Accurate hydrogen production system drying regeneration system and control method thereof
By detecting the actual gas flow rate and temperature, dynamically adjusting the drying and regeneration system of the hydrogen production equipment, the problem of insufficient use of the drying tower molecular sieve and too long regeneration time in the prior art is solved, and the equipment's adaptability to fluctuating power supplies and energy utilization is improved. Rate.
Patent Information
- Application Number
- CN202411296600.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the case of fluctuating power supply, the gas flow rate changes in the drying tower molecular sieve caused the drying tower molecular sieve to be insufficiently used and the regeneration time was too long, resulting in waste of energy.
By detecting the actual gas flow, dynamically adjusting the switching time of the drying tower, and using a temperature sensor to control the regeneration time of the regeneration tower, ensuring full use of molecular sieves and efficient energy utilization.
The hydrogen production equipment is stable and adaptable to hydrogen production in fluctuating power supply, improves energy utilization and avoids energy waste.
Smart Images

Figure CN119056209A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydrogen production equipment, and in particular to a precise drying and regeneration system for a hydrogen production system and a control method thereof. Background Art
[0002] At present, the switching time of the drying and regeneration equipment of domestic hydrogen production equipment is generally set to a fixed time in the PLC program based on the rated gas production of the system and the rated hydrogen drying processing capacity of the loaded molecular sieve, for example, the molecular sieve drying / regeneration switching is performed after 12 hours of operation. Under the coupling of renewable energy power generation or other variable power conditions, the actual gas flow rate will change. If it is still switched every 12 hours, the molecular sieve in the drying tower will not be fully used and the molecular sieve regeneration time will be too long, resulting in a waste of electricity. Summary of the invention
[0003] The purpose of the present invention is to provide a precise drying and regeneration system for a hydrogen production system and a control method thereof. By detecting the actual total gas flow V1 passing through the tower and controlling the switching time of the drying tower according to the actual gas flow, the adaptability of the hydrogen production equipment to unstable hydrogen production under fluctuating power supply conditions is improved, the energy utilization rate of the hydrogen production equipment is improved, and energy waste is avoided.
[0004] The above technical objectives of the present invention are achieved through the following technical solutions: A precise drying and regeneration system for a hydrogen production system comprises a hydrogen inlet and a plurality of system towers, wherein hydrogen enters the system tower from the hydrogen inlet, the system tower comprises at least two towers, one serving as a drying tower and the other serving as a regeneration tower, each system tower is provided with a molecular sieve and an electric heater; the electric heater controls the temperature of the system tower, the molecular sieve in the drying tower adsorbs and dries hydrogen, and the molecular sieve in the regeneration tower is restored to an adsorption state by thermal regeneration; A gas flow meter is provided at the hydrogen inlet, which counts the total volume V1 of hydrogen passing through the system tower body and compares it with the rated hydrogen drying processing volume V0 of the corresponding molecular sieve, and switches the working state of each system tower body according to the comparison result.
[0005] Furthermore, the rated hydrogen drying processing capacity V0=m*q / w, wherein m is the mass of the molecular sieve loaded in the corresponding drying tower, q is the unit adsorption capacity of the corresponding molecular sieve, and w is the water content of the hydrogen before drying.
[0006] Furthermore, when V1<V0, the working state of each system tower body remains unchanged, and V1 continues to increase as the hydrogen production equipment continues to operate until V1≥V0, when the original drying tower is controlled to switch to the regeneration tower.
[0007] Furthermore, the system tower bodies include three, which serve as a drying tower, a regeneration tower and an auxiliary tower respectively. When the working state of each system tower body is switched, the original drying tower is switched to the regeneration tower, the original regeneration tower is switched to the auxiliary tower, and the original auxiliary tower is switched to the drying tower.
[0008] Furthermore, the system tower body includes a first connecting pipe and a second connecting pipe, the first connecting pipe is connected to a plurality of first valve bodies, and is connected to a hydrogen inlet and first connecting pipes of other system tower bodies through corresponding first valve bodies, and the second connecting pipe is connected to a plurality of second valve bodies, and is connected to a hydrogen outlet and second connecting pipes of other system tower bodies through corresponding second valve bodies.
