Ground advanced exploration treatment method for coal mine tunnel crossing fault zone

Through ground drilling reinforcement and grouting treatment, the construction difficulty and safety problems of coal mine tunnels crossing fault zones are solved, and more efficient fault management and tunnel stability are achieved.

CN119041835AActive Publication Date: 2024-11-29安徽恒源煤电股份有限公司 +2

Patent Information

Application Number
CN202410984722.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-29
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

The prior art has great difficulty in construction, long construction period, limited reinforcement range and poor operation safety when crossing fault zones of coal mine tunnels, especially in the management of large fault zones.

Method used

The ground advance exploration and treatment method is adopted to design directional drilling structures and trajectories through the ground drilling field, ground drilling reinforcement is carried out, design reinforcement range is calculated, grouting is carried out, and geological data is obtained through well recording to guide subsequent excavation and recovery.

Benefits of technology

It reduces interference from underground operations, saves construction period, improves production efficiency, enhances the working environment and safety, and achieves more complete reinforcement and higher quality crack filling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041835A_ABST
    Figure CN119041835A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal mine tunnel disaster treatment, in particular to a ground advanced exploration treatment method for a coal mine tunnel crossing fault zone. The method comprises the steps that a ground drilling site is arranged, and a ground directional drilling structure and a drilling track are designed; the ground directional drilling structure comprises a first-opening straight hole section, a second-opening deflecting section and a third-opening branch section. Calculating a design reinforcement range; in a ground drilling field, drilling is carried out according to a ground directional drilling structure and a drilling track, and the first straight hole section drilling operation comprises drilling, casing lowering, pipe fixing and pressure testing; the grouting amount is calculated according to the designed reinforcement range, and grouting is conducted on the three-section branch section according to the grouting amount; logging is conducted in the drilling process of the second-opening deflecting section and the third-opening branch section, and logging data are obtained; and the grouting effect is evaluated, and hole sealing operation is conducted. According to the method, the rock mass around the roadway is reinforced through ground directional drilling before the underground roadway is tunneled, mutual interference with underground operation is small, and the production efficiency and the coal mining safety are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine tunnel disaster management, and in particular to a ground advance detection and management method for coal mine tunnels passing through fault zones. Background Art

[0002] Fault zones are common unfavorable geological bodies in coal-bearing strata. They are broken, stress-concentrated, and have water-conducting fissures. Under mining disturbance, they are high-risk areas for disasters such as water inrush, roof fall, rock burst, and mine tremors. Under normal processes, tunnels crossing fault zones are difficult to support, dangerous to operate, and difficult to maintain in the later stages.

[0003] The existing technology mainly protects the tunnel through the fault zone by strengthening support and underground surrounding rock grouting or a combination of the two. Strengthening support inevitably increases the difficulty of construction, prolongs the construction period, and affects production efficiency; underground surrounding rock grouting is limited by the underground working space, with low grouting pressure, short grouting section, small grouting volume, and limited reinforcement range, especially in the treatment of large fault zones. At the same time, the existing method requires manual construction within the disaster-causing impact range of the underground fault zone before the fault zone treatment is completed, the working environment of personnel is poor, and high requirements for construction safety measures. The existing technology has the defects of high construction difficulty, long construction period, limited reinforcement range, and poor operation safety. Summary of the invention

[0004] In order to solve the above technical problems, the purpose of the present invention is to provide a ground advance exploration and treatment method for coal mine tunnels passing through fault zones. The technical scheme adopted is as follows:

[0005] An embodiment of the present invention provides a method for ground advance detection and control of coal mine tunnels passing through fault zones:

[0006] Arrange the ground drilling site and design the ground directional drilling structure and drilling trajectory; the ground directional drilling structure includes a straight hole section, a deflection section, and a branch section; calculate and design the reinforcement range;

[0007] At the ground drilling site, drilling is carried out according to the ground directional drilling structure and drilling trajectory. The drilling operation of the first straight hole section includes drilling, casing lowering, pipe fixing and pressure testing; the grouting volume is calculated according to the designed reinforcement range, and grouting is carried out in the third branch section according to the grouting volume;

[0008] During the drilling process of the second opening and the third opening branch section, logging is carried out to obtain logging data and organize and summarize them; the grouting effect is evaluated and sealing operations are carried out.

