Powder-containing water treatment device for bulk cargo port
By designing a detachable sedimentation tank and magnetic suction assembly, combined with the diverting design of the water collection tank, the problem that the dock sewage treatment facilities cannot recover magnetic powder and occupy the operating area is solved, and efficient and economical powder-containing water treatment is achieved, which is suitable for the vast majority of people. Most bulk cargo ports.
Patent Information
- Application Number
- CN202411210234.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2044-08-30
AI Technical Summary
When the existing dock sewage treatment facilities are treated with powdered water generated in bulk ports, they cannot effectively recover high-value magnetic powder and occupy the dock operation area, making it difficult to meet the increasing environmental protection requirements.
A bulk port powder-containing water treatment device including a sedimentation tank, a magnetic suction assembly and a water collection tank is designed. The sedimentation tank can be detachably arranged between the pile foundations of the dock. The magnetic suction assembly includes a large-volume and a small-volume magnetic suction pool, The water tank is diverted to the magnetic suction assembly through the deflector plate for processing, and the water level control part and the powder collection part cooperate with the drain pipe to achieve efficient precipitation and recycling.
It realizes the recycling of high-value magnetic powder and the processing that does not occupy the dock operation area, adapts to the processing needs of different flows, improves processing efficiency and economy, and is suitable for most bulk ports, which are easy to use and low cost.
Smart Images

Figure CN119240877A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of dock sewage treatment, and more specifically, to a bulk cargo port powder-containing water treatment device. Background Art
[0002] A bulk cargo port refers to a port setting for loading and unloading bulk cargo (such as ore, coal and grain, etc.). The wastewater containing mineral powder particles generated during the loading and unloading of bulk cargo such as ore is powder water. Powder water is inevitably generated during the loading and unloading process at the bulk cargo port terminal. The traditional method is to set up a dock drainage ditch horizontally at the dock (along the width of the dock) and discharge it after treatment with the wastewater in the land drainage pipe. The value of magnetic powder in powder water is high, which is seriously wasted. The existing dock sewage treatment facilities are not only technologically backward, but many dock sewage treatment facilities are even in disrepair. The old docks even lack sewage treatment equipment, which makes it difficult to meet the increasingly stringent environmental protection requirements. The existing dock sewage treatment equipment cannot be installed in combination with the existing conditions of the dock, and needs to occupy the dock operation area. Most docks Sewage treatment equipment cannot recycle high-value magnetic powder. For example, in the utility model patent with announcement number CN208561947U, a sewage treatment equipment for a stone mine wharf is disclosed, including a front cover, a water inlet, an inspection port, a vent, a spiral stirring device, a circulation pipe, a positioning pin, a support column and a support plate. The water inlet is embedded and installed on the surface of the front cover, the vent is arranged parallel to the inspection port, the outer surface of the spiral stirring device is welded to the lower end of the vent, the circulation pipe is fixed to the outer surface of the spiral stirring device by the positioning pin, and the upper surface of the support column is connected to the lower end of the spiral stirring device. By setting a spiral stirring device, the propeller activates the chemical cleaning components in the chemical cleaning layer, so that the sewage is cleaned to the greatest extent, thereby improving the sewage treatment efficiency. It can be seen that the sewage treatment equipment of the above-mentioned stone mine wharf still has the following defects: first, it needs to occupy the operating area of the wharf; second, it cannot recycle high-value magnetic powder. Summary of the invention
[0003] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.
[0004] Another object of the present invention is to provide a bulk cargo port powder-containing water treatment device, which can recover high-value magnetic powder in the powder-containing water, and its installation does not require occupying the existing operating area of the terminal.
