Anchor bolt assembly for assembly type wind power generation foundation and installation method of anchor bolt assembly

By designing anchor bolt components for prefabricated wind power generation foundations, using positioning pins and screw support components to achieve rapid splicing and precise positioning, the problem of low installation efficiency of wind power generation foundations in the prior art is solved, and the installation accuracy and stability are improved.

CN119221463APending Publication Date: 2024-12-31KUSN LUCKY SEA IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411663821.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-20
Publication Date
2024-12-31

AI Technical Summary

Technical Problem

During the splicing process, the existing wind power foundation is mainly adjusted by personnel and lifting equipment to align the holes. The operation is complicated and the installation efficiency is low.

Method used

Design an anchor bolt assembly for prefabricated wind power generation foundation, including nylon protective cap, anchor rod, hex nut, positioning hexagonal nylon nut, sealing plug head, plastic sleeve, rubber gasket and other components, and support the assembly through positioning pins and screws Achieve rapid splicing and precise positioning, and use multiple plastic sleeves and washers for positioning and fixing.

Benefits of technology

It improves installation accuracy and efficiency, simplifies the splicing process, reduces construction costs, and improves the stability of the wind turbine foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119221463A_ABST
    Figure CN119221463A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of wind power generation, and discloses an anchor bolt assembly for an assembly type wind power generation foundation and an installation method of the anchor bolt assembly. Comprising an anchor rod, a first hexagonal nut, a first gasket, a positioning hexagonal nylon nut, a sealing plug, a first plastic sleeve, a rubber gasket, a first positioning pin, a second plastic sleeve, a second gasket, a second hexagonal nut, a second positioning pin, a positioning ring and a screw supporting assembly. According to the anchor bolt assembly for the assembly type wind power generation foundation, the lower foundation slice and the upper foundation ring can be rapidly spliced through the arranged first positioning pins, the installation precision can be improved, then positioning and fastening are achieved through step-by-step cooperation of the positioning anchor bolts and the common anchor bolts, the installation precision is improved, a convenient installation technology is provided, and the installation efficiency is improved. And the stability of the generator set foundation is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wind power generation, and in particular to an anchor bolt assembly for an assembled wind power generation foundation and an installation method thereof. Background Art

[0002] With the continuous development of wind power generation technology, the scale and power of wind turbines are increasing, and the requirements for the stability and reliability of wind power generation foundations are becoming higher and higher. Traditional wind power generation foundations are usually constructed by pouring on site, which has a long construction period, high cost, and difficult to ensure quality. In order to solve these problems, prefabricated wind power generation foundations are gradually being used. As a key component of the prefabricated wind power generation foundation, the structural design of the anchor assembly directly affects the stability and reliability of the foundation.

[0003] When assembling the foundation workpieces at the bottom of the wind turbine, the workpieces are mainly moved and positioned by the lifting equipment. After the splicing is completed, they are connected by the anchor bolt assembly. During the splicing process, the anchor bolt installation holes of the upper and lower workpieces need to be kept concentric and aligned so that the anchor bolts can pass through the holes to achieve connection and fixation. However, during the splicing process of existing workpieces, the alignment and adjustment of the holes are mainly carried out by personnel and lifting equipment, which is cumbersome to operate and has low installation efficiency. Therefore, there is an urgent need for an anchor bolt assembly for assembled wind power generation foundations to solve the above problems. Summary of the invention

[0004] In view of the problem that the alignment and adjustment of the hole positions of the above-mentioned existing workpieces during the splicing process are mainly performed by personnel and lifting equipment, the operation is cumbersome and the installation efficiency is low, the present invention is proposed.

[0005] Therefore, the purpose of the present invention is to provide an anchor assembly for an assembled wind power generation foundation and an installation method thereof, the purpose of which is to solve the problem that the alignment and adjustment of the hole positions of existing workpieces during the splicing process are mainly carried out by personnel and lifting equipment, the operation is cumbersome and the installation efficiency is low.