[0009] Preferably, the ground drilling site is arranged, including: when a tunnel passing through a fault has an inclination, the ground drilling site is set on a side of the tunnel with a higher elevation.

[0010] Preferably, designing the drilling trajectory includes: designing the drilling trajectory using compass professional software.

[0011] Preferably, the first straight hole section, the second angle-making section and the third branch section include:

[0012] The first straight hole section is connected with the second inclined section, and the second inclined section is connected with the third branch section; the third branch section consists of 4 branch holes, namely the top plate hole, the right side hole, the bottom plate hole and the left side hole; the top plate hole is located directly above the tunnel, the right side hole is located on the right side of the tunnel, the bottom plate hole is located directly below the tunnel, and the left side hole is located on the left side of the tunnel.

[0013] Preferably, the calculation formula for the design reinforcement range is:

[0014]

[0015] Among them, R is the radius of the plastic zone, i.e. the designed reinforcement range; r1 is the equivalent radius of the tunnel; H is the tunnel burial depth; γ is the average bulk density of the stratum; C is the cohesion of the surrounding rock; is the internal friction angle.

[0016] Preferably, drilling is performed according to the ground directional drilling structure and the drilling trajectory, including:

[0017] The first section is drilled, the first section is lowered, the first section is fixed, and the pressure is tested; the second section is drilled, the second section is lowered, the second section is fixed, and the pressure is tested, and logging is carried out during drilling; the third section is drilled in sections, and the forward stage grouting is carried out;

[0018] First, the casing is opened through the surface soil layer into the bedrock or stable formation, and second, the casing is opened to the target layer; the casing cementing includes: circulating drilling fluid to ensure the connectivity between the outer annular cavity of the casing and the inside of the casing, lowering the casing to the designed position, and injecting a single-liquid cement slurry into the casing for cementing until the cement returns to the ground from the annular space outside the casing, thereby completing the casing cementing;

[0019] When drilling three-way branch segments, it is necessary to calculate the drilling depth of each branch segment of the three-way opening. The calculation formula is:

[0020]

[0021] Where h is the drilling depth of each branch section, M is the coal seam thickness or mining height, P is the water head pressure, K p is the tensile strength of coal, and K is the safety factor.

[0022] Preferably, the grouting amount is calculated according to the designed reinforcement range, and grouting is performed in the three-opening branch section according to the grouting amount, including:

[0023] The geometric relationship is established according to the arrangement position of the branch holes, and the slurry diffusion radius is obtained in combination with the designed reinforcement range; the grouting volume of each branch hole is calculated, specifically:

[0024]

[0025] Where A represents the slurry consumption coefficient; R L represents the slurry diffusion radius; r represents the radius of the grouting hole arrangement circle; L represents the grouting section length; n represents the average crack rate of the rock mass; B is the slurry filling coefficient; m is the slurry solidification rate;

[0026] Grouting is performed on each branch hole according to the grouting amount of each branch hole, including: dividing each branch hole into three grouting sections, namely, a pre-fault grouting section, a mid-fault grouting section, and a post-fault grouting section; first grouting the pre-fault grouting section, sweeping the hole after the cement slurry solidifies, drilling into a lower section, then grouting the mid-fault grouting section, sweeping the hole after the cement slurry solidifies, drilling into a lower section, and finally grouting the post-fault grouting section.

[0027] Preferably, the logging includes: cuttings logging, drilling logging, simple hydrological observation and natural gamma logging.

[0028] Preferably, evaluating the grouting effect includes:

[0029] Set the grouting qualification conditions. If the grouting qualification conditions are met, the grouting is qualified. The grouting qualification conditions include:

[0030] The final grouting pressure must be greater than twice the clean water pressure; the pump volume at the end of grouting is less than or equal to the pump volume threshold, and the stabilization time is greater than the time threshold; the actual slurry injection volume is not less than the grouting volume of each branch hole; the water pressure test pressure after grouting is greater than the water pressure test pressure before grouting.

[0031] Preferably, the sealing operation includes:

[0032] After grouting of all three branch holes is completed, use single-liquid cement slurry and the lower-light drill rod method to fully seal the first straight hole section and the second inclined hole section. After the cement in the closed section solidifies, the distance between it and the borehole mouth is less than or equal to the preset distance.

