Automatic production line for annular parts

By designing an automated production line for ring parts, using robots and AGV trolleys to realize station conversion, the complexity of manual handling and loading during the production of ring parts is solved, production efficiency is improved and the production cycle is shortened.

CN119328532APending Publication Date: 2025-01-21SJS LTD

Patent Information

Application Number
CN202411105933.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2025-01-21

AI Technical Summary

Technical Problem

In the field of oil and gas drilling and production, Verbose body and Verbose seat are ring-shaped parts, with a harsh and vulnerable use environment, resulting in complex processes in their production process, requiring manual assistance for handling and loading, which takes up a lot of labor costs and time.

Method used

An automated production line for ring parts is designed, using robots and AGV trolleys to achieve rapid conversion between different workstations, replacing manual handling and loading. The production line includes first and second CNC lathes, robots, turning mechanisms, material buffer areas and other processing equipment.

Benefits of technology

Through the automated production line, the production efficiency of ring parts is improved, the product production cycle is shortened, and labor costs and time are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119328532A_ABST
    Figure CN119328532A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of annular part machining, and discloses an automatic production line for annular parts, which comprises a first numerical control lathe and a second numerical control lathe, the first robot can clamp a to-be-machined workpiece to the first numerical control lathe and the second numerical control lathe for machining, and a turnover mechanism used for assisting the first robot in turning over the to-be-machined workpiece is arranged at the position between the first numerical control lathe and the second numerical control lathe; the first material cache area is located in the clamping range of the first robot. According to the automatic production line for the annular parts, rapid switching among different stations in the product machining process is achieved, manual carrying, clamping and other work are replaced, the production efficiency is effectively improved, and the product production period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of annular parts processing, and in particular to an automated production line for annular parts. Background Art

[0002] At present, in the field of oil and gas drilling, valve bodies and valve seats are key components of the hydraulic end of reciprocating piston pumps. During the reciprocating motion of the piston pump, the valve body and valve seat make regular opening and closing movements to achieve the pumping of high-pressure liquid. Among them, the valve body and valve seat are annular parts as a whole, and their use environment is harsh. The service life is about 60 hours, so they are consumable parts.

[0003] However, in the production process of valve bodies and valve seats, a series of processing steps are usually required. During processing, due to the complexity of the process, manual assistance is often required for the handling and clamping of parts, which takes up labor costs and time costs. Therefore, there is an urgent need for an automated production line for annular parts. Summary of the invention

[0004] The purpose of the present invention is to address the deficiencies of the above-mentioned technology and provide an automated production line for annular parts, which realizes rapid conversion between different workstations during product processing, replaces manual handling, clamping and other work, effectively improves production efficiency and shortens product production cycle.

[0005] To achieve the above-mentioned purpose, the automated production line for annular parts designed in the present invention includes a first CNC lathe and a second CNC lathe, the spindle center lines of the first CNC lathe and the second CNC lathe are perpendicular to each other, and also includes a first robot that can clamp the workpiece to be processed to the first CNC lathe and the second CNC lathe for processing, a flipping mechanism is provided between the first CNC lathe and the second CNC lathe to assist the first robot in flipping the workpiece to be processed, and also includes a first material buffer area, and the first material buffer area is within the clamping range of the first robot.

[0006] Preferably, a second robot is also included, and a flaw detector, a cleaning machine, a comparator, a marking machine and a second material buffer area are sequentially provided downstream of the second CNC lathe. A material temporary storage area is provided on the flaw detector, and the material temporary storage area is within the clamping range of the first robot and the second robot, and the cleaning machine, the comparator, the marking machine and the second material buffer area are within the clamping range of the second robot.

[0007] Preferably, a product tray for placing workpieces to be processed is provided on the first material buffer area.

[0008] Preferably, a product tray for placing workpieces to be processed is provided on the second material buffer area.

[0009] Preferably, a rotatable workbench is provided on the turning mechanism, and a clamping cylinder for clamping the workpiece to be processed is provided on the workbench.

[0010] Preferably, the first robot is provided with a visual recognition system and a product grasping system, and the product grasping system comprises two sets of double-station disc-type grippers installed at the front end of the first robot arm.

[0011] Preferably, the second robot is provided with a visual recognition system and a product grasping system, and the product grasping system comprises two sets of double-station disc-type grippers installed at the front end of the second robot arm.

