A shower automatic assembly line

By designing an automatic shower assembly line and using equipment such as locking screw machines, accessory assembly modules, ball head assembly machines, and flow limiter filter pad assembly machines, automatic assembly and testing of shower components are realized, solving the problem of low manual assembly efficiency. and high cost issues, improving production efficiency and product quality.

CN109940388BActive Publication Date: 2024-10-01XIAMEN LIJU AUTOMATION TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910348253.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-04-28
Publication Date
2024-10-01
Estimated Expiration
2039-04-28

AI Technical Summary

Technical Problem

Shower production and assembly are mostly manual assembly, which has low efficiency, high cost and difficult to guarantee product quality. An automated solution is needed to improve production efficiency and reduce labor costs.

Method used

An automatic shower assembly line is designed, including a screw locking machine, an accessory assembly module, a ball head assembly machine, a water spray testing machine and a flow limiter filter pad assembly machine. The automatic assembly of each component is realized through equipment such as a manipulator and a visual leak detector. Assembly and inspection, reducing manual intervention.

Benefits of technology

It achieves an increase in shower assembly speed and work efficiency, significantly reduces employee workload and enterprise labor costs, further automates the assembly process, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109940388B_ABST
    Figure CN109940388B_ABST
Patent Text Reader

Abstract

The present invention discloses an automatic shower assembly line, which relates to the field of shower assembly equipment, including a screw locking machine and a body assembly module, wherein the screw locking machine is provided with a loading buffer station, a unloading buffer station and a plurality of screw locking stations located between the loading buffer station and the unloading buffer station; the body assembly module includes an accessory assembly machine, a visual leak detection machine, an upper cover conveyor line, a center hole screw locking machine and two body assembly manipulators, and the accessory assembly machine includes three vibration plates for conveying a supercharger, an O-ring and a gasket respectively, and an accessory assembly manipulator moving along a linear slide rail. The assembly line provided by the present invention has a fast assembly speed and high work efficiency, and reduces the workload of employees and the labor cost of the enterprise.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of shower assembly equipment, and in particular to an automatic shower assembly line. Background Art

[0002] With the rapid development of the manufacturing industry, labor costs are getting higher and higher, market competition is becoming increasingly fierce, and automation technology is particularly important in the production process. At present, the production and assembly of shower heads in the bathroom industry are mostly manual. The entire shower head includes multiple parts such as booster pads, O-rings, ball heads, flow restrictors, main bodies, face covers, and filter pads. There are as many as 10 to 20 production processes, some of which are difficult and manual assembly efficiency is low. Manual assembly lines require huge production costs, and product quality is difficult to guarantee. Summary of the invention

[0003] To solve the above problems, the present invention aims to provide an automatic shower assembly line.

[0004] To achieve the above object, the present invention adopts the following technical solutions:

[0005] A shower automatic assembly line, comprising a screw locking machine and a body assembly module, wherein the screw locking machine is provided with a loading buffer station, a unloading buffer station and a plurality of screw locking stations located between the loading buffer station and the unloading buffer station;

[0006] The body assembly module includes an accessory assembly machine, a visual leak detection machine, an upper cover conveyor line, a center hole screw locking machine and two body assembly manipulators. The accessory assembly machine includes three vibration plates for conveying a booster, an O-ring and a gasket respectively, and an accessory assembly manipulator that moves along a linear slide rail. The accessory assembly manipulator assembles the booster, the O-ring and the gasket onto the face cover assembly at the unloading buffer station of the screw locking machine or onto the upper cover conveyed by the upper cover conveyor line.

[0007] One of the body assembly robots moves the face cover assembly of the unloading buffer station of the screw locking machine to the visual leak detector for water detection and then moves it to the center hole screw locking machine. The other body assembly robot moves the upper cover on the upper cover conveyor line to the center hole screw locking machine.

