A shotcrete structure conducive to drainage and its construction method
By setting up drainage components and steel mesh in foundation pits or tunnels, a drainage network is formed and spraying and protection is carried out, the seepage problem caused by bedrock crack water is solved, the quality and structural firmness of the sprayed concrete are improved, and the cost is reduced and construction costs.
Patent Information
- Application Number
- CN201910551391.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-06-24
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2039-06-24
AI Technical Summary
In underground projects such as foundation pits and tunnels, the development of cracked water in bedrock surfaces of foundation pits or tunnels leads to seepage. The existing grouting and reinforcement methods are expensive and have a long construction period. The sprayed concrete cannot initially condense under the action of water flow, resulting in Poor quality and safety risks, and concrete erosion and shedding cause waste of materials, increasing construction costs.
By setting up drainage components, such as drainage pipes, transverse arc pipes and longitudinal arc pipes, a drainage network is formed, and connected to the steel mesh, inserted into bedrock or soil to discharge seepage, and at the same time, anchoring as an anchor to achieve The net is sprayed to form a concrete layer.
The quality of sprayed concrete is improved, costs are reduced, and the concrete reaches its initial setting state as soon as possible, reducing water seepage and material waste, and enhancing the overall firmness and waterproofing effect of the structure.
Smart Images

Figure CN110359464B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of geotechnical engineering, and in particular to a foundation pit drainage type shotcrete structure and a construction method thereof. Background Art
[0002] In foundation pits, tunnels and other underground projects, after the excavation of the foundation pit, bedrock fissure water develops on the surface of the foundation pit or the tunnel face, resulting in bedrock fissure water between the retaining piles. Currently, grouting reinforcement is used to prevent water seepage, but this method is expensive and has a long construction period. As an improvement, water seepage can be prevented by spraying concrete to form a concrete layer, but spraying concrete in the case of large-scale water seepage will prevent the concrete from reaching the initial setting state under the action of water flow, resulting in poor quality of sprayed concrete, and further causing the surrounding rock to be exposed for too long, thereby causing safety risks. At the same time, due to the occurrence of water seepage, concrete will be lost and fall off during spraying, resulting in waste of concrete materials and increased construction costs. Summary of the invention
[0003] In view of the above-mentioned defects of the prior art, the present invention provides a sprayed concrete structure and construction method thereof which is conducive to drainage. The structure drains the fissure water in the foundation pit bedrock or soil by setting a drainage pipe, and then implements the net spraying protection, thereby improving the quality of the sprayed concrete and reducing the cost. At the same time, the drainage pipe can also play the same anchoring role as the anchor rod, so that the overall structure is strong and has a good waterproof effect.
[0004] The technical solution adopted by the present invention to solve its technical problem is:
[0005] On the one hand, a shotcrete structure that is conducive to drainage is provided, which includes: a drainage component, part of which is located in bedrock or soil and is used to discharge seepage water in the bedrock or soil; a steel mesh that is connected to the drainage component and covers the surface of the bedrock or soil; and a concrete layer formed by spraying concrete onto the steel mesh.
[0006] Preferably, the drainage assembly comprises: at least one drainage pipe, one end of each drainage pipe is inserted into
[0007] The invention relates to a method for preparing a drainage pipe having a plurality of drainage holes in a bedrock or soil body, wherein the drainage pipe is inserted into the bedrock or soil body and has a plurality of first drainage holes, and the other end of each drainage pipe extends out from the concrete layer; and / or, at least one transverse arc tube is transversely accommodated in a first accommodation groove arranged on the bedrock or soil body, the curved surface of each transverse arc tube faces the bedrock or soil body, and each transverse arc tube has a second drainage hole; and / or, at least one longitudinal arc tube is longitudinally accommodated in a second accommodation groove arranged on the bedrock or soil body, the curved surface of each longitudinal arc tube faces the bedrock or soil body, and each longitudinal arc tube has a third drainage hole.
[0008] Preferably, the transverse arc tube and the longitudinal arc tube are perpendicular to each other, and the transverse arc tube and the longitudinal arc tube are
[0009] The spacing between the arc tubes is 1-2m.
[0010] Preferably, the drainage pipes are arranged in a plum blossom shape with a spacing of 1-3m, and the length of one end of each drainage pipe inserted into the bedrock or soil is 0.5-2m, and the length of one end of each drainage pipe extending from the concrete layer is 2-10cm.
