Device for producing laser crystal blanks

By adopting the design of adjusting components and sealing rings in the laser crystal growth device, the problems in the existing technology that the insulation material is easy to break and the temperature gradient is difficult to adjust are solved, efficient laser crystal blank production is achieved, and the yield and production efficiency are improved. .

CN110453276BActive Publication Date: 2024-10-01GANZHOU QIANDONG LASER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910698111.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-31
Publication Date
2024-10-01
Estimated Expiration
2039-07-31

AI Technical Summary

Technical Problem

Existing large-size laser crystal growth equipment has problems such as easy cracking of insulation materials, difficulty in temperature gradient adjustment, long production cycle, low efficiency, and low yield, especially when growing large-size laser crystal blanks.

Method used

The device design includes the shell, clamp, upper insulation part, lower insulation part, heating part and support part. By adjusting components and sealing rings, the accurate alignment of the melt flow center and stable control of the temperature field are achieved, reducing adjustment time. and energy consumption, and improves assembly convenience and thermal insulation effect through the raised and grooved structure.

Benefits of technology

It improves the yield of laser crystal blanks, shortens the production cycle, reduces energy consumption, extends the service life of the iridium crucible, and ensures the quality and production efficiency of large-size laser crystal blanks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110453276B_ABST
    Figure CN110453276B_ABST
Patent Text Reader

Abstract

The present invention discloses a device for producing laser crystal blanks, belonging to the technical field of laser crystal preparation. The device comprises a heating part, a supporting part and an adjusting part; the heating part comprises a heater (6) located outside the lower heat-insulating part and capable of horizontal movement and / or vertical movement; the supporting part comprises a supporting base (11) capable of horizontal movement and / or vertical movement; the characteristic is that the adjusting part is located outside the heating part and / or the supporting part, one end of which is connected to the heating part and / or the supporting part, and controls the movement of the heater (6) and / or the supporting base (10). The present invention controls the liquid flow center of the melt raw material (21) through the adjusting part, thereby saving the time required to cool the melt raw material (21) to room temperature and then melt it again when adjusting the liquid flow center of the melt raw material (21), saving time and energy, and extending the service life of the crucible (12).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a temperature field device for growing laser crystals, and in particular provides a device for growing large-size laser crystal blanks by a Czochralski method, belonging to the technical field of laser crystal preparation. Background Art

[0002] Laser crystal and growth technology are the core and foundation of laser technology development. The development trend of laser crystal growth technology is to grow high-quality large-size laser crystals by the pulling method. This technology not only requires a large-size furnace, a large-size crucible, and an optimized temperature field device, but also requires the coordinated assembly of these components and the reasonable matching of process parameters such as medium-frequency induced current, pulling speed, and rotation speed. Only when the above requirements are met can high-quality large-size laser crystals be grown.

[0003] The key technology to grow high-quality large-size laser crystals by the Czochralski method is to have a suitable temperature field device. At present, most of the temperature field devices required for large-size crystal growth use straight-cylindrical zirconia insulation materials, but they have many disadvantages, such as the insulation materials are prone to cracking at high temperatures, the workload of furnace loading is large, and the temperature gradient values ​​required for crystal growth, including radial temperature gradient and axial temperature gradient, are not easy to adjust.

[0004] The Chinese utility model patent with announcement date of January 19, 2011 and announcement number CN201713597U (hereinafter referred to as the patent) announced a heat preservation device for crystal growth, which adopts the technical scheme of "comprising a heat preservation part, the heat preservation device comprising a quartz tube and a zirconium tube with zirconium felt attached, a crucible can be placed in the zirconium tube, and a zirconium sand layer is provided between the quartz tube and the zirconium tube; a supporting part, the supporting part supports the heat preservation device, the supporting part comprises a zirconium tube and a zirconium tray on the zirconium tube; a zirconium shielding layer, the zirconium shielding layer is located above the heat preservation device; and an observation hole, the observation hole is connected with the heat preservation part", and achieved the technical effect of "better heat preservation performance, stable temperature field, and suitable for large-size crystal growth".

[0005] The technical solution described in this patent has the following defects during assembly and use: First, the zirconium tube 2, upper shielding layer 8 and lower shielding layer 7 and other upper and lower components are easy to move, which makes assembly inconvenient, and the gaps between the joint surfaces of the upper and lower components allow infrared rays to radiate directly from these gaps, resulting in local radiation heat dissipation strong points, making the local temperature low, or hot air flows along these gaps, resulting in excessive gas convection around the crystal blank, and ultimately causing defects such as cracking of the crystal blank due to uneven cooling; second, the zirconium tube 2, upper shielding layer 8 and lower shielding layer 7 are easy to break, especially the aforementioned thermal insulation materials used to prepare large-sized laser crystal blanks. Due to their large volume, residual processing stress, density differences in different parts and other defects, their lifespan is usually only about 3 months. What is more serious is that the debris generated during the breakage falls into the molten crystal raw material, which has a fatal impact on the quality of the crystal blank; third, when the laser crystal blank is taken out after the crystal pulling operation is completed, it must be The seed crystal rod and the laser crystal blank must be lifted together to the top of the upper shielding layer 8 to take out the obtained laser crystal blank, so that the overall height of the utility model is relatively high; Fourth, when the center of the raw material flow in the crucible deviates from the center position of the laser crystal blank, the laser crystal blank will have irregular growth shape and easy cracking during the growth process. When the center of the laser crystal, crucible and liquid flow need to be adjusted horizontally, the crystal pulling operation must be stopped to lower the temperature and then open the furnace door for adjustment. Each adjustment process includes the cooling of the molten raw material from about 1900°C to near room temperature after stopping the furnace and the subsequent heating time, which takes about a week, so that the production cycle including adjusting the center position of the melt flow once takes about 30 days. Sometimes, it is necessary to adjust the center of the raw material flow in the crucible several times for one crystal pulling operation; not only is the time long, the efficiency is low, and a lot of energy is consumed, but the loss caused by the deformation of the iridium crucible is increased, and the service life of the iridium crucible is about 7 batches. Especially large-sized laser crystal blanks need to be prepared under stable conditions, otherwise it is very easy to produce various defects such as internal stress due to factors such as temperature fluctuations, and the yield rate is extremely low. Large-sized laser crystal blanks require larger crucibles and furnaces, which are more expensive. In addition, the overall large-sized insulation material wall is more difficult to manufacture, and is more prone to cracking and other defects during use, which reduces the pass rate of laser crystal blanks and increases the production cost of laser crystals. The technical solution described in this patent makes the pass rate of laser crystal blanks (based on Nd:YAG, Φ68×145 crystal blanks) prepared using this patented technical solution less than 80%, power consumption ≥8000kwh / kg, long production cycle, inconvenient adjustment, and large iridium crucible loss. Summary of the invention

[0006] In order to overcome the above-mentioned defects of the prior art, the present invention provides a device for preparing a laser crystal blank, which adopts the following technical solutions:

[0007] The invention comprises a shell 10, a fixture 20, an upper heat-insulating part, a lower heat-insulating part, a heating part, a supporting part and an adjusting part. The shell 10 is provided with a fixture 20, an upper heat-insulating part, a lower heat-insulating part, a heating part and a supporting part from top to bottom. The upper heat-insulating part is superimposed on the lower heat-insulating part, and the lower heat-insulating part is superimposed on the supporting part. The upper heat-insulating part and the lower heat-insulating part have cavities for accommodating the fixture 20, and the fixture 20 extends into the cavity from the top of the upper heat-insulating part. The heating part is located on the outer side of the lower heat-insulating part and comprises a heater 6, and the heater 6 can move horizontally and / or up and down. The lower heat-insulating part comprises an insulating layer. The supporting part comprises a supporting base 11, and the supporting base 11 can move horizontally and / or up and down. The adjusting part is located on the outer side of the heating part and / or the supporting part, and one end is connected to the heating part and / or the supporting part to control the movement of the heater 6 and / or the supporting base 11. The supporting part supports the upper heat-insulating part and the lower heat-insulating part.

