Improved structure of full-casing spiral drilling machine and construction method of full-casing threaded cast-in-place pile

Through the design of the improved double power head auger drill and the casing spiral component, the problem of insufficient bearing capacity in high-rise buildings with the full casing rotary pile forming method in the existing technology has been solved, and efficient and economical medium and large diameter threads have been achieved. The construction of cast-in-place piles improves the pile bearing capacity and construction efficiency, and meets the requirements of energy conservation and environmental protection.

CN109113566BActive Publication Date: 2024-10-29刘淼
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN201710486248.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-06-23
Publication Date
2024-10-29
Estimated Expiration
2037-06-23

AI Technical Summary

Technical Problem

The existing full-casing rotary pile-forming method is difficult to meet the bearing capacity requirements of pile foundations in high-rise or super-high-rise buildings, and the construction efficiency and economic benefits are low. It is especially difficult to form large-diameter threads with high bearing capacity in hard soil or rock layers. Cast-in-place piles.

Method used

An improved double power head auger drill structure is adopted. A spiral component is provided on the outer wall of the casing. By rotating the double power head and the auger rod in opposite directions, a threaded space is formed and the casing is lifted. The pile body concrete threads are increased, and the pile side resistance and Carrying capacity.

Benefits of technology

The efficient construction of medium and large diameter threaded piles is achieved under existing mechanical power conditions, which significantly improves the pile bearing capacity and construction efficiency, reduces the amount of concrete, complies with energy conservation and environmental protection policies, and adapts to the increasing demand for pile bearing capacity of buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109113566B_ABST
    Figure CN109113566B_ABST
Patent Text Reader

Abstract

The present invention discloses an improved structure of a full-casing spiral drill and a full-casing threaded cast-in-place pile construction method, comprising a double-power head spiral drill (2), a casing (1) being installed on the double-power head spiral drill, a lower power head (4) being detachably installed on the casing and capable of rotating the casing, an upper power head (5) being arranged on the upper part of the lower power head; the upper power head being detachably connected to a spiral drill rod (6) capable of moving up and down in the casing, the lower end of the spiral drill rod being connected to a driller capable of moving in the casing; a spiral component (3) being integrally formed on at least part of the outer wall of the casing, wherein the spiral direction of the spiral component is opposite to the spiral direction of the spiral drill rod. The drilling rig is simple and durable to improve, and by using the full-casing spiral drill with the structure and the construction method of the present invention, medium and large diameter threaded piles can be formed under the existing mechanical equipment power conditions, so that the threaded special-shaped piles are more in line with the increasing demand for pile bearing capacity of current structures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an improved structure and a pile construction method, in particular to an improved structure of a full-tube spiral drilling machine and a full-tube threaded cast-in-place pile construction method, belonging to the technical field of construction engineering. Background Art

[0002] With the development of society, land resources are scarce, and buildings are gradually developing towards high-rise. The loads of buildings and structures are getting bigger and bigger, so pile types with higher bearing capacity, pile construction methods and pile machinery are widely used in foundation engineering, among which medium-diameter threaded cast-in-place piles and large-diameter cast-in-place piles are particularly widely used.

[0003] my country's research on threaded cast-in-place piles began in the 1990s, and a variety of pile types and construction methods have emerged so far. Practice has shown that under the same conditions, when the pile becomes a screw in the soil, the pile side resistance is 1-2 times that of the pile with the same cross-section, so the threaded pile has higher economic and practical value.

[0004] For high-rise, super-high-rise and bridge buildings, due to the excessive load of the structure, the single pile bearing capacity is required to be high, so various types of large-diameter bored piles are often used. By adopting large-diameter bored pile construction machinery and pile forming methods with full casing and pile forming in the pipe, the waste and environmental pollution caused by the mud wall protection of bored piles can be effectively avoided. Compared with bored piles with mud wall protection, the large-diameter bored piles formed have no empty soil at the pile end, no mud skin effect, and the whole casing wall protection, so there will be no broken piles or necking phenomena in complex soil layers such as soil and loose soil. Under the same conditions, the bearing capacity of the bored piles is improved to a certain extent, and the construction speed is fast, with high economic benefits.

[0005] In the prior art, the pile forming method of threaded cast-in-place piles is mostly to squeeze soil to form piles. The patent names are cast-in-place threaded pile forming process (patent number: 9611960265) and semi-screw piles and their pile forming method (patent number: 03128265.2). Both use a spiral drill to synchronously rotate the drill rod to drill, and then synchronously reverse the rotation of the drill to pump concrete to form the threaded section of the threaded pile or semi-screw pile. Because the pile forming method is to squeeze soil to form piles, it has high requirements on the power of the drill rig, and it is impossible to form a larger diameter threaded pile under the existing mechanical power conditions. Therefore, the threaded piles or semi-screw piles are mostly small diameter or medium diameter piles (pile diameter is 400mm-600mm). Due to the limitation of its pile diameter, its single pile bearing capacity is low, which cannot meet the requirements of high-rise or super-high-rise buildings for pile foundation bearing capacity, so its application range is relatively narrow.

[0006] Patent No. 200610138353.3 discloses a dual-power head spiral drill and its construction method. This method allows the lower power head to slide up and down outside the casing, and drives the rotating casing at any position of the casing, thereby providing a dual-power head drilling rig structure with low center of gravity and high stability. However, the method uses the spiral drill rod and drill bit in the casing to drill soil and form piles. This method is suitable for drilling in softer soil layers, but it is difficult to drill into piles when encountering hard soil layers and rock layers. In addition, the pile forming device is a cylindrical steel casing, and the pipe pulling method is non-rotating pipe pulling. The cast-in-place pile formed is a cylindrical cast-in-place pile with the same cross-section as the casing. The circumferential resistance of this cylindrical cast-in-place pile is low, so the pile bearing capacity is not improved compared with the traditional cast-in-place pile, and the economic benefit is poor. In the process of lifting the casing, a non-rotating static extraction process is adopted. The casing does not engage with the soil around the pile to generate upward torque through rotation. It is difficult to pull the larger diameter casing out of the soil by relying solely on the drilling rig's own lifting equipment. Therefore, this construction equipment and process is not only difficult to pull the pipe into piles in sticky or hard soil layers, but also cannot meet the construction needs of larger diameter full-casing cast-in-place piles.