[0005] In order to achieve these purposes and other advantages according to the present invention, a bulk port powder water treatment device is provided, comprising: A sedimentation tank is detachably arranged between a pair of pier pile foundations, the pair of pier pile foundations are arranged along the extension direction of the pier, the sedimentation tank is arranged above the water surface and a drainage pipe is arranged at the bottom thereof; A magnetic attraction component is arranged above the sedimentation tank, comprising a large-volume magnetic attraction tank and a small-volume magnetic attraction tank which are arranged in sequence upward from the sedimentation tank, wherein the large-volume magnetic attraction tank and the small-volume magnetic attraction tank are both configured to be connected to the sedimentation tank and allow a small flow of powder-containing water to pass through, and the small-volume magnetic attraction tank and the large-volume magnetic attraction tank are both openly arranged and overflow water from the top of the small-volume magnetic attraction tank flows into the large-volume magnetic attraction tank; A water collecting trough is arranged below the dock surface layer along the extension direction of the dock, and the dock surface layer is provided with a drainage hole connected to the water collecting trough, and the bottom of the water collecting trough is provided with a first guide plate for guiding the water to the small-volume magnetic suction pool, and the side of the water collecting trough is provided with a second guide plate for guiding the water to the large-volume magnetic suction pool; Wherein, the small-volume magnetic attraction pool and the large-volume magnetic attraction pool are respectively provided with a first magnetic attraction structure and a second magnetic attraction structure to absorb magnetic powder in powder-containing water.
[0006] Preferably, the sedimentation tank includes a water level control part and a powder collecting part which are arranged in sequence from top to bottom, the water level control part and the powder collecting part are detachably sealed and connected, and the drain pipe is arranged at the lower part of the water level control part, a water level sensor is provided in the water level control part, a control valve is provided on the drain pipe, and the water level sensor and the control valve are both electrically connected to a controller.
[0007] Preferably, an outer side wall of the water level control part is provided with a clamp mounting seat, and a clamp connected to the wharf pile foundation is provided on the clamp mounting seat; the clamp mounting seats of adjacent sedimentation tanks are staggered in the vertical direction.
[0008] Preferably, the large-volume magnetic attraction pool is arranged above the sedimentation pool, and a first water seepage hole communicating with the sedimentation pool is provided at the bottom of the large-volume magnetic attraction pool.
[0009] Preferably, two small-volume magnetic pools are provided, and either small-volume magnetic pool comprises a small-volume magnetic pool body and a connecting pipe arranged at the bottom of the small-volume magnetic pool body, the bottom of the connecting pipe is connected to the bottom of the large-volume magnetic pool through a flange, and the bottom of the connecting pipe is provided with a second seepage hole connected to the sedimentation tank.
[0010] Preferably, any small-volume magnetic pool body includes a cylindrical portion and a conical portion that are integrally arranged.
[0011] Preferably, a pair of small-volume magnetic pool bodies are arranged on a small-volume magnetic pool base, a flange connected to the connecting pipe is provided at the bottom of the small-volume magnetic pool base, and the conical portion of the small-volume magnetic pool body is arranged in the small-volume magnetic base.
[0012] Preferably, the first magnetic attraction structure includes: A first motor, which is arranged on a first motor mounting frame, wherein the first motor mounting frame is arranged on the inner edge of the small-volume magnetic pool body; A plurality of first magnetic frames are connected to the motor shaft of the first motor and rotate with the motor shaft of the first motor. The first magnetic frames are arranged obliquely and close to the inner wall of the conical part of the small-volume magnetic pool body.
[0013] Preferably, the second magnetic attraction structure includes: A second motor is arranged on the small-volume magnetic pool base and a motor shaft of the second motor extends into the large-volume magnetic pool; A plurality of second magnetic frames are connected to the motor shaft of the second motor and rotate along with the motor shaft of the second motor. The second magnetic frames are arranged near the bottom of the large-volume magnetic pool.