[0008] One of the preferred technical solutions of the present invention, the heating part also includes a heater base 8, and the heater 6 is fixed on the heater base 8; the adjusting component includes a first adjusting component 7 and / or a second adjusting component 9; the first adjusting component 7 controls the movement of the heater base 8, and the second adjusting component 9 controls the movement of the supporting base 11.

[0009] Another preferred technical solution of the present invention is that the outer shell 10 has a hole 118; the first regulator and / or the second regulator 9 includes a screw 92 and a nut 93; the surface of the screw 92 has an external thread, and the nut 93 has an internal thread matching the external thread of the screw 92, one end of the screw 92 is connected to the heater base 8, and the other end passes through the nut 93 and extends out of the nut 93; the nut 93 passes through the hole 118 and is connected to the outer shell 10.

[0010] According to another preferred technical solution of the present invention, the nut 93 can be shaken up and down and / or left and right relative to the housing 10.

[0011] In another preferred technical solution of the present invention, the screw rod 92 has an angle with the horizontal plane. The angle between the screw rod 92 and the horizontal plane is 3-15°, preferably 3-6°.

[0012] According to another preferred technical solution of the present invention, the housing 10 is provided with a door and / or a protective gas inlet.

[0013] According to another preferred technical solution of the present invention, the second regulator 9 also includes a sealing ring 119, and the sealing ring 119 has a retaining ring 115, a center hole 116 and a cylindrical ring 117. The retaining ring 115 is located at one end of the sealing ring 119, and the cylindrical ring 117 extends from the retaining ring 115 to the other end of the sealing ring 119. The center hole 116 is located inside the retaining ring 115 and the cylindrical ring 117 and passes through the retaining ring 115 and the cylindrical ring 117; the sealing ring 119 is located between the nut 93 and the hole 118, the retaining ring 115 is located on one side of the outer shell 10, the cylindrical ring 117 is located in the hole 118, and the nut 93 passes through the center hole 116 and one end extends out of the outer shell 10.

[0014] According to another preferred technical solution of the present invention, a sealing ring 119 is provided on each side of the housing 10 .

[0015] In another preferred technical solution of the present invention, the first regulator 7 and / or the second regulator 9 further comprises a spring 71 , one end of the spring 71 is connected to the heater base 8 or the support base 11 , and the other end is fixed to the inner side of the housing 10 .

[0016] Another preferred technical solution of the present invention is that there is grease between the outer thread surface of the screw 92 and the inner thread surface of the nut 93.

[0017] Another preferred technical solution of the present invention also includes a hook 2 and an insulation ring 3, wherein the insulation ring 3 is located on the outside of the upper insulation part, and the hook 2 is located on the upper part of the shell 10, and the hook 2 is used to control or adjust the position of the insulation ring 3.

[0018] Another preferred technical solution of the present invention is that the bottom surface of the upper insulation part has a continuous upper insulation raised circle or an upper insulation groove circle, and the top surface of the insulation layer has a continuous fifth groove circle or a fifth raised circle, and the upper insulation raised circle is embedded with the fifth groove circle, or the upper insulation groove circle is embedded with the fifth raised circle.

[0019] Another preferred technical solution of the present invention is that the upper insulation part includes a first insulation tube 1 and / or a second insulation tube 4; the bottom surface of the first insulation tube 1 is provided with a continuous second raised circle or a second grooved circle; the body of the second insulation tube 4 is provided with an observation hole 41, and the top surface is provided with a continuous third grooved circle or a third raised circle, and the opening position of the observation hole 41 on the outer wall of the second insulation tube 4 is higher than the opening position on the inner wall of the second insulation tube 4; the first insulation tube 1 is located above the second insulation tube 4, and the second raised circle is embedded in the third grooved circle or the third raised circle is embedded in the second grooved circle; the upper insulation raised circle is the second raised circle or the fourth raised circle, and the upper insulation grooved circle is the second grooved circle or the fourth grooved circle.

[0020] Another preferred technical solution of the present invention is that there are at least two groups of first thermal insulation tubes 1 and / or second thermal insulation tubes 4; the top surface of the first thermal insulation tube 1 has a continuous first raised circle or a first grooved circle, and the bottom surface of the second thermal insulation tube 4 has a continuous fourth grooved circle or a fourth raised circle; each group of first thermal insulation tubes 1 and each group of second thermal insulation tubes 4 are vertically stacked structures; in two adjacent groups of first thermal insulation tubes 1, the second raised circle or the second grooved circle of the upper first thermal insulation tube 1 is engaged with the first grooved circle or the first raised circle of the lower first thermal insulation tube 1; in two adjacent groups of second thermal insulation tubes 4, the third grooved circle or the third raised circle of the lower second thermal insulation tube 4 is engaged with the fourth grooved circle or the fourth raised circle of the upper second thermal insulation tube 4.

[0021] According to another preferred technical solution of the present invention, the first heat-insulating cylinder 1 includes at least two first heat-insulating blocks 101, and the first heat-insulating blocks 101 have the same height and mutually adapted structures.

[0022] According to another preferred technical solution of the present invention, the top surface of the first insulation block 101 has a continuous first protrusion 109 or a first groove 100, the bottom surface has a continuous second protrusion 104 or a second groove 105, one side plane has a first side protrusion 108 running vertically through the plane, and the other side plane has a first side groove 107 corresponding to the first side protrusion 108; when forming the first insulation tube 1, the first side protrusion 108 of one first insulation block 101 is embedded in the first side groove 107 of another adjacent first insulation block 101.

[0023] Another preferred technical solution of the present invention is that the second protrusions 104 on the bottom surfaces of the several first insulation blocks 101 form a closed second protrusion circle, or the several second grooves 105 form a closed second groove circle; the first protrusions 109 on the top surfaces of the several first insulation blocks 101 form a closed first protrusion circle, or the first grooves 100 on the top surfaces of the several first insulation blocks 101 form a closed first groove circle.

