A kind of automatic production method and production equipment of double steel plate shear wall components

By splitting the double steel plate shear wall into a straight double steel plate shear wall and combining it with CNC cutting and welding technology, the problem of automated production in the field of building steel structures has been solved, standardized production has been achieved, costs have been reduced and efficiency and quality have been improved. .

CN108127352BActive Publication Date: 2024-10-29石柏林
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN201810032956.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-01-13
Publication Date
2024-10-29
Estimated Expiration
2038-01-13

AI Technical Summary

Technical Problem

There is a lack of automated production methods in the field of building steel structures. The limiting factor is the diversification of cross-sectional forms, sizes and nodes of steel structure components, which cannot be standardized.

Method used

An automated production method and production equipment for double steel plate shear wall components is proposed. By splitting the double steel plate shear wall into a straight double steel plate shear wall, combined with CNC cutting and welding technology, the automated production of nodes, including bending, is achieved Position welding of type splicing joints, extended diaphragm joints and web connecting plates.

Benefits of technology

It realizes the automated and standardized production of building steel structures, saves labor costs, reduces material and energy consumption, improves production efficiency and weld quality, and significantly increases corporate profit margins.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN108127352B_ABST
    Figure CN108127352B_ABST
Patent Text Reader

Abstract

The present invention relates to an automated production method and production equipment for double steel plate shear wall components, and belongs to the field of building steel structure and automation. The automated production method mainly includes welding of straight double steel plate shear wall components, upper and lower double steel plate shear wall component splicing node processing, beam-wall rigid connection node welding, floor support plate and shear member welding, rust removal and painting processing methods. The automated production equipment includes double steel plate shear wall unit production equipment, end steel plate and middle full-length stiffener feeding equipment, straight double steel plate shear wall component internal rod splicing equipment, straight double steel plate shear wall component end processing equipment, double steel plate shear wall component beam-wall rigid connection node welding equipment, floor support plate and shear member welding equipment, rust removal equipment, and paint painting equipment. Its beneficial effects are: realizing the automated production of double steel plate shear wall components, reducing costs and losses, increasing production speed, increasing profit margins, and increasing economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an automated production method and production equipment for double steel plate shear wall components, and belongs to the field of building steel structures and automation. Background Art

[0002] At present, there is no automated production method in the field of building steel structures. There are many constraints, and the most important one is that the cross-sectional form, cross-sectional size, and node diversity of steel structure components cannot be standardized.

[0003] In order to respond to the "Made in China 2025" plan and accelerate the development of building steel structures and increase the proportion of prefabricated buildings, the present invention is aimed at a double steel plate shear wall structure (also known as an outsourced steel plate shear wall structure), and proposes an automated production method and production equipment for double steel plate shear wall components, so as to achieve fully automated production of steel components from materials to finished products, thereby achieving the purpose of reducing energy consumption, reducing labor costs, limiting material loss, and improving production efficiency.

[0004] The double steel plate shear wall structure mainly includes double steel plate shear wall components and H-shaped steel beam components. The double steel plate shear wall structure has a natural advantage in achieving automation: the thickness of the steel plates on both sides of the double steel plate shear wall is relatively small, and the thickness is not large. For example, for a 100m high high-rise residential structure, 90% of the steel plate walls have a thickness of no more than 6mm. In view of this, by simplifying the nodes and standardizing the relevant parameters, it is able to meet the conditions for automated production and is suitable for most multi-story steel structure buildings of high height. The present invention proposes an automated production method for the double steel plate shear wall components.

[0005] For a common double steel plate shear wall component, in addition to the splicing between the double steel plate shear wall unit and the end plate, the main nodes include the on-site vertical splicing nodes of the upper and lower double steel plate shear wall components, the rigid connection nodes between the steel beam and the double steel plate shear wall, and the connection nodes between the floor slab and the double steel plate shear wall. The automated production of each node is achieved by simplifying, merging, and standardizing the variable parameters in the node. For example, the web connection plate in the rigid connection node between the steel beam and the double steel plate shear wall can be cut by a CNC cutting device to obtain web connection plates of various sizes. Summary of the invention

[0006] The purpose of the present invention is to provide an automated production method and production equipment for double steel plate shear wall components, so as to realize automated and standardized production in the field of building steel structures.