[0008] Furthermore, the visual leak detector comprises a water pool, a placing table is provided at the mouth of the water pool, and a CCD camera is provided above the placing table.

[0009] Furthermore, the screw locking machine includes a jig circulation loop, which includes two front and rear jig lifting mechanisms and a jig conveying line and a jig return line located between the two jig lifting mechanisms, and the jig return line is located below the jig conveying line; the loading buffer station, the unloading buffer station and the screw locking station are arranged on the jig conveying line, and four screw locking stations are provided on the jig conveying line, and a screw locking robot is arranged on one side of each screw locking station, and a CCD camera is arranged above each screw locking station.

[0010] Furthermore, a palletizing loader, an inner line assembly line and an inkjet printer are sequentially arranged in front of the input end of the screw locking machine. The palletizing loader transmits materials to the inner line assembly line, and the face cover assembly is preliminarily assembled on the inner line assembly line. The inkjet printer includes an inkjet input assembly line and an inkjet robot. The input end of the inkjet input assembly line is connected to the inner line assembly line, and the output end of the inkjet input assembly line is provided with a inkjet station, and a inkjet terminal and a CCD camera are provided above the inkjet station. The inkjet robot moves the face cover assembly on the inkjet station to the loading cache station of the screw locking machine.

[0011] Furthermore, the assembly line also includes a ball head assembly machine, which includes a nut conveyor line, a body transfer mechanism, a body output line and a ball head assembly robot. The body transfer mechanism receives the shower body formed by the body assembly module. The nut conveyor line is provided with a washer assembly station, a ball head assembly station and an oiling station in sequence along the conveying direction. The washer assembly station, the ball head assembly station and the oiling station are respectively equipped with a washer feeding mechanism, a ball head feeding mechanism and an oiling mechanism. The nut is assembled with a washer and a ball head in sequence to form a ball head assembly. After the ball head assembly is oiled by the oiling mechanism, it is moved by the ball head assembly robot to the shower body on the body transfer mechanism. After the ball head assembly and the shower body are assembled on the body transfer mechanism, they are output from the body output line.

[0012] Furthermore, the ball head feeding mechanism includes a ball head conveyor line, a through gauge detection assembly and a fork grabbing assembly. The through gauge detection assembly is located between the ball head conveyor line and the nut conveyor line. The fork grabbing assembly moves and spans over the ball head conveyor line, the through gauge detection assembly and the nut conveyor line. The fork grabbing assembly is provided with two synchronously moving grabbing cylinders. One grabbing cylinder grabs the ball head on the ball head conveyor line to the through gauge detection assembly for detection, and the other grabbing cylinder grabs the ball head that has passed the detection on the through gauge detection assembly to the nut at the ball head assembly station of the nut conveyor line.

[0013] Furthermore, the gasket feeding mechanism includes a vibration plate, a straight vibrator, a dividing mechanism and a gasket grabbing mechanism. The straight vibrator is provided with a straight vibration track. The vibration plate is connected to the dividing mechanism through the straight vibration track. The gaskets are output by the vibration plate and transported to the dividing mechanism via the straight vibration track. The gasket grabbing mechanism grabs the gaskets on the dividing mechanism and installs them into the nuts on the gasket assembly station.

[0014] Furthermore, the assembly line also includes a water splash testing machine, which is provided with a conveying mechanism, and one side of the conveying mechanism is provided with five stations, namely, a positioning station, a first water splash measuring station, a second water splash measuring station, a water blowing station and a swing-blowing station. The shower body output by the ball head assembly machine enters the positioning station, and the conveying mechanism includes a product clamping component and a left-right translation component that drives the product clamping component to move left and right, and a retreat component that drives the product clamping component to move forward and backward. Driven by the left-right translation component and the retreat component, the product clamping component synchronously moves the shower body on four consecutive stations of the water splash testing machine, so that the shower body at the positioning station flows through the first water splash measuring station, the second water splash measuring station, the water blowing station and the swing-blowing station in sequence.