[0014] The present invention has at least the following beneficial effects: First, the bulk cargo port powder-containing water treatment device provided by the present invention comprises a water collection tank, a magnetic suction component and a sedimentation tank arranged in sequence from top to bottom, wherein the magnetic suction component is provided with a first magnetic suction structure and a second magnetic suction structure to recover high-value magnetic powder in the powder-containing water, thereby improving the economic efficiency of the bulk cargo port powder-containing water treatment device; Secondly, the bulk cargo port powder water treatment device provided by the present invention can be detachably installed between a pair of dock pile foundations, does not occupy the dock operation area, and the drainage pipe arranged at the lower part of the sedimentation tank can be connected to the existing dock drainage ditch, making full use of the conditions of the existing dock, requiring less modification of the existing dock, and having strong integration with the existing dock, and can be applied to most of the existing bulk cargo ports; Thirdly, the powder-containing water treatment device for bulk cargo port provided by the present invention has a first guide plate and a second guide plate on the water collecting tank for guiding water to a small volume magnetic suction pool and a large volume magnetic suction pool respectively, and the installation height of the second guide plate is higher than that of the first guide plate. The powder-containing water with a small flow rate flows into the small volume magnetic suction pool for treatment through the first guide plate, and the powder-containing water with a large flow rate flows into the small volume magnetic suction pool and the large volume magnetic suction pool for simultaneous treatment through the first guide plate and the second guide plate respectively. It is suitable for use at docks with powder-containing water with different flow rates and has strong promotional properties. Fourthly, the bulk cargo port powder water treatment device provided by the present invention has a detachable sedimentation tank and a dock pile foundation, and regularly recovers the magnetic powder adsorbed in the small-volume magnetic suction tank and the large-volume magnetic suction tank, and at the same time regularly cleans the sediment at the bottom of the sedimentation tank, which is easy to use and low in cost; Fifth, the powder-containing water treatment device for a bulk cargo port provided by the present invention has a water level sensor in the sedimentation tank and a control valve on the drain pipe. When the water level in the sedimentation tank reaches a preset value, the drain pipe opens to discharge the precipitated water in the sedimentation tank into the dock drainage ditch, which can ensure sufficient precipitation of the powder in the sedimentation tank and continuous use of the powder-containing water treatment device, and has high treatment efficiency.
[0015] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of a bulk cargo port powder-containing water treatment device in one technical solution of the present invention; Figure 2 It is a schematic diagram of the installation of the bulk cargo port powder-containing water treatment device in another technical solution of the present invention; Figure 3 It is a structural schematic diagram of the water collecting tank in another technical solution of the present invention; Figure 4 This is a schematic diagram of the installation of a pair of small-volume magnetic suction pools in another technical solution of the present invention. DETAILED DESCRIPTION
[0017] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0018] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.
[0019] like Figures 1 to 4 As shown, the present invention provides a bulk port powder water treatment device, comprising: A sedimentation tank, which is detachably arranged between a pair of pier pile foundations 1, the pair of pier pile foundations 1 are arranged along the extension direction of the pier, the sedimentation tank is arranged above the water surface and a drainage pipe 19 is arranged at the bottom thereof; A magnetic suction component is arranged above the sedimentation tank, comprising a large-volume magnetic suction pool 22 and a small-volume magnetic suction pool arranged in sequence upward from the sedimentation tank, wherein the large-volume magnetic suction pool 22 and the small-volume magnetic suction pool are both configured to be connected to the sedimentation tank and allow a small flow of powder-containing water to pass through, and the small-volume magnetic suction pool and the large-volume magnetic suction pool 22 are both openly arranged and overflow water from the top of the small-volume magnetic suction pool flows into the large-volume magnetic suction pool 22; A water collecting trough 12 is arranged below the dock surface layer 11 along the extension direction of the dock, and the dock surface layer 11 is provided with a drainage hole connected to the water collecting trough 12, and the bottom of the water collecting trough 12 is provided with a first guide plate 7 for guiding water to the small-volume magnetic suction pool, and the side is provided with a second guide plate 9 for guiding water to the large-volume magnetic suction pool 22; The small-volume magnetic attraction pool and the large-volume magnetic attraction pool 22 are respectively provided with a first magnetic attraction structure and a second magnetic attraction structure to absorb magnetic powder in powder-containing water.
