessment; the safety monitoring platform can receive and process on-site data in real time and conduct safety risk assessment. Once a potential safety risk or abnormal situation is found, the system will immediately trigger the early warning mechanism and send early warning information to relevant personnel. This real-time risk assessment and early warning capability can ensure that safety risks at the construction site are controlled and eliminated in a timely manner; through automation and intelligent means, comprehensive monitoring and management of construction quality and safety risks are achieved. This can not only reduce manual intervention and reduce the risk of human error, but also improve work efficiency and accuracy; through real-time detection, precise positioning, efficient traceability and early warning mechanisms, S4 can promptly detect and deal with problems and risks in construction, thereby avoiding the expansion of problems and increased losses. This helps to reduce management costs and improve the overall benefits of the project.
[0166] One embodiment of the present invention, as Figure 2 As shown, a system for implementing an intelligent management method for engineering decoration based on artificial intelligence, the system comprises:
[0167] Data fusion module: Based on the data fusion algorithm, it fuses the multi-source data from multiple heterogeneous data sources, converts them into a unified data format, and transmits the fused multi-source data to the edge device for pre-processing;
[0168] Risk prediction module: construct a digital twin model of the decoration site based on the preprocessed data, train the digital twin model through a machine learning algorithm, and predict the decoration risk based on the trained digital twin model;
[0169] Automatic adjustment module: Through the construction scheduling algorithm, the construction plan is dynamically adjusted according to the project progress, risk prediction results and resource status, and the construction resources are automatically adjusted according to real-time needs based on the intelligent allocation algorithm;
[0170] Problem identification module: Automatically detect construction quality through machine vision, identify potential quality problems, and use IoT devices to monitor the safety status of the construction site in real time.
[0171] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. An intelligent management method for engineering decoration based on artificial intelligence, characterized in that: The method comprises: S1. Based on the data fusion algorithm, the multi-source data from multiple heterogeneous data sources are fused and converted into a unified data format, and the fused multi-source data is transmitted to the edge device for pre-processing; S2. Build a digital twin model of the decoration site based on the preprocessed data, train the digital twin model through a machine learning algorithm, and predict the decoration risk based on the trained digital twin model; S3. Through the construction scheduling algorithm, the construction plan is dynamically adjusted according to the project progress, risk prediction results and resource status, and based on the intelligent allocation algorithm, the construction resources are automatically adjusted according to real-time needs; S4. Automatically inspect construction quality through machine vision, identify potential quality issues, and use IoT devices to monitor the safety status of the construction site in real time.
2. The intelligent management method for engineering decoration based on artificial intelligence according to claim 1 is characterized in that: Said S1 comprises: S11. Determine data collection requirements, formulate data collection plans based on data collection requirements, and connect various heterogeneous data sources through data collection interfaces; S12. Based on the data quality monitoring system, the quality of the collected data is monitored through real-time data verification and anomaly detection algorithms; S13. Preliminary classification and screening of data based on business needs and data characteristics, and elimination of irrelevant or low-value data; S14. Build a data fusion framework and use data fusion algorithms to deeply fuse heterogeneous data at the semantic level; S15. According to the time series characteristics and spatial distribution characteristics of the data, time series alignment and spatial matching are performed during the data fusion process, and the quality of the fused data is evaluated through the data quality evaluation mechanism; S16. Through the data processing engine deployed on edge devices and edge computing algorithms, feature extraction, data compression and preliminary analysis of real-time data are performed.
3. The intelligent management method for engineering decoration based on artificial intelligence according to claim 2 is characterized in that: The S12 comprises: Receive data from each collection point in real time through the data capture mechanism, and temporarily store the data in a high-performance cache system; Perform preliminary format conversion and standardization on the received heterogeneous data, check whether the data is complete, and verify the consistency of the internal logic of the data through the set data range and business rules; Determine the timeliness of data based on its timestamp and business requirements, and use the correlation and contextual information between data to perform verification; Detect outliers in data through statistical methods and perform anomaly detection on complex multivariate data based on machine learning models; In the case of unlabeled data, unsupervised learning methods are used to discover potential abnormal groups or patterns in the data. Combined with business rules and historical experience, an abnormal identification rule library is built to automatically match and identify abnormal data through the rule engine. The detected abnormal data is marked and causal analysis is used to obtain the root cause of the abnormal data.
4. The intelligent management method for engineering decoration based on artificial intelligence according to claim 2 is characterized in that: The S15 comprises: Preprocess the data with time series characteristics to ensure the comparability of different data sources in the time dimension, and use dynamic time warping and the longest common subsequence algorithm to align the time series data; For data with spatial distribution characteristics, coordinate system uniform conversion is performed to convert geographic coordinates in different coordinate systems into a unified WGS-84 coordinate system; Use spatial index and spatial interpolation to match and fuse spatial data, build a data quality assessment index system, and evaluate the quality of the fused data; By integrating existing data quality monitoring tools, data quality assessment tasks are automatically performed, and machine learning models are introduced to learn from historical data quality assessment results and predict the quality status of future data; potential quality issues can be discovered in advance; Establish a data quality feedback mechanism to provide feedback on data quality issues during data use, thus forming a closed-loop data quality management process; In response to the data quality issues reported, we use causal analysis to find the root causes of the problems and continuously optimize the data fusion strategy based on the quality assessment results and feedback; Establish a continuous data quality monitoring mechanism, conduct quality assessments on the fused data regularly or in real time, and continuously iterate and optimize the data fusion framework and process based on the assessment results.
