Improved precast beam transportation fixing tool
By designing a prefabricated beam transportation and fixing tool including a fixing frame, vertical steel pipe and height adjustment mechanism, the problem of prefabricated beam slip and rolling during transportation is solved, and a more efficient and safe fixing method is achieved, replacing the Traditional rope fixing improves construction efficiency and safety.
Patent Information
- Application Number
- CN202420953042.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-06
- Publication Date
- 2024-12-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In prefabricated buildings and bridge construction, prefabricated beams are prone to slip or rollover during transportation due to uneven distribution of center of gravity. Traditional rope fixing methods are inefficient and have low safety, and will lead to wear and safety after long-term use. Hidden danger.
A prefabricated beam transportation and fixing tool including a fixing frame, a vertical square steel pipe, a movable frame and a height adjustment mechanism is designed to quickly fix the prefabricated beam by clamping gaskets and wires, replacing the traditional rope fixing method.
It improves transportation safety and efficiency, reduces labor consumption and material wear, reduces safety hazards, simplifies operating procedures, and improves construction speed and safety.
Smart Images

Figure CN222179352U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction industry transportation, in particular to an improved prefabricated beam transportation and fixing tool. Background Art
[0002] Prefabricated beams are often used in the construction of prefabricated buildings, bridge municipal prefabricated components, and wharf prefabricated components. Among prefabricated beams, T-beams and rectangular beams are two common forms. T-beams are formed by digging out the concrete in the tensile area of the rectangular beam that does not contribute to the bending strength. In addition to having exactly the same bending strength as the original rectangular beam, it can save concrete, reduce the deadweight of the component, and improve the spanning capacity. The special shape design makes the T-beam have the cross-sectional characteristics of a large upper cross-section and a small lower cross-section. In terms of weight distribution, it has the characteristics of being heavy on top and light on the bottom, and the center of gravity will move up to a certain extent. The upper and lower cross-sections of the rectangular beam are consistent. Although the shape does not have the uneven distribution of the upper and lower parts of the T-beam, the center of gravity distribution is also higher for some rectangular beams with a large height-to-width ratio.
[0003] For these two types of beams with a high center of gravity distribution, if there are no reliable fixing means and measures to fix the beams during the transfer transportation using flatbed trucks, the beams are prone to slippage or even instability and rollover due to bumps and uneven road conditions during transportation, with disastrous consequences. Under normal conditions, prefabricated beams can be fixed during transportation by tools such as ropes, but using ropes to fix them often requires a large amount of ropes and a large amount of manpower to tie and untie the ropes. In long-distance transportation, the ropes will not move for a long time after they are fixed, and the ropes will accelerate wear in the stressed state, which will pose a greater safety hazard over time. In short-distance transfers, due to the high frequency of transportation and loading and unloading, rope fixing is relatively time-consuming and labor-intensive, affecting the efficiency of transfer transportation; the ropes wear a lot and the maintenance cost is high; the wear of the ropes affects the fixing effect, and once the ropes break, it will cause safety hazards. For this reason, we propose an improved prefabricated beam transportation and fixing tool to solve the above problems. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art, such as the problems of low loading and unloading efficiency and low safety in the traditional rope fixing method, and proposes an improved prefabricated beam transportation fixing tool.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] An improved prefabricated beam transportation and fixing tool comprises a fixing frame, vertical square steel tubes are fixedly arranged on both sides of the fixing frame, the two vertical square steel tubes are connected to the fixing frame through a plurality of support frames, and movable frames are slidably inserted in the two vertical square steel tubes, height adjustment mechanisms corresponding to the movable frames are arranged on the two vertical square steel tubes, prefabricated beams are placed on the fixing frame, and fixing mechanisms corresponding to the prefabricated beams are arranged on the two movable frames.
[0007] Preferably, the height adjustment mechanism includes two clamping blocks, and the inner walls of the two vertical square steel tubes are provided with telescopic grooves corresponding to the clamping blocks. The two clamping blocks are respectively slidably arranged in the two telescopic grooves, and the two clamping blocks are connected to the inner walls of the telescopic grooves through springs. The two movable frames are provided with a plurality of height adjustment holes corresponding to the clamping blocks, and the two clamping blocks are provided with corresponding pulling mechanisms.