[0033] The embodiments of the present invention have at least the following beneficial effects: the present invention arranges a ground drilling site, designs a ground directional drilling structure and a drilling trajectory, and then drills holes in the ground drilling site according to the ground directional drilling structure and the drilling trajectory, and reinforces the rock mass around the tunnel by ground directional drilling before excavating the underground tunnel, thereby realizing the advance treatment of the fault, reducing mutual interference with the underground operation, saving construction time, and greatly improving production efficiency, and being able to adapt to large faults with long extension, large drop, and large fault distance. At the same time, the working site is located on the ground, with a good working environment and high safety. Through the treatment of the surrounding rock and grouting, the tunnel excavation and support are greatly improved. and maintenance working environment, which improves the safety of excavation, support and maintenance work; the grouting volume is calculated according to the designed reinforcement range, and grouting is carried out in the three-opening branch section according to the grouting volume. Compared with the underground surrounding rock grouting, the grouting pump has a large volume and a long distance, a large reinforcement range, more sufficient slurry diffusion, a higher filling rate for cracks, and better reinforcement quality. In addition, the segmented grouting can achieve targeted treatment of the fault position and avoid a large amount of grouting material waste; logging is carried out during the drilling process of the second-opening inclined section and the three-opening branch section to obtain logging data, further clarifying the geological conditions around the tunnel and the fault structure characteristics, which has a strong guiding significance for subsequent excavation and mining. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 A method flow chart of a method for ground advance exploration and control of coal mine tunnels passing through fault zones provided by an embodiment of the present invention;

[0036] Figure 2 A three-dimensional schematic diagram of a drilling arrangement for a ground advance exploration and treatment method for a coal mine tunnel passing through a fault zone provided by an embodiment of the present invention;

[0037] Figure 3 A schematic longitudinal section diagram of a drilling structure for a method for ground advance exploration and treatment of a coal mine tunnel passing through a fault zone provided by an embodiment of the present invention;

[0038] Figure 4 A schematic cross-sectional diagram of branch hole arrangement and reinforcement range of a ground advance exploration and treatment method for coal mine tunnels passing through fault zones provided by an embodiment of the present invention;

[0039] Figure 5A planar projection diagram of a directional drilling trajectory of a ground advance exploration and treatment method for coal mine tunnels passing through fault zones provided by an embodiment of the present invention;

[0040] Figure 6 A cross-sectional projection diagram of a directional drilling and grouting section along a coal mine tunnel for a ground advance exploration and control method for crossing a fault zone provided in an embodiment of the present invention.

[0041] The reference numerals in the figure are as follows: 1-ground drilling site; 2-first opening straight hole section; 3-second opening inclined section; 4-third opening branch section; 41-top plate hole; 42-right side hole; 43-bottom plate hole; 44-left side hole; 411-top plate hole fault front grouting section; 412-top plate hole fault middle grouting section; 413-top plate hole fault post grouting section; 5-tunnel; 6-fault; 7-topsoil layer; 8-target layer; 9-first opening casing; 10-second opening casing; 11-second opening landing point. DETAILED DESCRIPTION

[0042] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the specific implementation method, structure, features and effects of a ground advance exploration and treatment method for coal mine tunnels passing through fault zones proposed by the present invention in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures, or characteristics in one or more embodiments may be combined in any suitable form.

[0043] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0044] The following is a detailed description of a specific scheme of a ground advance detection and control method for coal mine tunnels passing through fault zones provided by the present invention in conjunction with the accompanying drawings.

[0045] Example:

[0046] The main application scenarios of the present invention are: in the process of coal mining, tunnel excavation often encounters complex geological structures such as fault zones. Fault zones not only affect the stability of the tunnel, but may also cause safety problems such as roof collapse and coal wall spalling, seriously affecting the production efficiency and safety of the mine. Therefore, it is particularly important to adopt ground advance exploration and control methods to conduct advance exploration and control of coal mine tunnels passing through fault zones. Through the application of the technical solution of the present invention, it is possible to achieve advance exploration and control of complex geological structures such as fault zones, providing strong guarantees for safe production and efficient excavation of mines.