[0007] Patent No. 201210351079.3 discloses a walking double-rotation down-the-hole drill, which uses a down-the-hole hammer to impact and form a hole. The lower power head is connected to the casing and rotates and follows. The high-pressure gas at the bottom of the hammer blows the debris, rock debris and other objects to the upper spiral drill rod and discharges them out of the casing through the spiral drill rod. This equipment has a fast drilling speed and high working efficiency in frozen soil, rock layer, pebbles, boulders and hard soil layers. However, because its pile-forming device is still a cylindrical steel casing, it is impossible to generate an upward torque by rotation to lift the casing. Therefore, its pipe lifting method is mostly to use a vibrating hammer and a crane to vibrate and pull the pipe. The process is relatively complicated and the efficiency is relatively low. The cast-in-place pile formed is a cylindrical pile with the same cross-section as the casing, with a small pile side resistance. The pile bottom area is only equal to the bottom of the down-the-hole hammer, that is, the bottom area of ​​the casing. The bottom cannot be expanded again. The vertical bearing capacity of the pile is further improved by increasing the pile bottom area.

[0008] Patent No. 201410814937.2 discloses a construction method for full-casing vibration extrusion and expansion cast-in-place piles. The casing is pressed into the soil using a vibrating hammer. When encountering hard soil layers such as rock layers and pebble layers, it is difficult to press the casing in using only the vibration force of the vibrating hammer. After the casing is sunk, the soil in the casing is cleaned mechanically or manually. Pipe sinking and soil cleaning are carried out in two steps, with slow results and long construction time. After the soil in the casing is cleaned, a vibrating reamer is used to vibrate and expand the bottom of the pile hole. This method is to expand the hole. The pile bottom is a bearing stratum that is mostly a hard soil layer and a rock layer. The geology is relatively hard and dense, and it is difficult to form an enlarged head at the bottom of the pile by vibration extrusion.

[0009] The above equipment and pile-forming methods are relatively common in the full-casing rotary pile-forming methods, and they are also highly efficient and economically beneficial. Although the existing full-casing rotary drilling machinery and pile-forming methods have overcome many difficulties in the construction of large-diameter bored piles, the large-diameter bored piles formed are all equal-section linear bored piles, and it is impossible to form concrete screws on the pile body to increase the measured resistance of the bored piles, nor is it possible to expand the hole twice in the hard soil and rock layers at the bottom of the pile, and increase the resistance of the bored pile end by increasing the pile bottom area, thereby further improving the vertical bearing capacity of the bored pile. Therefore, the construction industry is in urgent need of a new type of large-diameter bored pile that has a higher bearing capacity and uses less concrete under the same conditions, meets the requirements of national energy-saving and environmental protection policies, and can meet the increasing demand for pile bearing capacity of buildings. Summary of the invention

[0010] In order to solve the above technical problems, the purpose of the present invention is to provide an improved structure of a full-casing spiral drilling rig and a full-casing threaded cast-in-place pile construction method. The dual-power drilling used in the improved structure and method greatly increases the excavation capacity of the equipment, making the construction of medium and large diameter full-casing threaded piles a reality under existing mechanical power conditions, and has achieved breakthrough progress in pile foundation construction.

[0011] The present invention achieves the above-mentioned object through the following technical solutions: an improved structure of a full-casing auger, comprising a double-power-head auger, a casing is installed on the double-power-head auger, a lower power head capable of rotating is detachably installed on the casing, and an upper power head is arranged on the upper part of the lower power head;

[0012] The upper power head is detachably connected to a spiral drill rod capable of moving up and down in the casing, and the lower end of the spiral drill rod is connected to a driller capable of moving in the casing.

[0013] A spiral component is integrally formed on at least a portion of the outer wall of the casing, wherein the spiral direction of the spiral component is opposite to the spiral direction of the auger rod.

[0014] Further, the drilling device is one of a down-the-hole hammer and a drill bit.

[0015] Furthermore, the casing 1 comprises at least two casings detachably connected, and one end of any casing can be detachably connected to the lower power head; the spiral drill rod comprises at least two drill rods with spiral blades, and adjacent drill rods are detachably connected.

[0016] Furthermore, at least part of the spiral member has a thickness of not less than 3 cm; at least part of the spiral member has a height perpendicular to the sleeve of not less than 3 cm; at least part of the spiral member has a trapezoidal cross-section, and the root thickness is greater than the top thickness.

[0017] A full-sleeve full-rotation rotary machine, on which a sleeve with a spiral component is installed.

[0018] A full set of pipe threaded cast-in-place pile construction method, the construction method comprising the following steps:

[0019] 1) Using a double-power head auger, align the casing with a spiral member and the auger rod with a drill with the pile position, start the upper power head to drive the auger rod to rotate in the direction of its spiral blades, use the drill to drill, and at the same time start the lower power head to drive the casing to rotate in the opposite direction of the auger rod, and the auger rod discharges the soil and rock debris guided upward by the drill out of the casing;

[0020] 2) After the casing is drilled to the designed depth and the soil and rock debris in the casing are cleaned, the lower power head and the upper power head are closed, the rotation of the casing and the auger rod is stopped, the auger rod is lifted out of the casing and the lower power head, and the auger rod is removed;

[0021] 3) placing a steel cage into the casing and pouring concrete into the casing. After the concrete is poured to a predetermined height, placing the auger rod back onto the concrete and steel cage in the casing, and starting the lower power head to rotate and lift in the opposite direction to the casing during rotary drilling;

[0022] 4) During the process of lifting the casing, the spiral member rotates, bites and shears the soil on the wall of the pile hole, generating an upward torque to assist in lifting the casing and forming a threaded space on the inner wall of the pile hole; at the same time, the concrete in the casing flows into the pile hole and fills the threaded space on the hole wall until the casing is completely lifted out of the ground, forming a fully sleeved threaded cast-in-place pile with concrete threads on the pile body.