[0011] Preferably, the transverse arc tube and / or the longitudinal arc tube is a semicircular tube with a diameter of 2-5 cm.
[0012] Preferably, the steel mesh is detachably connected to the drain pipe.
[0013] Preferably, the steel bar diameter of the steel mesh is 6 mm, and the mesh aperture is 150 mm*150 mm.
[0014] Preferably, the concrete layer is made of cement, crushed stone, river sand, accelerator and water, and the weight ratio is cement:accelerator:river sand:crushed stone:water=(400-450):(30-45):(700-800):(700-800):(150-300).
[0015] Preferably, the shotcrete structure further comprises: a geotextile fixed to the bedrock or soil surface.
[0016] On the other hand, a construction method of the above-mentioned shotcrete structure is also provided, which comprises the following steps:
[0017] S1. The surface of the bedrock or soil is leveled, and a first receiving groove and / or a second receiving groove are opened on the bedrock or soil;
[0018] S2. A transverse arc tube is arranged in each first receiving tank, and the curved surface of each transverse arc tube is directed toward the bedrock or soil; and / or, a longitudinal arc tube is arranged in each second receiving tank, and the curved surface of each longitudinal arc tube is directed toward the bedrock or soil;
[0019] S3. Drill a hole in the bedrock or soil, and insert one end of the drainage pipe into the hole in the bedrock or soil;
[0020] S4, covering the steel mesh on the surface of the bedrock or soil, and connecting it to the drainage pipe;
[0021] And S5, spraying concrete onto the steel mesh to form a concrete layer, and leveling the surface.
[0022] The beneficial effects of the technical solution of the present invention are:
[0023] In the present invention, a drainage network is formed by arranging transverse arc pipes and longitudinal arc pipes to increase the drainage function. At the same time, the drainage pipes inserted into the bedrock or soil of the foundation pit can also serve as anchor rods to anchor the bedrock or soil of the foundation pit while exercising the drainage function, so that the overall structure is highly firm. On this basis, the mesh spraying protection is implemented, which can greatly reduce water seepage, improve the quality of shotcrete, and reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0025] Figure 1 is a longitudinal cross-sectional view of the shotcrete structure in the first embodiment of the present invention;
[0026] Figure 2 is a front view of the drainage assembly in the first embodiment of the present invention;
[0027] Figure 3 It is a cross-sectional view of the transverse arc tube and the longitudinal arc tube in the first embodiment of the present invention. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0029] The embodiments are only used to explain the present invention and are not used to limit the present invention.
[0030] Embodiment 1:
[0031] Figure 1It is shown that the sprayed concrete structure that is conducive to drainage in the present invention includes: a drainage component, part of which is located in the bedrock or soil S of the foundation pit, and is used to discharge the seepage water in the bedrock or soil S of the foundation pit; a steel mesh 1, which is connected to the drainage component and the steel mesh 1 covers the surface of the bedrock or soil S of the foundation pit; and a concrete layer 2, which is formed by spraying concrete onto the steel mesh 1.
[0032] Specifically, the drainage assembly includes: at least one (preferably several) drainage pipes 3, one end of each drainage pipe 2 is inserted into the bedrock or soil S of the foundation pit, and the portion of the drainage pipe 3 inserted into the bedrock or soil S of the foundation pit is provided with several first drainage holes 31, and the other end of each drainage pipe 3 extends out of the concrete layer 2; and / or at least one (preferably several) transverse arc pipe 4 (such as Figure 2 As shown), it is transversely accommodated in a first accommodation groove opened on the bedrock or soil S, the curved surface of each transverse arc tube 4 faces and is close to the bedrock or soil S, and each transverse arc tube 4 is provided with a second drainage hole 41 (as shown Figure 3 and / or, at least one longitudinal arc tube 5 is longitudinally accommodated in a second accommodation groove opened on the bedrock or soil S, the curved surface of each longitudinal arc tube 5 faces and is close to the bedrock or soil S, and each longitudinal arc tube 5 is provided with a third drainage hole 51 (as shown in FIG. Figure 3 shown).