[0047] See also Figure 1, which shows a method flow chart of a method for ground advance exploration and control of coal mine tunnels passing through fault zones provided by an embodiment of the present invention, the method comprising the following steps:

[0048] Step S1, arrange the ground drilling site, and design the ground directional drilling structure and drilling trajectory; the ground directional drilling structure includes a first straight hole section, a second inclined section and a third branch section; calculate and design the reinforcement range.

[0049] Before drilling, it is necessary to analyze the geographical data of the fault zone, and then proceed to the next step of construction to obtain the survey data of the fault zone in the current mining area. The survey data includes exploration geological reports and three-dimensional seismic reports. The basic characteristics of the fault zone are obtained using the survey data, including the position, strike, fault distance, drop and inclination of the fault zone. Then, the roadway through the fault is designed. The geographical characteristics of the roadway include the position, strike, slope and its relative position relationship with the fault. According to the position, strike, slope and relative position relationship of the roadway through the fault zone with the fault zone, the design reinforcement range is determined, the ground drilling site is arranged, and the ground directional drilling structure and drilling trajectory are designed. The drilling structure includes a straight hole section, a second inclined section and a third branch section.

[0050] The ground drilling site should be set up in a flat, open and conveniently located location. When the tunnel passing through the fault has an inclination, the ground drilling site should be set up on the side with a higher elevation. For example, Figure 5 , Figure 6 As shown, the tunnel passes through the fault. According to the existing survey data, it is inferred that the fault is located in the middle of the mining area. It is a large normal fault with a northeastward strike and a southeastward dip. The dip angle is 60-70° and the drop is 10-70m. The strike length in the mining area is about 2km. The tunnel is excavated along the coal seam slope along the strike of 284° and crosses the fault. The ground is mainly basic farmland. A temporary land use is approved to set up a ground drilling site at a location about 400m northeast of the tunnel.

[0051] Set up ground directional drilling structure, such as Figure 2As shown, the ground directional drilling structure is a three-opening structure, including a first opening straight hole section, a second opening inclined section and a third opening branch section, wherein the third opening branch section includes four branch holes. The first opening straight hole section, the second opening inclined section and the third opening branch section constitute a hole group, the first opening straight hole section is connected with the second opening inclined section, and the second opening inclined section is connected with the third opening branch section. The aperture of the first straight hole section is the first preset value, the aperture of the second inclined section is the second preset value, and the aperture of the third branch section is the third preset value. Preferably, the first preset value, the second preset value and the third preset value are 311mm, 215.9mm and 152.4mm respectively. A branch hole is set on the top plate, bottom plate, left side and right side of the tunnel, respectively: the top plate hole is located directly above the tunnel, the right side hole is located on the right side of the tunnel, the bottom plate hole is located directly below the tunnel, and the left side hole is located on the left side of the tunnel. Preferably, in an embodiment of the present invention, the top plate hole is located 3m above the tunnel, the right side hole is located 3m on the right side of the tunnel, the bottom plate hole is located 3m below the tunnel, and the left side hole is located 3m on the left side of the tunnel. Figure 4 shown.

[0052] The design of drilling trajectory includes: using the professional software compass to design the drilling trajectory. The parameters of the first straight hole section, the second inclined section and the top plate hole drilling trajectory are shown in Table 1:

[0053] Table 1. Example table of drilling trajectory parameters

[0054]

[0055]

[0056] Furthermore, it is necessary to calculate the design reinforcement range. The design reinforcement range is determined by the plastic zone range of the surrounding rock after tunnel excavation. The calculation formula is:

[0057]

[0058] Among them, R is the radius of the plastic zone, i.e. the designed reinforcement range; r1 is the equivalent radius of the tunnel; H is the tunnel burial depth; γ is the average bulk density of the stratum; C is the cohesion of the surrounding rock; is the internal friction angle.

[0059] Substituting the mine-related parameters, r1=3m, cohesion C=20MPa, γ=2.5, H=450m, and internal friction angle φ=35 into the formula, the designed reinforcement range radius is obtained to be 12.16m.