[0009] Furthermore, the system tower body also includes a temperature sensor, which measures the outlet gas temperature of the corresponding regeneration tower as T0. T0 gradually increases with the thermal regeneration process. When T0 reaches or exceeds the given value T1, the corresponding electric heater is turned off, the regeneration of the molecular sieve in the regeneration tower is completed, and the regeneration tower is on standby and cooled naturally.
[0010] The present application also discloses a precise control method for a drying and regeneration system of a hydrogen production system, comprising: After the actual gas flow rate inside the system is detected by the gas flow meter, the gas flow meter feeds back the flow signal to the PLC. After receiving the flow signal, the PLC counts the total volume V1 of hydrogen passing through the system tower body from each system tower body switch to the next switch. When V1<V0, the tower bodies of each system maintain the working state unchanged, and V1 increases continuously with the continuous operation of the hydrogen production equipment until V1≥V0, when the original drying tower is controlled to switch to the regeneration tower, and the original regeneration tower is switched to the drying tower or auxiliary tower.
[0011] Furthermore, the temperature sensor in the regeneration tower measures its corresponding outlet gas temperature as T0, which gradually increases during the thermal regeneration process. When T0 reaches or exceeds a given value T1, the corresponding electric heater is turned off, the molecular sieve regeneration in the regeneration tower is completed, and the regeneration tower is put on standby and cooled.
[0012] In summary, the present invention has the following beneficial effects: The drying and regeneration system controls the switching time of the drying tower according to the actual gas flow rate, realizes the full use of the molecular sieve, and improves the adaptability of the hydrogen production equipment to unstable hydrogen production under fluctuating power supply conditions; The regeneration time of the regeneration tower is controlled by detecting the temperature of the gas at the outlet of the regeneration tower, thereby improving the energy utilization rate of the hydrogen production equipment and avoiding energy waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall structure of a precise drying and regeneration system of a hydrogen production system in the present invention; Figure 2 It is a flow chart of the switching process in a control method of a precise drying and regeneration system of a hydrogen production system in the present invention; Figure 3 It is a flow chart of the regeneration process in a control method of a precise dry regeneration system of a hydrogen production system in the present invention.
[0014] In the figure, 1. gas flow meter; 2. temperature sensor; 3. system tower body; 4. pneumatic valve. DETAILED DESCRIPTION
[0015] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings, and this embodiment does not constitute a limitation of the present invention. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0016] A precise drying and regeneration system for hydrogen production system, such as Figure 1 As shown, it includes a hydrogen inlet, a hydrogen outlet and a plurality of system tower bodies 3. Hydrogen enters the system tower body 3 from the hydrogen inlet. The system tower body 3 includes at least two, one as a drying tower and the other as a regeneration tower. In this embodiment, the system tower body 3 includes three, which are respectively used as a drying tower, a regeneration tower and an auxiliary tower. The towers of the system tower body 3 are connected by stainless steel pipes. A group of pneumatic valves 4 are installed on each branch of the pipe to realize the connection and disconnection between the tower bodies. It can also be used in drying and regeneration equipment of other types or structures, such as a double-tower circulating drying equipment.
[0017] like Figure 1 As shown, a molecular sieve and an electric heater are installed in each system tower body 3; the electric heater controls the temperature of the system tower body 3, the molecular sieve in the drying tower adsorbs and dries the hydrogen, and the molecular sieve in the regeneration tower is restored to the adsorption state by thermal regeneration through the control of the electric heater; the three system tower bodies 3 realize cyclic switching among the drying tower, the regeneration tower, and the auxiliary tower through PLC control of the switch of the pneumatic valve 4 and the operation of the electric heater.
[0018] like Figure 1 As shown, a gas flow meter 1 is installed at the hydrogen inlet, and the gas flow meter 1 is used to count the total volume V1 of hydrogen passing through the system tower body 3, and compare it with the rated hydrogen drying processing capacity V0 of the corresponding molecular sieve, and switch the working state of each system tower body 3 according to the comparison result, that is, the total volume V1 of hydrogen passing through the tower after each tower switching and before the next switching is obtained by the PLC through the gas flow meter 1 at the hydrogen inlet of the drying regeneration system.