[0015] Furthermore, the assembly line also includes a flow limiter filter screen rubber pad assembly machine, which includes a shower body conveyor line and a flow limiter filter screen rubber pad assembly robot. The shower body conveyor line is sequentially provided with a loading station, an assembly station, a cleaning station and a unloading station. A material picking mechanism is provided above the loading station to pick up the shower body from the water splash testing machine and place the shower body at the loading station. A cleaning brush is provided above the cleaning station, and the cleaning brush can be lifted and rotated relative to the cleaning station. A flow limiter feeding mechanism and a filter screen rubber pad feeding mechanism are provided on one side of the shower body conveyor line. The flow limiter filter screen rubber pad assembly robot picks up the flow limiter and the filter screen rubber pad from the flow limiter feeding mechanism and the filter screen rubber pad feeding mechanism respectively and assembles the two into the shower body on the assembly station in turn. The shower body at the loading station flows through the assembly station and the cleaning station in turn and then reaches the unloading station.

[0016] Furthermore, the flow limiter feeding mechanism and the filter rubber pad feeding mechanism both include a vibrating plate, a straight vibrator and a material dividing mechanism. The straight vibrator is provided with a slide groove, which connects the vibrating plate and the material dividing mechanism. The flow limiter or the filter rubber pad is transported by the vibrating plate to the material dividing mechanism and waits to be picked up.

[0017] Compared with the prior art, the present invention has the following advantages:

[0018] The automatic shower assembly line provided by the present invention includes a screw locking machine and a body assembly module. Each component is automatically assembled on each machine according to a set installation sequence. Compared with the traditional manual assembly line, the assembly line provided by the present invention has a fast assembly speed and high work efficiency, reducing employee workload and enterprise labor costs. In a further optimization scheme, the automatic shower assembly line of the present invention also includes a ball head assembly machine, a water splash tester, and a flow restrictor filter screen rubber pad assembly machine, etc., to further realize the automation of the assembly process, reduce manual labor of personnel, and improve production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The overall structural diagram of the automatic shower assembly line is shown;

[0020] Figure 2 It is a schematic diagram of the positional relationship between the internal assembly line and the inkjet input line;

[0021] Figure 3 It is a schematic diagram of the structure of the palletizing loader;

[0022] Figure 4 This is a schematic diagram of the positional relationship between the screw locking machine and the accessory assembly machine;

[0023] Figure 5 It is a structural diagram of the body assembly module;

[0024] Figure 6 It is a structural schematic diagram of a ball head assembly machine;

[0025] Figure 7 It is the overall schematic diagram of the water splash test machine;

[0026] Figure 8 It is a structural schematic diagram of the transport mechanism of the water splash test machine;

[0027] Fig. 9 yes Figure 8 Schematic diagram from another angle;

[0028] Fig.10 It is a structural schematic diagram of a flow restrictor filter screen rubber pad assembly machine. DETAILED DESCRIPTION

[0029] The present invention will now be further described with reference to the accompanying drawings and specific implementation methods.

[0030] See also Figure 1 and Figure 5A shower automatic assembly line includes a screw locking machine 4 and a body assembly module 5. The screw locking machine 4 is provided with a loading buffer station, a unloading buffer station and a plurality of screw locking stations located between the loading buffer station and the unloading buffer station; the body assembly module 5 includes an accessory assembly machine 51, a visual leak detection machine 52, an upper cover conveyor line 53, a center hole screw locking machine 54 and two body assembly manipulators. The accessory assembly machine 51 includes three vibration plates for conveying a supercharger, an O-ring and a gasket respectively, and an accessory assembly moving along a linear slide rail. The accessory assembly robot 511 assembles the booster, O-ring and gasket to the face cover assembly of the unloading and buffering station of the screw locking machine 4 or to the upper cover conveyed by the upper cover conveyor line 53; one of the main body assembly robots moves the face cover assembly of the unloading and buffering station of the screw locking machine 4 to the visual leak detection machine 52 for water outlet detection and then moves it to the center hole screw locking machine 54, and the other main body assembly robot moves the upper cover on the upper cover conveyor line 53 to the center hole screw locking machine 54.