[0006] To solve the above technical problems, the present invention provides the following technical solutions: an anchor bolt assembly for an assembled wind power generation foundation, comprising a nylon protective cap, an anchor rod, a hexagonal nut, a washer, a positioning hexagonal nylon nut, a sealing plug, a plastic sleeve, a rubber washer, a positioning pin, a plastic sleeve, a washer, a hexagonal nut, a nylon protective cap, a positioning pin, a positioning ring, a screw support assembly, an upper anchor plate, and a lower anchor plate. The positioning pin and the screw support assembly are both in multiple forms and are evenly distributed on the positioning holes formed in the positioning ring. The anchor rod, the hexagonal nut, the washer, the positioning hexagonal nylon nut, the plastic sleeve, the rubber washer, the plastic sleeve, the washer, and the hexagonal nut constitute a positioning anchor bolt. The anchor rod, the hexagonal nut, the washer, the sealing plug, the plastic sleeve, the rubber washer, the plastic sleeve, the washer, and the hexagonal nut constitute a common anchor bolt, and the nylon protective cap and the nylon protective cap are respectively connected to both ends of the anchor rod.

[0007] As a design scheme of the anchor assembly for the assembled wind power generation foundation described in the present invention, the lower anchor plate is located at the upper and lower ends of the lower foundation segment, a plurality of anchor holes are opened on the lower anchor plate at equal intervals, and a plurality of the plastic sleeves are arranged between two lower anchor plates arranged up and down.

[0008] As a design scheme of the anchor bolt assembly for the assembled wind power generation foundation described in the present invention, the screw support assembly includes a support screw arranged in the positioning hole of the positioning ring, the support screw is located on both sides of the positioning hole and is threadedly connected with a hexagonal nut three, a washer three is provided on the upper side of the hexagonal nut three located on the lower side, and the lower end of the support screw is fixedly connected with an embedded plate.

[0009] As a design scheme of the anchor bolt assembly for the assembled wind power generation foundation described in the present invention, the positioning pin 2 includes a pin arranged in the positioning hole of the positioning ring, and the pin is located on both sides of the positioning hole and is threadedly connected with a hexagonal nut 4, and a washer 4 is provided on the upper side of the hexagonal nut 4 located on the lower side.

[0010] As a design scheme of the anchor bolt assembly for the assembled wind power generation foundation described in the present invention, the plastic sleeve is arranged in the upper foundation ring, the sealing plug is interference fit with the upper end of the plastic sleeve, and the sealing plug is threadedly connected to the anchor rod.

[0011] As a design scheme of the anchor assembly for the assembled wind power generation foundation described in the present invention, the upper anchor plates are of semicircular structure, two in number, and a plurality of anchor holes are opened on the upper anchor plates at equal intervals.

[0012] As a design scheme of the anchor bolt assembly for the assembled wind power generation foundation of the present invention, the positioning pin 1 is a convex structure.

[0013] As a design scheme of the anchor bolt assembly for the assembled wind power generation foundation described in the present invention, the nylon protective cap 1 is interference fit with the upper end of the anchor rod, and the nylon protective cap 2 is threadedly fit with the lower end of the anchor rod.

[0014] To achieve the above object, the present invention provides the following technical solution: a method for installing an anchor assembly for a prefabricated wind power generation foundation, comprising the following steps:

[0015] S1, multiple plastic sleeves 1 are arranged at equal intervals in the casting mold of the upper foundation ring, so that they are cast and formed with the upper foundation ring, multiple plastic sleeves 2 are arranged at equal intervals in the casting mold of the lower foundation slice, and two lower anchor plates are arranged at both ends of the plastic sleeves 2, so that they are cast and formed with the lower foundation slice;

[0016] S2. Each supporting screw is arranged in a circular shape and at equal intervals on the positioning holes of the positioning ring. A washer three is sleeved on the lower end of the supporting screw and connected with a hexagonal nut three. Another hexagonal nut three is connected to the upper part of the supporting screw. The two hexagonal nuts three are fixed to the positioning ring to embed the embedded plate in the foundation cushion layer.

[0017] S3. The pins are distributed in the positioning holes of the positioning ring at equal intervals. A washer 4 is sleeved on the lower end of the pin and connected to a hexagonal nut 4. The upper end is connected to another hexagonal nut 4, so that the two hexagonal nuts 4 are in contact with the positioning ring.