[0023] Furthermore, if the required pile depth is greater than the height of the pile frame, during the sinking and drilling process, the connection between the lower power head and the casing, and the connection between the upper power head and the auger rod are separated; at least one casing and auger rod are connected through a detachable connection, and then the lower power head and the casing, the upper power head and the auger rod are connected respectively, and then drilling is continued. After the drilling is completed, the rear auger rod should be removed first, and then the auger rod should be lifted out of the casing and removed. In the process of rotating and lifting the casing to pile, after the rear-connected casing is completely lifted out of the ground and the concrete in the pipe is completely drained, the lifting of the pipe should be stopped, and after the rear-connected casing is removed, the original casing should continue to be rotated and lifted until it is completely lifted out of the ground, and concrete can be added as needed during the process of rotating and lifting the pipe.

[0024] A full set of pipe threaded cast-in-place pile construction method, the construction method comprising:

[0025] 1) moving a full-casing, full-rotation drilling rig with a spiral member to the pile position, and aligning the casing with the pile position;

[0026] 2) starting the full-casing full-rotation drilling rig, rotating and pressing the casing into the soil in the spiral direction of the spiral member, using auxiliary soil extraction drilling equipment to clear the soil and rock debris in the casing out of the casing, until the casing is rotated and drilled to a desired depth, and the casing is cleaned, and then the drilling is stopped;

[0027] 3) Put a steel cage in the casing and pour concrete. After the concrete is poured to a predetermined height, the casing is rotated in the opposite direction to be lifted. During the rotation and lifting process, the spiral member rotates, bites and shears the soil in the pile hole, generates an upward torque to lift the casing, and forms a threaded space on the hole wall of the pile hole. At the same time, the concrete in the casing flows into the pile hole and quickly fills the threaded space on the hole wall until the casing is lifted out of the ground to form a fully sleeved threaded cast-in-place pile;

[0028] 4) During the rotating pipe lifting process, additional concrete can be poured as needed.

[0029] Preferably, when the casing is drilled into the hard soil layer or rock layer at the bottom of the pile, the spiral member is used to rotate and shear the wall of the pile hole to expand the pile hole for a second time to form the enlarged head portion of the lower part of the cast-in-place pile.

[0030] Preferably, when the casing is drilled to the designed depth, after the debris in the pipe is cleaned up, concrete can be poured directly in the pipe. After the rotating pipe lifting pile is completed, a plain concrete full-set pipe threaded cast-in-place pile is formed, or a steel cage is inserted by the post-installation method to form a reinforced concrete full-set pipe threaded cast-in-place pile.

[0031] The beneficial effects of the present invention are as follows: a spiral component with a certain thickness and height is arranged on the outer wall of the casing of the improved structure, which can screw-engage the soil around the pile hole when the casing is rotated and drilled and lifted, generating downward or upward torque, and shearing the hole wall when the casing is rotated and lifted, forming a threaded space with a certain thickness and depth. The spiral component can be a spiral blade, which is easier to shear into the soil during drilling, reducing the difficulty of drilling. The spiral component can also be a toothed component arranged and combined according to a spiral trajectory. The threaded space sheared by the toothed component combined spiral component is more regular and reliable. The spiral component can also be a combination of a spiral blade and a toothed component, and the height of the two is determined according to the needs of the construction pile type. During construction, according to different soil layers, the thickness and height of the spiral component are equal to or greater than the designed thread thickness of the threaded pile. The height of the spiral component can ensure that the thread shape of the threaded pile formed under various geological environments meets the design requirements. The lower part or the entirety of the outer spiral component of the casing is a trapezoidal structure, and the threaded space formed by shearing on the inner wall of the pile hole and the threaded teeth of the threaded pile body are also trapezoidal structures. The trapezoidal thread structure with a root thickness greater than the top thickness is not easily damaged by soil shearing, making the quality of the threaded pile more stable and reliable. Because the thread shape of the threaded pile, including the thread height, thickness, and cross-sectional shape of the thread, is closest to the shape of the spiral component at the bottom of the outer wall of the casing, the spiral component at the bottom of the casing should have a certain height and thickness and should be a trapezoidal structure. When the drilling rig is a double-power head spiral drilling rig, during the drilling process, the casing and the spiral drill rod in the casing rotate and drill in their respective spiral directions. Because their spiral directions are opposite, their rotation directions during drilling are also opposite. The opposite rotation directions can make it easier for the spiral drill rod to discharge objects such as soil or rock debris in the casing out of the casing. The dual-power drilling used in the equipment and construction method of this case greatly increases the drilling capacity of the equipment. The spiral drill rod and the down-the-hole hammer or drill bit in the casing drill a hole to form a threaded pile core space. The casing rotates to expand the hole, and the casing spiral component rotates to shear the pile hole wall to form a threaded space, making the construction of medium and large diameter threaded piles a reality under the power conditions of existing mechanical equipment, and has made a breakthrough in the construction of special-shaped pile foundations. The lower drilling device of the spiral drill rod described in this case is a down-the-hole hammer or a drill bit, which can be flexibly selected according to the geological conditions. In harder soil layers, pebbles, gravel layers, or when it is necessary to enter rock formations, the spiral drill rod is selected to connect the down-the-hole hammer, and the down-the-hole hammer is used to impact and form a hole, which increases the excavation capacity of the equipment in hard soil layers and speeds up the rock entry speed; when constructing in softer soil layers, the spiral drill rod can be selected to connect the drill bit, which can increase the speed of soil extraction and drilling in soft soil.Moreover, in the improved structure of the equipment in this case, the lower power head and casing, and the upper power head and auger rod are all detachably connected. The casing can be composed of at least two detachably connected casings, and the auger rod can also be composed of multiple detachably connected drill rods with spiral blades. The structure and connection method of such casing and auger rod make it possible for the actual length of the casing and auger rod used to be higher than the height of the pile frame during construction, and thus the hole depth can be greater than the height of the pile frame. Therefore, the improved structure breaks through the dependence of the pile depth on the height of the pile frame, and increases the pile drilling depth of the equipment without increasing the height of the pile frame by adding casing and auger rod during the drilling process, effectively avoiding the increase in machinery cost caused by an excessively high pile frame, and the disadvantages of prone to rollover due to the poor stability of the excessively high pile frame during construction. During transportation, smaller pile frames are easy to load and unload, and fewer vehicles are required, greatly saving transportation costs.

