A fan factory inspection method and fan load simulation device
By installing a load simulation device on the fan outlet and adjusting the size and direction of the ventilation opening, the accuracy problem of the fan's incoming inspection was solved, and the actual load of the fan was simulated for testing, ensuring the accuracy and adaptability of the fan's quality control.
Patent Information
- Application Number
- CN201910346639.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-04-27
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2039-04-27
AI Technical Summary
In existing technologies, the incoming inspection of wall-hung boiler fans mostly adopts open-type testing, which leads to a large difference between the fan's operating conditions and the actual usage conditions. This makes it impossible to effectively detect the actual usage parameters of the fan, resulting in situations where the performance is qualified but the actual use is abnormal.
A fan load simulation device is installed on the air outlet of the fan. By adjusting the size and direction of the air vent of the load simulation device, the wind resistance of the gas water heater is simulated, so as to achieve accurate detection of the actual load of the fan.
By simulating the actual load of the fan, the accuracy of the fan inspection upon arrival at the factory is ensured, and unqualified fans are prevented from entering the production line. It can adapt to the testing requirements of gas water heating equipment of different specifications, and has a simple structure and is easy to use.
Smart Images

Figure CN110132622B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to component detection of gas water heaters, and in particular to a fan entry detection method and a fan load simulation device. Background Art
[0002] In the prior art, the fan of the wall-mounted boiler is mostly tested in an open manner before entering the factory. Under this test condition, there is a large difference between the operating conditions of the fan and the actual use conditions of the fan, and the actual use parameters of the fan cannot be effectively detected and determined. There is a situation where the performance is qualified during the open test but abnormal in actual use. Summary of the invention
[0003] In view of the problems existing in the prior art, one object of the present invention is to provide a method for detecting and accurately determining the fan usage parameters before entering the factory.
[0004] Another object of the present invention is to provide a fan load simulation device to simulate the actual load of the fan and strengthen the quality control of the fan entering the factory.
[0005] To achieve the above objectives, the present invention adopts the following technical solutions.
[0006] A method for detecting a fan entering a factory is characterized in that a load simulation device is first installed on the fan outlet, and then the fan usage parameters are detected; the load simulation device is used to simulate the wind resistance of the gas water heater equipment when it is working.
[0007] As a further illustration of the above solution, different load simulation devices are installed on the air outlet of the fan to generate different loads according to the different types of gas water heaters matched with the fan.
[0008] As a further illustration of the above solution, the load change of the load simulation device is achieved by adjusting the size of the ventilation opening of the load simulation device.
[0009] As a further illustration of the above scheme, the load simulation device includes a first sleeve and a second sleeve which are sleeved together, an annular load sheet is provided between the first sleeve and the second sleeve, and the load of the load simulation device is changed by changing the aperture of the annular load sheet.
[0010] As a further illustration of the above solution, the first sleeve and the second sleeve have different opening diameters, and the load simulation device is matched with different fan openings by reversing the matching direction of the load simulation device.
[0011] As a further illustration of the above solution, the air outlet of the fan faces upward, and the load simulation device is directly sleeved on the air outlet of the fan in a sleeve manner.
[0012] A fan load simulation device, characterized in that it includes: a first sleeve, a second sleeve and an annular load sheet, wherein a first boss is provided in the first sleeve, the annular load sheet is placed in the first sleeve and abuts against one side of the first boss, and one end of the second sleeve extends into the first sleeve and abuts against the annular load sheet.
[0013] As a further illustration of the above solution, the first sleeve and the second sleeve are both cylindrical or prismatic, and the inner hole size of the annular load sheet is smaller than the opening size of the first sleeve and the second sleeve.
[0014] As a further illustration of the above solution, the first boss is an annular protrusion located in the middle of the first sleeve.
[0015] As a further illustration of the above solution, a second boss is provided in one end of the second sleeve, and the end extends into the first sleeve; the other end of the second sleeve protrudes out of the first sleeve.
[0016] The beneficial effects of the present invention are:
[0017] 1. Before testing, a fan load simulation device is installed on the fan outlet to simulate the actual working load of the gas water heater, so that it is basically consistent with the operating state after installation on the whole machine or the difference is small, so as to directly and effectively test the parameters actually used by the fan; strengthen the quality control of the fan entering the factory to ensure that the fan performance meets the design requirements; and avoid unqualified fans from entering the production line.
[0018] 2. By changing the load of the fan load simulation device, the fan test state can be adjusted, which can adapt to the simulation detection of gas water heaters of various specifications.
[0019] 3. The fan load simulation device adopts a sleeve + annular load plate structure. Through simple combination, one set of device can be used to test different load conditions of fans with two different air outlet diameters. It has a simple structure and is easy to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 Shown is a schematic diagram of the first sleeve structure.