[0060] Step S2, at the ground drilling site, drilling is performed according to the ground directional drilling structure and drilling trajectory. The drilling operation of the first straight hole section includes drilling, casing lowering, pipe fixing and pressure testing; the grouting amount is calculated according to the designed reinforcement range, and grouting is performed in the third branch section according to the grouting amount.

[0061] Furthermore, at the ground drilling site, drilling is carried out according to the ground directional drilling structure and drilling trajectory, including: 1. drilling of the first straight hole section, lowering of the first casing, fixing of the first pipe, and pressure testing; 2. drilling of the second inclined section, lowering of the second casing, fixing of the second pipe, and pressure testing, and logging during drilling; 3. segmented drilling of the third branch section, forward three-stage grouting, and logging during the drilling process.

[0062] It is necessary to select a suitable drilling tool combination according to the drilling design plan. The drilling tool combination used for the straight hole section is: Φ311mm roller drill bit + Φ172mm screw + 411*410 conversion short section + Φ165mm non-magnetic drill collar + Φ165mm drill collar + Φ127mm drill rod;

[0063] The drilling tool combination used in the second opening and deflection section is: Φ215.9mm PDC drill bit + Φ172mm screw + Φ165mm directional short section + Φ165mm non-magnetic drill collar + Φ127mm drill pipe;

[0064] The drilling tool combination used in the three-opening branch section is: Φ152.4mm PDC drill bit + Φ127mm screw + Φ121mm directional short section + Φ121mm non-magnetic drill collar + Φ89mm drill rod + Φ89mm weighted drill rod + Φ89mm drill rod.

[0065] When drilling a three-branch section, it is necessary to calculate the drilling depth of the three-branch section. The calculation formula is:

[0066]

[0067] Where, M is the thickness of the coal seam or the mining height (m), P is the water head pressure (MPa), K p is the tensile strength of coal (MPa), and K is the safety factor. The depth of the three-opening branch section should satisfy that the length after crossing the fault is not less than h. Preferably, in the embodiment of the present invention, the drilling depth of the three-opening branch section is set equal to h. The implementer can set the drilling depth of the three-opening branch section according to the actual situation of the mining area, but the depth must be greater than or equal to h.

[0068] When drilling the first straight hole section and the second inclined section, it is necessary to conduct pipe casing and pressure test operations. Figure 3 As shown; among them, the aperture of the first straight hole section is 311mm, the specification of the first casing is Φ244.5×8.94mm, and the first casing penetrates the topsoil layer into the bedrock or stable stratum 5-10m. The implementer can set it according to the specific situation; the aperture of the second inclined section is 215.9mm, the specification of the second casing is Φ177.8×8.05mm, and the second casing is to the target layer position; the third branch section is a bare hole with a diameter of 152.4mm.

[0069] The specific method of casing is to circulate drilling fluid to ensure the connectivity between the outer annular cavity of the casing and the inner part of the casing, lower the casing to the designed position, and inject single-liquid cement slurry into the casing for cementing until the cement returns to the ground from the outer annular space of the casing. The single-liquid cement slurry uses P·O42.5 cement, and the slurry density is not less than 1.6g / cm 3 .

[0070] The pressure test standard is 1.5 times the clean water pressure and 1.2 times the designed grouting pressure. The qualified standard is that the grouting does not exceed 0.5Mpa after maintaining the pressure for 30 minutes. During the drilling operations of the first straight hole section, the second inclined section and the third branch section, MWD drilling monitoring equipment is used for inclination measurement, and screw drilling tools are used for orientation.

[0071] Furthermore, it is necessary to perform grouting in the three-opening branch section, calculate the grouting amount according to the designed reinforcement range, and perform grouting in the three-opening branch section according to the grouting amount. The grouting amount should satisfy that the slurry diffusion range is not less than the designed reinforcement range. The geometric relationship is constructed according to the branch hole arrangement position, such as Figure 4 As shown in the figure, circles are drawn with the four branch holes as the center. The intersection of the four circles and the designed reinforcement range divides the boundary of the designed reinforcement range into equal parts. The grout diffusion radius R can be obtained by combining the geometric relationship with the designed reinforcement range. L The grouting volume is 9.25m, and the calculation formula is as follows:

[0072]

[0073] Where A represents the slurry consumption coefficient, which is 1.2; R L represents the slurry diffusion radius; r represents the radius of the grouting hole arrangement circle, which is 6m; L represents the grouting section length, which is 154.86m; n represents the average rock mass crack ratio, which is 0.15; B is the slurry filling coefficient, which is 0.9; m is the slurry solidification rate, which is 0.85. The total designed grouting volume of the hole group is calculated to be 1796m 3 , and calculate the grouting volume of each branch hole at the same time.