[0031] In this embodiment, the visual leak detector 52 includes a pool, a placement table is provided at the pool mouth, and a CCD camera is provided above the placement table. The upper cover conveyor line 53 is a belt conveyor line, and a CCD camera is provided above the output end of the upper cover conveyor line 53. The visual leak detector 52 includes a pool, a placement table is provided at the pool mouth, and a CCD camera is provided above the placement table.

[0032] See also Figure 4 In this embodiment, the screw locking machine 4 includes a jig circulation loop, which includes two jig lifting mechanisms 41 at the front and rear, a jig conveying line 42 and a jig return line 43 located between the two jig lifting mechanisms 41, and the jig return line 43 is located below the jig conveying line 42. The loading buffer station, the unloading buffer station and the screw locking station are arranged on the jig conveying line 42, and a screw locking manipulator is arranged on one side of each screw locking station, and a CCD camera is arranged above each screw locking station. Preferably, four screw locking stations are arranged on the jig conveying line 42.

[0033] It is understandable that the number of screw locking stations is determined according to the type of screws on the shower panel, and preferably each screw locking station corresponds to locking screws of one specification. In the present embodiment, the jig conveyor line 42 and the jig return line 43 may adopt a known conveyor line structure, such as a belt conveyor line or a double-speed chain conveyor line. The jig conveyor line 42 and the jig return line 43 in the present embodiment preferably adopt a double-speed chain conveyor line, and six jigs for carrying the face cover assembly circulate in the jig circulation loop. The jig lifting mechanism 41 in the present embodiment may adopt a mechanism with a translation function commonly found in the art, such as a linear slide mechanism, a motor-driven double-speed chain mechanism, or may adopt a structure in which a cylinder drives the jig to lift and lower. The specific assembly method of the jig lifting mechanism 41 is a conventional technology in the art and will not be repeated here.

[0034] See also Figure 1 In this embodiment, a stacking loader 1, an inner line assembly line 2 and an inkjet printer 3 are sequentially arranged in front of the input end of the screw locking machine 4. The stacking loader 1 transmits the surface cover material to the inner line assembly line 2, and the surface cover assembly is preliminarily assembled on the inner line assembly line 2. The inkjet printer 3 includes an inkjet input assembly line 31 and an inkjet manipulator 32. The input end of the inkjet input assembly line 31 is connected to the inner line assembly line 2, and the output end of the inkjet input assembly line 31 is provided with a inkjet station, and a inkjet terminal 33 and a CCD camera are provided above the inkjet station. The inkjet manipulator 32 moves the surface cover assembly on the inkjet station to the loading cache station of the screw locking machine 4.

[0035] See also Figure 3 The palletizing loader 1 in this embodiment is preferably a gantry type palletizer. The specific structure of the gantry type palletizer can refer to the structure of the existing gantry type palletizer on the market, which can move materials in the up and down directions. Figure 2 The inner line assembly line 2 in this embodiment is a belt conveyor line, and a light source is provided above the belt conveyor line. The operators are located on both sides of the inner line assembly line 2 to preliminarily assemble the components of the face cover assembly together. The preliminarily assembled face cover assembly flows from the inner line assembly line 2 to the inkjet printer 3, and the inkjet printer 3 performs coding operations on the inside of the face cover.