[0032] This improved structure is simple and durable. The full set of pipe threaded bored piles formed by the double-power head spiral drill with this structure and the construction method of this case can reach a pile diameter of 800mm-3000mm. Compared with bored piles of equal cross-section with the same diameter, the threaded piles not only have a greatly improved bearing capacity, but also the concrete volume required for the pile body is only about 60% of various bored piles of the same diameter and cross-section, which is in line with the national energy conservation and emission reduction policy. The full set of pipe threaded bored piles in this case not only greatly improves the pile side resistance through the threaded engagement between the pile and the pile side soil, but also can be used to expand the rock or hard soil layer through the external spiral member of the casing when making rock-embedded piles, or when the bearing layer at the bottom of the pile is a harder soil layer, and further improve the pile end bearing capacity by expanding the cross-section of the pile bottom, thereby comprehensively improving the pile bearing capacity, making full use of the concrete strength of the large-diameter pile body, and obtaining higher economic benefits.

[0033] A spiral component with a certain thickness and height is arranged on the outer wall of the casing of the improved structure. Specifically, the thickness D and height H of the entire spiral component of the outer wall of the casing or the part of the spiral component close to the lower part of the outer wall of the casing are not less than 3 cm. The spiral component can screw-engage the soil around the pile hole when the casing is rotated and drilled and lifted, generating downward or upward torque. When the casing is rotated and lifted, the spiral component with a certain thickness and height shears the hole wall to form a threaded space with a certain thickness and depth. The threaded pile body threads formed by such a spiral space are not easily damaged by soil shearing. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 This is a schematic diagram of the improved structure of the dual-power head auger drilling rig of the present invention;

[0035] Figure 2 It is a schematic diagram of the combined structure of the full-casing full-rotation drilling rig and the soil drilling auxiliary equipment of the present invention;

[0036] Figure 3This is a schematic diagram of the full casing auger drilling machine of the present invention when the spiral component is a spiral blade;

[0037] Figure 4 This is a schematic diagram of the present invention when the spiral component of the full casing spiral drilling machine is a single or multiple tooth-shaped structure, and the cross-section of the spiral component is a trapezoidal member;

[0038] Figure 5 It is a schematic diagram of the full casing auger drilling machine of the present invention when the spiral component is a combination of spiral blades and toothed components;

[0039] Figure 6 It is a schematic diagram of the construction method of combining a full-casing full-rotation auger drill with auxiliary soil-taking drilling equipment such as a rotary drill or a grab bucket according to the present invention;

[0040] Figure 7 This is a schematic diagram of a pile forming method when the double-power head spiral drilling machine of the present invention is connected with the spiral drilling rod and the drill bit;

[0041] Figure 8 It is a schematic diagram of the construction method of the double-power head auger drill of the present invention, the auger drill rod is connected to the down-the-hole hammer, and the casing and auger drill rod are added during the drilling process;

[0042] Fig. 9 Schematic diagram of the construction method of forming an enlarged head at the bottom of a full-set pipe thread pile according to the present invention

[0043] Fig.10 It is a schematic diagram of the construction method of the full-casing variable-diameter threaded pile of the present invention;

[0044] Fig.11 This is a schematic diagram of the construction method of the full-casing half-screw pile of the present invention;

[0045] Fig.12 This is a schematic diagram of the structure of the spiral drill rod connected to the drill bit of the present invention;

[0046] In the figure: 1. casing, 2. double-power head spiral drilling rig, 3. spiral member, 3-1, toothed member, 4. lower power head, 5. upper power head, 6. spiral drill rod, 7. auxiliary soil drilling equipment, 8. down-the-hole hammer, 9. drill bit, 10. full-casing and full-rotation drilling rig, H height of spiral member, D thickness of spiral member, D1 thickness of root of spiral member, D2 thickness of top of spiral member. DETAILED DESCRIPTION

[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] like Figure 1 As shown: an improved structure of a full-casing auger, comprising a double-power-head auger 2, on which a casing 1 is mounted, on which a lower power head 4 capable of rotating is detachably mounted, and an upper power head 5 is disposed on the upper part of the lower power head 4;

[0049] The upper power head 5 is detachably connected to a spiral drill rod 6 that can move up and down in the casing 1, and the lower end of the spiral drill rod 6 is connected to a drill that can move in the casing 1; wherein the drill can be either a down-the-hole hammer 7 or a drill bit 8, such as Fig.12 shown.

[0050] A spiral component 3 is integrally formed on at least a portion of the outer wall of the casing 1 , wherein the spiral direction of the spiral component 3 is opposite to the spiral direction of the spiral drill rod 6 .

[0051] The spiral member 3 may be a spiral blade, or may include at least one tooth-shaped member 3 - 1 , or the spiral blade and the tooth-shaped member 3 - 1 may be combined together.

[0052] The casing 1 comprises at least two casings detachably connected, and one end of any casing 1 can be detachably connected to the lower power head 4; the spiral drill rod 6 comprises at least two drill rods with spiral blades, and adjacent drill rods are detachably connected.

[0053] The thickness of at least part of the spiral member 3 is not less than 3 cm; the height of at least part of the spiral member perpendicular to the sleeve 1 is not less than 3 cm; the cross-section of at least part of the spiral member 3 is trapezoidal, and the root thickness is greater than the top thickness.

[0054] A full-casing full-rotation rotary machine 10 is provided, on which a casing 1 with a spiral component 3 is installed.