[0033] In this embodiment, the above-mentioned "transverse" refers to the extension direction of the tunnel foundation pit, and "longitudinal" refers to the height direction of the foundation pit bedrock or soil S. Preferably, the drainage pipes 3 are arranged in a plum blossom shape, with a spacing of 1-3m (preferably 2m), and the length of one end of each drainage pipe 3 inserted into the bedrock or soil S is 0.5-2m (preferably 1.5m), and the length of one end of each drainage pipe 3 extending from the concrete layer 2 is 2-10cm (preferably 5cm). At the same time, the transverse arc pipe 41 and the longitudinal arc pipe 51 are perpendicular to each other, and the spacing between the transverse arc pipe 41 and the longitudinal arc pipe 51 is 1-2m (preferably 1.5m), and the aperture of the first drainage hole 31 and / or the second drainage hole 41 and / or the third drainage hole 51 is 0.5-5cm. Furthermore, the transverse arc tube 41 and / or the longitudinal arc tube 51 are semicircular tubes made of PVC material with a diameter of 2-5 cm (preferably 3 cm), thereby, the complete circular tube can be directly cut to form a semicircular arc tube, which is simple to process and manufacture.
[0034] Furthermore, in this embodiment, the steel mesh 1 and the drainage pipe 3 can be detachably connected by wire tying or fixedly connected by welding. Thus, the transverse arc pipe 4 and the longitudinal arc pipe 5 can form a drainage network to increase the drainage function. At the same time, the steel mesh 1 and the drainage pipe 3 are connected as one to increase the structural strength. At the same time, the drainage pipe 3 inserted into the bedrock or soil of the foundation pit can also serve as an anchor rod to anchor the bedrock or soil of the foundation pit while exercising the drainage function, further improving the firmness of the overall structure.
[0035] In addition, in order to further improve the anti-seepage function, the shotcrete structure also includes: a geotextile 6, which is fixed to the surface of the bedrock or soil S and is located between the steel mesh 1 and the bedrock or soil S; preferably, the geotextile 6 is fixed to the surface of the bedrock or soil S of the foundation pit by fixings such as iron, and is arranged between two retaining piles 100, and the geotextile 6 can be a filament geotextile with a width of 2 to 3m (preferably 2.5m) and a length of 2 to 3m (preferably 2.5m); at the same time, if the seepage area is too large, the geotextile 6 has several pieces, and the adjacent two geotextiles 6 are overlapped, and the overlap length is 10-15 cm (preferably 12 cm), and the overlapping part is fixed with fasteners such as iron fixings at every 40-60 cm (preferably 50 cm) vertically on the upper edge. As a result, the geotextile 6 can prevent the fissure water accumulated in the transverse arc tube 41 and / or the longitudinal arc tube 51 from further seeping out. Furthermore, a predetermined number of geotextiles 6 can be flexibly selected for overlapping use according to the size of the seepage area, which is convenient for transportation and laying. At the same time, the reinforcement of fasteners can prevent the geotextile 6 from being loosely overlapped due to its overall area being too large and its weight being too heavy, thereby ensuring the anti-seepage effect. The third fastener is easy to install and disassemble, which is convenient for construction.
[0036] The concrete layer 2 is made of PO 42.5 cement, crushed stone with a particle size of 5 to 10 mm, river sand, an accelerating setting agent (such as a WJS type accelerating setting agent) and water, with a water-cement ratio of 0.35-0.50 (preferably 0.44), a sand ratio of 45-55% (preferably 49%), and by weight ratio, cement: accelerating setting agent: river sand: crushed stone: water = (400-450): (30-45): (700-800): (700-800): (150-300) (preferably 430:40:750:800:200), so that the concrete layer 2 formed has good structural strength and excellent quality.
[0037] Embodiment 2:
[0038] This embodiment also provides a construction method of the shotcrete structure as described in the first embodiment, which comprises the following steps:
[0039] S1. The surface of the foundation pit bedrock or soil is leveled, and a first receiving groove and / or a second receiving groove are opened on the bedrock or soil;
[0040] S2. A transverse arc tube is arranged in each first receiving groove, and the curved surface of each transverse arc tube is oriented toward and closely attached to the bedrock or soil; and / or, a longitudinal arc tube is arranged in each second receiving groove, and the curved surface of each longitudinal arc tube is oriented toward and closely attached to the bedrock or soil;
[0041] S3. Drill a hole in the bedrock or soil, and insert one end of the drainage pipe into the hole in the bedrock or soil;
[0042] S4, covering the steel mesh on the surface of the bedrock or soil, and connecting it to the drainage pipe;
[0043] And S5, spraying concrete onto the steel mesh to form a concrete layer, and leveling the surface.
[0044] It should be noted that the technical features in the above-mentioned embodiments 1 and 2 can be combined arbitrarily, and the technical solutions formed by the combination all belong to the protection scope of the present invention.