[0036] See also Figure 6 , the assembly line also includes a ball head assembly machine 6, which is located behind the body assembly module 5. The ball head assembly machine 6 includes a nut conveying line 61, a body transfer mechanism 62, a body output line 63 and a ball head assembly manipulator 64. The body transfer mechanism 62 receives the shower body assembled by the body assembly module 5. The nut conveying line 61 is provided with a washer assembly station, a ball head assembly station and an oiling station in sequence along the conveying direction. The washer assembly station, the ball head assembly station and the oiling station are respectively provided with a washer feeding mechanism 65, a ball head feeding mechanism 66 and an oiling mechanism 67. The nut is assembled with a washer and a ball head in sequence to form a ball head assembly. After the ball head assembly is oiled by the oiling mechanism 67, it is moved by the ball head assembly manipulator 64 to the shower body on the body transfer mechanism 62. After the ball head assembly and the shower body are assembled on the body transfer mechanism 62, they are output from the body output line 63. In this embodiment, the nut conveying line 61 and the body output line 63 are both belt conveyor lines.

[0037] The washer conveying mechanism includes a vibration plate, a straight vibrator, a material dividing mechanism and a washer grabbing mechanism. The straight vibrator is provided with a straight vibration track. The vibration plate is connected to the material dividing mechanism through the straight vibration track. The washers are output by the vibration plate and conveyed to the material dividing mechanism through the straight vibration track. The washer grabbing mechanism grabs the washers on the material dividing mechanism and installs them into the nuts on the washer assembly station.

[0038] The ball head feeding mechanism 66 includes a ball head conveyor line, a through gauge detection assembly and a fork grabbing assembly. The through gauge detection assembly is located between the ball head conveyor line and the nut conveyor line 61. The fork grabbing assembly moves and spans over the ball head conveyor line, the through gauge detection assembly and the nut conveyor line 61. The fork grabbing assembly is provided with two synchronously moving grabbing cylinders. One grabbing cylinder grabs the ball head on the ball head conveyor line to the through gauge detection assembly for detection, and the other grabbing cylinder grabs the ball head that has passed the through gauge detection assembly to the nut at the ball head assembly station of the nut conveyor line 61.

[0039] The through gauge detection assembly includes a vertically arranged linear slide and a motor fixed on the linear slide, a through gauge is fixed on the rotating shaft of the motor, a clamping assembly for fixing the ball head is provided above the motor, the clamping assembly includes a fixed block and a clamping block driven by a cylinder, the clamping block and the fixed block cooperate to clamp the ball head together and the threaded hole of the ball head faces the through gauge. In this embodiment, preferably, the nut conveying line 61, the ball head conveying line and the body output line 63 are all belt conveying lines.

[0040] The oiling mechanism 67 includes a lifting cylinder, a rotary motor fixed on the lifting cylinder, and a glue valve fixed on the rotating shaft of the rotary motor. The glue valve is eccentrically arranged relative to the rotating shaft of the rotary motor. When the rotary motor rotates, the glue valve oils the ball head assembly on the oiling station.

[0041] The body transfer mechanism 62 includes a shower body loading platform, a ball-locking head platform and a transfer assembly, wherein the transfer assembly includes two linear slide rails, the shower body loading platform and the ball-locking head platform are located between the two linear slide rails, each linear slide rail is provided with two front and rear lifting cylinders, each lifting cylinder is installed with a transverse telescopic cylinder, the transfer assembly moves the shower body from the shower body loading platform to the ball-locking head platform, and the ball head assembly is locked with the shower body on the ball-locking head platform.

[0042] See also Figure 1 , Figures 7 to 9 The assembly line also includes a water splash tester 7. After the ball head assembly is locked to the shower body, the water splash tester 7 tests the water splash of the shower body. The water splash tester 7 includes a water pool, and a conveying mechanism 71 is provided above the water pool. One side of the conveying mechanism 71 is provided with a positioning station, a first water splash measuring station, a second water splash measuring station, a water blowing station and a blow-throwing station, a total of five stations. The shower body output by the ball head assembly machine 6 enters the positioning station. The conveying mechanism 71 includes a product clamping assembly 71 and a left-right translation assembly 72 that drives the product clamping assembly 71 to move left and right, and a retreat assembly 73 that drives the product clamping assembly 71 to move forward and backward. Under the drive of the left-right translation assembly 72 and the retreat assembly 73, the product clamping assembly 71 synchronously moves the shower body on the four consecutive stations of the water splash tester 7, so that the shower body at the positioning station flows through the first water splash measuring station, the second water splash measuring station, the water blowing station and the blow-throwing station in sequence.