[0055] A full set of pipe threaded cast-in-place pile construction method, the construction method comprising the following steps:

[0056] 1) Using a double-power head auger 2, align the casing 1 with the spiral member 3 and the auger rod 6 with the drill with the pile position, start the upper power head 5 to drive the auger rod 6 to rotate in the direction of its spiral blades, and use the drill to drill, while starting the lower power head 4 to drive the casing 1 to rotate and follow in the opposite direction of the auger rod 6, and the auger rod 6 discharges the soil and rock debris guided upward by the drill out of the casing 1;

[0057] 2) After the casing 1 is drilled to the designed depth and the soil and rock debris in the casing are cleaned, the lower power head 4 and the upper power head 5 are closed, the rotation of the casing 1 and the auger rod 6 is stopped, the auger rod 6 is lifted out of the casing 1 and the lower power head 4, and then the auger rod 6 is removed;

[0058] 3) Put the steel cage into the casing 1, and pour concrete into the casing 1. After the concrete is poured to a predetermined height, put the auger rod 6 back onto the concrete and steel cage in the casing 1, start the lower power head to lift the casing 1, and rotate and lift it in the opposite direction to the direction in which the casing 1 is rotated and drilled;

[0059] 4) During the lifting process of the casing 1, the spiral member 3 rotates, bites and shears the soil on the wall of the pile hole, generating an upward torque to assist in lifting the casing and forming a threaded space on the inner wall of the pile hole; at the same time, the concrete in the casing 1 flows into the pile hole and fills the threaded space on the hole wall until the casing 1 is completely lifted out of the ground, forming a full-cased threaded cast-in-place pile with concrete threads on the pile body.

[0060] If the required pile depth is greater than the height of the pile frame, during the sinking and drilling process, the connection between the lower power head 4 and the casing 1, and the connection between the upper power head 5 and the auger rod 6 are separated; at least one casing and auger rod are connected through a detachable connection, and then the lower power head 4 and the casing 1, and the upper power head 5 and the auger rod 6 are respectively connected, and then drilling is continued. After the drilling is completed, the rear auger rod should be removed first, and then the auger rod 6 should be lifted out of the casing 1 and the lower power head 4 and removed. In the process of rotating and lifting the casing 1 to form a pile, after the rear-connected casing is completely lifted out of the ground and the concrete in the pipe is completely drained, the rotation of the lifting pipe should be stopped, and after the rear-connected casing is removed, the original casing should continue to be rotated and lifted until it is completely lifted out of the ground, and concrete can be supplemented as needed during the rotation and lifting process.

[0061] A full set of pipe threaded cast-in-place pile construction method, the construction method comprising:

[0062] 1) moving the full-casing full-rotation drilling rig 10 with the spiral member 3 to the pile position, and aligning the casing 1 with the pile position;

[0063] 2) Start the full-casing full-rotation drilling rig 10, rotate and press the casing 1 into the soil according to the spiral direction of the spiral member 3, and use auxiliary soil drilling equipment such as a rotary drill and a grab bucket to clear the rock debris and soil in the casing 1 out of the casing until the casing 1 is rotated and drilled to the required depth, and the casing is cleaned, and then the drilling is stopped;

[0064] 3) Put the steel cage in and pour concrete into the casing. After the concrete is poured to a predetermined height, the casing 1 is rotated in the opposite direction to be lifted. During the rotation and lifting process, the spiral member 3 rotates to bite and shear the soil in the pile hole, generates an upward torque to lift the casing 1, and forms a threaded space on the hole wall of the pile hole. At the same time, the concrete in the casing 1 flows into the pile hole and quickly fills the threaded space on the hole wall until the casing 1 is lifted out of the ground to form a fully sleeved threaded cast-in-place pile.

[0065] 4) During the rotating pipe lifting process, additional concrete can be poured as needed.

[0066] When the casing 1 is drilled into the hard soil layer or rock layer at the bottom of the pile, the spiral member 3 is used to rotate and shear the wall of the pile hole to expand the pile hole for a second time to form the enlarged head portion of the lower part of the cast-in-place pile.

[0067] When the casing 1 is drilled to the designed depth, after the debris in the pipe is cleaned, concrete can be directly poured in the pipe. After the pipe is rotated and lifted to form piles, a plain concrete full-set pipe threaded cast-in-place pile is formed, or a steel cage is inserted by the post-installation method to form a reinforced concrete full-set pipe threaded cast-in-place pile.

[0068] A spiral component with a certain thickness and height is arranged outside the casing, which is opposite to the spiral direction of the inner screw. The spiral direction of the spiral component is opposite to the spiral blade of the auger rod. During the drilling process, the casing and the screw both rotate in their respective spiral directions, generating downward torque for drilling. Because their respective spiral directions are opposite, during drilling, the rotation direction of the auger rod is opposite to that of the casing, which is more conducive to the auger rod to discharge the soil, rock debris and other objects in the casing out of the casing. The spiral component with a certain thickness and height shears the hole wall when the casing is rotated and lifted, forming a threaded space with a certain thickness and depth, which can ensure that concrete can flow into and fill the threaded space before the soil body flows back, forming the thread teeth of the threaded cast-in-place pile body. The thickness and height of the spiral component are equal to or greater than the designed thread thickness and height of the threaded pile according to the different construction soil layers, which can ensure that the thread shape of the threaded pile formed in various geological environments meets the design requirements. The lowermost or all of the outer spiral member of the casing is a trapezoidal structure, and the threaded space formed by shearing on the inner wall of the pile hole and the threaded pile body thread are also trapezoidal. Experiments have shown that the trapezoidal thread has a strong shear resistance, and the trapezoidal pile body thread is not easily damaged by soil shearing, thereby providing higher pile side resistance. During the sinking and lifting process, the casing engages with the surrounding soil through rotation to generate downward or upward torque, which greatly increases the drilling and lifting capacity of the drilling rig. In addition, in the improved structure of the equipment in this case, the casing and the lower power head, the spiral drill rod and the upper power head are all detachably connected. The casing can also be detachably connected by at least two casings, and the spiral drill rod can also be detachably connected by multiple drill rods with spiral blades. This structure breaks through the dependence of the pile depth on the height of the pile frame. By adding casing and spiral drill rod during the drilling process, the equipment pile drilling depth is increased without increasing the height of the pile frame, effectively avoiding the disadvantages of poor stability and prone to rollover accidents during the construction of the over-high pile frame. The equipment of this case has an improved structure, which is simple and durable. The full-casing rotary threaded drill rig with this structure and the construction method of this case use dual-power soil drilling to easily drill into hard soil or rock layers to form a larger diameter and deeper cast-in-place pile hole. By using the spiral component added outside the casing, during the pipe lifting process, the pile is formed inside the pipe and the screw thread of the cast-in-place pile body is formed outside the pipe. By increasing the amount of concrete used, the pile diameter is further increased, the area around the pile is increased, and the soil resistance on the pile side is greatly improved by spiral engagement with the soil around the pile. The bottom expansion technology of the construction method of the present invention can form The locally enlarged pile bottom portion increases the pile end load by increasing the pile bottom area in the hard soil layer or rock layer, thereby further increasing the overall bearing capacity of the pile. The structure and pile forming method of the present invention comply with the national energy conservation and emission reduction policy, and increase the pile side resistance through three effective ways without increasing the pile forming load and concrete consumption, namely, thread diameter expansion, threaded engagement between the pile body and the soil around the pile through the concrete thread teeth, and increasing the end load by expanding the pile bottom area. The pile bearing capacity is greatly improved, and the concrete strength of the medium and large diameter pile bodies is fully utilized, with extremely high cost performance and economic benefits.