[0007] The technical solution adopted by the present invention is:

[0008] An automated production method for double steel plate shear wall components, characterized in that: double steel plate shear walls of various shapes are split into straight double steel plate shear walls, and the straight double steel plate shear walls exceeding the transportation width are further split into straight double steel plate shear walls with a width that meets the transportation requirements;

[0009] The straight double steel plate shear wall with a width that meets the requirements comprises at least one double steel plate shear wall unit, and the double steel plate shear wall unit is composed of steel plates (1) on both sides and a middle connecting piece (2).

[0010] Further, the double steel plate shear wall unit production equipment is connected to the internal rod splicing equipment of the straight double steel plate shear wall component, and the produced multiple double steel plate shear wall units, or the produced double steel plate shear wall units and the end steel plates (3) and / or the middle full-length stiffener (4) are positioned and fixed, and then welded;

[0011] The end steel plates (3) and the middle full-length stiffening plates (4) are fed by steel coils on a steel coil feeding platform, and the steel coils are placed on the steel coil feeding platform.

[0012] Furthermore, the end processing equipment of the straight double steel plate shear wall component is connected to the double steel plate shear wall component, and the vertical splicing node processing is performed on the double steel plate shear wall component. The vertical splicing node adopts a bending type splicing node, and the steel plates (1) on both sides and / or the end steel plates (3) are bent. The splicing ear plate in the vertical splicing node is fixed to the double steel plate shear wall by welding, or fixed by tension bolts. When welding is used, the ear plate is directly welded to the straight double steel plate shear wall component; when tension bolts are used, tension bolt holes are opened at the corresponding positions of the ear plates of the straight double steel plate shear wall component.

[0013] Further, the double steel plate shear wall component beam-wall rigid connection node welding equipment is connected, and the double steel plate shear wall component beam-wall rigid connection node adopts an extended partition node. After the straight double steel plate shear wall component is cut by a cutting device, the extended partition (7) is positioned and fixed to the cutting seam and welded; the web connecting plate (8) is positioned and fixed by a positioning welding device and welded;

[0014] The overhanging partition plate (7) and the web connecting plate (8) are both produced in advance and used during welding.

[0015] Further, the floor support plate (9) and the floor shear member (10) are welded together by connecting the support plate units in sequence and welding them together. When the total length of the floor support plate cannot be formed by one or more support plate units, one or more of the support plate units are cut before welding to meet the total length requirement.

[0016] The floor slab shear-resistant member (10) and the support plate unit are produced in advance and used during welding.

[0017] Preferably, the steel coil feeding platform is movable, and a steel coil cutting device is provided in front of the steel coil. When it is necessary to switch to steel coils of other specifications, the steel coil is cut off, and then the steel coil feeding platform is moved to move the steel coil of the required specification to the feeding position.

[0018] Preferably, when welding the I-shaped double steel plate shear wall component splicing equipment, welding starts from the middle of the I-shaped double steel plate shear wall component to both ends, and welding is performed in two directions simultaneously.

[0019] Preferably, the end processing equipment of the straight-line double steel plate shear wall component performs high-frequency induction heating on the two side steel plates (1) and / or the end steel plates (3) before bending.

[0020] Further, when welding a rigid joint matching the reference web connection plate, the reference web connection plate is positioned and fixed, and then welded;

[0021] When the web plate connection plate required for the welded rigid joint is smaller than the reference web plate connection plate, the cutting device is controlled to cut the reference web plate connection plate, and then the reference web plate connection plate is positioned, fixed, and welded;

[0022] The reference web connecting plates are classified according to the cross-sectional height of the H-shaped steel beam in the rigid joint, and the web connecting plates corresponding to the H-shaped steel beam with a higher cross-sectional height are used as the reference web connecting plates in each category;

[0023] The cutting device is used to cut the reference web connecting plate to obtain the web connecting plate matching the welded rigid joint.

[0024] Furthermore, it is connected with rust removal equipment and paint painting equipment.

[0025] Furthermore, all equipment and production processes are controlled by computers.