[0012] Preferably, an AGV trolley is also provided for automatically lifting and moving the product tray to a designated position.

[0013] Preferably, a transmission belt is provided downstream of the marking machine, and the transmission belt is within the clamping range of the second robot.

[0014] Compared with the prior art, the present invention has the following advantages: a robot is used in conjunction with an AGV to achieve the conversion between different workstations in the product processing process, replacing manual work such as handling and clamping, thereby effectively improving production efficiency and shortening product production cycle. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The figure is a schematic diagram of the structure of the automatic production line for ring-shaped parts according to the present invention.

[0016] The components in the figure are numbered as follows:

[0017] The first CNC lathe 1, the second CNC lathe 2, the first robot 3, the turning mechanism 4, the first material buffer area 5, the second robot 6, the flaw detector 7, the cleaning machine 8, the comparator 9, the marking machine 10, the second material buffer area 11, the material temporary storage area 12, the product tray 13, and the transmission belt 14. DETAILED DESCRIPTION

[0018] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0019] like Figure 1As shown, an automated production line for annular parts includes a first CNC lathe 1 and a second CNC lathe 2, the spindle center lines of the first CNC lathe 1 and the second CNC lathe 2 are perpendicular to each other, and also includes a first robot 3 that can clamp the workpiece to be processed to the first CNC lathe 1 and the second CNC lathe 2 for processing, a flipping mechanism 4 is provided between the first CNC lathe 1 and the second CNC lathe 2 to assist the first robot 3 in flipping the workpiece to be processed, and also includes a first material buffer area 5, and the first material buffer area 5 is within the clamping range of the first robot 3.

[0020] In addition, it also includes a second robot 6. A flaw detector 7, a cleaning machine 8, a comparator 9, a marking machine 10 and a second material buffer area 11 are arranged in sequence downstream of the second CNC lathe 2. A material temporary storage area 12 is arranged on the flaw detector 7. The material temporary storage area 12 is within the clamping range of the first robot 3 and the second robot 6. The cleaning machine 8, the comparator 9, the marking machine 10 and the second material buffer area 11 are within the clamping range of the second robot 6.

[0021] In this embodiment, a product tray 13 for placing workpieces to be processed is disposed on the first material buffer area 5 , and a product tray 13 for placing workpieces to be processed is disposed on the second material buffer area 11 .

[0022] In this embodiment, a rotatable worktable is provided on the flipping mechanism 4, and a clamping cylinder for clamping the workpiece to be processed is provided on the worktable. When the flipping mechanism 4 is used, the first robot 3 clamps the workpiece to be processed after being processed by the first CNC lathe 1, and places it on the worktable of the flipping mechanism 4. The clamping cylinder on the worktable clamps the workpiece to be processed, and then the worktable is turned around so that the first robot 3 can clamp the other end of the workpiece to be processed, and put the workpiece to be processed into the second CNC lathe 2 again in the clamped state, so that the flipping of the workpiece can be realized.

[0023] In addition, in the present embodiment, the first robot 3 and the second robot 6 are both articulated robots, model Estun ER50-R2100-P, and the first robot 3 and the second robot 6 are provided with a visual recognition system and a product grasping system. The visual recognition system is an Omron 2D camera, and the product grasping system includes two sets of double-station disk-type grippers installed at the front end of the arms of the first robot 3 and the second robot 6, that is, the first robot 3 and the second robot 6 can grasp two workpieces to be processed at the same time, thereby saving time when switching processes.

[0024] In this embodiment, the first CNC lathe 1 and the second CNC lathe 2 are both TT200 CNC lathes, the flaw detector 7 is an eddy current flaw detector, the first robot 3 places the workpiece to be processed in the material temporary storage area 12 of the flaw detector 7, and the flaw detector 7 can be used to perform flaw detection on the workpiece to be processed. The cleaning machine 8 is an ultrasonic cleaning machine. After the flaw detection is completed, the second robot 6 places the workpiece to be processed in the cleaning machine 8 to clean the workpiece to be processed. The comparator 9 is a Renishaw comparator. After cleaning, the size of the workpiece to be processed is detected. The marking machine 10 is a laser marking machine, which performs marking processing on the workpiece to be processed.