[0018] S4, sleeve an anchor hole at the bottom of the lower foundation segment onto the pin, and fit the lower foundation segment with the positioning ring. After all the lower foundation segments are assembled, remove the positioning pin 2 from the positioning ring;

[0019] S5. Install a rubber gasket on the upper end of the second plastic sleeve, and insert the first positioning pin into the large concave hole reserved in the lower foundation segment;

[0020] S6, connect the small concave hole at the bottom of the upper foundation ring to the corresponding positioning pin, so that the upper foundation ring is placed on the lower foundation segment;

[0021] S7, pass the anchor rod in the positioning anchor bolt through the plastic sleeve 1, the rubber washer, and the lower plastic sleeve 2 in sequence, connect the washer 2 and the hexagonal nut 2 to the lower end of the anchor rod in sequence, and connect the positioning hexagonal nylon nut to the upper end of the anchor rod;

[0022] S8. Pass the anchor bolt hole of the upper anchor plate through the anchor rod and set it on the positioning hexagonal nylon nut, so that the upper anchor plate is set at the water level, and then connect the washer 1 and the hexagonal nut 1 in sequence to the upper end of the anchor rod;

[0023] S9. Pass the anchor rod of the ordinary anchor bolt through the upper anchor plate, sealing plug, plastic sleeve 1, rubber washer, plastic sleeve 2 in sequence. Connect the lower end of the anchor rod with washer 2 and hexagonal nut 2 in sequence. Connect the upper end of the anchor rod with washer 1 and hexagonal nut 1 in sequence.

[0024] Beneficial effects of the present invention:

[0025] 1. The present invention can quickly splice the lower foundation segment with the upper foundation ring through the positioning pin, and can improve the installation accuracy. Then, the positioning anchor bolts and ordinary anchor bolts are coordinated in steps to achieve positioning first and then tightening, which not only improves the installation accuracy, but also provides a convenient installation technology, and is beneficial to improving the stability of the generator set foundation.

[0026] 2. The present invention mainly solves the problem of difficult on-site construction through assembled design, and is also convenient for transportation and storage, thereby reducing the cost of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.

[0028] in:

[0029] Figure 1 The figure is a schematic diagram of the assembly structure state of the anchor bolt assembly for the assembled wind power generation foundation of the present invention.

[0030] Figure 2 The present invention is a schematic diagram of the structure of a positioning ring, a screw support assembly and a positioning pin of an anchor assembly for an assembled wind power generation foundation.

[0031] Figure 3 The present invention is a schematic diagram of the structure of a screw support assembly of an anchor assembly for an assembled wind power generation foundation.

[0032] Figure 4 This is a schematic diagram of the second structure of the positioning pin of the anchor bolt assembly for the assembled wind power generation foundation of the present invention.

[0033] Figure 5 Schematic diagram of the structure of the positioning anchor bolt (left) and the common anchor bolt (right) of the anchor bolt assembly for the assembled wind power generation foundation of the present invention.

[0034] Figure 6 The present invention is a schematic cross-sectional view of a sealing plug and a plastic sleeve structure of an anchor assembly for an assembled wind power generation foundation.

[0035] Figure 7 The present invention is a schematic diagram of the structural cross-section of nylon protective cap 1 and nylon protective cap 2 of the anchor bolt assembly for the assembled wind power generation foundation.

[0036] Figure 8This is a schematic diagram of the assembly of the lower anchor plate and plastic sleeve structures used in the assembled wind power generation foundation of the present invention.

[0037] Fig. 9 Anchor bolt assembly for assembled wind power generation foundation of the present invention Figure 8 Enlarged schematic diagram of the structural section at point A in the middle.

[0038] Fig.10 The diagram is a schematic diagram of the upper anchor plate structure of the anchor bolt assembly for the assembled wind power generation foundation of the present invention.

[0039] Fig.11 The figure is a schematic diagram of the overall assembly structure of the anchor bolt assembly for the assembled wind power generation foundation of the present invention.