[0026] An automated production equipment for double steel plate shear wall components, characterized in that: the equipment comprises double steel plate shear wall unit production equipment, end steel plate and middle full-length stiffener feeding equipment, straight double steel plate shear wall component internal rod splicing equipment, straight double steel plate shear wall component end processing equipment, double steel plate shear wall component beam-wall rigid joint welding equipment, floor support plate and shear member welding equipment, rust removal equipment, and paint painting equipment;

[0027] After each device is finished producing, it will be controlled by computer to enter the production of the next device;

[0028] The double steel plate shear wall unit production equipment is used to produce double steel plate shear wall units;

[0029] The end steel plate and middle full-length stiffening plate feeding equipment is used to provide the steel plates required for the end steel plates (3) and the middle full-length stiffening plates (4), and the equipment comprises a steel coil feeding platform, the steel coil feeding platform is movable, and a steel coil cutting device is arranged in front of the steel coil;

[0030] The internal rod splicing equipment of the straight double steel plate shear wall component is used to weld the internal rods of the straight double steel plate shear wall component into a straight double steel plate shear wall component;

[0031] The I-shaped double steel plate shear wall component end processing device is used to bend the two side steel plates (1) and / or the end steel plates (3) at the upper and lower ends of the I-shaped double steel plate shear wall component, and weld the ear plates, or open tension bolt holes on the I-shaped double steel plate shear wall component at the corresponding positions of the ear plates;

[0032] The double steel plate shear wall component beam-wall rigid joint welding equipment is used to weld the extended diaphragm (7) and the web connecting plate (8), weld the extended diaphragm (7), and cut the position of the double steel plate shear wall component corresponding to the extended diaphragm (7);

[0033] The floor support plate and anti-shear member welding equipment is used for welding the floor support plate (9) and the floor anti-shear member (10), and comprises a support plate cutting device;

[0034] The floor support plate (9) is composed of one or more support plate units. When the total length of the floor support plate (9) cannot be composed of an integral number of support plate units, one or more of the support plate units are cut before welding to meet the total length requirement.

[0035] The pallet cutting device is used to cut the pallet unit to form a floor pallet (9) that meets the length requirements;

[0036] The rust removal equipment is used to remove rust from the straight double steel plate shear wall components;

[0037] The paint brushing equipment is used to apply paint to the straight double steel plate shear wall components.

[0038] Preferably, the end processing equipment of the I-shaped double steel plate shear wall component comprises a high-frequency heating device for heating the two side steel plates (1) and / or the end steel plates (3) at the upper and lower ends of the I-shaped double steel plate shear wall component before bending.

[0039] The double steel plate shear wall component beam-wall rigid joint welding equipment further comprises a web connection plate cutting device;

[0040] The cutting device is used to cut the reference web connecting plate to obtain the web connecting plate matching the welded rigid joint.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] 1. Realize the automated production of double steel plate shear wall components;

[0043] 2. Save a lot of labor costs, which is conducive to solving the problem of aging;

[0044] 3. Material loss and energy consumption are reduced to extremely low levels;

[0045] 4. Can significantly increase production speed;

[0046] 5. Effectively improve weld quality and production quality;

[0047] 6. Significantly increase the company's profit margin. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 Schematic diagram of double steel plate shear wall unit.

[0049] Figure 2 It is a schematic diagram of a straight-line double steel plate shear wall with only double steel plate shear wall units.

[0050] Figure 3 Schematic diagram of a straight double steel plate shear wall with end steel plates.

[0051] Figure 4 This is a schematic diagram of a straight-line double steel plate shear wall containing end steel plates and internal full-length stiffeners.

[0052] Figure 5 Schematic diagram of a straight-line double steel plate shear wall with an internal full-length stiffener.

[0053] Figure 6 Schematic diagram of the bent vertical splicing node of the double steel plate shear wall.

[0054] Figure 7 This is a schematic diagram of the rigid connection node of steel beam-double steel plate shear wall.

[0055] Figure 8 Schematic diagram of the floor support plate and floor shear member nodes.