[0019] like Figure 1As shown, the rated hydrogen drying processing capacity V0=m*q / w, wherein m is the mass of the molecular sieve loaded in the corresponding drying tower, q is the unit adsorption capacity of the corresponding molecular sieve, which is determined by the selected molecular sieve, and w is the water content of the hydrogen before drying, which is obtained by measurement or preset by different process parameters; When V1<V0, the working state of each system tower body 3 remains unchanged, and V1 increases continuously as the hydrogen production equipment continues to operate until V1≥V0, and the original drying tower is controlled to switch to the regeneration tower; in this embodiment, when the working state of each system tower body 3 is switched, the original drying tower is switched to the regeneration tower, the original regeneration tower is switched to the auxiliary tower, and the original auxiliary tower is switched to the drying tower; In the above embodiment, the regeneration time of the molecular sieve in the regeneration tower is usually shorter than the working time of the drying tower. When the molecular sieve in the drying tower is saturated with adsorption and switched to the regeneration tower, the molecular sieve in the regeneration tower has completed thermal regeneration.
[0020] like Figure 1 As shown, each system tower body 3 includes a first connecting pipe (upper) and a second connecting pipe (lower), i.e., a stainless steel pipe, on which a pneumatic valve 4 is installed. Specifically, each first connecting pipe is connected to three first valve bodies, namely valve a, valve b, and valve c. The other ends of the valves a on the three first connecting pipes are connected to each other and connected to the hydrogen inlet for the introduction of hydrogen. The other ends of the valves b on the three first connecting pipes are connected to each other for the introduction / discharge of hydrogen to other system tower bodies 3. The other ends of the valves c on the three first connecting pipes are connected to each other for the discharge / introduction of hydrogen to other system tower bodies 3. Finally, the first connecting pipes connected to the hydrogen inlet and other system tower bodies 3 are realized through the corresponding first valve bodies. The second connecting pipe is connected to three second valve bodies, namely valve e, valve f, and valve g. The other ends of the valve e on the three second connecting pipes are connected to each other and to the hydrogen outlet for the discharge of hydrogen. The other ends of the valve f on the three second connecting pipes are connected to each other for the introduction / discharge of hydrogen to other system tower bodies 3. The other ends of the valve g on the three second connecting pipes are connected to each other for the discharge / introduction of hydrogen to other system tower bodies 3. Finally, the second connecting pipe connected to the hydrogen outlet and the other system tower body 3 is realized through the corresponding second valve body.
[0021] like Figure 1 As shown, the system tower body 3 also includes a temperature sensor 2. In this embodiment, the temperature sensor 2 is installed at the gas inlet and outlet (the first connecting pipe and the second connecting pipe) of each system tower body 3; the interlocking temperature of the set temperature of the electric heater in each system tower body 3 is T1, and its value is mainly related to the set temperature of the electric heater, which is generally lower than the set temperature of the electric heater; the corresponding set temperature of the electric heater in the regeneration tower is the thermal regeneration temperature of the corresponding molecular sieve, and different types of molecular sieves have different thermal regeneration temperature ranges; Specifically, the temperature sensor 2 at the outlet of the regeneration tower measures the gas temperature there as T0, which gradually increases as the thermal regeneration process proceeds. When T0 reaches or exceeds the given value T1, the electric heater circuit is automatically cut off. At this time, the regeneration of the molecular sieve in the regeneration tower is completed, and the regeneration tower is on standby and cooled naturally (the given value T1 can be preset according to the molecular sieve).