[0020] In the above technical solution, if Figure 1 or Figure 2 As shown, the bulk cargo port powder water treatment device is suitable for a wharf whose wharf pile foundation 1 is a supporting pile, such as Figure 1 or Figure 2 As shown, the wharf structure includes wharf pile foundations 1 arranged in sequence along the extension direction of the wharf, a plurality of wharf pile foundations 1 are provided with cross beams 3 along the width direction of the wharf, a plurality of longitudinal beams 4 are arranged on the cross beams 3, and the wharf surface layer 11 is arranged on the longitudinal beams 4. The bulk cargo port powder water treatment device includes a water collecting trough 12, a magnetic suction assembly and a sedimentation tank from top to bottom, wherein the water collecting trough 12 is arranged below the wharf surface layer 11, and a drainage hole connected to the water collecting trough 12 is arranged on the wharf surface layer 11. The powder water (including flushing water) generated during the loading and unloading process of the bulk cargo port flows into the water collecting trough 12 through the drainage hole on the wharf surface layer 11. The water collecting trough 12 is arranged along the extension direction of the wharf. Along the width direction of the wharf, the number of the water collecting troughs 12 corresponds to the number of the sedimentation tanks, that is, according to the actual demand for the discharge of powder water at the wharf, multiple sedimentation tanks can be arranged along the width direction of the wharf, and multiple water collecting troughs 12 should also be arranged corresponding to multiple sedimentation tanks. The water collecting tank 12 can quickly and temporarily store the powder-containing water generated by the dock surface layer 11 in its inner cavity, thereby reducing the water accumulation on the dock surface layer 11 .
[0021] like Figure 3 As shown, in the above technical solution, the magnetic suction component is arranged below the water collecting tank 12, and the powder-containing water in the water collecting tank 12 is gradually guided to the magnetic suction component for processing through the first guide plate 7 and the second guide plate 9. Corresponding to the first guide plate 7 and the second guide plate 9 arranged at different heights, the first guide plate 7 and the second guide plate 9 are respectively provided with a first slot 71 and a second slot 91 at the contact point with the water collecting tank 12. The magnetic suction component includes a small-volume magnetic suction pool and a large-volume magnetic suction pool 22, wherein the small-volume magnetic suction pool is located above the large-volume magnetic suction pool 22, and water overflowing from the small-volume magnetic suction pool can flow into the large-volume magnetic suction pool 22. When the amount of powder-containing water in the water collecting tank 12 is small, the first guide plate with a lower installation height is installed at a lower height. The guide plate 7 guides a small part of the powder-containing water in the water collection tank 12 to the small volume magnetic suction pool for treatment and then directly enters the sedimentation tank for sedimentation; when the amount of powder-containing water in the water collection tank 12 is large, the first guide plate 7 with a lower installation height guides a small part of the powder-containing water in the water collection tank 12 to the small volume magnetic suction pool for treatment, while the second guide plate 9 with a higher installation height guides the powder-containing water in the water collection tank 12 to the large volume magnetic suction pool 22 for treatment, and then further introduces it into the sedimentation tank for sedimentation. If the powder-containing water in the small volume magnetic suction pool overflows into the large volume magnetic suction pool 22, it will be processed by the large volume magnetic suction pool 22, and the first magnetic suction structure and the second magnetic suction structure are respectively provided in the small volume magnetic suction pool and the large volume magnetic suction pool 22 to absorb the magnetic powder in the powder-containing water. This setting can adapt to the use of docks with different flow rates of powder-containing water, and has strong promotion.
[0022] In the above technical solution, the sedimentation tank is arranged below the magnetic suction component. The powder-containing water treated by the magnetic suction component absorbs most of the magnetic powder and then enters the sedimentation tank to further precipitate other solid powders. The sedimentation tank is detachably connected to the wharf pile foundation 1, and the magnetic powder adsorbed in the small-volume magnetic suction tank and the large-volume magnetic suction tank 22 can be regularly recovered. At the same time, the sediment at the bottom of the sedimentation tank is cleaned regularly. It is easy to use, easy to maintain, and low in cost.
[0023] In one of the technical solutions, the sedimentation tank includes a water level control part 18 and a powder collecting part 20 which are arranged in sequence from top to bottom. The water level control part 18 and the powder collecting part 20 are detachably sealed and connected, and the drain pipe 19 is arranged at the lower part of the water level control part 18. A water level sensor is provided in the water level control part 18, and a control valve is provided on the drain pipe 19. The water level sensor and the control valve are both electrically connected to a controller.