[0043] In this embodiment, the product clamping assembly 71 is a finger cylinder, the left and right translation assembly 72 is a push rod cylinder, and the retreat assembly 73 includes a cylinder that drives the mounting frame to move forward and backward and a sliding guide rail assembly that assists the mounting frame to move forward and backward. The mounting frame is fixedly set on the slider of the sliding guide rail assembly.

[0044] See also Figure 1 and Figure 8 The assembly line also includes a flow limiter filter screen rubber pad assembly machine 8, which includes a shower body conveyor line 81 and a flow limiter filter screen rubber pad assembly robot 82. The shower body conveyor line 81 is provided with a loading station, an assembly station, a cleaning station and a unloading station in sequence. A material picking mechanism 83 is provided above the loading station to pick up the shower body from the water splash tester 7 and place the shower body at the loading station. A cleaning mechanism 84 is arranged above the cleaning station. The cleaning mechanism 84 includes a cleaning lifting cylinder, a rotating motor installed on the cleaning lifting cylinder and a cleaning brush installed on the rotating shaft of the cleaning rotating motor. The cleaning brush can be lifted and rotated relative to the cleaning station under the action of the cleaning lifting cylinder and the rotating motor.

[0045] The material picking mechanism 83 includes a material picking translation mechanism and a material picking lifting mechanism installed on the material picking translation mechanism. The material picking lifting mechanism is provided with a finger cylinder, which clamps the shower body and places the shower body at the loading station of the shower body conveyor line 81. In this embodiment, the material picking translation mechanism and the material picking lifting mechanism are screw type linear modules or synchronous belt type linear modules.

[0046] See also Figure 8 A flow limiter feeding mechanism 85 and a filter rubber pad feeding mechanism 86 are provided on one side of the shower body conveyor line 81. The flow limiter filter rubber pad assembly manipulator 82 picks up the flow limiter and the filter rubber pad from the flow limiter feeding mechanism 85 and the filter rubber pad feeding mechanism 86 respectively and assembles the two into the shower body on the assembly station in sequence. The shower body at the loading station flows through the assembly station and the cleaning station in turn and arrives at the unloading station. The flow limiter feeding mechanism 85 and the filter rubber pad feeding mechanism 86 both include a vibration plate, a straight vibrator and a material distribution mechanism. The straight vibrator is provided with a chute, which connects the vibration plate and the material distribution mechanism. The flow limiter or the filter rubber pad is transported from the vibration plate to the material distribution mechanism and waits to be picked up.

[0047] In this embodiment, the body assembly robot, the coding robot 32 and the ball head assembly robot 64 are all common general robots, and the screw locking robot is the existing screw locking machine 4 robot on the market. The rear end of the flow limiter filter screen rubber pad assembly machine 8 is also provided with a product output line 9 and a bag opening and packaging machine 10. The product output line 9 is a common belt conveyor line, and the bag opening and packaging machine 10 can use existing equipment on the market.

[0048] The working steps of the assembly line of the present invention are as follows:

[0049] 1. The palletizing loader 1 picks up the cover material, and the employee pre-assembles the cover material at the inner assembly line 2 to form a cover assembly. The pre-assembled cover assembly is then transported to the inkjet printer 3. After the date and other information are sprayed on the inkjet printer 3, the cover assembly is moved to the screw locking machine 4. After passing through four screw locking stations in sequence, the cover assembly is fixed and assembled completely, and then enters the main body assembly module.