[0008] Preferably, the pulling mechanism includes two pull rods, which are respectively fixed on the side walls of the two blocks close to the spring, and the two pull rods are slid through the side wall of one side of the vertical square steel pipe, and the ends of the two pull rods away from the blocks are fixedly connected with pull handles.
[0009] Preferably, the fixing mechanism includes two clamping washers, fixing nuts are fixedly provided on the two movable frames, through-holes are rotatably provided on the two fixing nuts, the two through-holes are arranged in an L-shape, and the threads of the two through-holes are arranged corresponding to the fixing nuts, the two clamping washers are respectively fixedly provided on the ends of the two through-holes that are close to each other, and handles are rotatably provided on the ends of the two through-holes that are away from each other.
[0010] Preferably, an anti-slip buffer pad is fixedly provided on the side walls of the two clamping gaskets away from the harness.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] (1) The tool is easy to make, the principle is simple, the material is universal, and it is convenient to make on the construction site;
[0013] (2) Simple operation and clear process ensure construction safety while greatly speeding up construction, reducing work intensity, improving work efficiency and saving time;
[0014] (3) Construction safety is guaranteed and potential safety hazards are reduced;
[0015] (4) Fixed and standardized operation, easy to learn, and conducive to promotion and use. By further optimizing the transmission device and material type, the reliability and durability of this product can be further improved and the weight can be reduced, thereby further creating higher economic benefits and use value;
[0016] (5) Fixing the prefabricated beams with a steel frame is easier to operate than with ropes, and the steel structure has less wear and tear, and the safety factor is improved, which can effectively solve the safety and convenience problems brought by rope fixation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a three-dimensional structural schematic diagram of an improved prefabricated beam transportation and fixing tool proposed by the utility model;
[0018] Figure 2 This is a structural diagram of the precast beam when it is fixed;
[0019] Figure 3 for Figure 2 Schematic diagram of the structure at A in the middle.
[0020] In the figure: 1 fixed frame, 2 vertical square steel pipe, 3 support frame, 4 movable frame, 5 fixing nut, 6 through thread, 7 clamping gasket, 8 handle, 9 pull rod, 10 pull handle, 11 telescopic slot, 12 clamping block, 13 spring, 14 height adjustment hole, 15 prefabricated beam. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0022] Reference Figure 1-Figure 3An improved prefabricated beam transportation and fixing tool comprises a fixing frame 1, both sides of the fixing frame 1 are fixedly provided with vertical square steel tubes 2, the two vertical square steel tubes 2 are connected to the fixing frame 1 through a plurality of support frames 3, and the two vertical square steel tubes 2 are both slidably inserted with a movable frame 4, the two vertical square steel tubes 2 are provided with a height adjustment mechanism corresponding to the movable frame 4, the height adjustment mechanism comprises two clamping blocks 12, the inner walls of the two vertical square steel tubes 2 are both provided with telescopic grooves 11 corresponding to the clamping blocks 12, the two clamping blocks 12 are respectively slidably arranged in the two telescopic grooves 11, and the two clamping blocks 12 are inserted through a plurality of support frames 3. The spring 13 is connected to the inner wall of the telescopic slot 11, and the two movable frames 4 are provided with a plurality of height adjustment holes 14 for use with the block 12. The two blocks 12 are provided with a corresponding pulling mechanism, and the pulling mechanism includes two pull rods 9, which are respectively fixed on the side walls of the two blocks 12 close to the spring 13, and the two pull rods 9 are slidably penetrated through the side wall of the vertical square steel pipe 2, and the ends of the two pull rods 9 away from the block 12 are fixedly connected with a pull handle 10, and a prefabricated beam 15 is placed on the fixed frame 1, and the two movable frames 4 are provided with a corresponding The fixing mechanism comprises two clamping washers 7, two movable frames 4 are fixedly provided with fixing nuts 5, two fixing nuts 5 are rotatably provided with through-wires 6, two through-wires 6 are provided in an L-shape, and the threads of the two through-wires 6 are provided corresponding to the fixing nuts 5, two clamping washers 7 are respectively fixedly provided at the ends of the two through-wires 6 close to each other, and the ends of the two through-wires 6 away from each other are rotatably provided with handles 8, and the side walls of the two clamping washers 7 away from the through-wires 6 are fixedly provided with anti-skid buffer pads, and the fixing frame 1 is made of square steel pipe, according to the size of the transport flatbed truck used The movable frame 4 is welded to the same size as the prefabricated beam 15. The movable frame 4 is made of thickened square steel pipe, and its specification is one size smaller than that of the vertical square steel pipe 2. When in use, the movable frame 4 is inserted into the vertical square steel pipe 2. Adjustment holes 14 are opened every 5 cm at the bottom of the movable frame 4. After the height of the movable frame 4 is adjusted, the block 12 is inserted into the height adjustment hole 14 to achieve rapid adjustment of the height of the movable frame 4. Through the cooperation of the through wire 6 and the fixing nut 5, the clamping gasket 7 is pushed, so that the prefabricated beam 15 can be quickly clamped and fixed, replacing the rope fixing method, thereby improving the loading and unloading efficiency and transportation safety.