[0024] In the above technical solution, the sedimentation tank is configured with a water level control part 18 and a powder collecting part 20 that can be detachably arranged from top to bottom. The lower powder collecting part 20 can be directly disassembled to clean the sediment at the bottom of the sedimentation tank. Taking into full consideration that the proportion of magnetic powder content in the sediment is relatively low, the magnetic powder recovery cycle and the sediment cleaning cycle are quite different, and only the lower powder collecting part 20 can be disassembled to clean the sediment. When the water level in the sedimentation tank reaches the preset value, the drain pipe 19 is opened to discharge the water after sedimentation in the sedimentation tank into the dock drainage ditch, which can not only ensure the full precipitation of the powder in the sedimentation tank, but also ensure the continuous use of the powder-containing water treatment device, and the treatment efficiency is high. A way to realize the detachable sealed connection between the water level control part 18 and the powder collecting part 20: an ear plate is provided at the connection between the water level control part 18 and the powder collecting part 20, a sealing strip is provided between the two ear plates, and a sealing strip is provided at the contact between the water level control part 18 and the powder collecting part 20.
[0025] In one of the technical solutions, the outer wall of the water level control part 18 is provided with a clamp 17 mounting seat 2, and the clamp 17 mounting seat 2 is provided with a clamp 17 connected to the dock pile foundation 1; the clamp 17 mounting seats 2 of adjacent sedimentation tanks are staggered in the vertical direction, and the detachable connection between the sedimentation tank and the dock pile foundation 1 is achieved through the clamp 17 structure. When the sedimentation tanks are set at a high density, the clamp 17 mounting seats 2 of adjacent sedimentation tanks are staggered in the vertical direction, which is convenient for the installation of the sedimentation tanks.
[0026] In one of the technical solutions, the large-volume magnetic suction pool 22 is arranged above the sedimentation tank, and a first seepage hole connected to the sedimentation tank is provided at the bottom of the large-volume magnetic suction pool 22, and a partial cover plate is provided on the top of the sedimentation tank. The large-volume magnetic suction pool 22 is sealed and connected to the sedimentation tank, so that the powder-containing powder treated by the large-volume magnetic suction pool 22 can enter the sedimentation tank to precipitate other solid powders. The aperture and arrangement density of the seepage holes should not be too large to ensure that the powder-containing water stays in the large-volume magnetic suction pool 22 for a sufficient time to ensure the recovery rate of the magnetic powder.
[0027] like Figure 4 As shown, in one of the technical solutions, two small-volume magnetic suction pools are provided, and any small-volume magnetic suction pool includes a small-volume magnetic suction pool body 6 and a connecting pipe 16 arranged at the bottom of the small-volume magnetic suction pool body 6, the bottom of the connecting pipe 16 is connected to the bottom of the large-volume magnetic suction pool 22 through a flange, and a second water seepage hole connected to the sedimentation tank is provided at the bottom of the connecting pipe 16. The small-volume magnetic suction pool and the large-volume magnetic suction pool 22 are connected as a whole through the connecting pipe 16, so that when the sedimentation tank is disassembled, the large-volume magnetic suction pool 22 and the small-volume magnetic suction pool are disassembled together, and the magnetic powder in the large-volume magnetic suction pool 22 and the small-volume magnetic suction pool are recovered at the same time.
[0028] like Figure 4 As shown, in one of the technical solutions, any small-volume magnetic pool body 6 includes an integrally arranged cylindrical portion 61 and a conical portion 62. After the small-volume magnetic pool body 6 is reduced in diameter, the flow rate of the powder-containing water in the small-volume magnetic pool body 6 can be effectively controlled to ensure that the powder-containing water stays in the small-volume magnetic pool body 6 for a sufficient time, thereby ensuring the recovery rate of the magnetic powder.
[0029] like Figure 4 As shown, in one of the technical solutions, a pair of small-volume magnetic pool bodies 6 are arranged on a small-volume magnetic pool base, and a flange connected to the connecting pipe 16 is provided at the bottom of the small-volume magnetic pool base. The conical portion 62 of the small-volume magnetic pool body 6 is arranged in the small-volume magnetic seat. The setting of the small-volume magnetic pool base is beneficial to the stability of the small-volume magnetic pool body 6, and is also convenient for further installation of the second magnetic structure.