[0040] Description of reference numerals:

[0041] 1. Nylon protective cap one; 2. Anchor rod; 3. Hexagonal nut one; 4. Washer one; 5. Positioning hexagonal nylon nut; 6. Sealing plug; 7. Plastic sleeve one; 8. Rubber washer; 9. Lower anchor plate; 10. Positioning pin one; 11. Plastic sleeve two; 12. Washer two; 13. Hexagonal nut two; 14. Nylon protective cap two; 15. Positioning pin two; 1501. Pin; 1502. Hexagonal nut four; 1503. Washer four; 16. Positioning ring; 17. Screw support assembly; 1701. Support screw; 1702. Hexagonal nut three; 1703. Washer three; 1704. Embedded plate; 18. Upper anchor plate; 19. Heat shrink sleeve. DETAILED DESCRIPTION

[0042] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0043] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0044] Reference Figure 1-10, which is the first embodiment of the present invention, provides an anchor bolt assembly for an assembled wind power generation foundation, and the anchor bolt assembly for the assembled wind power generation foundation includes a nylon protective cap 1, an anchor rod 2, a hexagonal nut 3, a washer 4, a positioning hexagonal nylon nut 5, a sealing plug 6, a plastic sleeve 7, a rubber washer 8, a positioning pin 10, a plastic sleeve 2 11, a washer 2 12, a hexagonal nut 2 13, a nylon protective cap 2 14, a positioning pin 2 15, a positioning ring 16, a screw support assembly 17, an upper anchor plate 18, a lower anchor plate 9, a positioning pin 2 15, a screw The supporting components 17 are in multiple forms and are evenly distributed on the positioning holes opened in the positioning ring 16. The anchor rod 2, hexagonal nut 3, washer 4, positioning hexagonal nylon nut 5, plastic sleeve 7, rubber washer 8, plastic sleeve 2 11, washer 2 12, and hexagonal nut 2 13 constitute a positioning anchor bolt. The anchor rod 2, hexagonal nut 3, washer 4, sealing plug 6, plastic sleeve 7, rubber washer 8, plastic sleeve 2 11, washer 2 12, and hexagonal nut 2 13 constitute a common anchor bolt, and nylon protective cap 1 and nylon protective cap 2 14 are respectively connected to the two ends of the anchor rod 2.

[0045] In the above technical solution, the screw support assembly 17 and the positioning ring 16 are used together to provide positioning for the lower foundation segment during splicing. After the positioning pin 15 is connected to the positioning ring 16, it can be plugged into the anchor hole of the lower foundation segment to accurately position the lower foundation segment. The positioning anchor bolt can limit the position of the spliced ​​lower foundation segment and the upper foundation ring. After all the foundations are assembled, the ordinary anchor bolts are connected to the foundation, and all anchor bolt connectors are tightened to achieve quick and accurate installation.

[0046] The lower anchor plate 9 is located at the upper and lower ends of the lower foundation segment, and a plurality of anchor holes are opened on the lower anchor plate 9 at equal intervals, and a plurality of plastic sleeves 11 are arranged between the two lower anchor plates 9 arranged up and down. The lower anchor plate 9 is cast on the lower foundation segment, specifically, one piece is cast on the upper and lower surfaces of the lower foundation segment, and a plurality of plastic sleeves 11 pass through the anchor holes, and the ends of the plastic sleeves 11 completely penetrate the anchor holes of the lower anchor plate 9, and the upper end surface is exposed to the upper surface by not less than 10mm, and the lower end surface is flush with the upper surface of the bottom of the lower anchor plate 9, ensuring that the through hole of the plastic sleeve 11 is concentric with the anchor hole, and the lower anchor plate 9 and the plastic sleeve 11 are cast in the lower foundation segment through a mold in advance, so that they are cast and formed together with the lower foundation segment, and the lower anchor plate 9 can not only increase the rigidity of the lower foundation segment, but also ensure the verticality of the anchor hole, thereby ensuring the stability of the anchor connection.

[0047] The screw support assembly 17 includes a support screw 1701 arranged in the positioning hole of the positioning ring 16, and the support screw 1701 is located on both sides of the positioning hole and is threadedly connected with a hexagonal nut three 1702, and a washer three 1703 is provided on the upper side of the hexagonal nut three 1702 located on the lower side, and the lower end of the support screw 1701 is fixedly connected with an embedded plate 1704. After each support screw 1701 is connected to the positioning ring 16 through the hexagonal nut three 1702, the embedded plate 1704 can be embedded in the foundation cushion layer, so that the positioning ring 16 is fixedly welded on the foundation cushion layer, which is used to provide positioning and support for the splicing of the lower foundation segments.