[0025] When this embodiment is used, when turning is required, the first robot 3 grabs the workpiece to be processed on the first CNC lathe 1 and the second CNC lathe 2 to complete the operation. After the first robot 3 and the second robot 6 clamp the workpiece to be processed, they can put the workpiece to be processed into the designated CNC lathe according to work needs. After the CNC lathe clamps the workpiece to be processed, automatic turning can be performed. When flaw detection, cleaning, air blowing, size detection and marking are required, the second robot 6 grabs the workpiece to be processed and completes the operation on the flaw detector 7, the cleaning machine 8, the comparator 9, and the marking machine 10. If all the above operations are required, after turning is completed, the first robot 3 places the workpiece to be processed on the material temporary storage area 12, and the second robot 6 can perform subsequent operations.

[0026] In addition, an AGV trolley may be provided to automatically lift and move the product tray 13 to a designated position, so that when other operations need to be performed on the workpiece to be processed, the workpiece to be processed can be transferred before the AGV trolley is used.

[0027] Similarly, a transmission belt 14 may be provided downstream of the marking machine 10 . The transmission belt 14 is within the gripping range of the second robot 6 , and the processed workpiece may be directly transmitted to a subsequent process via the transmission belt 14 .

[0028] Taking the valve body valve seat of the hydraulic end of the plunger pump as an example, the main processes in the processing process are: rough turning, carburizing, normalizing, sandblasting, fine turning (including outer diameter, end face and conical surface), vulcanization process, rubber turning, flaw detection, cleaning, air blowing, marking, and size detection of parts. Among them, some processes can be processed in the same workshop, such as turning, flaw detection, cleaning, air blowing, marking, and size detection; while other processes need to be carried out in other workshops or specific occasions due to the characteristics of the process itself, such as carburizing process, normalizing process, sandblasting process, and vulcanization process. Therefore, in this embodiment, the process equipment that can be processed in the same workshop is centrally set up, and the process conversion and parts handling between each other are completed by the first robot 3 and the second robot 6; and the process that needs to be processed in other workshops or specific occasions, the transfer of products is realized by the AGV car.

[0029] Specifically, during operation, the AGV trolley delivers the workpiece to be processed to the first material buffer area 5 via the product pallet 13 in the entire line process, and then processes it through the first CNC lathe 1 and the second CNC lathe 2. That is, the first robot 3 visually identifies the position of the workpiece to be processed, and after the first robot 3 is guided by visual positioning to complete the grasping, it is sent to the first CNC lathe 1 for processing. The parts processed in a sequence are flipped through the flipping station 4 and then sent to the second CNC lathe 2 for processing. The processed parts are sent back to the product pallet 13 by the first robot 3 through the palletizing function. When a pallet of workpieces is processed, the first robot 3 sends a signal to the AGV trolley to change materials.

[0030] After the AGV trolley sends the processed workpiece into the first material buffer area 5, the workpiece is transported to the carburizing, normalizing and sandblasting workshops by the AGV trolley. After the workpiece is processed, it is transported back to the first material buffer area 5 by the AGV trolley. The first robot 3 visually identifies the position of the workpiece, and after the first robot 3 is guided by visual positioning to complete the grasping, it is sent to the first CNC lathe 1 and the second CNC lathe 2 for processing. The processed workpiece is returned to the product pallet 13 by the first robot 3 through the palletizing function. When a pallet of parts is processed, the first robot 3 sends a signal to the AGV trolley to change materials.

[0031] Finally, the AGV transports the workpiece to the vulcanization workshop. After processing, it is transported back to the first material buffer area 5 by the AGV. The first robot 3 visually identifies the material position. After the first robot 3 is guided by visual positioning to complete the grabbing, it is sent to the first CNC lathe 1 and the second CNC lathe 2 for processing. The processed workpiece is sent to the flaw detector 7 by the first robot 3 for flaw detection. The workpiece that passes the flaw detection is grabbed by the second robot 6 and sent to the cleaning machine 8 for cleaning and air blowing. The second robot 6 then grabs the workpiece and sends it to the comparator 9 for workpiece size detection. The workpiece that passes the size detection is sent to the marking machine 10 by the second robot 6 for marking. After marking, the material is unloaded and stacked to complete the processing of the entire process of the parts.

[0032] The present invention is used for the automated production line of annular parts, and adopts the method of a robot in cooperation with an AGV trolley to realize the conversion between different workstations in the product processing process, replacing manual work such as handling and clamping, thereby effectively improving production efficiency and shortening product production cycle.