[0074] At the same time, the grouting volume of each branch hole is obtained, and then grouting is carried out. Each branch hole is grouted three times, namely, grouting before the fault, grouting in the fault and grouting after the fault. That is to say, each branch hole is divided into three grouting sections, namely, grouting before the fault, grouting in the fault and grouting after the fault. The grouting range before the fault is from the second opening point to 20-30m before the fault, the grouting range in the fault is from the end of the first section of the grouting to 10m after the fault, and the grouting range after the fault is from 10m after the fault to the bottom of the hole. The forward grouting method is adopted, that is, drilling one section and injecting one section, and sweeping the hole and drilling into the next section after the cement slurry solidifies; taking the top plate hole 41 as an example, when grouting, the front grouting section of the top plate hole fault is first grouted, and the hole is swept after the cement slurry solidifies, and the next section is drilled, and then the middle grouting section of the top plate hole fault is grouted, and the hole is swept after the cement slurry solidifies, and the next section is drilled, and finally the grouting section after the top plate hole fault is grouted. The grouting end pressure of the grouting section before the top plate hole fault is 8.9MPa, the grouting end pressure of the grouting section in the middle of the top plate hole fault is 8.5MPa, and the grouting end pressure of the grouting section after the top plate hole fault is 9.1MPa. The total grouting volume of the 41 branch hole is 476m 3 The drilling and grouting of the other three branch holes are the same as those of the top plate holes.

[0075] Step S3, logging is performed during the drilling process of the second opening and the third opening branching section, and the logging data is obtained and sorted out and summarized; the grouting effect is evaluated and the sealing operation is performed.

[0076] During the drilling operation, logging is required to obtain logging data, which is conducive to subsequent analysis. Specifically, logging is carried out during the drilling process of the second opening and the third opening branch section. The logging includes cuttings logging, drilling logging, simple hydrological observation and natural gamma logging.

[0077] Specifically, rock cuttings logging includes: accurately collecting rock cuttings at a unified location according to the logging interval and delay time, washing or rinsing according to different lithologies, drying and archiving, and recording lithologies; recording one point every 10m in the second opening section, gradually increasing the density near the drilling mark layer, and recording one point every 1m in the third opening branch section until the end of the hole;

[0078] Mud logging during drilling includes: recording one point for every 1m of drilling progress from the bedrock section to completion. It is necessary to record the sudden change points during drilling at any time so as to timely discover coal seams, karst caves, fault fracture zones, and determine the starting and ending depths, lengths (thickness) of coal seams, karst caves, and fault fracture zones;

[0079] Simple hydrological observations include: observing the water level once after each drilling and before drilling, observing the water level in the hole once every hour during drilling stops; observing once every 2 hours during normal drilling, and observing once every 10 to 30 minutes when the drilling fluid loss is found to be increasing. When the drilling fluid loss is >5m3 / h, stop drilling, measure the stable water level in the hole, and perform grouting to plug the leak. When all the drilling fluid is lost, the pump should be turned on to measure the maximum loss; when the drilling hole encounters leakage, drill drop, or severe collapse of the fault fracture zone, the layer position and the starting and ending depths of the borehole should be recorded in detail; when water gushing from the borehole is found during drilling, drilling should be stopped immediately, the drilling depth and layer position should be determined, and a pressure gauge should be installed at the borehole to measure the borehole water pressure. At the same time, the amount and temperature of the gushing water should be measured, and water samples should be taken for testing of the water quality;

[0080] Natural gamma logging includes: measuring the variation curve of formation radioactivity intensity with depth while drilling, and inferring lithology and fracture filling layers.

[0081] After obtaining the logging data, it is summarized and organized to form a database for subsequent analysis and utilization.

[0082] The grouting effect needs to be evaluated during the branch hole drilling and grouting process. A water pressure test is performed before and after grouting in each grouting section to evaluate the grouting effect.