[0024] Another preferred technical solution of the present invention is that the second thermal insulation tube 4 includes at least two third thermal insulation blocks 43, the third thermal insulation block 43 has an observation hole 41, a continuous third groove 45 or a third protrusion 44 on the top surface, a continuous fourth groove 45 or a fourth protrusion 44 on the bottom surface, a second side protrusion 46 running vertically through the plane on one side plane, and a second side groove 47 corresponding to the second side protrusion 46 on the other side plane; the opening position of the observation hole 41 located on the outer wall of the third thermal insulation block 43 is higher than the opening position located on the inner wall of the third thermal insulation block 43; when forming the second thermal insulation tube 4, the second side protrusion 46 of one third thermal insulation block 43 is embedded in the second side groove 47 of another adjacent third thermal insulation block 43; at this time, the third grooves 45 or the third protrusions 44 on the top surfaces of several third thermal insulation blocks 43 form a closed third groove circle or a third protrusion circle, and the fourth grooves 45 or the fourth protrusions 44 on the bottom surface form a closed fourth groove circle or a fourth protrusion circle. In another preferred technical solution of the present invention, the second heat-insulating cylinder 4 comprises at least one second heat-insulating block 42 and one third heat-insulating block 43; the top surfaces of the second heat-insulating block 42 and the third heat-insulating block 43 have continuous third grooves 45. Or a third protrusion 44, the bottom surface of the second insulation block 42 and the third insulation block 43 has a continuous fourth groove 45 or a fourth protrusion 44, one side plane of the second insulation block 42 and the third insulation block 43 has a second side convexity 46 that runs vertically through the plane, and the other side plane has a second side groove 47 corresponding to the second side convexity 46; when forming the second insulation tube 4, the second side convexity 46 of one second insulation block 42 or the third insulation block 43 is embedded in the second side groove 47 of another adjacent second insulation block 42 or the third insulation block 43, the third grooves 45 on the top surfaces of several second insulation blocks 42 and the third insulation blocks 43 form a closed third groove circle, or the fourth grooves 45 or fourth protrusions 44 on the bottom surfaces of several second insulation blocks 42 and the third insulation blocks 43 form a closed fourth groove circle or a fourth protrusion circle.

[0025] According to another preferred technical solution of the present invention, the second heat-insulating blocks 42 and / or the third heat-insulating blocks 43 of the second heat-insulating cylinder 4 have the same height and mutually adapted structures.

[0026] In another preferred technical solution of the present invention, the first insulation block 101 is the same as the second insulation block 42.

[0027] Another preferred technical solution of the present invention is that the lower insulation part also includes a chassis 15 and a sand layer 16, and the insulation layer includes an inner insulation layer 5, an outer insulation layer 13, and a middle insulation layer 14, which are the inner insulation layer 5, the middle insulation layer 14, and the outer insulation layer 13 from the inside to the outside, respectively; the chassis 15 and the sand layer 16 are located at the bottom of the inner insulation layer 5, wherein the chassis 15 is located above the sand layer 16; the fifth raised circle and the fifth groove circle are located on the top surface of the inner insulation layer 5 and / or the outer insulation layer 13.

[0028] According to another preferred technical solution of the present invention, the inner thermal insulation layer 5 comprises at least two fourth thermal insulation blocks 55, each of the fourth thermal insulation blocks 55 is in an arc shape, and a fourth side convexity 58 running vertically through the plane is provided on one side plane of the fourth thermal insulation block 55, and a fourth side groove 59 corresponding to the fourth side convexity 58 is provided on the other side plane; when forming the inner thermal insulation layer 5, the fourth side convexity 58 of one fourth thermal insulation block 55 is embedded in the fourth side groove 59 of another adjacent fourth thermal insulation block 55.

[0029] In another preferred technical solution of the present invention, the top surface of the fourth heat-insulating block 55 has a continuous fifth protrusion 56 or a fifth groove 54, and the bottom surface has a continuous sixth protrusion 53 or a sixth groove 57. When forming the inner heat-insulating layer 5, the fifth protrusion 56 or the fifth groove 54 of each fourth heat-insulating block 55 forms a complete fifth protrusion circle or a fifth groove circle; the sixth protrusion 53 or the sixth groove 57 of the fourth heat-insulating block 55 forms a complete sixth groove circle or a sixth protrusion circle.

[0030] In another preferred technical solution of the present invention, the inner insulation layer 5 is composed of at least two sections of an upper and lower structure. When forming the inner insulation layer 5, the fifth raised circle of the lower inner insulation layer is embedded in the sixth groove circle of the upper inner insulation layer, or the sixth raised circle of the upper inner insulation layer is embedded in the fifth groove circle of the lower inner insulation layer.

[0031] According to another preferred technical solution of the present invention, the support portion includes a support base 11, a pad 17 and a support component 18, which are the pad 17, the support component 18 and the support base 11 from top to bottom.

[0032] Another preferred technical solution of the present invention further includes a second regulator 9 , one end of which is connected to the support base 11 .

[0033] According to another preferred technical solution of the present invention, the other end of the second regulator 9 passes through the housing 10 and extends out of the housing 10 .

[0034] In another preferred technical solution of the present invention, the adjusting part further includes a third adjuster 23; the third adjuster 23 is located below the support base 11, one end of which is connected to the support base 11 to control the support base 11 to move up and down.

[0035] According to another preferred technical solution of the present invention, the supporting portion includes the other end of the third adjuster 23 passing through the housing 10 and extending outside the housing 10 .

[0036] According to another preferred technical solution of the present invention, the top surface of the pad 17 has a seventh raised circle or a seventh grooved circle, and the bottom surface has an eighth raised circle or an eighth grooved circle, and the seventh raised circle is embedded in the sixth grooved circle, or the sixth raised circle is embedded in the seventh grooved circle.

[0037] According to another preferred technical solution of the present invention, the top surface of the support component 18 has a ninth raised circle or a ninth groove circle, and the bottom surface has a tenth raised circle or a tenth groove circle.

[0038] According to another preferred technical solution of the present invention, the top surface of the support base 11 has an eleventh raised circle or an eleventh grooved circle.

[0039] According to another preferred technical solution of the present invention, the eighth raised circle is embedded in the ninth grooved circle, or the ninth raised circle is embedded in the eighth grooved circle.

[0040] According to another preferred technical solution of the present invention, the tenth raised circle is embedded in the eleventh groove circle, or the eleventh raised circle is embedded in the tenth groove circle.

[0041] Another preferred technical solution of the present invention is that the second thermal insulation tube 4 includes at least one second thermal insulation block 42 and at least one third thermal insulation block 43, or includes at least two second thermal insulation blocks 42; the second thermal insulation block 42 and the third thermal insulation block 43 have a second side convexity 46 on one side and a second side groove 47 on the other side; the third thermal insulation block 43 has an observation hole 41, and the opening position of the observation hole 41 on the outer wall of the third thermal insulation block 43 is higher than the opening position on the inner wall of the third thermal insulation block 43; when the second thermal insulation tube 4 is formed, the second side convexity 46 of one second thermal insulation block 42 or the third thermal insulation block 43 is embedded in the second side groove 47 of another adjacent second thermal insulation block 42 or third thermal insulation block 43.

[0042] In another preferred technical solution of the present invention, the first side protrusion 108 and / or the second side protrusion 46 is a raised semi-cylinder.

[0043] According to another preferred technical solution of the present invention, the first side groove 107 and / or the second side groove 47 is a semi-cylindrical depression or a rectangular depression.

[0044] Another preferred technical solution of the present invention is that when forming the first thermal insulation tube 1, the second protrusions 104 on the bottom surfaces of several first thermal insulation blocks 101 form a closed second protrusion circle, or the second grooves 105 form a closed second groove circle; the first protrusions 109 on the top surfaces of several first thermal insulation blocks 101 form a closed first protrusion circle, or the first grooves 100 on the top surfaces of several first thermal insulation blocks 101 form a closed first groove circle.