[0048] The locating pin 15 includes a pin 1501 arranged in the locating hole of the locating ring 16. The pin 1501 is located on both sides of the locating hole and is threadedly connected with a hexagonal nut 1502. A washer 1503 is provided on the upper side of the hexagonal nut 1502 located on the lower side. The upper end of the pin 1501 is higher than the top surface of the locating ring 16. When the lower foundation segment is fitted to the locating ring 16, the bottom anchor hole can be connected to the pin 1501, so that each lower foundation segment is accurately set on the locating ring 16, so that all the lower foundation segments can be accurately spliced.

[0049] A plastic sleeve 7 is arranged in the upper base ring, and a sealing plug 6 is interference fit with the upper end of the plastic sleeve 7. The sealing plug 6 is threadedly connected to the anchor rod 2. The plastic sleeve 7 is pre-arranged in a casting mold of the upper base ring so that it is cast and formed with the upper base ring. The sealing plug 6 is arranged in a convex shape and is provided with an internal thread matched with the anchor rod 2. After the sealing plug 6 is connected to the anchor rod 2, its lower end is plugged into the upper end of the plastic sleeve 7, and the upper end of the plastic sleeve 7 is deformed by force so that it is sealed and connected with the sealing plug 6.

[0050] Among them, refer to Figure 5 A heat shrink sleeve 19 is also sleeved on the upper end of the plastic sleeve 7. The heat shrink sleeve 19 is heated and shrunk to tightly connect the upper end of the plastic sleeve 7 in the positioning anchor bolt and the anchor rod 2, and to tightly connect the upper end of the plastic sleeve 7 in the ordinary anchor bolt and the sealing plug 6 and the anchor rod 2, thereby further improving the sealing performance.

[0051] The upper anchor plates 18 are of a semicircular structure, two in number, and a plurality of anchor holes are provided on the upper anchor plates 18 at equal intervals. The two upper anchor plates 18 are spliced ​​to form a ring structure, and a connecting plate is provided on the lower side of the joint of the two upper anchor plates 18, and two through holes are provided on the connecting plate. A threaded groove is provided on the upper side of the through hole of the upper anchor plate 18, and the screws pass through the through hole of the connecting plate and are connected to the threaded groove, so that the two upper anchor plates 18 are spliced ​​and fixed.

[0052] The anchor holes of the upper anchor plate 18, the plastic sleeve 1 7, the rubber gasket 8, the plastic sleeve 2 11, and the anchor holes of the lower anchor plate 9 are vertically and concentrically arranged so that the anchor rod 2 can pass through to connect the upper foundation ring with the lower foundation segment.

[0053] The rubber gasket 8 is sleeved on the protruding part of the upper end of the plastic sleeve 11, so that the gravity of the upper foundation ring drives the rubber gasket 8 to deform, so that the rubber gasket 8 is tightly connected with the plastic sleeve 11 and the anchor rod 2, avoiding leakage when grouting between the upper foundation ring and the lower foundation segment.

[0054] The rubber gasket 8 is a high-strength polyurethane elastic gasket with a steel wire strip, which can achieve deformation sealing while avoiding rupture and damage, thereby enhancing structural stability.

[0055] The positioning pin 10 is a convex structure and is an integrally formed arrangement. A large concave hole compatible with the positioning pin 10 is reserved on the outer side of the top of the lower basic segment, and a small concave hole compatible with the positioning pin 10 is reserved on the outer side of the bottom of the upper basic ring. The positioning pin 10 is pre-placed on the large concave hole, and the upper basic ring can be quickly and accurately positioned and connected with the lower basic segment by engaging with the positioning pin 10 through the small concave hole.

[0056] The nylon protective cap 1 is interference fit with the upper end of the anchor rod 2, and the nylon protective cap 2 14 is threadedly matched with the lower end of the anchor rod 2. A plurality of reinforcing ribs are fixed at equal intervals inside the nylon protective cap 1. The nylon protective cap 1 is interference fit with the threaded portion of the upper end of the anchor rod 2 through the reinforcing ribs. A threaded groove matching the threaded portion of the anchor rod 2 is provided inside the nylon protective cap 2 14. The nylon protective cap 2 14 is threadedly connected to the lower end of the anchor rod 2. By setting the nylon protective cap 1 and the nylon protective cap 2 14, the ends of the anchor rod 2 are protected from rust during use.