5. The intelligent management method for engineering decoration based on artificial intelligence according to claim 1 is characterized in that: The S2 comprises: S21. Based on BIM and GIS, build a three-dimensional model of the decoration site, integrate the physical simulation engine, and simulate the physical environment and dynamic change process of the decoration site; S22, map multi-source data into the digital twin model, and update and dynamically display the data in real time; S23. Select a machine learning framework and algorithm library, and use cross-validation and grid search to perform hyperparameter tuning and performance evaluation on the digital twin model through training data sets; S24. Based on the trained digital twin model, the risk status of the decoration site is predicted in real time, and the risk warning threshold is set, and warning information is automatically generated according to the prediction results; S25. Use the early warning notification mechanism to notify relevant personnel in multiple ways, track and manage early warning information, and record the processing process and results.
6. The intelligent management method for engineering decoration based on artificial intelligence according to claim 5 is characterized in that: The S24 comprises: Extract multi-dimensional features from the digital twin model and construct a comprehensive risk prediction input vector based on the extracted multi-dimensional features; Principal component analysis is used to select features and reduce dimensionality. For time series data, sliding windows are used for feature processing to capture the time dependency and dynamic change patterns in the data. Combine multiple machine learning algorithms for integrated learning, use recurrent neural networks to process real-time data streams through real-time data processing modules, and dynamically predict risk status based on the processing results; Quantify the uncertainty of the prediction results through Monte Carlo simulation and evaluate the confidence interval of the prediction results; According to business needs and security standards, the prediction results are divided into different risk levels, and corresponding warning thresholds are set. Differentiated warning rules are formulated for different risk levels; Establish a dynamic adjustment mechanism for risk warnings, and adjust warning strategies and thresholds in a timely manner based on historical warning effects, business changes, and environmental changes; automatically generate warning information based on prediction results and warning rules.
7. The intelligent management method for engineering decoration based on artificial intelligence according to claim 1 is characterized in that: The S3 includes: S31. Collect project progress data in real time and dynamically adjust and optimize the construction plan based on risk prediction results; S32. Based on external factors, formulate emergency plans and alternative plans, build resource demand forecasting models, and forecast resource demand by combining historical data and current project status; S33, optimally allocate resources through intelligent allocation algorithms, and automate resource request, approval and allocation processes through resource scheduling systems; S34. Establish a dynamic resource adjustment mechanism to dynamically adjust the resource allocation plan according to project progress and real-time needs, and use resource monitoring and reporting tools to track resource usage in real time and generate resource usage reports.
8. The intelligent management method for engineering decoration based on artificial intelligence according to claim 1 is characterized in that: The S33 comprises: Construct a resource allocation algorithm framework based on multi-objective optimization, determine the optimization goals, and prioritize resource allocation based on multiple factors through the project priority evaluation model; Build a cost-benefit analysis module to evaluate the impact of different resource allocation plans on the total cost, benefits and ROI of the project; Analyze each process, build the overall architecture and process logic of the automation system based on the analysis results, integrate the intelligent allocation algorithm into the resource scheduling system, and develop interfaces with other systems, including ERP and CRM, for data sharing and process docking; Through AI-assisted approval, the rationality of resource requests can be automatically determined based on historical data and current situations. The Internet of Things and big data can be used to monitor project progress and resource usage in real time and collect real-time data. Develop dynamic resource adjustment strategies based on real-time data and intelligent analysis, and use simulation technology to simulate different adjustment plans; According to the preset report templates and user needs, resource usage reports are automatically generated, and the monitoring and reporting results are fed back to the intelligent allocation algorithm and resource scheduling system to continuously optimize the algorithm model and scheduling strategy to form a closed loop of continuous improvement.
9. The intelligent management method for engineering decoration based on artificial intelligence according to claim 8 is characterized in that: The S4 comprises: S41. Use the machine vision system deployed at the decoration site to collect image data in real time, and use the image recognition algorithm based on deep learning to automatically identify quality problems in construction; S42. Label and classify the identified quality problems, generate a test report, automatically push it to relevant personnel, and locate the quality problems to specific construction sites and components in combination with the BIM model; S43. Through the quality traceability system, key information and data in the construction process are recorded to support the traceability and analysis of quality issues; S44. Cover the safety risk points of the decoration site through IoT devices, and collect on-site data in real time through IoT devices; S45. Receive and process on-site data in real time through the security monitoring platform, and conduct security risk assessment and early warning based on the processing results.
10. A system for implementing the intelligent management method for engineering decoration based on artificial intelligence as claimed in claim 1, characterized in that: The system comprises: Data fusion module: Based on the data fusion algorithm, it fuses the multi-source data from multiple heterogeneous data sources, converts them into a unified data format, and transmits the fused multi-source data to the edge device for pre-processing; Risk prediction module: construct a digital twin model of the decoration site based on the preprocessed data, train the digital twin model through a machine learning algorithm, and predict the decoration risk based on the trained digital twin model; Automatic adjustment module: Through the construction scheduling algorithm, the construction plan is dynamically adjusted according to the project progress, risk prediction results and resource status, and the construction resources are automatically adjusted according to real-time needs based on the intelligent allocation algorithm; Problem identification module: Automatically detect construction quality through machine vision, identify potential quality problems, and use IoT devices to monitor the safety status of the construction site in real time.
Citation Information
Cited By
Large model AI integrated intelligent production scheduling system
CN119313127A
Enterprise project informatization management method, device and system and storage medium
CN119379222A
Real-time monitoring method of intelligent manufacturing digital twin system and related equipment
CN119445044A
Marine environment risk assessment method and system based on multi-source data fusion
CN119719691A
Marine Environment Risk Assessment Method and System Based on Multi-Source Data Fusion
CN119719691B