[0056] In the figure: 1 is the steel plates on both sides of the double steel plate shear wall unit, 2 is the middle connector of the double steel plate shear wall unit, 3 is the end steel plates of the double steel plate shear wall, 4 is the full-length stiffener inside the end steel plates of the double steel plate shear wall, 5 is the connecting ear plate in the vertical splicing node, 6 is the folded plate connecting tie bar in the vertical splicing node, 7 is the extended partition plate in the steel beam-double steel plate shear wall rigid connection node, 8 is the web connection plate in the steel beam-double steel plate shear wall rigid connection node, 9 is the floor support plate, 10 is the floor shear member, and 11 is the floor. DETAILED DESCRIPTION

[0057] Split double steel plate shear walls of various shapes into straight double steel plate shear walls, and further split straight double steel plate shear walls that exceed the transportation width into straight double steel plate shear walls with a width that meets the transportation requirements;

[0058] The straight double steel plate shear wall with a width that meets the requirements comprises at least one double steel plate shear wall unit, and the double steel plate shear wall unit is composed of steel plates (1) on both sides and a middle connecting piece (2);

[0059] Connecting the double steel plate shear wall unit production equipment with the internal rod splicing equipment of the straight double steel plate shear wall component, positioning and fixing the produced multiple double steel plate shear wall units, or the produced double steel plate shear wall units and the end steel plates (3) or / and the middle full-length stiffener (4), and then welding them;

[0060] The end steel plates (3) and the middle full-length stiffening plates (4) are fed by steel coils on a steel coil feeding platform, and the steel coils are placed on the steel coil feeding platform.

[0061] Further, the end processing equipment of the straight double steel plate shear wall component is connected to the double steel plate shear wall component, and the vertical splicing node processing is performed on the double steel plate shear wall component. The vertical splicing node adopts a bending type splicing node, and the steel plates (1) on both sides and / or the end steel plates (3) are bent. The splicing ear plate in the vertical splicing node is fixed to the double steel plate shear wall by welding, or fixed by tension bolts. When welding is used, the ear plate is directly welded to the straight double steel plate shear wall component; when tension bolts are used, tension bolt holes are opened at the corresponding positions of the ear plates of the straight double steel plate shear wall component;

[0062] Further, the double steel plate shear wall component beam-wall rigid connection node welding equipment is connected, and the double steel plate shear wall component beam-wall rigid connection node adopts an extended partition node. After the straight double steel plate shear wall component is cut by a cutting device, the extended partition (7) is positioned and fixed to the cutting seam and welded; the web connecting plate (8) is positioned and fixed by a positioning welding device and welded;

[0063] The extended partition plate (7) and the web connecting plate (8) are produced in advance and used during welding;

[0064] Further, the floor support plate (9) and the floor shear member (10) are welded together by connecting the support plate units in sequence and welding them together. When the total length of the floor support plate cannot be formed by one or more support plate units, one or more of the support plate units are cut before welding to meet the total length requirement.

[0065] The floor slab shear-resistant member (10) and the support plate unit are produced in advance and used during welding.

[0066] Preferably, the steel coil feeding platform is movable, and a steel coil cutting device is provided in front of the steel coil. When it is necessary to switch to steel coils of other specifications, the steel coil is cut off, and then the steel coil feeding platform is moved to move the steel coil of the required specification to the feeding position.

[0067] Preferably, when welding the I-shaped double steel plate shear wall component splicing equipment, welding starts from the middle of the I-shaped double steel plate shear wall component to both ends, and welding is performed in two directions simultaneously.

[0068] Preferably, the end processing equipment of the straight-line double steel plate shear wall component performs high-frequency induction heating on the two side steel plates (1) and / or the end steel plates (3) before bending.

[0069] Further, when welding a rigid joint matching the reference web connection plate, the reference web connection plate is positioned and fixed, and then welded;

[0070] When the web plate connection plate required for the welded rigid joint is smaller than the reference web plate connection plate, the cutting device is controlled to cut the reference web plate connection plate, and then the reference web plate connection plate is positioned, fixed, and welded;

[0071] The reference web connecting plates are classified according to the cross-sectional height of the H-shaped steel beam in the rigid joint, and the web connecting plates corresponding to the H-shaped steel beam with a higher cross-sectional height are used as the reference web connecting plates in each category;

[0072] The cutting device is used to cut the reference web connecting plate to obtain the web connecting plate matching the welded rigid joint.