[0022] This embodiment also discloses a precise control method for the drying and regeneration system of the hydrogen production system, such as Figure 2 As shown, after the actual gas flow rate inside the system is detected by the gas flow meter 1, the gas flow meter 1 feeds back the flow signal to the PLC. After receiving the flow signal, the PLC counts the total volume V1 of hydrogen passing through the system tower body 3 from each time the system tower body 3 is switched to the next switch. The PLC detects the total volume V1 of hydrogen passing through the tower in real time, and compares V1 with the rated hydrogen drying processing volume V0; When V1<V0, the tower bodies 3 of each system maintain the working state unchanged and continue to operate, and V1 increases continuously as the hydrogen production equipment continues to operate until V1≥V0, when the PLC sends a signal to control the switch of the pneumatic valve 4 of the drying and regeneration system and the start and stop of the electric heater to realize the switching of the operating state, so that the original drying tower is switched to the regeneration tower, the original regeneration tower is switched to the auxiliary tower, and the original auxiliary tower is switched to the drying tower; like Figure 3 As shown, at the same time, the temperature sensor 2 in the regeneration tower measures its corresponding outlet gas temperature as T0, and T0 gradually increases with the thermal regeneration process. When T0 reaches or exceeds the given value T1, the corresponding electric heater is turned off, the molecular sieve regeneration in the regeneration tower is completed, and the regeneration tower is on standby and cooled. Example
[0023] The molecular sieves loaded in the tower bodies 3 of the three systems are 13X molecular sieves, and each tower is loaded with 200 kg; the pneumatic valve 4 is a DC-H00034 pneumatic two-way ball valve, and the temperature sensor 2 is a TS900 protective temperature sensor 2; Operate the hydrogen production equipment, open valve 10201 (valve a in the first connecting pipe above tower A), valve 10213 (valve g in the second connecting pipe below tower A), valve 10216 (valve g in the second connecting pipe below tower B), valve 10205 (valve b in the first connecting pipe above tower B), valve 10208 (valve b in the first connecting pipe above tower C), valve 10217 (valve e in the second connecting pipe below tower C), close the other pneumatic valves 4, and operate the electric heater of tower B. The gas enters from the top of tower A and exits from the bottom, then flows into tower B, enters from the bottom of tower B and exits from the top, and finally flows into tower C, enters from the top of tower C and exits from the bottom; at this time, tower A is a drying tower, tower B is a regeneration tower, and tower C is an auxiliary tower.
[0024] 220℃ is the interlocking temperature of the electric heater set temperature in the regeneration tower, which is lower than the electric heater set temperature of 265℃. The electric heater set temperature in the regeneration tower is the 13X molecular sieve thermal regeneration temperature, which is generally 160℃~300℃; The gas temperature at the outlet of the regeneration tower is T0, which is measured by the temperature sensor 2 at the outlet of the regeneration tower. T0 gradually increases with the progress of the thermal regeneration process. When T0 reaches or exceeds the given value of 240°C, the electric heater circuit is automatically cut off, the molecular sieve regeneration in the regeneration tower is completed, and the regeneration tower is on standby and cooled naturally.
[0025] The total volume of hydrogen V1 passing through the tower after each tower switch and before the next switch is calculated by the gas flow meter 1 at the hydrogen inlet of the drying regeneration system through the PLC; the rated hydrogen drying processing capacity V0=m*q / w=200kg*(1kg / 10kg) / (1.6g / m 3 )=12500 m 3 ; After the actual gas flow rate inside the system is detected by the gas flow meter 1, the gas flow meter 1 feeds back the flow signal to the PLC. After receiving the flow signal, the PLC counts the total volume V1 of hydrogen passing through the drying tower after each tower switching and before the next switching; PLC real-time statistics detection V1, and compare V1 with the rated hydrogen drying processing volume V0; When V1<12500 m 3 When the tower is in operation, the tower is kept in operation. V1 increases with the continuous operation of the hydrogen production equipment until V1 ≥ 12500 m 3 When the gas is in the air-conditioning state, the PLC sends a signal to control the switch of the pneumatic valve 4 of the drying and regeneration system, and opens valve 10207 (valve a in the first connecting pipe above tower C), valve 10219 (valve g in the second connecting pipe below tower C), valve 10213 (valve g in the second connecting pipe below tower A), valve 10202 (valve b in the first connecting pipe above tower A), valve 10205 (valve b in the first connecting pipe above tower B), and valve 10214 (valve e in the second connecting pipe below tower B). The remaining pneumatic valves 4 are closed, and the electric heater of tower A is operated. At this time, the gas enters from the top of tower C and exits from the bottom, then flows into tower A, enters from the bottom of tower A and exits from the top, and finally flows into tower B, enters from the top of tower B and exits from the bottom, so that tower A is switched to the regeneration tower, tower B is switched to the auxiliary tower, and tower C is switched to the drying tower. Example
[0026] The molecular sieves loaded in the three towers are 5A molecular sieves, and each tower is loaded with 160 kg; the pneumatic valve 4 is a DC-H00034 pneumatic two-way ball valve; Run the hydrogen production equipment, open valves 10207, 10219, 10213, 10202, 10205, and 10214, close the remaining pneumatic valves 4, and run the electric heater of tower A. At this time, the gas enters from the top of tower C and exits from the bottom, then flows into tower A, enters from the bottom of tower A and exits from the top, and finally flows into tower B, enters from the top of tower B and exits from the bottom. At this time, tower A is a regeneration tower, tower B is an auxiliary tower, and tower C is a drying tower.