[0069] like Figure 1 As shown: An improved structure of a full casing spiral drilling machine is provided with a lower power head 4 capable of driving a hollow cylindrical casing 1 to rotate, and the lower power head 4 is detachably connected to the casing 1. An upper power head 5 is provided on the upper part of the lower power head 4, and the upper power head 5 is connected to a spiral drill rod 6 that can move in the casing 1, and a down-the-hole hammer 7 or a drill bit 8 that can move in the casing 1 is connected to the bottom of the spiral drill rod 6, and the spiral direction of the spiral member 3 is opposite to that of the spiral drill rod 6.

[0070] like Figure 2 As shown, the structure of the full-casing pipe thread rotary drilling rig is a combination of a full-casing pipe rotary drilling rig and auxiliary soil drilling equipment such as a rotary drill or a grab bucket.

[0071] like Figure 3 As shown, the spiral member 3 is a spiral blade

[0072] like Figure 4 As shown, the spiral member 3 is a single or multiple tooth-shaped members. When the spiral member is trapezoidal, the thickness D1 of the root of the spiral member is greater than the thickness D2 of the top of the spiral member.

[0073] like Figure 5 As shown, the spiral member 3 is a combination of a spiral blade and a single or multiple toothed members. In the figure, 3 is a spiral blade-shaped spiral member, and 3-1 is a toothed spiral member.

[0074] like Figure 6 As shown, the method of forming a full-casing threaded pile is as follows: 1. Move the full-casing rotary drilling rig with the equipment structure of the patent to the pile position, align the casing with the pile position, and rotate and press the casing into the soil in the direction of the spiral component on the outer wall of the casing. 2. Use auxiliary soil-taking drilling equipment such as a rotary drilling rig or a grab bucket to follow up and clear out the soil, rock debris and other objects in the casing until the casing is rotated and drilled to the depth of the pile bottom. 3. After cleaning the bottom of the hole, pull out the auxiliary equipment from the casing and put a steel cage in the casing. 4. After the steel cage is placed, pour concrete into the casing. 5. After the concrete is poured, the casing is reversely rotated to lift the casing, and the spiral component on the outer wall of the casing rotates to shear the outer hole wall of the casing to form a pile hole with threads. The concrete in the casing quickly fills the threaded pile hole formed by the casing lifting to form a threaded pile body. During the casing lifting process, if necessary, concrete can be poured into the casing again to make up the material until the casing is lifted out of the ground to form a reinforced concrete threaded cast-in-place pile.

[0075] like Figure 7As shown, the method for forming a fully-cased threaded pile is as follows: 1. Move the dual-power head drilling rig with the patented equipment structure to the pile position, and align the casing connected to the lower power head with the drill bit at the bottom of the spiral drill rod in the casing at the pile position. 2. Start the upper and lower power heads, the spiral drill rod and the casing rotate in the opposite direction, use the drill bit and the spiral drill rod to drill the soil, the casing rotates and follows, and the spiral drill rod discharges the soil, rock debris, etc. out of the casing until the casing is pressed to the bottom depth of the hole. 3. After the bottom of the hole and the inside of the casing are cleaned, lift the spiral drill rod out of the casing, disconnect the casing from the lower power head, and then move the drilling rig away. 4. Put the prepared steel cage in the casing and pour concrete. 5. After the concrete is poured, move the drilling rig back and reconnect the lower power head to the casing. Put the down-the-hole hammer into the casing and press it on the steel cage to prevent the steel cage from rising with the casing during the casing lifting. 6. Use the lower power head and the drilling rig lifting equipment to rotate and lift the casing in the opposite direction. During the casing rotation and lifting process, the spiral components on the outer wall of the casing rotate and bite and shear the outer hole wall of the casing, generating an upward torque to assist in lifting the casing and forming a pile hole with a thread. The concrete in the casing quickly fills the threaded pile hole formed by the casing lifting to form a threaded pile body. 7. During the casing lifting process, if necessary, concrete can be poured into the casing again until the casing is lifted out of the ground to form a reinforced concrete threaded cast-in-place pile.