[0057] During use, the plastic sleeve 1 7 is arranged in the mold of the upper foundation ring so that it is cast together with the upper foundation ring, and the plastic sleeve 2 11 and the lower anchor plate 9 are arranged in the mold of the lower foundation segment so that they are formed together with the lower foundation segment; each support screw 1701 is distributed in a ring with equal spacing, a hexagonal nut 3 1702 is connected to the support screw 1701, and a washer 3 1703 is sleeved, the positioning ring 16 is placed on the washer 3 1703, and then another hexagonal nut 3 1702 is connected to the support screw 1701, and the embedded plate 1704 is embedded in On the foundation cushion, after the foundation cushion is cured, adjust the positioning ring 16 horizontally; connect a hexagonal nut 1502 to the pin 1501, and set the washer 1503. Multiple pins 1501 are distributed in a ring with equal intervals and pass through the connecting hole at the bottom of the positioning ring 16, and then connect another hexagonal nut 1502 so that the upper end of the pin 1501 protrudes from the top of the positioning ring 16; the lower foundation segment is attached to the outside of the positioning ring 16, and the bottom anchor hole is plugged with the pin 1501, and the top of the lower foundation segment is embedded so that its through hole passes through Through the plastic sleeve 11, and set the rubber gasket 8 on the upper end of the plastic sleeve 11, put the inner positioning pin 10 into the large concave hole at the top of the lower foundation segment, after the lower foundation segment is spliced, align the upper foundation ring with the positioning pin 10 through the small concave hole at the bottom and install it; pass the anchor rod 2 in the positioning anchor bolt from top to bottom through the upper foundation ring, rubber gasket 8, and lower foundation segment in sequence, connect the washer 12 and hexagonal nut 13 at the lower end of the anchor rod 2 in sequence, connect the positioning hexagonal nylon nut 5 at the upper end of the anchor rod 2, and match the anchor hole of the upper anchor plate 18 to the anchor rod 2 Insert and adjust the positioning hexagonal nylon nut 5 to set the water level of the upper anchor plate 18; pass the anchor rod 2 of the ordinary anchor bolt through the upper anchor plate 18, the sealing plug 6, the upper foundation ring, the rubber gasket 8, and the lower foundation piece from top to bottom, and connect the lower end of the anchor rod 2 with the washer 2 12 and the hexagonal nut 2 13 in sequence, and finally connect the upper ends of all the anchor rods 2 with the washer 1 4 and the hexagonal nut 1 3 in sequence, tighten each hexagonal nut to complete the installation, and finally engage the nylon protective cap 1 on the upper end of the anchor rod 2, and thread the nylon protective cap 2 14 on the lower end of the anchor rod 2.

[0058] A method for installing an anchor bolt assembly for an assembled wind power generation foundation comprises the following steps:

[0059] S1, multiple plastic sleeves 1 7 are arranged at equal intervals in the casting mold of the upper foundation ring, so that they are cast and formed with the upper foundation ring, multiple plastic sleeves 2 11 are arranged at equal intervals in the casting mold of the lower foundation slice, and two lower anchor plates 9 are arranged at both ends of the plastic sleeve 2 11, so that they are cast and formed with the lower foundation slice;

[0060] S2. Each support screw 1701 is arranged in a circular shape and at equal intervals on the positioning holes of the positioning ring 16. A washer 1703 is sleeved on the lower end of the support screw 1701 and connected to a hexagonal nut 1702. Another hexagonal nut 1702 is connected to the upper part of the support screw 1701. The two hexagonal nuts 1702 fix the positioning ring 16, and the embedded plate 1704 is embedded in the foundation cushion layer.

[0061] S3. The pins 1501 are distributed in the positioning holes of the positioning ring 16 at equal intervals. A washer 1503 is sleeved on the lower end of the pin 1501 and connected to a hexagonal nut 1502. The upper end is connected to another hexagonal nut 1502, so that the two hexagonal nuts 1502 abut against the positioning ring 16.