[0027] 180℃ is the interlocking temperature of the electric heater set temperature in the regeneration tower, which is 220℃ lower than the electric heater set temperature. The electric heater set temperature in the regeneration tower is the 5A molecular sieve thermal regeneration temperature. The 5A molecular sieve thermal regeneration temperature is generally 200℃~350℃.
[0028] The gas temperature at the outlet of the regeneration tower is T0, which is measured by the temperature sensor 2 at the outlet of the regeneration tower. T0 gradually increases with the progress of the thermal regeneration process. When T0 reaches or exceeds the given value of 180°C, the electric heater circuit is automatically cut off, the molecular sieve regeneration in the regeneration tower is completed, and the regeneration tower is on standby and cooled naturally.
[0029] The total volume of hydrogen V1 passing through the tower after each tower switch and before the next switch is calculated by PLC through the gas flow meter 1 at the hydrogen inlet of the drying regeneration system. Rated hydrogen drying capacity V0 = m*q / w = 160kg*(1.8kg / 10kg) / (1.6g / m 3 )=18000 m 3 ; After the actual gas flow rate inside the system is detected by the gas flow meter 1, the gas flow meter 1 feeds back the flow signal to the PLC. After receiving the flow signal, the PLC counts the total volume V1 of hydrogen passing through the drying tower after each tower switching and before the next switching; PLC real-time statistics detection V1, and compare V1 with the rated hydrogen drying processing volume V0; When V1<18000 m 3 When the tower is in operation, the tower is kept in operation. V1 increases with the continuous operation of the hydrogen production equipment until V1 ≥ 18000 m 3When the gas is in the air-conditioning state, the PLC sends a signal to control the switch of the pneumatic valve 4 of the drying and regeneration system, and opens valve 10204 (valve a in the first connecting pipe above tower B), valve 10216 (valve g in the second connecting pipe below tower B), valve 10219 (valve g in the second connecting pipe below tower C), valve 10208 (valve b in the first connecting pipe above tower C), valve 10202 (valve b in the first connecting pipe above tower A), and valve 10211 (valve e in the second connecting pipe below tower A). The remaining pneumatic valves 4 are closed, and the electric heater of tower C is operated. At this time, the gas enters from the top of tower B and exits from the bottom, then flows into tower C, enters from the bottom of tower C and exits from the top, and finally flows into tower A, enters from the top of tower A and exits from the bottom, so that tower A is switched to the auxiliary tower, tower B is switched to the drying tower, and tower C is switched to the regeneration tower.
[0030] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions should also be deemed to fall within the protection scope of the technical solution of the present invention.