[0076] like Figure 8As shown, the double-power head spiral drill rig, the spiral drill rod is connected to the down-the-hole hammer, and the construction method of adding casing and spiral drill rod during the sinking process is as follows: 1. Move the drilling rig to the pile position, and align the casing and the down-the-hole hammer at the lower part of the spiral drill rod with the pile position. 2. Start the upper and lower power heads. The casing and the spiral drill rod rotate and drill in opposite directions. The down-the-hole hammer impacts to form a hole, and the casing rotates and follows. 3. After the casing is completely drilled into the ground, the upper power head is separated from the spiral drill rod, and the lower power head is separated from the casing and the upper and lower power heads are lifted upward. 4. Connect a spiral drill rod to the spiral drill rod again, and then connect a casing to the upper part of the casing accordingly, and connect the connected spiral drill rod and casing to the upper and lower power heads respectively. 5. Continue drilling until the casing sinks to the required depth. After the soil in the casing is drained, lift the upper power head until the rear spiral drill rod is completely out of the casing and the lower power head. 6. Fix the spiral drill rod, and after removing the rear spiral drill rod, move the upper power head downward to connect it to the spiral drill rod in the casing. 7. Lift the upper power head until the auger rod and down-the-hole hammer are completely lifted out of the casing and the lower power head. 8. Separate the lower power head from the casing and move the drilling rig away, put a steel cage in the casing, and pour concrete. The ninth step is to move the drilling rig back, connect the lower power head to the casing, sink the auger rod, press the down-the-hole hammer on the steel cage to prevent the steel cage from rising with the casing when the casing is lifted. 9. Rotate the casing in the opposite direction to lift it. After the rear casing is completely lifted out of the ground and the concrete in the pipe is completely drained, stop lifting the pipe, separate the lower power head from the rear casing, remove the rear casing, move the lower power head downward and connect it to the casing, press the down-the-hole hammer on the steel cage, and continue to rotate the lifting pipe in the opposite direction. 10. After the casing is completely lifted out of the ground, a full-casing threaded cast-in-place pile is formed.

[0077] like Fig. 9As shown, the secondary bottom expansion and rock entry method in the full-casing threaded pile forming method is as follows: 1. Move the dual-power head drilling rig with the equipment structure of this patent to the pile position, and align the casing connected to the lower power head with the down-the-hole hammer at the bottom of the spiral drill rod in the casing at the pile position. 2. Start the upper and lower power heads and auxiliary equipment such as air compressors, use the down-the-hole hammer to impact drilling, and the casing rotates and follows up. Use high-pressure gas to discharge the soil and other materials out of the hole, and the spiral drill rod assists in soil discharge until the casing is pressed to the rock formation at the bottom of the hole. 3. The down-the-hole hammer impacts the rock formation to form a hole for the first time, slowing down the casing rotation and follow-up speed, and using the spiral component outside the casing to rotate and crush the down-the-hole hammer to impact the hole wall, and the generated rock debris is guided upward through the spiral component for secondary hole expansion to form a lower expanded part with a pile hole diameter equal to the outer diameter of the casing spiral component until the pile bottom depth is reached. 4. After the bottom of the hole is cleaned, lift the auger rod and down-the-hole hammer out of the casing, disconnect the casing from the lower power head, move the drill rig away, put the prepared steel cage in the casing and pour concrete. 6. After the concrete is poured, move the drill rig back and reconnect the lower power head to the casing. Put the down-the-hole hammer into the casing and press it on the steel cage to prevent the steel cage from rising with the casing during the casing lifting. 7. Use the lower power head and the drilling rig lifting equipment to rotate and lift the casing in the opposite direction. During the casing rotation and lifting process, the spiral component on the outer wall of the casing rotates and shears the outer hole wall of the casing to form a pile hole with a thread. The concrete in the casing quickly fills the threaded pile hole formed by the casing lifting to form a threaded pile body. 8. During the casing lifting process, if necessary, concrete can be poured into the casing again to make up the material until the casing is lifted out of the ground to form a reinforced concrete threaded cast-in-place pile.

[0078] like Fig.10 As shown, the construction method of variable diameter threaded piles in the full-casing threaded pile construction method: Full-casing variable diameter threaded piles: 1. Move the drilling rig with spiral components and enlarged screw teeth on the outside of the casing to the pile position, start the power equipment, rotate the casing into the ground, and discharge the soil, rock debris, etc. in the hole until the casing is pressed to the bottom depth of the hole. 2. After the bottom of the hole is cleaned, put the prepared steel cage in the casing and pour concrete. 3. After the concrete is poured, rotate and lift the casing in the opposite direction. During the rotation and lifting of the casing, the spiral component on the outer wall of the casing rotates and shears the outer hole wall of the casing to form a pile hole with threads. The concrete in the casing quickly fills the threaded pile hole formed by the casing lifting to form a threaded pile body. 4. The casing is lifted to the designed variable diameter of the pile, and the rotation direction is changed to positive rotation to continue lifting the casing. The spiral components on the outer wall of the casing shear and destroy the soil, bite between the spiral components, and form a cylindrical pile hole. The enlarged screw teeth shear the pile hole wall to form a threaded space. The concrete in the casing quickly fills the threaded pile hole space generated by the lifting of the casing, forming an upper threaded pile section with an increased upper diameter and opposite thread direction. During the casing lifting process, if necessary, concrete can be poured into the casing again to make up for the material until the casing is lifted out of the ground to form a reinforced concrete variable diameter threaded cast-in-place pile.

[0079] like Fig.11 As shown, the construction method of the semi-screw pile in the full-casing screw pile construction method is as follows: 1. Move the drilling rig with the equipment structure of the present patent to the pile position, rotate and press the casing into the ground, and discharge the soil, rock debris, etc. out of the hole until the casing is pressed to the bottom depth of the hole; 2. After the bottom of the hole is cleaned, put the prepared steel cage in the casing and pour concrete; 3. After the concrete is poured, rotate and lift the casing in the opposite direction. During the rotation and lifting of the casing, the spiral component on the outer wall of the casing rotates and shears the outer hole wall of the casing to form a pile hole with a thread. The concrete in the casing quickly fills the threaded pile hole formed by the casing lifting to form a threaded pile body; 4. The casing is lifted to the designed diameter change of the pile, and the rotation direction is changed to forward rotation to continue to lift the casing. The spiral component on the outer wall of the casing shears and destroys the soil, bites between the spiral components, and forms a cylindrical pile hole. The concrete in the casing quickly fills the cylindrical pile hole space generated by the casing lifting to form the upper straight rod section of the semi-screw pile. During the casing lifting process, if necessary, concrete filling material can be poured into the casing again until the casing is lifted out of the ground to form a reinforced concrete semi-screw cast-in-place pile.