[0083] Taking the top plate hole grouting as an example, the water pressure test pressure before and after grouting is:

[0084] Table 2. Water pressure test record

[0085]

[0086] After obtaining the water pressure test results, the grouting effect is comprehensively evaluated by combining the grouting volume, grouting final pressure and grouting end pump volume. Specifically, the grouting qualified conditions are set. If the grouting qualified conditions are met, the grouting is qualified. The grouting qualified conditions are as follows:

[0087] 1. The final grouting pressure is > 2 times of the hydrostatic pressure;

[0088] 2. When the grouting is finished, the pump volume is less than or equal to the pump volume threshold, and the stable time is greater than the time threshold;

[0089] 3. The actual grouting volume is not less than the theoretical grouting volume. The theoretical grouting volume refers to the calculated grouting volume of each branch hole.

[0090] 4. The water pressure test pressure after grouting is greater than the water pressure test pressure before grouting.

[0091] Among them, preferably, the pump volume threshold is 60L / min, the time threshold is 30min, and the greater the actual slurry injection volume and the water pressure test pressure after grouting, the better the grouting effect.

[0092] Finally, it is necessary to carry out sealing operations and site restoration. Site restoration includes demolition of temporary structures, removal of hardened sites, disposal of construction waste, and land restoration. After grouting of all three branch holes in the hole group is completed, use single-liquid cement slurry with a water-cement ratio of ≤0.8 and a specific gravity of ≥1.6, and adopt the method of lower-light drill rod to fully seal the first straight hole section 2 and the second inclined hole section 3. After the cement in the closed section solidifies, the distance between it and the borehole mouth is less than or equal to the preset distance. Preferably, the preset distance is 5m.

[0093] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The above is a description of a specific embodiment of this specification. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0094] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

[0095] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for ground advance exploration and control of coal mine tunnels passing through fault zones, characterized in that: The method includes: Arrange the ground drilling site and design the ground directional drilling structure and drilling trajectory; the ground directional drilling structure includes a straight hole section, a deflection section, and a branch section; calculate and design the reinforcement range; At the ground drilling site, drilling is carried out according to the ground directional drilling structure and drilling trajectory. The drilling operation of the first straight hole section includes drilling, casing lowering, pipe fixing and pressure testing; the grouting volume is calculated according to the designed reinforcement range, and grouting is carried out in the third branch section according to the grouting volume; During the drilling process of the second opening and the third opening branch section, logging is carried out to obtain logging data and organize and summarize them; the grouting effect is evaluated and sealing operations are carried out.

2. A method for ground advance exploration and control of coal mine tunnels passing through fault zones according to claim 1, characterized in that: The method of arranging the ground drilling site includes: when a tunnel passing through a fault has an inclination angle, the ground drilling site is arranged on a side with a higher elevation of the tunnel.

3. A method for ground advance exploration and treatment of coal mine tunnels passing through fault zones according to claim 1, characterized in that: The designing of the drilling trajectory includes: using the professional software Compass to design the drilling trajectory.

4. The method for ground advance detection and treatment of coal mine tunnels passing through fault zones according to claim 1 is characterized in that: The first straight hole section, the second inclined hole section and the third branch section include: The first straight hole section is connected with the second inclined section, and the second inclined section is connected with the third branch section; the third branch section consists of 4 branch holes, namely the top plate hole, the right side hole, the bottom plate hole and the left side hole; the top plate hole is located directly above the tunnel, the right side hole is located on the right side of the tunnel, the bottom plate hole is located directly below the tunnel, and the left side hole is located on the left side of the tunnel.

5. The method for ground advance exploration and treatment of coal mine tunnels passing through fault zones according to claim 1 is characterized in that: The calculation formula for the design reinforcement range is: Among them, R is the radius of the plastic zone, i.e. the designed reinforcement range; r1 is the equivalent radius of the tunnel; H is the tunnel burial depth; γ is the average bulk density of the stratum; C is the cohesion of the surrounding rock; is the internal friction angle.