[0062] S4, sleeve an anchor hole at the bottom of the lower foundation segment onto the pin 1501, and fit the lower foundation segment with the positioning ring 16. After all the lower foundation segments are assembled, remove the positioning pin 15 from the positioning ring 16;

[0063] S5. Sleeve the rubber gasket 8 on the upper end of the plastic sleeve 11, and insert the positioning pin 10 into the large concave hole reserved in the lower foundation segment;

[0064] S6. Connect the small concave hole at the bottom of the upper foundation ring to the corresponding positioning pin 10, so that the upper foundation ring is placed on the lower foundation segment;

[0065] S7, pass the anchor rod 2 in the positioning anchor bolt through the plastic sleeve 1 7, the rubber washer 8, and the lower plastic sleeve 2 11 in sequence, connect the washer 2 12 and the hexagonal nut 2 13 to the lower end of the anchor rod 2 in sequence, and connect the positioning hexagonal nylon nut 5 to the upper end of the anchor rod 2;

[0066] S8, pass the anchor bolt hole of the upper anchor plate 18 through the anchor rod 2 and set it on the positioning hexagonal nylon nut 5, so that the upper anchor plate 18 is set at the water level, and the upper end of the anchor rod 2 is then connected with a washer 4 and a hexagonal nut 3 in sequence;

[0067] S9. Pass the anchor rod 2 of the common anchor bolt through the upper anchor plate 18, the sealing plug 6, the plastic sleeve 1 7, the rubber gasket 8, the plastic sleeve 2 11 in sequence. The lower end of the anchor rod 2 is connected with the gasket 2 12 and the hexagonal nut 2 13 in sequence. The upper end of the anchor rod 2 is connected with the gasket 1 4 and the hexagonal nut 1 3 in sequence.

[0068] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. An anchor assembly for an assembled wind power generation foundation, characterized in that: The invention comprises a nylon protective cap (1), an anchor rod (2), a hexagonal nut (3), a washer (4), a positioning hexagonal nylon nut (5), a sealing plug (6), a plastic sleeve (7), a rubber washer (8), a positioning pin (10), a plastic sleeve (11), a washer (12), a hexagonal nut (13), a nylon protective cap (14), a positioning pin (15), a positioning ring (16), a screw support assembly (17), an upper anchor plate (18), and a lower anchor plate (9). The positioning pin (15) and the screw support assembly (17) are both in the form of a plurality of evenly distributed positioning holes formed in the positioning ring (16). The anchor rod (2), hexagonal nut one (3), washer one (4), positioning hexagonal nylon nut (5), plastic sleeve one (7), rubber washer (8), plastic sleeve two (11), washer two (12), and hexagonal nut two (13) constitute a positioning anchor bolt; the anchor rod (2), hexagonal nut one (3), washer one (4), sealing plug (6), plastic sleeve one (7), rubber washer (8), plastic sleeve two (11), washer two (12), and hexagonal nut two (13) constitute a common anchor bolt, and the nylon protective cap one (1) and the nylon protective cap two (14) are respectively connected to the two ends of the anchor rod (2).

2. The anchor bolt assembly for the assembled wind power generation foundation according to claim 1, characterized in that: The lower anchor plate (9) is located at the upper and lower ends of the lower foundation segment, a plurality of anchor bolt holes are provided on the lower anchor plate (9) at equal intervals, and a plurality of plastic sleeves (11) are provided between two lower anchor plates (9) arranged in an upper and lower arrangement.

3. The anchor bolt assembly for the assembled wind power generation foundation according to claim 1, characterized in that: The screw support assembly (17) comprises a support screw (1701) arranged in a positioning hole of a positioning ring (16); the support screw (1701) is threadedly connected with a hexagonal nut three (1702) on both sides of the positioning hole; a washer three (1703) is provided on the upper side of the hexagonal nut three (1702) located on the lower side; and the lower end of the support screw (1701) is fixedly connected with an embedded plate (1704).

4. The anchor bolt assembly for the assembled wind power generation foundation according to claim 1, characterized in that: The positioning pin 2 (15) includes a pin (1501) arranged in a positioning hole of a positioning ring (16), and the pin (1501) is threadedly connected with a hexagonal nut 4 (1502) on both sides of the positioning hole, and a washer 4 (1503) is provided on the upper side of the hexagonal nut 4 (1502) located on the lower side.