[0080] A casing structure of a full-casing rotary screw drill and a construction method of a threaded cast-in-place pile provide an effective way to form large-diameter threaded cast-in-place piles and large-diameter expanded-bottom threaded cast-in-place piles. During the sinking and lifting process of the casing with a spiral component, the spiral component rotates and bites the soil around the casing to generate an upward or downward torque, which can make the casing sink or lift more easily. During the lifting process of the casing, the spiral component rotates and shears the inner wall of the pile hole to form a threaded pile hole. At the same time, the concrete flowing out of the casing quickly fills the thread space formed by the rising casing under the pressure of its own weight to form a threaded cast-in-place pile body. It is found in practice that the thread of the threaded pile body is closest to the shape of the lowest spiral component that forms the thread space, so the spiral component with a certain thickness and height at the bottom and its height and thickness are not less than the design value of the threaded pile thread can ensure that the thread of the threaded pile body meets the specifications and design requirements in various strata. A single or multiple toothed components with a height greater than that of the other spiral components at the bottom can increase the thread height of the threaded pile without increasing the drilling resistance, and provide higher pile side resistance. The spiral component of the lower trapezoidal structure can form a trapezoidal thread pile body thread with stronger anti-punching ability. The upper spiral component can also have a certain thickness, height and shape to further ensure the quality of the thread pile thread. It can also be set as a thinner or higher spiral blade to reduce drilling resistance and increase drilling and lifting torque. When the pile bottom needs to be enlarged, the casing rotation follow-up speed can be slowed down, and the outer spiral component of the casing can be used to rotate and shear the pile hole wall formed by the inner drill rod and the connected down-the-hole hammer or drill bit to further expand the pile hole and form a cylindrical expansion part with a bottom diameter equal to the outer diameter of the casing spiral component. If the lower soil layer or rock layer is relatively hard, the outer spiral component of the casing is difficult to rotate and expand the hole. The outer spiral component of the casing can be set into a conical structure that gradually increases from bottom to top, thereby expanding the pile hole multiple times step by step, thereby increasing the pile bottom end resistance by expanding the pile bottom area.

[0081] The above embodiments are preferred implementation modes of the present invention and are only used to facilitate the explanation of the present invention. They are not intended to limit the present invention in any form. Any person with ordinary knowledge in the relevant technical field, if they do not depart from the scope of the technical features of the present invention, can make equivalent embodiments by partial changes or modifications made by the technical contents disclosed in the present invention, and they still fall within the scope of the technical features of the present invention without departing from the technical features of the present invention.

Claims

1. A method for constructing a full set of pipe threaded cast-in-place piles, characterized in that: Including the improved structure of the full casing auger drilling machine; The improved structure of the full-casing auger drill comprises a double-power-head auger drill (2), a casing (1) being mounted on the double-power-head auger drill (2), a lower power head (4) being detachably mounted on the casing (1) and capable of rotating, an upper power head (5) being arranged on the upper part of the lower power head (4); The upper power head (5) is detachably connected to a spiral drill rod (6) capable of moving up and down in the casing (1), and the lower end of the spiral drill rod (6) is connected to a driller capable of moving in the casing (1); A spiral component (3) is integrally formed on at least part of the outer wall of the casing (1), wherein the spiral direction of the spiral component (3) is opposite to the spiral direction of the spiral drill rod (6); the spiral component (3) is a spiral blade, and a toothed spiral component is provided on the spiral blade type spiral component (3); The drilling device is one of a down-the-hole hammer (8) and a drill bit (9); The casing (1) comprises at least two casings connected in a detachable manner, and one end of any of the casings (1) can be detachably connected to the lower power head (4); the spiral drill rod (6) comprises at least two drill rods with spiral blades, and adjacent drill rods are detachably connected; The thickness of at least part of the spiral component (3) is not less than 3 centimeters; the height of at least part of the spiral component (3) perpendicular to the sleeve (1) is not less than 3 centimeters; the cross-section of at least part of the spiral component (3) is trapezoidal, and the thickness of the root is greater than the thickness of the top; The construction method comprises the following steps: 1) Move the drilling rig with a spiral member and an enlarged toothed spiral member outside the casing to the pile position, start the power equipment, rotate the casing into the ground, and discharge the soil and rock debris in the hole until the casing is pressed to the bottom depth of the hole; 2) After the bottom of the hole is cleaned, put the prepared steel cage into the casing and pour concrete; 3) After the concrete is poured, the casing is rotated in the opposite direction to be lifted. During the process of rotating and lifting the casing, the spiral component on the outer wall of the casing rotates and shears the outer hole wall of the casing to form a pile hole with a thread. The concrete in the casing quickly fills the threaded pile hole formed by the casing lifting to form a threaded pile body; 4) The casing is lifted to the designed diameter change point of the pile, and the rotation direction is changed to positive rotation to continue lifting the casing. The spiral components on the outer wall of the casing shear and destroy the soil, bite between the spiral components to form a cylindrical pile hole, and the enlarged screw teeth shear the pile hole wall to form a thread space. The concrete in the casing quickly fills the threaded pile hole space generated by the lifting of the casing, forming an upper threaded pile section with an enlarged upper diameter and opposite thread direction; During the casing lifting process, if necessary, concrete filling material can be poured into the casing again until the casing is lifted out of the ground to form a reinforced concrete variable diameter threaded cast-in-place pile.

Citation Information

Patent Citations

  • Walking dual-swing downhole drill

    CN102828690A

  • Construction method of full casing soil sampling vibration compaction and expansion cast-in-place pile

    CN104631442B

  • Half screw pile and its pile forming method thereof

    CN1254587C

  • Separable driving type sleeve screw drilling rig and its construction method

    CN1944939B

  • Threaded grouting pile enabling pipeline sinking and rotary excavating earth borrowing to be synchronous

    CN103161156A