[0045] Another preferred technical solution of the present invention is that the top surfaces of the second heat-insulating blocks 42 and the third heat-insulating blocks 43 have continuous third grooves 45 or third protrusions 44, and the bottom surfaces of the second heat-insulating blocks 42 and the third heat-insulating blocks 43 have continuous fourth grooves 45 or fourth protrusions 44; when forming the second heat-insulating cylinder 4, the third grooves 45 on the top surfaces of several second heat-insulating blocks 42 and the third heat-insulating blocks 43 form a closed third groove circle, or the third protrusions 44 on the top surfaces of several second heat-insulating blocks 42 and the third heat-insulating blocks 43 form a closed third protrusion circle. Similarly, when assembling the device for preparing the laser crystal blank, the remaining protrusions form corresponding closed protrusion circles; and the remaining grooves form corresponding groove circles.

[0046] According to another preferred technical solution of the present invention, the central diameters of the raised circles and the grooved circles are the same.

[0047] According to another preferred technical solution of the present invention, the upper heat-insulating portion further comprises a cover 22, and the cover 22 is located on the top of the upper heat-insulating portion.

[0048] According to another preferred technical solution of the present invention, the bottom surface of the cover 22 has a protrusion or groove ring 221, the protrusion cooperates with the first groove ring or the fifth groove ring, and the groove ring 221 cooperates with the first protrusion ring or the fifth protrusion ring.

[0049] According to another preferred technical solution of the present invention, the cover 22 is a semicircular ring sheet.

[0050] According to another preferred technical solution of the present invention, the protrusion is a continuous protrusion circle.

[0051] According to another preferred technical solution of the present invention, the protrusions are discontinuous point-shaped protrusions or protrusion segments.

[0052] According to another preferred technical solution of the present invention, when assembling the device for preparing the laser crystal blank, the first to eleventh protrusions respectively form closed first to eleventh protrusion circles.

[0053] According to another preferred technical solution of the present invention, when assembling the device for preparing the laser crystal blank, the first to eleventh grooves respectively form closed first to eleventh groove circles.

[0054] The present invention also provides a method for using the aforementioned device for preparing a laser crystal blank, comprising:

[0055] During the preparation of the laser crystal blank 19 , the flow center of the molten raw material 21 is kept aligned with the center of the laser crystal blank 19 by adjusting components.

[0056] One of the preferred technical solutions of the method for using the device for preparing a laser crystal blank of the present invention further includes the following preparation steps:

[0057] Step 1: hang the seed crystal on the fixture 20 and place the crystal raw material in the crucible 12;

[0058] Step 2: Place the crucible 12 in the lower heat-insulating part, align the center of the crucible 12 with the center of the seed crystal on the fixture 20, and assemble the device for preparing the laser crystal blank;

[0059] Step 3, turning on the heater 6 to heat the crucible 12 and the crystal raw material therein;

[0060] Step 4, waiting for the crystal raw material in the crucible 12 to be completely melted into the melt raw material 21;

[0061] Step 5, adjusting the adjusting component so that the flow center of the molten raw material 21 is aligned with the center of the seed crystal;

[0062] Step six: adjust the height of the fixture 20 so that the seed crystal contacts the surface of the molten raw material 21 .

[0063] Another preferred technical solution of the method for using the device for preparing laser crystal blanks of the present invention is to control the hook 2 to adjust the number and / or position of the insulation ring 3 when checking and / or adjusting the liquid flow center of the molten raw material 21, observing the growth of the laser crystal blank 19, and adjusting the cooling speed of the laser crystal blank 19.

[0064] The present invention controls the flow center of the melt raw material 21 by adjusting the part, thus saving the time required to cool the melt raw material 21 in a molten state to room temperature and then remelt the solid raw material when adjusting the flow center of the melt raw material 21, saving a lot of energy, and reducing the extrusion of the crucible 12 by the phase change of the melt raw material 21, thereby extending the service life. In addition, the first insulation tube 1 and / or the second insulation tube 4 and the inner insulation layer 5 adopt a splicing structure, which saves the cost of insulation materials on the one hand, and facilitates the assembly of the device for preparing the laser crystal blank and the removal of the prepared laser crystal blank 19 on the other hand. The use of the protrusion and groove matching structure between the main insulation components not only facilitates positioning and assembly, prevents heat loss caused by thermal radiation along the gap between the joint surfaces of the insulation components, but also prevents the strong convection gas generated in the furnace from affecting the laser crystal blank, thereby improving the yield rate of the laser crystal blank. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Figure 1 Schematic diagrams of embodiments 1 and 2 of the present invention;

[0066] Figure 2 for Figure 1 Schematic diagram of the cross section of the second insulation tube 4.

[0067] Figure 3 for Figure 1 Schematic diagram of the cross section of the first insulation tube 1.

[0068] Figure 4It is a schematic diagram of the cross-section of the protrusions, grooves and filling structure.

[0069] Figure 5 It is a schematic diagram of the cross-section of the protrusions, grooves and filling structure.

[0070] Figure 6 It is a schematic diagram of the cross-section of the protrusions, grooves and filling structure.

[0071] Figure 7 It is a schematic diagram of the cross-section of the protrusions, grooves and filling structure.

[0072] Figure 8 It is a schematic diagram of the cross-section of the protrusions, grooves and filling structure.

[0073] Among them, 1 is the first insulation tube, 2 is the hook, 3 is the insulation ring, 4 is the second insulation tube, 5 is the inner insulation layer, 6 is the heater, 7 is the first regulator, 8 is the heating base, 9 is the second regulator, 10 is the outer shell, 11 is the supporting base, 12 is the crucible, 13 is the outer insulation layer, 14 is the middle insulation layer, 15 is the bottom plate, 16 is the sand layer, 17 is the pad, 18 is the supporting tube, 19 is the crystal blank, 20 is the crystal pulling clamp, 21 is the raw material melt, 22 is the cover, and 23 is the third regulator. DETAILED DESCRIPTION

[0074] The present invention will be further described in detail below with reference to the accompanying drawings.

[0075] Example 1

[0076] Device for preparing laser crystal blanks, see Figure 1 and Figure 2 , Figure 3 , Figure 4 To indicate the side convexities and side concave grooves, Figure 2 Only half of the first heat-insulating cylinder 1 is shown; Figure 3 Only half of the second heat-insulating cylinder 4 including the third heat-insulating block 43 is shown.

[0077] The device for preparing laser crystal blanks described in this embodiment includes a housing 10 and the following components located in the housing 10: from top to bottom, a hook 2, a crystal lifting fixture 20, an upper insulation part, a lower insulation part, a heating part and a supporting part; in addition, it also includes an adjustment part.

[0078] The housing 10 has a door and an argon inlet (not shown in the figure). In addition, four through holes 118 are evenly distributed at the bottom of the lower insulation part and the bottom of the supporting part on the side of the housing 10; and three through holes 118 are evenly distributed on the bottom of the housing 10.