Claims
1. A precise drying and regeneration system for a hydrogen production system, characterized by: It includes a hydrogen inlet and several system tower bodies. Hydrogen enters the system tower body from the hydrogen inlet. The system tower body includes at least two, one as a drying tower and the other as a regeneration tower. Each system tower body is provided with a molecular sieve and an electric heater. The electric heater controls the temperature of the system tower body. The molecular sieve in the drying tower adsorbs and dries the hydrogen, and the molecular sieve in the regeneration tower is restored to an adsorption state by thermal regeneration. A gas flow meter is provided at the hydrogen inlet, which counts the total volume V1 of hydrogen passing through the system tower body and compares it with the rated hydrogen drying processing volume V0 of the corresponding molecular sieve, and switches the working state of each system tower body according to the comparison result.
2. According to claim 1, a precise drying and regeneration system for a hydrogen production system is characterized in that: The rated hydrogen drying processing capacity V0=m*q / w, wherein m is the mass of the molecular sieve loaded in the corresponding drying tower, q is the unit adsorption capacity of the corresponding molecular sieve, and w is the water content of the hydrogen before drying.
3. A precise drying and regeneration system for a hydrogen production system according to claim 1 or 2, characterized in that: When V1<V0, the tower bodies of each system maintain the working state unchanged, and V1 continues to increase as the hydrogen production equipment continues to operate until V1≥V0, when the original drying tower is controlled to switch to the regeneration tower.
4. According to claim 1, a precise drying and regeneration system for a hydrogen production system is characterized in that: The system tower body includes three, which are respectively used as a drying tower, a regeneration tower and an auxiliary tower. When the working state of each system tower body is switched, the original drying tower is switched to the regeneration tower, the original regeneration tower is switched to the auxiliary tower, and the original auxiliary tower is switched to the drying tower.
5. A precise drying and regeneration system for a hydrogen production system according to claim 1 or 4, characterized in that: The system tower body includes a first connecting pipe and a second connecting pipe, the first connecting pipe is connected to a plurality of first valve bodies, and is connected to a hydrogen inlet and the first connecting pipes of other system tower bodies through corresponding first valve bodies, and the second connecting pipe is connected to a plurality of second valve bodies, and is connected to a hydrogen outlet and the second connecting pipes of other system tower bodies through corresponding second valve bodies.
6. According to claim 1, a precise drying and regeneration system for a hydrogen production system is characterized by: The system tower body also includes a temperature sensor, which measures the outlet gas temperature of the corresponding regeneration tower as T0. T0 gradually increases with the thermal regeneration process. When T0 reaches or exceeds the given value T1, the corresponding electric heater is turned off, the molecular sieve regeneration in the regeneration tower is completed, and the regeneration tower is on standby and cooled naturally.
7. A control method for a precise drying and regeneration system of a hydrogen production system according to claim 1, characterized in that: include, After the actual gas flow rate inside the system is detected by the gas flow meter, the gas flow meter feeds back the flow signal to the PLC. After receiving the flow signal, the PLC counts the total volume V1 of hydrogen passing through the system tower body from each system tower body switch to the next switch. When V1<V0, the tower bodies of each system maintain the working state unchanged, and V1 increases continuously with the continuous operation of the hydrogen production equipment until V1≥V0, when the original drying tower is controlled to switch to the regeneration tower, and the original regeneration tower is switched to the drying tower or auxiliary tower.
8. The control method of a precise drying and regeneration system of a hydrogen production system according to claim 7, characterized in that: The temperature sensor in the regeneration tower measures its corresponding outlet gas temperature as T0. T0 gradually increases with the thermal regeneration process. When T0 reaches or exceeds the given value T1, the corresponding electric heater is turned off, the molecular sieve regeneration in the regeneration tower is completed, and the regeneration tower is on standby and cooled.
Citation Information
Patent Citations
Hydrogen regeneration control method and hydrogen drying system
CN116185106A
Method and system for purifying and drying hydrogen
CN116216642A
Drying device of electrolytic hydrogen production system, electrolytic hydrogen production system and control method
CN116856006A
Two-tower nondestructive gas drying device
CN217795412U
Hydrogen purification system
CN218879458U
Cited By
Control method and controller for regeneration drying tower in hydrogen purification system and hydrogen purification system
CN120325057A
Small distributed water electrolysis hydrogen production and hydrogenation all-in-one machine
CN120797017A