A technology for modifying asphalt and asphalt, applied in building components, building insulation materials, construction and other directions, can solve the problems of increasing the cost of modified asphalt, poor construction workability, high price, etc., and achieve good economic benefits, construction workability, etc. Good, improve the effect of high temperature performance
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2015-12-23
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the field of modified asphalt preparation, and in particular relates to a modified asphalt conforming to PG82-22 grade and a preparation method thereof. Background technique
[0002] At present, the early disease of the asphalt pavement of expressway in our country is rutting as the main form, especially on the expressway with heavy load, high temperature and channelized traffic. The maintenance cost of road milling and resurfacing caused by rutting is increasing at a high rate rate increases year by year.
[0003] Asphalt is a viscoelastic material. As the temperature increases, especially as the load action time and number of actions increase, asphalt gradually approaches the plastic body, and its stiffness modulus will be greatly reduced, and its resistance to deformation will drop sharply, resulting in rutting. Such as permanent deformation. In order to solve the rutting disease, the commonly used method is to modify the ...
Examples
Embodiment 1
[0045] Embodiment 1, prepare the modified asphalt of PG82-22 grade:
[0046] The preparation method of the modified bitumen conforming to PG82-22 grade specifically comprises the following steps:
[0047] 1) Raw material preparation: Weigh 100 parts of No. 50 bitumen, 4 parts of SBS, 3 parts of PE and 0.35 parts of stabilizer according to the parts by mass, and set aside;
[0048]2) Preparation of modified asphalt: heat No. 50 asphalt to 185°C; then slowly add SBS and PE into No. HMD stabilizer, and stirred and developed at 180°C and 1000rpm for 5 hours, kept stirring and gradually lowered the temperature, and prepared modified asphalt conforming to PG82-22.
Embodiment 2
[0049] Embodiment 2, prepare the modified asphalt of PG82-22 grade:
[0050] The preparation method of the modified bitumen conforming to PG82-22 grade specifically comprises the following steps:
[0051] 1) Raw material preparation: Weigh 100 parts of No. 50 bitumen, 5 parts of SBS, 1 part of PE and 0.4 part of stabilizer according to the parts by mass, and set aside;
[0052] 2) Preparation of modified asphalt: heat No. 50 asphalt to 185°C; then slowly add SBS and PE into No. Industrial-grade sulfur powder, and stirred at 180°C and 2000rpm for 4 hours, kept stirring and gradually lowered the temperature to prepare modified asphalt that meets PG82-22.
Embodiment 3
[0053] Embodiment 3, prepare the modified asphalt of PG82-22 grade:
[0054] The preparation method of the modified bitumen conforming to PG82-22 grade specifically comprises the following steps:
[0055] 1) Raw material preparation: Weigh 100 parts of No. 50 bitumen, 4 parts of SBS, 1 part of polyphosphoric acid and 0.3 part of stabilizer according to the parts by mass, and set aside;
[0056] 2) Preparation of modified asphalt: heat No. 50 asphalt to 185°C; then slowly add SBS to No. anhydride, and stirred at 180°C and 2000rpm for 4 hours, and finally, added polyphosphoric acid at 170°C, and kept stirring at 170°C for 2 hours, kept stirring and gradually lowered the temperature, and prepared modified asphalt conforming to PG82-22.