[0030] In one of the technical solutions, the first magnetic attraction structure includes: A first motor 13, which is arranged on a first motor 13 mounting frame 10, and the first motor 13 mounting frame 10 is arranged on the inner edge 23 of the small-volume magnetic pool body 6; A plurality of first magnetic frames 5 are connected to the motor shaft 14 of the first motor 13 and rotate with the motor shaft 14 of the first motor 13 . The first magnetic frames 5 are arranged at an angle and close to the inner wall of the tapered portion 62 of the small-volume magnetic pool body 6 .
[0031] In the above technical solution, the first magnetic suction frame 5 includes a first connecting frame connected to the motor shaft 14 of the first motor 13 and a first magnetic strip detachably connected to the first connecting frame. In order to realize the detachable connection between the first magnetic strip and the first connecting frame, the first magnetic strip is installed on the first magnetic strip mounting seat, and the first magnetic strip mounting seat is detachably connected to the first connecting frame. One way to realize it is: the end where the first connecting frame is connected to the first magnetic strip mounting seat is provided with a connecting outer edge, and the first magnetic strip mounting seat is arranged on the connecting outer edge and fixed with bolts. The installation method of the first magnetic strip mounting seat and the first magnetic strip is: the first magnetic strip mounting seat is provided with a first magnetic strip clamping groove, and the first magnetic strip is clamped in the clamping groove.
[0032] In the above technical solution, the first magnetic frame 5 rotates with the motor shaft 14 of the first motor 13, which increases the probability of the first magnetic frame 5 attracting magnetic powder and fully ensures the recovery rate of the magnetic powder.
[0033] In one of the technical solutions, the second magnetic attraction structure includes: A second motor 8, which is arranged on the small-volume magnetic pool base and the motor shaft 15 of the second motor 8 extends into the large-volume magnetic pool 22; A plurality of second magnetic frames 21 are connected to the motor shaft 15 of the second motor 8 and rotate along with the motor shaft 15 of the second motor 8 . The second magnetic frames 21 are arranged near the bottom of the large-volume magnetic pool 22 .
[0034] Similarly, in the above technical solution, the second magnetic suction frame 21 includes a second connecting frame connected to the motor shaft 15 of the second motor 8 and a second magnetic strip detachably connected to the second connecting frame. In order to realize the detachable connection between the second magnetic strip and the second connecting frame, the second magnetic strip is installed on the second magnetic strip mounting seat, and the second magnetic strip mounting seat is detachably connected to the second connecting frame. One way to realize it is: the end where the second connecting frame is connected to the second magnetic strip mounting seat is provided with a connecting outer edge, and the second magnetic strip mounting seat is arranged on the connecting outer edge and fixed with bolts. The installation method of the second magnetic strip mounting seat and the second magnetic strip is: the second magnetic strip mounting seat is provided with a second magnetic strip clamping groove, and the second magnetic strip is clamped in the clamping groove.
[0035] In one of the technical solutions, the installation method of the bulk port powder water treatment device is as follows: Step 1: pre-assemble the magnetic suction component and the sedimentation tank of the bulk port powder water treatment device into a whole; Step 2: design the installation density of the bulk port powder water treatment device according to the different powder water contents of each terminal, and install the whole assembly assembled in step 1 one by one between the terminal pile foundations 1 according to the designed installation density; Step three, according to the installation density of step two, design the water collection trough 12 and the number of water collection troughs 12, so that the first guide plate 7 and the second guide plate 9 on the water collection trough 12 correspond to the positions of each small volume magnetic suction pool and the large volume magnetic suction pool 22 respectively, and install the water collection trough 12.
[0036] The number of equipment and the processing scale described here are used to simplify the description of the present invention. The application, modification and variation of the bulk port powder water treatment device of the present invention will be obvious to those skilled in the art.