[0023] In the utility model, when fixing and transporting the prefabricated beam 15, it is only necessary to adjust the extended height of the movable frame 4 according to the height of the prefabricated beam 15, and after the clamping gasket 7 is close to the middle section of the prefabricated beam 15, a 1 cm rubber pad is glued and spread on the surface of the middle position of the fixing frame 1 as an anti-slip measure for the placement surface of the prefabricated beam 15, and then the prefabricated beam 15 is hoisted and placed between the two clamping gaskets 7, and the wire 6 is rotated to complete the clamping and fixing of the prefabricated beam 15. The prefabricated beam 15 is fixed by the steel frame, which is simpler to operate than the rope, and the steel structure has less wear and tear, and the safety factor is improved, which can well solve the safety and convenience problems brought by rope fixing.
[0024] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An improved prefabricated beam transport and fixing tool, comprising a fixing frame (1), characterized in that: Vertical square steel tubes (2) are fixedly arranged on both sides of the fixed frame (1); the two vertical square steel tubes (2) are connected to the fixed frame (1) through a plurality of support frames (3); movable frames (4) are slidably inserted into the two vertical square steel tubes (2); height adjustment mechanisms corresponding to the movable frames (4) are provided on the two vertical square steel tubes (2); prefabricated beams (15) are placed on the fixed frame (1); and the two movable frames (4) are provided with fixing mechanisms corresponding to the prefabricated beams (15).
2. An improved prefabricated beam transport and fixing tool according to claim 1, characterized in that: The height adjustment mechanism comprises two clamping blocks (12), the inner walls of the two vertical square steel tubes (2) are provided with telescopic grooves (11) corresponding to the clamping blocks (12), the two clamping blocks (12) are respectively slidably arranged in the two telescopic grooves (11), and the two clamping blocks (12) are connected to the inner walls of the telescopic grooves (11) through springs (13), the two movable frames (4) are provided with a plurality of height adjustment holes (14) corresponding to the clamping blocks (12), and the two clamping blocks (12) are provided with corresponding pulling mechanisms.
3. An improved prefabricated beam transport and fixing tool according to claim 2, characterized in that: The pulling mechanism comprises two pull rods (9), the two pull rods (9) are respectively fixedly arranged on the side walls of one end of two clamping blocks (12) close to the spring (13), and the two pull rods (9) are slidably penetrated through the side wall of one side of the vertical square steel tube (2), and the ends of the two pull rods (9) away from the clamping blocks (12) are fixedly connected with pull handles (10).
4. The improved prefabricated beam transport and fixing tool according to claim 1, characterized in that: The fixing mechanism comprises two clamping washers (7), a fixing nut (5) is fixedly provided on each of the two movable frames (4), a through-wire (6) is rotatably provided on each of the two fixing nuts (5), the two through-wires (6) are arranged in an L-shape, and the threads of the two through-wires (6) are arranged corresponding to the fixing nuts (5), the two clamping washers (7) are respectively fixedly provided at one end of the two through-wires (6) close to each other, and a handle (8) is rotatably provided at one end of the two through-wires (6) away from each other.
5. An improved prefabricated beam transport and fixing tool according to claim 4, characterized in that: An anti-slip buffer pad is fixedly provided on the side walls of the two clamping gaskets (7) away from the harness (6).