[0079] The regulating part includes a first regulator 7, a second regulator 9 and a third regulator 23. The first regulator 7 has 4 pieces, which are evenly distributed on the outside of the bottom of the heating part. The second regulator 9 has 4 pieces, which are evenly distributed on the outside of the bottom of the supporting part. The third regulator 23 has 3 pieces, which are evenly distributed below the supporting part. Each first regulator 7 and the third regulator 23 includes a bolt 92 and a nut 93, respectively. Each second regulator 9 includes a bolt 92, a nut 93 and a sealing ring 119, respectively. The surface of the bolt 92 has an external thread, and one end has a square head 73. The nut 93 has an internal thread that matches the external thread on the surface of the bolt 92. The sealing ring 119 is made of elastic material such as rubber, and has a retaining ring 115 and a circular ring 117. The retaining ring 115 is located at one end of the circular ring 117 and is connected to the circular ring 117 as a whole. There is a center hole 116 inside the retaining ring 115 and the circular ring 117. When the first regulator 7 and the third regulator 23 are formed, the thread on the surface of the bolt 92 passes through the nut 93. When the second regulator 9 is formed, the thread on the surface of the bolt 92 passes through the nut 93, and the nut 93 passes through the center hole 116 of the sealing ring 119. In addition, there is grease between the external thread of each bolt 92 and the internal thread of the nut 93. When installed, one end of each bolt 92 having the square head 73 extends out of the housing 10.

[0080] The support part includes a support base 11, a zirconium pad 17 and a support zirconium cylinder 18. From bottom to top, they are the support base 11, the support zirconium cylinder 18 and the zirconium pad 17. The support base 11 is located at the center of the bottom of the shell 10, and has an eleventh annular raised ring 106 on the top surface. The support zirconium cylinder 18 is annular and is placed on the support base 11; it has a tenth annular groove ring 187 on its bottom surface and a ninth annular raised ring 186 on its top surface. The eleventh annular raised ring 106 is embedded in the tenth annular groove 187. The zirconium pad 17 is placed on the support zirconium cylinder 18, and the zirconium pad 17 has an eighth annular groove ring 177 on its bottom surface and a seventh annular raised ring 176 on its top surface. The ninth annular raised ring 186 is embedded in the eighth annular groove ring 177. The end of the bolt 92 in the second adjuster 9 without the square head 73 is connected to the support base 11, and the sealing ring 119 of each second adjuster 9 extends into the housing 10 from the outside of the through hole 118 on the side of the housing 10, and the ring 117 of the sealing ring 119 is respectively located in the through hole 118 at the bottom of the corresponding support part of the housing 10, and the retaining ring 115 of the sealing ring 119 is located on the outside of the housing 10. The second adjuster 9 adjusts the position of the support base 11 in the horizontal and vertical directions. The nuts 93 of each third adjuster 23 pass through the through holes 118 on the bottom surface of the housing 10 and are welded to the bottom surface of the housing 10; the third adjuster 23 adjusts the position of the support base 10 in the horizontal and vertical directions.

[0081] The lower heat-insulating part includes a heat-insulating zirconium tube 5, a quartz tube 13, a zirconium sand layer 14, a zirconium bottom plate 15, a zirconium sand grain layer 16 and a heat-insulating felt (not shown in the figure). The heat-insulating zirconium tube 5 and the quartz tube 13 are both placed upright on the zirconium pad 17, wherein the heat-insulating zirconium tube 5 is located inside the quartz tube 13. The top surface of the heat-insulating zirconium tube 5 has a fifth annular raised circle, and the bottom surface has a sixth annular groove circle. The seventh annular raised circle 176 is embedded in the sixth annular groove. After being assembled into a device for preparing a laser crystal blank, the height of the heat-insulating zirconium tube 5 except for the fifth annular raised circle is the same as that of the quartz tube 13. The heat-insulating zirconium felt is pasted on the entire inner wall of the quartz tube 13. The gap between the heat-insulating zirconium tube 5 and the heat-insulating zirconium felt is filled with zircon sand to form a zirconium sand layer 14. The height of the zirconium sand layer 14 is the same as that of the quartz tube 13. The zirconium bottom plate 15 is a circular ring with a Φ20-35mm center hole. A layer of zircon sand is arranged in the heat-insulating zirconium cylinder 5 on the zirconium pad 17, and the zirconium bottom plate 15 is placed on the zircon sand; there is a gap between the zirconium bottom plate 15 and the heat-insulating zirconium cylinder 5, and after the gap and the center hole of the zirconium bottom plate 15 are filled with zircon sand, all the zircon sand in the heat-insulating zirconium cylinder 5 form a zircon sand layer 16. The height of the zircon sand layer 16 is flush with the zirconium bottom plate 15, so that the zircon sand can fully fill the gap between the zirconium bottom plate 15 and the heat-insulating zirconium cylinder 5, and does not affect the stable placement of the iridium crucible 12 in the future. The center hole of the zirconium bottom plate 15 can reduce the risk of damage to the zirconium bottom plate 15.

[0082] The heating part includes an induction coil 6 and a heating base 8. The induction coil 6 and the heating base 8 are located outside the quartz tube 13. The induction coil 6 is fixed on the heating base 8, the upper end of the induction coil 6 is slightly lower than the top of the quartz tube 13, and the lower end is flush with the top of the zirconium chassis 15. The heating base 8 can move in the horizontal direction. The nuts 93 of each first regulator 7 pass through the through holes 118 at the bottom of the insulation part on the side of the shell 10 and are welded to the side of the shell 10. The end of each first regulator 7 without the square head 73 is connected to the base 8 of the heating device.