[0073] Furthermore, it is connected with rust removal equipment and paint painting equipment.

[0074] Furthermore, all equipment and production processes are controlled by computers.

[0075] An automated production equipment for double steel plate shear wall components, characterized in that: the equipment comprises double steel plate shear wall unit production equipment, end steel plate and middle full-length stiffener feeding equipment, straight double steel plate shear wall component internal rod splicing equipment, straight double steel plate shear wall component end processing equipment, double steel plate shear wall component beam-wall rigid joint welding equipment, floor support plate and shear member welding equipment, rust removal equipment, and paint painting equipment;

[0076] After each device is finished producing, it will be controlled by computer to enter the production of the next device;

[0077] The double steel plate shear wall unit production equipment is used to produce double steel plate shear wall units;

[0078] The end steel plate and middle full-length stiffening plate feeding equipment is used to provide the steel plates required for the end steel plates (3) and the middle full-length stiffening plates (4), and the equipment comprises a steel coil feeding platform, the steel coil feeding platform is movable, and a steel coil cutting device is arranged in front of the steel coil;

[0079] The internal rod splicing equipment of the straight double steel plate shear wall component is used to weld the internal rods of the straight double steel plate shear wall component into a straight double steel plate shear wall component;

[0080] The I-shaped double steel plate shear wall component end processing device is used to bend the two side steel plates (1) and / or the end steel plates (3) at the upper and lower ends of the I-shaped double steel plate shear wall component, and weld the ear plates, or open tension bolt holes on the I-shaped double steel plate shear wall component at the corresponding positions of the ear plates;

[0081] The double steel plate shear wall component beam-wall rigid joint welding equipment is used to weld the extended diaphragm (7) and the web connecting plate (8), weld the extended diaphragm (7), and cut the position of the double steel plate shear wall component corresponding to the extended diaphragm (7);

[0082] The floor support plate and anti-shear member welding equipment is used for welding the floor support plate (9) and the floor anti-shear member (10), and comprises a support plate cutting device;

[0083] The floor support plate (9) is composed of one or more support plate units. When the total length of the floor support plate (9) cannot be composed of an integral number of support plate units, one or more of the support plate units are cut before welding to meet the total length requirement.

[0084] The pallet cutting device is used to cut the pallet unit to form a floor pallet (9) that meets the length requirements;

[0085] The rust removal equipment is used to remove rust from the straight double steel plate shear wall components;

[0086] The paint brushing equipment is used to apply paint to the straight double steel plate shear wall components.

[0087] Preferably, the end processing equipment of the I-shaped double steel plate shear wall component comprises a high-frequency heating device for heating the two side steel plates (1) and / or the end steel plates (3) at the upper and lower ends of the I-shaped double steel plate shear wall component before bending.

[0088] The double steel plate shear wall component beam-wall rigid joint welding equipment further comprises a web connection plate cutting device;

[0089] The cutting device is used to cut the reference web connection plate to obtain a web connection plate that matches the welded rigid joint;

[0090] The reference web connecting plates are classified according to the cross-sectional height of the H-shaped steel beam in the rigid joint, and the web connecting plates corresponding to the H-shaped steel beam with a higher cross-sectional height are used as the reference web connecting plates in each category;

[0091] All equipment and production processes are controlled by computers.

[0092] The legends given in the accompanying drawings are for illustration only and should not be understood as representing only the contents expressed by the legends.

[0093] The contents described in the embodiments of this specification are only examples of the implementation forms of the invention concept, and the protection scope of the present invention should not be considered to be limited to the specific forms described in the embodiments. Equivalent technical means that can be thought of according to the invention concept should also be included in the protection scope of the present invention.