[0021] Figure 2 Shown is a schematic diagram of the second sleeve structure.
[0022] Figure 3 Shown is a schematic diagram of the annular load sheet structure.
[0023] Figure 4 Shown is a schematic diagram of the forward assembly structure of the fan simulation detection device.
[0024] Figure 5Shown is another schematic diagram of the forward assembly structure of the fan simulation detection device.
[0025] Figure 6 Shown is a schematic diagram of the reverse assembly structure of the fan simulation detection device.
[0026] Figure 7 Shown is another schematic diagram of the reverse assembly structure of the fan simulation detection device.
[0027] Description of reference numerals:
[0028] 1: first sleeve, 2: second sleeve, 3: annular load sheet.
[0029] 1-1: first boss, 2-1: second boss. DETAILED DESCRIPTION
[0030] In the description of the present invention, it should be noted that directional words, such as the terms "center", "lateral", "longitudinal", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc., indicating directions and positional relationships are based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of narrating the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and cannot be understood as limiting the specific scope of protection of the present invention.
[0031] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features. Therefore, the definition of "first" and "second" features can explicitly or implicitly include one or more of the features. In the description of the present invention, "at least" means one or more, unless otherwise clearly and specifically defined.
[0032] In the present invention, unless otherwise specified and limited, the terms "assemble", "connect", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can also be a mechanical connection; it can be directly connected, or it can be connected through an intermediate medium, or the two elements can be internally connected. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0033] In the invention, unless otherwise specified and limited, a first feature being “above” or “below” a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being “above”, “below”, and “above” a second feature includes that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “above”, “below”, and “below” a second feature includes that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0034] The following is a further description of the specific implementation of the present invention in conjunction with the drawings of the specification, so that the technical solution and its beneficial effects of the present invention are clearer and more explicit. The following description of the embodiments with reference to the drawings is exemplary and intended to explain the present invention, but cannot be understood as limiting the present invention.
[0035] Embodiment 1
[0036] like Figure 1-Figure 3 As shown, a wind turbine load simulation device is characterized in that it includes: a first sleeve 1, a second sleeve 2 and an annular load sheet 3, a first boss 1-1 is provided in the first sleeve 1, the annular load sheet 3 is placed in the first sleeve 1 and abuts against one side of the first boss 1-1, and one end of the second sleeve 2 extends into the first sleeve 1 and abuts against the annular load sheet 3.
[0037] Wherein, the first sleeve 1 and the second sleeve 2 are both cylindrical tubes, and when one end of the second sleeve 2 extends into the first sleeve 1, the outer wall of the second sleeve 2 contacts the inner wall of the first sleeve 1. In other embodiments, the first sleeve 1 and the second sleeve 2 are both prismatic tubes or other cylindrical structures, which are not limited to this embodiment.
[0038] The first boss 1-1 is an annular protrusion located in the middle of the first sleeve 1, and the inner hole size of the annular load sheet 3 is smaller than the opening size of the first sleeve 1 and the second sleeve 2. A second boss 2-1 is provided in one end of the second sleeve 2, and the end extends into the first sleeve 1; the other end of the second sleeve 2 protrudes out of the first sleeve 1.
[0039] In actual application, there are two specifications for the fan outlet size of gas water heaters (such as wall-mounted boilers, etc.). Assume that the fan outlet diameter with a top tube structure is D1, and the fan outlet diameter without a top tube structure is D2. The outer diameter of the first sleeve 1 is D3, and the wall thickness is 1mm; the inner diameter of the first boss 1-1 is D4, the height is b, the distance between the lower edge of the first boss 1-1 and the bottom of the first sleeve 1 is a, and the distance between the upper edge of the first boss 1-1 and the top of the first sleeve 1 is c; the outer diameter of the second sleeve 2 is D5, the wall thickness is 1mm, the inner diameter of the second boss 2-1 is D6, and the height is b. Preferably, the outer diameter of the annular load sheet 3 is D1, the inner diameter is X, and the thickness is d; preferably, the second boss 2-1 is arranged at the bottom of the second sleeve 2, and the distance between the upper edge of the second boss 2-1 and the top of the second sleeve 2 is a, and a>c; preferably, D3-2>D1>D4, D4=D6, D6<D2-2, D5-2>D2, to ensure the device effect; the unit of each dimension is mm.
[0040] like Figure 4 , Figure 5 As shown, when assembled in the forward direction, it is used to match and test the fan with a top cylinder structure. The annular load sheet 3 is placed from the top of the first sleeve 1, limited by the first annular boss 1-1, and then the second sleeve 2 is placed in the first sleeve 1, and the annular load sheet 3 is fixed by the gravity of the second sleeve 2. By holding the first sleeve 1, the whole sleeve is moved and put on the fan outlet.