[0083] The upper insulation part includes a first insulation tube 1, an insulation ring 3, a second insulation tube 4 and a cover 22. The first insulation tube 1 is superimposed on the second insulation tube 4, and the cover 22 covers the top of the first insulation tube 1. The insulation ring 3 is sleeved outside the first insulation tube 1 and the second insulation tube 4 and stacked on the lower insulation part. That is, the second insulation tube 4 and the insulation ring 3 are above the insulation zirconium tube 5, the first insulation tube 1 is above the second insulation tube 4, and the cover 22 is above the first insulation tube 1; a plurality of insulation rings 3 stacked on the quartz tube 13 are sleeved from the outside of the bottom of the second insulation tube 4. The bottom surface of the cover 22 has a groove ring 221, and the groove ring 221 cooperates with the first raised ring. The total height of the insulation ring 3 exceeds the bottom surface of the first insulation tube 1; preferably, it is slightly lower than the top of the first insulation tube 1. The first thermal insulation tube 1 comprises 6 first thermal insulation blocks 101 with a cross section of 1 / 6 of a circle; the 6 first thermal insulation blocks 101 are spliced ​​into a straight cylinder. A side plane of each first thermal insulation block 101 has a first side convexity 108 that runs vertically through the side plane, and a first side groove 107 corresponding to the first side convexity 108 is provided on the other side plane; a continuous first arc-shaped protrusion 104 is provided on the top surface of the first thermal insulation block 101, and a second arc-shaped groove 105 corresponding to the first arc-shaped protrusion 104 is provided on the bottom surface; the first side convexity 108 of one first thermal insulation block 101 is embedded in the first side groove 107 of another adjacent first thermal insulation block 101 to form the first thermal insulation tube 1; the first protrusions 104 on the top surfaces of the 6 first thermal insulation blocks 101 form a complete first protrusion circle, and the second grooves 105 on the bottom surface form a complete second groove circle. The second heat-insulating tube 4 is formed into a straight tube shape by splicing five second heat-insulating blocks 42 with a cross section of 1 / 6 of a circle and one third heat-insulating block 43 with a cross section of 1 / 6 of a circle. Each second heat-insulating block 42 has a second side convexity 46, a second side groove 47 and a third arc-shaped protrusion 44 which are respectively the same as the first side convexity 108, the first side groove 107 and the first arc-shaped protrusion 104 of the first heat-insulating block 101; the difference between the second heat-insulating block 42 and the first heat-insulating block 101 is that the second arc-shaped groove 45 on the bottom surface is adapted to the fifth arc-shaped protrusion 56 on the top surface of the heat-insulating zirconium tube 5; the difference between the third heat-insulating block 43 and the second heat-insulating block 42 is that the third heat-insulating block is provided with an observation hole 41, and the opening of the observation hole 41 located on the outer wall of the third heat-insulating block 43 is higher and smaller than the opening of the inner wall (that is, the observation hole 41 is small outside and large inside, high outside and low inside, and is suitable for observation from top to bottom in the shape of a trumpet tube). During installation, the five second insulation blocks 42 are embedded in the second side groove 47 of the adjacent second insulation block 42 according to the second side protrusion 46 of the first second insulation block 42, and so on until the second side protrusion 46 of the fifth second insulation block 42 is embedded in the second side groove 47 of the adjacent third insulation block 43, and the second side protrusion 46 of the third insulation block 43 is embedded in the second side groove 47 of the adjacent first second insulation block 42 to form a second insulation tube 4; the third arc-shaped protrusion 44 forms a complete third protrusion circle.When assembling the device for preparing laser crystal blanks, the third raised ring is embedded in the second groove ring. There are multiple pieces of the alumina insulation ring 3, which are all stacked on the quartz tube 13 and the like and are looped outside the second insulation tube 4 or looped outside the second insulation tube 4 and the first insulation tube 1. If there are gaps between the first insulation tube 1 and the second insulation tube 4, between the second insulation tube 4 and the insulation inner tube 5, and / or there are gaps between the fifth protrusion 56 and the fourth arc-shaped groove 45, the second arc-shaped protrusion 44 and the fourth protrusion 56 and other protrusions can prevent infrared rays from radiating directly outward from these gaps. When assembling the device for preparing laser crystal blanks, the first insulation block 101 can also be used to replace the second insulation block 42. The first insulation tube 1 and the second insulation tube 4 can also be wrapped with insulation felt and connected together to facilitate assembly.

[0084] The inner cavity formed by the first heat-insulating cylinder 1 , the second heat-insulating cylinder 4 and the heat-insulating zirconium cylinder 5 accommodates the iridium crucible 12 , the crystal pulling fixture 20 , the laser crystal blank 19 and the like.

[0085] A crystal lifting fixture 20 is installed at the center of the top of the housing 10. The crystal lifting fixture 20 can move up and down in the cavity formed by the first insulation tube 1, the second insulation tube 4 and the insulation zirconium tube 5, and its bottom end can be higher than the top of the first insulation tube 1. On the outside of the crystal lifting fixture 20, a hook 2 for hooking the alumina insulation ring 3 is provided. The hook 2 has three claws, which are evenly distributed on the periphery of the alumina insulation ring 3. The hook 2 can make three-dimensional movements to hook up any alumina insulation ring 3 and the alumina insulation rings 3 above and put them on the outside of the second insulation tube 4 and / or the first insulation tube 1, or to hook up any insulation circular ring 3 and the insulation circular rings 3 above to the second insulation tube 4 or the first insulation tube 1.

[0086] The zirconium base plate 15 provides a stable placement surface for the iridium crucible 12 .

[0087] By adjusting the thickness of the zircon sand layer 16, the upper and lower positions of the iridium crucible 12 can be adjusted, and the horizontal state of the zirconium chassis 15 can be conveniently adjusted. It is convenient to adjust the axial temperature gradient of the temperature field; the zirconium chassis 15 has a central hole in the middle, and the central hole is preferably Φ20-35mm, which is conducive to forming the radial temperature gradient required for the growth of large-sized crystals and reducing the risk of damage to the zirconium chassis 15. The zircon sand layer 14 can reduce the damage to the insulation layer 5 or the quartz tube 13 caused by the difference in thermal expansion and contraction between the insulation layer 5 and the quartz tube 13 while ensuring the total thickness of the insulation.

[0088] When the first adjuster 7 can be shaken up and down relative to the housing 10, rotating the bolt 92 of the first adjuster 7 can move the heater base 8 and the heater 6 up and down, adjust the relative position of the iridium crucible 12 and the induction coil, and play a role in adjusting the effective power of the heater 6.

[0089] When in use, open the door on the outer shell 10 and hang the seed crystal on the crystal pulling fixture 20, then place the crystal raw material in the iridium crucible 12, and place the iridium crucible 12 on the zirconium chassis 15 in the heat-insulating zirconium tube 5, so that a gap is left between the iridium crucible 12 and the heat-insulating zirconium tube 5; and align the center of the iridium crucible 12 with the center of the seed crystal on the crystal pulling fixture 20, and assemble the device for preparing laser crystal blanks as described above. After that, the door on the shell 10 is closed, the shell 10 is evacuated, and high-purity argon gas is filled in to replace the air, and then the heating device 6 is turned on to heat the crystal raw material in the iridium crucible 12. The crystal raw material in the iridium crucible 12 is completely melted to become a melt raw material 21. The temperature is kept constant for about 1 hour to make the melt raw material 21 evenly mixed. During this period, part or all of the alumina insulation ring 3 is suspended by the hook 2, and the liquid flow of the melt raw material 21 in the iridium crucible 12 is observed through the observation hole 41 (because the melt near the wall of the iridium crucible 12 is heated by the heat transferred from the wall of the iridium crucible 12, the melt near the wall of the iridium crucible 12 has a high temperature and a reduced density and floats upward, resulting in natural convection in which the melt raw material 21 rises along the wall of the iridium crucible 12 and then moves toward the center of the iridium crucible 12, and then moves downward from the center of the iridium crucible 12 and finally returns to the wall of the iridium crucible 12; as a result of natural convection, the heat and melt from the iridium crucible 12 are transferred to the center of the iridium crucible 12, and are continuously provided to the growth surface of the crystal blank 19). The bolt 92 of the first regulator 7 is turned to control the flow center of the melt raw material 21 to be located at the center of the crucible 12 and aligned with the center of the seed crystal, and then the seed crystal is lowered to make the seed crystal contact the melt raw material 21 and keep the center of the seed crystal or the center of the laser crystal blank aligned with the flow center of the melt raw material 21, and the operation of preparing the crystal blank 19 is started, so that the melt raw material 21 in the iridium crucible 12 slowly crystallizes and generates the laser crystal blank 19, which is slowly raised by the crystal pulling fixture 20, and the laser crystal blank 19 gradually enters the cavity in the upper insulation part for insulation or slow cooling. When checking the melt raw material 21 or observing the growth of the crystal blank 19, the hook 2 can be controlled to hook up the part of the alumina insulation ring 3 that blocks the observation hole 41 to above the observation hole 41 of the second insulation cylinder 4, and after the observation is completed, the hooked alumina insulation ring 3 is put back to its original position to reduce the heat dissipated from the observation hole 41 and prevent the crystal blank 19 from being overcooled by the surrounding cold gas convection. The cooling rate of the crystal blank 19 can also be adjusted by adjusting the number of alumina insulation rings 3. When the temperature of the laser crystal blank 19 drops to a suitable temperature, the alumina insulation rings 3 are removed by the hook 2, and the upper insulation part and the lower insulation part are removed to take out the obtained laser crystal blank 19.