[0045] In summary, the present invention forms a drainage network by setting transverse arc pipes and longitudinal arc pipes to increase the drainage function. At the same time, the drainage pipes inserted into the bedrock or soil of the foundation pit can also serve as anchors to the bedrock or soil of the foundation pit while exercising the drainage function, so that the overall structure is highly firm. On this basis, the net spraying protection is implemented, which can greatly reduce water seepage, and when spraying concrete, it can ensure that the concrete reaches the initial setting state as soon as possible, thereby improving the quality of the sprayed concrete and preventing the concrete from being lost with water seepage, thereby reducing material waste and construction costs.
[0046] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A shotcrete structure that is conducive to drainage, characterized in that: include: A drainage component, part of which is located in the bedrock or soil body and is used to drain the seepage water in the bedrock or soil body; A steel mesh connected to the drainage assembly, and the steel mesh covers the surface of the bedrock or soil; and a concrete layer formed by spraying concrete onto the steel mesh; Wherein, the drainage assembly includes: at least one drainage pipe, one end of each drainage pipe is inserted into the bedrock or soil, and the portion of the drainage pipe inserted into the bedrock or soil is provided with a plurality of first drainage holes, and the other end of each drainage pipe extends out from the concrete layer; and / or, at least one transverse arc tube, which is transversely accommodated in a first accommodation groove provided on the bedrock or soil, the curved surface of each transverse arc tube faces the bedrock or soil, and each transverse arc tube is provided with a second drainage hole; and / or, at least one longitudinal arc tube, which is longitudinally accommodated in a second accommodation groove provided on the bedrock or soil, the curved surface of each longitudinal arc tube faces the bedrock or soil, and each longitudinal arc tube is provided with a third drainage hole; Wherein, the drainage pipes are arranged in a plum blossom shape, and the transverse arc pipes and / or the longitudinal arc pipes are semicircular pipes.
2. The shotcrete structure according to claim 1, characterized in that: The transverse arc tube and the longitudinal arc tube are perpendicular to each other, and the spacing between the transverse arc tube and the longitudinal arc tube is 1-2m.
3. The shotcrete structure according to claim 1, characterized in that: The distance between the drainage pipes is 1-3 m, and the length of one end of each drainage pipe inserted into the bedrock or soil is 0.5-2 m, and the length of one end of each drainage pipe extending from the concrete layer is 2-10 cm.
4. The shotcrete structure according to claim 1, characterized in that: The diameter of the transverse arc tube and / or the longitudinal arc tube is 2-5 cm.
5. The shotcrete structure according to claim 1, characterized in that: The steel mesh is detachably connected to the drainage pipe.
6. The shotcrete structure according to claim 1, characterized in that: The steel bar diameter of the steel mesh is 6 mm, and the mesh aperture is 150 mm*150 mm.
7. The shotcrete structure according to claim 1, characterized in that: The concrete layer is made of cement, crushed stone, river sand, accelerating setting agent and water, and the weight ratio is cement: accelerating setting agent: river sand: crushed stone: water = (400-450): (30-45): (700-800): (700-800): (150-300).
8. The shotcrete structure according to any one of claims 1 to 7, characterized in that: The sprayed concrete structure further comprises: a geotextile fixed on the bedrock or soil surface.
9. A construction method for a shotcrete structure as claimed in claim 1, characterized in that: The steps include: S1. The surface of the bedrock or soil is leveled, and a first receiving groove and / or a second receiving groove are opened on the bedrock or soil; S2. A transverse arc tube is arranged in each first receiving tank, and the curved surface of each transverse arc tube is directed toward the bedrock or soil; and / or, a longitudinal arc tube is arranged in each second receiving tank, and the curved surface of each longitudinal arc tube is directed toward the bedrock or soil; S3. Drill a hole in the bedrock or soil, and insert one end of the drainage pipe into the hole in the bedrock or soil; S4, covering the steel mesh on the surface of the bedrock or soil, and connecting it to the drainage pipe; And S5, spraying concrete onto the steel mesh to form a concrete layer, and leveling the surface.
Citation Information
Patent Citations
Early-strength sprayed concrete
CN105503102A
Waterproof sprayed layer structure using impermeable shotcrete and construction method thereof
CN107916945A
Waterproof structure of anchor-plate retaining traffic tunnel
CN203939509U
Sprayed concrete structure beneficial to drainage
CN211472506U