6. The method for ground advance exploration and treatment of coal mine tunnels passing through fault zones according to claim 1 is characterized in that: The drilling according to the ground directional drilling structure and drilling trajectory includes: The first section is drilled, the first section is lowered, the first section is fixed, and the pressure is tested; the second section is drilled, the second section is lowered, the second section is fixed, and the pressure is tested, and logging is carried out during drilling; the third section is drilled in sections, and the forward stage grouting is carried out; First, the casing is opened through the surface soil layer into the bedrock or stable formation, and second, the casing is opened to the target layer; the casing cementing includes: circulating drilling fluid to ensure the connectivity between the outer annular cavity of the casing and the inside of the casing, lowering the casing to the designed position, and injecting a single-liquid cement slurry into the casing for cementing until the cement returns to the ground from the annular space outside the casing, thereby completing the casing cementing; When drilling three-way branch segments, it is necessary to calculate the drilling depth of each branch segment of the three-way opening. The calculation formula is: Where h is the drilling depth of each branch section, M is the coal seam thickness or mining height, P is the water head pressure, K p is the tensile strength of coal, and K is the safety factor.

7. The method for ground advance detection and treatment of coal mine tunnels passing through fault zones according to claim 1 is characterized in that: The grouting amount is calculated according to the designed reinforcement range, and grouting is performed in the three-opening branch section according to the grouting amount, including: The geometric relationship is established according to the arrangement position of the branch holes, and the slurry diffusion radius is obtained in combination with the designed reinforcement range; the grouting volume of each branch hole is calculated, specifically: Where A represents the slurry consumption coefficient; R L represents the slurry diffusion radius; r represents the radius of the grouting hole arrangement circle; L represents the grouting section length; n represents the average crack rate of the rock mass; B is the slurry filling coefficient; m is the slurry solidification rate; Grouting is performed on each branch hole according to the grouting amount of each branch hole, including: dividing each branch hole into three grouting sections, namely, a pre-fault grouting section, a mid-fault grouting section, and a post-fault grouting section; first grouting the pre-fault grouting section, sweeping the hole after the cement slurry solidifies, drilling into a lower section, then grouting the mid-fault grouting section, sweeping the hole after the cement slurry solidifies, drilling into a lower section, and finally grouting the post-fault grouting section.

8. The method for ground advance exploration and treatment of coal mine tunnels passing through fault zones according to claim 1 is characterized in that: The logging includes: cuttings logging, drilling logging, simple hydrological observation and natural gamma logging.

9. The method for ground advance exploration and treatment of coal mine tunnels passing through fault zones according to claim 1, characterized in that: The evaluation of the grouting effect comprises: Set the grouting qualification conditions. If the grouting qualification conditions are met, the grouting is qualified. The grouting qualification conditions include: The final grouting pressure must be greater than twice the clean water pressure; the pump volume at the end of grouting is less than or equal to the pump volume threshold, and the stabilization time is greater than the time threshold; the actual slurry injection volume is not less than the grouting volume of each branch hole; the water pressure test pressure after grouting is greater than the water pressure test pressure before grouting.

10. The method for ground advance exploration and treatment of coal mine tunnels passing through fault zones according to claim 1, characterized in that: The sealing operation comprises: After grouting of all three branch holes is completed, use single-liquid cement slurry and the lower-light drill rod method to fully seal the first straight hole section and the second inclined hole section. After the cement in the closed section solidifies, the distance between it and the borehole mouth is less than or equal to the preset distance.

Citation Information

Patent Citations

  • Construction method of passage of large-section tunnel by water diversion fault

    CN102808628A

  • Pre-grouting reinforcement technology for ground construction of structural fracture zone of mining working face

    CN111075478A

  • Method for blocking water burst of high-pressure drill holes of underground fault fracture zone

    CN111764863A

  • Advanced grouting reinforcement treatment method for passing through structural crushed zone of fully mechanized coal mining face

    CN113027467A

  • Method for conducting advanced grouting reinforcement on deep-buried long tunnel on earth surface

    CN116291482A

Cited By

  • Precise targeted advanced treatment method for unfavorable geological tunnel section of deep-buried long tunnel

    CN119957229A

  • Grouting and filling method for gangue slurry in pinniform directional drilling high-level mining subsidence area

    CN120487232A

  • Ground treatment method for advancing shield tunneling machine to penetrate through fault zone

    CN120649908A