[0090] When the flow center of the molten raw material 21 deviates from the center of the laser crystal blank 19, the laser crystal blank 19 will have unfavorable factors such as irregular shape, poor crystal quality, easy cracking of the crystal or uneven temperature during the growth process. When adjusting the flow center of the molten raw material 21, the square head 73 can be clamped with a tool such as a wrench, and the bolt 92 of the first regulator 7 can be turned to move the position of the induction coil 6 to achieve the purpose of adjusting the flow center of the molten raw material 21, and / or the bolt 92 of the second regulator 9 can be turned to move the supporting base 11 and all its supported components as a whole, and the iridium crucible 12 can be moved to adjust the flow center of the molten raw material 21. The bolt 92 of the first adjusting bolt 7 is rotated to move the heating device 6 to adjust the liquid flow center of the molten raw material 21 alone without moving the iridium crucible 12 and other components and the molten raw material 21; the second adjusting bolt 9 is rotated to adjust the position of the supporting base 10 so that the supporting zirconium tube 18, the iridium crucible 12 and the molten raw material 21 and other components supported on the supporting base 10 are moved to adjust the temperature field center of the molten raw material 21 alone; the first adjusting bolt 7 and the second adjusting bolt 9 are rotated at the same time to maximize the movement position of the center of the molten raw material 21, so as to maximize the consistency of the liquid flow center of the molten raw material 21, the center of the crucible 12, and the center of the crystal blank 19. The bolt 92 of the third adjusting device 23 can move the supporting base 11 and all its supported components up and down as a whole, adjust the relative position of the iridium crucible 12 and the induction coil, and adjust the effective power of the heater.

[0091] The adjustments made by the first regulator 7, the second regulator 9 and the third regulator 23 can be completed without opening the shell 10 and maintaining continuous preparation of the crystal blank 19, saving a lot of time for stopping the furnace to cool down and then heating up. Not opening the shell 11 can also reduce the loss of argon gas, avoid the iridium crucible from experiencing a large temperature drop and temperature rise, and be squeezed and deformed by the molten raw material 21, lose iridium gold and shorten the service life of the iridium crucible, and extend the service life of the iridium crucible to more than 10 times.

[0092] If there are few liquid flow lines of the molten raw material 21 in the iridium crucible 12 and the radial temperature gradient of the molten raw material 21 is not large enough, the position of the iridium crucible 12 can be adjusted by adjusting the support base adjustment component 9 in the vertical direction to change the temperature of the molten raw material 21 .

[0093] Compared with the technical solution described in the Chinese utility model patent with announcement number CN201713597U, the present invention divides the first insulation tube 1 of the upper insulation part into 6 first insulation blocks 101, and divides the second insulation tube 4 into 5 second insulation blocks 42 and 1 third insulation block 43 with a cross-section of 1 / 6 circular ring, which reduces the damage to the first insulation tube 1 and the second insulation tube 4 caused by internal stress when heated, so that the life of the first insulation block 101, the second insulation block 42 and the third insulation block 43 can reach more than 1 year, greatly saving the cost of insulation tubes. The structure of protrusions embedded in grooves at each connection makes it possible to quickly position the upper and lower or left and right adjacent parts without sliding between them to save installation time. Each protrusion can also prevent heat from being directly radiated from the gaps between the joints to produce local heat dissipation strong points, resulting in defects such as large local temperature differences, which can ensure the insulation effect and extend the service life of each insulation component; filling high-temperature resistant fiber cotton or fiber felt 48 between each protrusion and groove prevents the escape of hot gas in the upper insulation part and the lower insulation part, which saves energy on the one hand and prevents strong convection of gas around the crystal blank 19 on the other.

[0094] By adding or removing the external alumina insulation ring 3, the radial temperature gradient in the insulation tube can be adjusted to avoid defects such as cracking of large-sized crystals due to too rapid cooling during the cooling process; the observation hole 41 adopts a trumpet shape that is small on the outside and large on the inside, which can observe a larger range and is convenient for production personnel to observe the crystal growth at any time without affecting the insulation effect.

[0095] The improvement of the observation hole of the present invention reduces heat loss and power consumption.

[0096] After the first insulation tube 1, the second insulation tube 4 and the inner insulation layer 5 are spliced ​​in multiple blocks, when an insulation block is damaged, only the damaged insulation block needs to be replaced, and the remaining undamaged insulation blocks can continue to be used, which can save about 30% of the insulation material cost.

[0097] The present invention can disassemble the upper insulation part and directly take out the obtained laser crystal blank 19, without lifting the clamp 20 and the laser crystal blank 19 as a whole to above the top of the upper insulation part, and can reduce the height of the device for preparing the laser crystal blank by 300-500mm.

[0098] The grease between the external threads of the bolts 92 and the internal threads of the nuts 93 not only acts as a lubricant, but also acts as a seal to prevent gas flow inside and outside the housing 10 , reduce the loss of protective gas, and prevent the air outside the housing 10 from oxidizing the crystal blank 19 and the melt material 21 .

[0099] Calculated on the basis of Nd:YAG, Φ68×145 crystal blanks, the finished product rate of laser crystal blanks prepared by adopting the technical solution of the present invention is ≥90%, and the power consumption is ≤6000kwh / kg.

[0100] Example 2

[0101] Device for preparing laser crystal blanks, see Figure 1 and Figure 2 , Figure 3 , Figure 4 , Figure 3 , Figure 8 .

[0102] This embodiment is basically the same as Embodiment 1, except that:

[0103] First, the first insulation block 101 and the second insulation block 42 are the same, which can reduce the variety of insulation blocks, reduce the number of insulation block spare parts, facilitate management and save costs.

[0104] Second, the through hole 118 on the side of the housing 10 for mounting the second regulator 9 is elliptical.

[0105] Third, the middle part of the nut 93 of the second adjuster 9 has a slot 95 . The width of the slot 95 in the length direction is greater than the thickness of the housing 10 , and the slot 95 is stuck in the elliptical through hole 118 .

[0106] The nut 93 has a slot 95 in the middle thereof which is clamped in the elliptical through hole 118 so that the angle between the bolt 92 for adjusting the second adjuster 9 and the horizontal plane can be increased to more than ±20°.

[0107] Fourth, there is no first regulator 7 and third regulator 23. When the position of the liquid flow center and / or the liquid level, axial temperature gradient, and radial temperature gradient of the melt material 21 need to be adjusted, it is only completed through the second regulator 9.

[0108] Example 3

[0109] Device for preparing laser crystal blanks, see Figure 1 and Figure 2 , Figure 3 , Figure 4 , Figure 3 , Figure 8 .