[0050] 2. The upper cover conveyor line 53 in the main body assembly module inputs the upper cover. According to different shower products, the face cover assembly of one shower product is first assembled with the booster pad and the O-ring, and then leak-tested by the visual leak detector 52, and then assembled with the upper cover on the center hole locking screw machine 54. The face cover assembly of another shower product is directly leak-tested by the visual leak detector 52 and then moved to the center hole locking screw machine 54, the booster pad and the O-ring are assembled into the upper cover, and the upper cover is assembled with the face cover on the center hole locking screw machine 54.

[0051] 3. The product output in step 2 is assembled with a ball head in the ball head assembly machine 6, then enters the water splash test machine 7 for water splash test, and then the flow restrictor and filter screen rubber pad are assembled in the flow restrictor filter screen rubber pad assembly machine 8, and finally output from the product output line 9 and packaged in the bag opening and packaging machine 10, thus completing the entire shower assembly process.

[0052] The automatic shower assembly line provided in this embodiment includes a screw locking machine, a body assembly module, a ball head assembly machine, a water splash tester, and a flow restrictor filter pad assembly machine, etc. Each component is automatically assembled on each machine according to a set installation sequence. Compared with the traditional manual assembly line, this assembly line has a fast assembly speed and high work efficiency, reducing employee workload and enterprise labor costs.

[0053] The above records are only embodiments of the present invention. Any modification or change made by a person familiar with the present technology using the present invention shall fall within the patent scope claimed by the present invention and shall not be limited to those disclosed in the embodiments.

Claims

1. A shower automatic assembly line, characterized by: It includes a screw locking machine and a body assembly module, wherein the screw locking machine is provided with a loading buffer station, a unloading buffer station and a plurality of screw locking stations located between the loading buffer station and the unloading buffer station; The body assembly module includes an accessory assembly machine, a visual leak detection machine, an upper cover conveyor line, a center hole screw locking machine and two body assembly manipulators. The accessory assembly machine includes three vibration plates for conveying a booster, an O-ring and a gasket respectively, and an accessory assembly manipulator that moves along a linear slide rail. The accessory assembly manipulator assembles the booster, the O-ring and the gasket onto the face cover assembly at the unloading buffer station of the screw locking machine or onto the upper cover conveyed by the upper cover conveyor line. One of the body assembly manipulators moves the cover assembly of the unloading buffer station of the screw locking machine to the visual leak detector for water detection and then moves it to the center hole screw locking machine, and the other body assembly manipulator moves the upper cover on the upper cover conveyor line to the center hole screw locking machine; A stacking loader, an inner line assembly line and an inkjet printer are sequentially arranged in front of the input end of the screw locking machine. The stacking loader transmits materials to the inner line assembly line. The face cover assembly is preliminarily assembled on the inner line assembly line. The inkjet printer includes an inkjet input assembly line and an inkjet manipulator. The input end of the inkjet input assembly line is connected to the inner line assembly line. The output end of the inkjet input assembly line is provided with an inkjet station. A inkjet terminal and a CCD camera are arranged above the inkjet station. The inkjet manipulator moves the face cover assembly on the inkjet station to the loading cache station of the screw locking machine. The assembly line also includes a ball head assembly machine, which includes a nut conveying line, a body transfer mechanism, a body output line and a ball head assembly manipulator. The body transfer mechanism receives the shower body formed by the body assembly module. The nut conveying line is provided with a washer assembly station, a ball head assembly station and an oiling station in sequence along the conveying direction. The washer assembly station, the ball head assembly station and the oiling station are respectively provided with a washer feeding mechanism, a ball head feeding mechanism and an oiling mechanism. The nut is assembled with a washer and a ball head in sequence to form a ball head assembly. The ball head assembly is oiled by the oiling mechanism and is moved by the ball head assembly manipulator to the shower body on the body transfer mechanism. The ball head assembly and the shower body are assembled on the body transfer mechanism and then output from the body output line. The assembly line also includes a water splash tester, and a conveying mechanism is provided on the water splash tester. A positioning station, a first water splash tester, a second water splash tester, a water blowing station and a blow-throwing station are sequentially provided on one side of the conveying mechanism, and a total of five stations are provided. The shower body output by the ball head assembly machine enters the positioning station. The conveying mechanism includes a product clamping component and a left-right translation component that drives the product clamping component to move left and right, and a retreat component that drives the product clamping component to move forward and backward. Under the drive of the left-right translation component and the retreat component, the product clamping component synchronously moves the shower body on the four consecutive stations of the water splash tester, so that the shower body at the positioning station flows through the first water splash tester, the second water splash tester, the water blowing station and the blow-throwing station in sequence. The assembly line also includes a flow limiter filter screen rubber pad assembly machine, which includes a shower body conveyor line and a flow limiter filter screen rubber pad assembly robot. The shower body conveyor line is sequentially provided with a loading station, an assembly station, a cleaning station and a unloading station. A material picking mechanism is provided above the loading station to pick up the shower body from the water splash tester and place the shower body at the loading station. A cleaning brush is provided above the cleaning station, and the cleaning brush can be lifted and rotated relative to the cleaning station. A flow limiter feeding mechanism and a filter screen rubber pad feeding mechanism are provided on one side of the shower body conveyor line. The flow limiter filter screen rubber pad assembly robot picks up the flow limiter and the filter screen rubber pad from the flow limiter feeding mechanism and the filter screen rubber pad feeding mechanism respectively and assembles the two into the shower body on the assembly station in turn. The shower body at the loading station flows through the assembly station and the cleaning station in turn and then reaches the unloading station.