5. The anchor bolt assembly for the assembled wind power generation foundation according to claim 1, characterized in that: The plastic sleeve (7) is arranged in the upper base ring, the sealing plug (6) is interference fit with the upper end of the plastic sleeve (7), and the sealing plug (6) is threadedly connected to the anchor rod (2).

6. The anchor bolt assembly for the assembled wind power generation foundation according to claim 1, characterized in that: The upper anchor plates (18) are of semicircular structure, two in number, and a plurality of anchor bolt holes are provided on the upper anchor plates (18) at equal intervals.

7. The anchor assembly for the assembled wind power generation foundation according to claim 1, characterized in that: The positioning pin 1 (10) is a convex structure.

8. The anchor bolt assembly for the assembled wind power generation foundation according to claim 1, characterized in that: The nylon protective cap 1 (1) is interference fit with the upper end of the anchor rod (2), and the nylon protective cap 2 (14) is threadedly fit with the lower end of the anchor rod (2).

9. A method for installing an anchor assembly for a prefabricated wind power generation foundation, which is applied to the anchor assembly for a prefabricated wind power generation foundation described in claims 1 to 8, characterized in that: The following steps are involved: S1, multiple plastic sleeves 1 (7) are arranged at equal intervals in the casting mold of the upper foundation ring so as to be cast together with the upper foundation ring, multiple plastic sleeves 2 (11) are arranged at equal intervals in the casting mold of the lower foundation segment, and two lower anchor plates (9) are arranged at both ends of the plastic sleeves 2 (11) so as to be cast together with the lower foundation segment; S2. Each support screw rod (1701) is arranged in a circular shape at equal intervals on the positioning holes of the positioning ring (16). A washer three (1703) is sleeved on the lower end of the support screw rod (1701) and connected to a hexagonal nut three (1702). Another hexagonal nut three (1702) is connected to the upper part of the support screw rod (1701). The two hexagonal nuts three (1702) fix the positioning ring (16), and the embedded plate (1704) is embedded in the foundation cushion layer. S3, the pins (1501) are distributed in the positioning holes of the positioning ring (16) at equal intervals, a washer four (1503) is sleeved on the lower end of the pin (1501) and connected to a hexagonal nut four (1502), and another hexagonal nut four (1502) is connected to the upper end, so that the two hexagonal nuts four (1502) are in contact with the positioning ring (16); S4, an anchor hole at the bottom of the lower foundation segment is sleeved on the pin (1501), and the lower foundation segment is fitted with the positioning ring (16). After all the lower foundation segments are assembled, the positioning pin 2 (15) is removed from the positioning ring (16); S5. Sleeve a rubber gasket (8) on the upper end of the second plastic sleeve (11), and insert the first positioning pin (10) into the large concave hole reserved in the lower base segment; S6. Connect the small concave hole at the bottom of the upper foundation ring to the corresponding positioning pin 1 (10), so that the upper foundation ring is placed on the lower foundation segment; S7, the anchor rod (2) in the positioning anchor bolt is passed through the plastic sleeve 1 (7), the rubber washer (8), and the lower plastic sleeve 2 (11) in sequence, the lower end of the anchor rod (2) is connected to the washer 2 (12) and the hexagonal nut 2 (13) in sequence, and the upper end of the anchor rod (2) is connected to the positioning hexagonal nylon nut (5); S8, pass the anchor bolt hole of the upper anchor plate (18) through the anchor rod (2) and place it on the positioning hexagonal nylon nut (5), so that the upper anchor plate (18) is set at the water level, and the upper end of the anchor rod (2) is then connected with a washer (4) and a hexagonal nut (3) in sequence; S9. The anchor rod (2) of the common anchor bolt is passed through the upper anchor plate (18), the sealing plug (6), the plastic sleeve 1 (7), the rubber washer (8), and the plastic sleeve 2 (11) in sequence. The lower end of the anchor rod (2) is connected to the washer 2 (12) and the hexagonal nut 2 (13) in sequence. The upper end of the anchor rod (2) is connected to the washer 1 (4) and the hexagonal nut 1 (3) in sequence.