[0037] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. Bulk cargo port powder water treatment device, characterized in that: include: A sedimentation tank is detachably arranged between a pair of pier pile foundations, the pair of pier pile foundations are arranged along the extension direction of the pier, the sedimentation tank is arranged above the water surface and a drainage pipe is arranged at the bottom thereof; A magnetic attraction component is arranged above the sedimentation tank, comprising a large-volume magnetic attraction tank and a small-volume magnetic attraction tank which are arranged in sequence upward from the sedimentation tank, wherein the large-volume magnetic attraction tank and the small-volume magnetic attraction tank are both configured to be connected to the sedimentation tank and allow a small flow of powder-containing water to pass through, and the small-volume magnetic attraction tank and the large-volume magnetic attraction tank are both openly arranged and overflow water from the top of the small-volume magnetic attraction tank flows into the large-volume magnetic attraction tank; A water collecting trough is arranged below the dock surface layer along the extension direction of the dock, and the dock surface layer is provided with a drainage hole connected to the water collecting trough, and the bottom of the water collecting trough is provided with a first guide plate for guiding the water to the small-volume magnetic suction pool, and the side of the water collecting trough is provided with a second guide plate for guiding the water to the large-volume magnetic suction pool; Wherein, the small-volume magnetic attraction pool and the large-volume magnetic attraction pool are respectively provided with a first magnetic attraction structure and a second magnetic attraction structure to absorb magnetic powder in powder-containing water.
2. The bulk port powder water treatment device according to claim 1, characterized in that: The sedimentation tank includes a water level control part and a powder collecting part which are arranged in sequence from top to bottom. The water level control part and the powder collecting part are detachably sealed and connected, and the drain pipe is arranged at the lower part of the water level control part. A water level sensor is arranged in the water level control part, and a control valve is arranged on the drain pipe. The water level sensor and the control valve are both electrically connected to a controller.
3. The bulk port powder water treatment device according to claim 2, characterized in that: The outer side wall of the water level control part is provided with a clamp mounting seat, and the clamp mounting seat is provided with a clamp connected to the wharf pile foundation; the clamp mounting seats of adjacent sedimentation tanks are staggered in the vertical direction.
4. The bulk port powder water treatment device according to claim 3, characterized in that: The large-volume magnetic attraction pool is arranged above the sedimentation pool, and a first water seepage hole communicating with the sedimentation pool is provided at the bottom of the large-volume magnetic attraction pool.
5. The bulk port powder water treatment device according to claim 4, characterized in that: There are two small-volume magnetic pools, and each small-volume magnetic pool includes a small-volume magnetic pool body and a connecting pipe arranged at the bottom of the small-volume magnetic pool body. The bottom of the connecting pipe is connected to the bottom of the large-volume magnetic pool through a flange, and the bottom of the connecting pipe is provided with a second seepage hole connected to the sedimentation tank.
6. The bulk port powder water treatment device according to claim 5, characterized in that: Any small-volume magnetic pool body includes a cylindrical portion and a conical portion that are integrally arranged.
7. The bulk port powder water treatment device according to claim 6, characterized in that: A pair of small-volume magnetic pool bodies are arranged on a small-volume magnetic pool base, a flange connected to the connecting pipe is provided at the bottom of the small-volume magnetic pool base, and a conical portion of the small-volume magnetic pool body is arranged in the small-volume magnetic seat.
8. The bulk port powder water treatment device according to claim 7, characterized in that: The first magnetic attraction structure includes: A first motor, which is arranged on a first motor mounting frame, wherein the first motor mounting frame is arranged on the inner edge of the small-volume magnetic pool body; A plurality of first magnetic frames are connected to the motor shaft of the first motor and rotate with the motor shaft of the first motor. The first magnetic frames are arranged obliquely and close to the inner wall of the conical part of the small-volume magnetic pool body.
9. The bulk port powder water treatment device according to claim 8, characterized in that: The second magnetic attraction structure includes: A second motor is arranged on the small-volume magnetic pool base and a motor shaft of the second motor extends into the large-volume magnetic pool; A plurality of second magnetic frames are connected to the motor shaft of the second motor and rotate along with the motor shaft of the second motor. The second magnetic frames are arranged near the bottom of the large-volume magnetic pool.
Citation Information
Patent Citations
Port crane maintenance robot
CN105437239A
Magnetic separation equipment and magnetic coagulation precipitation pool sewage treatment system
CN110590049A
Preparation device and method of terramycin
CN110643497A
Magnetic biochemical sewage treatment device
CN116655070A
Oily sewage treatment device for ports and piers
CN117776463A