2. The automatic shower assembly line according to claim 1, characterized in that: The visual leak detector comprises a water pool, a placing table is arranged at the opening of the water pool, and a CCD camera is arranged above the placing table.

3. The automatic shower assembly line according to claim 1, characterized in that: The screw locking machine includes a jig circulation loop, which includes two front and rear jig lifting mechanisms and a jig conveying line and a jig return line located between the two jig lifting mechanisms, and the jig return line is located below the jig conveying line; the loading buffer station, the unloading buffer station and the screw locking station are arranged on the jig conveying line, and four screw locking stations are arranged on the jig conveying line, and a screw locking robot is arranged on one side of each screw locking station, and a CCD camera is arranged above each screw locking station.

4. The automatic shower assembly line according to claim 1, characterized in that: The ball head feeding mechanism includes a ball head conveying line, a through gauge detection component and a fork grabbing component. The through gauge detection component is located between the ball head conveying line and the nut conveying line. The fork grabbing component moves and spans over the ball head conveying line, the through gauge detection component and the nut conveying line. The fork grabbing component is provided with two synchronously moving grabbing cylinders. One grabbing cylinder grabs the ball head on the ball head conveying line to the through gauge detection component for detection, and the other grabbing cylinder grabs the ball head that has passed the through gauge detection component to the nut at the ball head assembly station of the nut conveying line.

5. The automatic shower assembly line according to claim 1, characterized in that: The gasket feeding mechanism includes a vibration plate, a straight vibrator, a material dividing mechanism and a gasket grabbing mechanism. The straight vibrator is provided with a straight vibration track. The vibration plate is connected to the material dividing mechanism through the straight vibration track. The gaskets are output by the vibration plate and transported to the material dividing mechanism through the straight vibration track. The gasket grabbing mechanism grabs the gaskets on the material dividing mechanism and installs them into the nuts on the gasket assembly station.

6. The automatic shower assembly line according to claim 1, characterized in that: The flow limiter feeding mechanism and the filter rubber pad feeding mechanism both include a vibrating plate, a straight vibrator and a material dividing mechanism. The straight vibrator is provided with a slide groove, which connects the vibrating plate and the material dividing mechanism. The flow limiter or the filter rubber pad is transported by the vibrating plate to the material dividing mechanism to be picked up.