[0041] like Figure 6 , Figure 7 As shown, when assembled in reverse, it is used to match and test a fan without a top tube structure. After assembling the first sleeve 1, the annular load sheet 3, and the second sleeve 2 in the forward assembly order, the whole is inverted so that the first sleeve 1 is on the top and the second sleeve 2 is on the bottom. By holding the second sleeve 2, the whole is moved and put on the fan outlet. According to the test requirements, the annular load sheet 3 of the corresponding inner diameter can be easily replaced.
[0042] When the length of the air outlet of the fan is greater than a, the top of the air outlet is against the first boss 1-1 of the first sleeve 1 or the second boss 2-1 of the second sleeve 2, which means it is fully assembled. When the length of the air outlet of the fan is not greater than a, the riveted end of the fan volute is against the bottom of the first sleeve 1 or the second sleeve 2, which means it is fully assembled.
[0043] Embodiment 2
[0044] A method for detecting a fan entering a factory is characterized in that a load simulation device is first installed on the fan outlet, and then the fan usage parameters are detected; the load simulation device is used to simulate the wind resistance of the gas water heater equipment when it is working.
[0045] According to the different types of gas water heaters matched with the fan, different load simulation devices are installed on the fan outlet to generate different loads. The load change of the load simulation device is achieved by adjusting the size of the vent of the load simulation device.
[0046] Specifically, the load simulation device preferably includes a first sleeve and a second sleeve which are sleeved together, an annular load sheet is provided between the first sleeve and the second sleeve, and the load of the load simulation device is changed by changing the aperture of the annular load sheet.
[0047] Further preferably, the first sleeve and the second sleeve have different opening diameters, and the load simulation device is matched with different fan openings by reversing the matching direction of the load simulation device. During actual testing, the fan outlet faces upward, and the load simulation device is directly sleeved on the fan outlet in a sleeve manner.
[0048] Through the description of the above structure and principle, those skilled in the art should understand that the present invention is not limited to the above specific implementations, and improvements and substitutions based on the present invention using the known technology in the art fall within the protection scope of the present invention, and the protection scope of the present invention should be defined by the claims and their equivalents. Parts not described in the specific implementations are prior art or common knowledge.
Claims
1. A method for detecting a fan entering a factory, characterized in that: First, a load simulation device is installed on the air outlet of the fan, and then the use parameters of the fan are detected; the load simulation device is used to simulate the wind resistance of the gas water heater equipment when it is working; according to the different types of gas water heater equipment matched with the fan, different load simulation devices are installed on the air outlet of the fan to generate different loads; the load change of the load simulation device is achieved by adjusting the size of the vent of the load simulation device; The load simulation device includes a first sleeve and a second sleeve which are sleeved together, an annular load plate is provided between the first sleeve and the second sleeve, and the load of the load simulation device is changed by changing the aperture of the annular load plate; the first sleeve and the second sleeve have different opening diameters, and the load simulation device is matched with different fan openings by adjusting the assembly direction of the load simulation device.
2. A fan factory inspection method according to claim 1, characterized in that: The air outlet of the fan faces upward, and the load simulation device is directly sleeved on the air outlet of the fan in a sleeve-type manner.
3. A fan load simulation device, characterized in that: include: A first sleeve, a second sleeve and an annular load sheet, wherein a first boss is provided in the first sleeve, the annular load sheet is placed in the first sleeve and abuts against one side of the first boss, and one end of the second sleeve extends into the first sleeve and abuts against the annular load sheet; The above-mentioned fan load simulation device is installed on the fan outlet, and then the fan usage parameters are detected; the fan load simulation device is used to simulate the wind resistance of the gas water heater equipment when it is working; according to the different types of gas water heater equipment matched with the fan, different fan load simulation devices are installed on the fan outlet to generate different loads; the load change of the fan load simulation device is achieved by changing the aperture of the annular load sheet; the first sleeve and the second sleeve have different opening diameters, and the fan load simulation device is matched with different fan openings by adjusting the assembly direction of the fan load simulation device.
4. A fan load simulation device according to claim 3, characterized in that: The first sleeve and the second sleeve are both cylindrical or prismatic, and the inner hole size of the annular load sheet is smaller than the opening size of the first sleeve and the second sleeve.
5. A fan load simulation device according to claim 3, characterized in that: The first boss is an annular protrusion located in the middle of the first sleeve.
6. A fan load simulation device according to claim 3, characterized in that: A second boss is arranged in one end of the second sleeve, and the end extends into the first sleeve; the other end of the second sleeve protrudes out of the first sleeve.