[0033] It should be noted that the description of the above technical solutions is exemplary, and this specification can be embodied in different forms and should not be interpreted as being limited to the technical solutions set forth herein. On the contrary, providing these descriptions will make the disclosure of the present invention thorough and complete, and will fully convey the scope disclosed in this specification to those skilled in the art. In addition, the technical solutions of the present invention are limited only by the scope of the claims.

[0034] The various aspects disclosed for describing the present specification and claims are merely examples, and therefore, the present specification and claims are not limited to the details shown. In the above description, when the detailed description of the related known functions or configurations is determined to be unnecessary to obscure the focus of the present specification and claims, the detailed description will be omitted.

[0035] Finally, it should be pointed out that the above content is a further detailed description of the invention in combination with specific implementation methods. It cannot be considered that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, simple replacements made without departing from the concept of the present invention should be regarded as belonging to the protection scope of the present invention. The above embodiments are only more representative examples of the present invention. Obviously, the present invention is not limited to the above embodiments, and there can be many variations. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention should be considered to belong to the protection scope of the present invention.

Claims

1. An automated production line for ring-shaped parts, characterized in that: The invention comprises a first CNC lathe (1) and a second CNC lathe (2), wherein the spindle center lines of the first CNC lathe (1) and the second CNC lathe (2) are perpendicular to each other, and further comprises a first robot (3) capable of clamping a workpiece to be processed to the first CNC lathe (1) and the second CNC lathe (2) for processing, a flipping mechanism (4) is provided between the first CNC lathe (1) and the second CNC lathe (2) for assisting the first robot (3) in flipping the workpiece to be processed, and further comprises a first material buffer area (5), wherein the first material buffer area (5) is within the clamping range of the first robot (3).

2. The automated production line for ring-shaped parts according to claim 1, characterized in that: The invention also comprises a second robot (6); a flaw detector (7), a cleaning machine (8), a comparator (9), a marking machine (10) and a second material buffer area (11) are arranged in sequence downstream of the second CNC lathe (2); a material temporary storage area (12) is arranged on the flaw detector (7); the material temporary storage area (12) is within the gripping range of the first robot (3) and the second robot (6); and the cleaning machine (8), the comparator (9), the marking machine (10) and the second material buffer area (11) are within the gripping range of the second robot (6).

3. The automated production line for ring-shaped parts according to claim 1, characterized in that: The first material buffer area (5) is provided with a product tray (13) for placing workpieces to be processed.

4. The automated production line for ring-shaped parts according to claim 2, characterized in that: The second material buffer area (11) is provided with a product tray (13) for placing workpieces to be processed.

5. The automated production line for ring-shaped parts according to claim 1, characterized in that: The turning mechanism (4) is provided with a rotatable workbench, and the workbench is provided with a clamping cylinder for clamping the workpiece to be processed.

6. The automated production line for ring-shaped parts according to claim 1, characterized in that: The first robot (3) is provided with a visual recognition system and a product grasping system, wherein the product grasping system comprises two sets of double-station disk-type grippers installed at the front end of the arm of the first robot (3).

7. The automated production line for ring-shaped parts according to claim 2, characterized in that: The second robot (6) is provided with a visual recognition system and a product grasping system, wherein the product grasping system comprises two sets of double-station disk-type grippers installed at the front end of the arm of the second robot (6).

8. The automated production line for ring-shaped parts according to claim 3 or 4, characterized in that: An AGV trolley is also provided for automatically lifting and moving the product tray (13) to a designated position.

9. The automated production line for ring-shaped parts according to claim 2, characterized in that: A transmission belt (14) is provided downstream of the marking machine (10), and the transmission belt (14) is within the gripping range of the second robot (6).

Citation Information

Patent Citations

  • Flexible production line for intelligent manufacturing based on Internet of Things and production method thereof

    CN107589731A

  • Motor end cover automatic machining production line and motor end cover automatic machining method

    CN111300052A

  • Disc part machining production line

    CN112024915A

  • Automatic production line for automobile brake calipers

    CN117961569A

  • Automatic line for integral processing of swash plate bracket

    CN218946908U

Cited By

  • Double-station part cleaning assembly line and cleaning method thereof

    CN120347011A

  • Large thin-wall shell intelligent boring and milling production line and operation method

    CN121403076A

  • Large thin-walled shell intelligent boring and milling processing line and operation method

    CN121403076B