Claims

1. An automated production method for double steel plate shear wall components, characterized in that: Split double steel plate shear walls of various shapes into straight double steel plate shear walls, and split straight double steel plate shear walls that exceed the transportation width into straight double steel plate shear walls with a width that meets the transportation requirements; The straight double steel plate shear wall with a width that meets the requirements comprises at least one double steel plate shear wall unit, and the double steel plate shear wall unit is composed of steel plates (1) on both sides and a middle connecting piece (2); The double steel plate shear wall unit production equipment is connected to the internal rod splicing equipment of the straight double steel plate shear wall component, and the produced double steel plate shear wall unit and the end steel plate (3) and / or the middle full-length stiffener (4) are positioned and fixed, and then welded; The end steel plate and the middle full-length stiffening plate feeding equipment is used to provide the steel plates required for the end steel plates (3) and the middle full-length stiffening plates (4), and the equipment comprises a steel coil feeding platform, and the end steel plates (3) and the middle full-length stiffening plates (4) are fed by steel coils on the steel coil feeding platform, and the steel coils are placed on the steel coil feeding platform; The device is connected to the end processing device of the straight double steel plate shear wall component, and the double steel plate shear wall component is processed at a vertical splicing node. The vertical splicing node adopts a bending type splicing node, and the steel plates (1) on both sides and / or the end steel plates (3) are bent. The splicing ear plate in the vertical splicing node is fixed to the double steel plate shear wall by welding, or by tension bolts. When welding is used, the ear plate is directly welded to the straight double steel plate shear wall component; when tension bolts are used, tension bolt holes are opened at corresponding positions of the ear plates of the straight double steel plate shear wall component; The double steel plate shear wall component beam-wall rigid connection node welding equipment is connected, and the double steel plate shear wall component beam-wall rigid connection node adopts an extended partition node. After the straight double steel plate shear wall component is cut by a cutting device, the extended partition (7) is positioned and fixed to the cutting seam and welded; the web connecting plate (8) is positioned and fixed by a positioning welding device and welded; The extended partition plate (7) and the web connecting plate (8) are produced in advance and used during welding; When welding the rigid joint that matches the reference web connection plate, position and fix the reference web connection plate and weld it; When the web plate connection plate required for the welded rigid joint is smaller than the reference web plate connection plate, the cutting device is controlled to cut the reference web plate connection plate, and then the reference web plate connection plate is positioned, fixed, and welded; The reference web connecting plates are classified according to the cross-sectional height of the H-shaped steel beam in the rigid joint, and the web connecting plates corresponding to the H-shaped steel beam with a higher cross-sectional height are used as the reference web connecting plates in each category; The cutting device is used to cut the reference web connection plate to obtain a web connection plate that matches the welded rigid joint; Connecting with the floor support plate and shear member welding equipment, welding the floor support plate (9) and the floor shear member (10), the floor support plate (9) is formed by welding support plate units connected in sequence, and when the total length of the floor support plate cannot be formed by one or more support plate units, one or more of the support plate units are cut before welding to meet the total length requirement; The floor slab shear-resistant member (10) and the support plate unit are produced in advance and used during welding.

2. The automatic production method of double steel plate shear wall components according to claim 1, characterized in that: The steel coil feeding platform is movable, and a steel coil cutting device is arranged in front of the steel coil. When it is necessary to switch to steel coils of other specifications, the steel coil is cut off, and then the steel coil feeding platform is moved to move the steel coil of the required specifications to the feeding position.

3. The automated production method for double steel plate shear wall components according to claim 1 or 2, characterized in that: When welding the internal rod splicing equipment of the I-shaped double steel plate shear wall component, welding starts from the middle of the I-shaped double steel plate shear wall component to both ends, and welding is performed in two directions simultaneously.

4. The method for automatically producing double steel plate shear wall components according to claim 3, characterized in that: The end processing equipment of the straight double steel plate shear wall component performs high-frequency induction heating on the steel plates (1) on both sides and / or the end steel plates (3) before bending.

5. The automatic production method of double steel plate shear wall components according to claim 4, characterized in that: Connect with rust removal equipment and paint painting equipment.

6. The method for automatically producing double steel plate shear wall components according to claim 5, characterized in that: All equipment and production processes are controlled by computers.

Citation Information

Patent Citations

  • All-bolt connection node structure of H-shaped steel beam and H-shaped steel column

    CN102653960A

  • Girder and multi-cavity steel plate shear wall connecting node and operation method thereof

    CN105952027A

  • Double-steel plate shear wall unit production method and production equipment

    CN106425295A

  • Dual-steel-plate shear wall vertical splice joint

    CN107130703A

  • Double steel plates shear force wall component automated production equipment

    CN207807035U