[0110] This embodiment is basically the same as the embodiment 1, except that two adjacent first adjusters 7 are replaced by springs 71, so that the horizontal positions of the induction coil 6 and the heating base 8 can be more conveniently adjusted by adjusting the two adjacent first adjusters 7. Part of the second adjusters 9 can also be replaced by springs.

[0111] Example 4

[0112] Device for preparing laser crystal blanks, see Figure 1 and Figure 2 , Figure 3 , Figure 4 , Figure 3 , Figure 8 .

[0113] This embodiment is basically the same as the embodiment 1, except that a gap 49 is left between each protrusion and the corresponding groove to facilitate the installation between the protrusion and the corresponding groove. In this embodiment, an appropriate amount of high temperature resistant fiber cotton or fiber felt 48 is filled in each gap 49. Filling an appropriate amount of high temperature resistant fiber cotton can prevent the airflow in the gap 49, prevent the internal cavity formed by the first insulation tube 1, the second insulation tube 4, and the insulation zirconium tube 5 from generating a strong convection airflow, avoid excessive cooling of the surface of the crystal blank 19, and ensure that the crystal blank 19 inside the cavity is in a stable environment.

[0114] Example 5

[0115] Device for preparing laser crystal blanks, see Figure 1 and Figure 2 , Figure 3 , Figure 4 , Figure 3 , Figure 8 .

[0116] This embodiment is basically the same as the embodiment 4, except that the heat-insulating zirconium cylinder 5 includes two zirconium heat-insulating blocks 55, one side plane of each zirconium heat-insulating block 55 has a fourth side protrusion 58 running through the plane, the other side plane has a fourth side groove 59 corresponding to the fourth side protrusion 58, the top surface has a continuous fifth protrusion 56, and the bottom surface has a continuous sixth groove 57. When forming the heat-insulating zirconium cylinder 5, the fourth side protrusion 58 of one zirconium heat-insulating block 55 is embedded in the fourth side groove 59 of another zirconium heat-insulating block 55; the fifth protrusion 56 of each zirconium heat-insulating block 55 forms a complete fifth protrusion circle, and the sixth groove 57 forms a complete sixth groove circle.

[0117] Example 6

[0118] Device for preparing laser crystal blanks, see Figure 1 and Figure 2 , Figure 3 , Figure 4 , Figure 3 , Figure 8 .

[0119] This embodiment is basically the same as the embodiment 5, except that the heat-insulating zirconium tube 5 includes 4 zirconium heat-insulating blocks 55, and each of the two zirconium heat-insulating blocks 55 forms an upper and lower zirconium tube. The fifth raised circle of the lower zirconium tube is embedded in the sixth groove circle of the upper zirconium tube. It is best to stagger the longitudinal seams of the upper and lower zirconium tubes in a "cross" shape. Dividing the heat-insulating zirconium tube 5 into two upper and lower sections reduces the weight and manufacturing difficulty of each zirconium heat-insulating block 55.

[0120] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents (such as using hydraulic devices instead of various regulators, etc.) without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A device for producing laser crystal blanks, comprising a housing (10), a fixture (20), an upper heat-insulating part, a lower heat-insulating part, a heating part, a supporting part and an adjusting part; the housing (10) comprises the fixture (20), the upper heat-insulating part, the lower heat-insulating part, the heating part and the supporting part from top to bottom; the upper heat-insulating part is superimposed on the lower heat-insulating part; the upper heat-insulating part and the lower heat-insulating part have cavities for accommodating the fixture (20), and the fixture (20) extends from the top of the upper heat-insulating part into the cavity; the heating part is located on the outer side of the lower heat-insulating part, and comprises a heater (6), and the heater (6) can move horizontally and / or up and down; the lower heat-insulating part comprises a heat-insulating layer; the supporting part comprises a supporting base (11), and the supporting base (11) can move horizontally and / or up and down; the characteristics are: The regulating part is located outside the heating part and / or the supporting part, one end of which is connected to the heating part and / or the supporting part, and controls the movement of the heater (6) and / or the supporting base (11); The heating part further comprises a heater base (8), and the heater (6) is fixed on the heater base (8); the adjusting part comprises a first adjusting component (7) and / or a second adjusting component (9); the first adjusting component (7) controls the movement of the heater base (8), and the second adjusting component (9) controls the movement of the supporting base (11); The housing (10) has a hole (118); the first adjusting component (7) and the second adjusting component (9) include a screw (92) and a nut (93); the screw (92) has an external thread, the nut (93) has an internal thread matching the external thread of the screw (92), the screw (92) passes through the nut (93), the nut (93) passes through the hole (118) and is connected to the housing (10); one end of the first adjusting component (7) is connected to the heater base (8); one end of the second adjusting component (9) is connected to the support base (11); the nut (93) can be shaken up and down and / or left and right relative to the housing (10); The second adjusting component (9) further comprises a sealing ring (119), wherein the sealing ring (119) comprises a retaining ring (115), a center hole (116) and a cylindrical ring (117); the retaining ring (115) is located at one end of the sealing ring (119), the cylindrical ring (117) extends from the retaining ring (115) to the other end of the sealing ring (119), and the center hole (116) is located inside the retaining ring (115) and the cylindrical ring (117), and penetrates the retaining ring (115) and the cylindrical ring (117); the sealing ring (119) is located between the nut (93) and the hole (118), the retaining ring (115) is located on one side of the housing (10), the cylindrical ring (117) is located in the hole (118), and the nut (93) passes through the center hole (116).

2. The device for producing laser crystal blanks according to claim 1, characterized in that: The upper heat-insulating portion comprises a first heat-insulating tube (1) and / or a second heat-insulating tube (4); the bottom surface of the first heat-insulating tube (1) is provided with a continuous second raised ring or a second grooved ring; the body of the second heat-insulating tube (4) is provided with an observation hole (41), and the top surface is provided with a continuous third grooved ring or a third raised ring, wherein the opening position of the observation hole (41) on the outer wall of the second heat-insulating tube (4) is higher than the opening position on the inner wall of the second heat-insulating tube (4); the first heat-insulating tube (1) is located above the second heat-insulating tube (4), and the second raised ring is embedded in the third grooved ring or the third raised ring is embedded in the second grooved ring.

3. The device for producing laser crystal blanks according to claim 1, characterized in that: The thermal insulation layer comprises an inner thermal insulation layer (5), and the inner thermal insulation layer (5) is located at the innermost layer of the thermal insulation layer.

4. The device for producing laser crystal blanks according to claim 3, characterized in that: The inner thermal insulation layer (5) comprises at least two fourth thermal insulation blocks (55), each of the fourth thermal insulation blocks (55) is in an arc shape, a fourth side convexity (58) vertically extending through the plane on one side of the fourth thermal insulation block (55), a fourth side groove (59) corresponding to the fourth side convexity (58) on the plane on the other side, a continuous fifth convexity (56) or fifth groove (54) on the top surface, and a continuous sixth convexity or sixth groove (57) on the bottom surface; when forming the inner thermal insulation layer (5), the fourth side convexity (58) of one fourth thermal insulation block (55) is embedded in the fourth side groove (59) of another adjacent fourth thermal insulation block (55); the fifth convexity (56) or fifth groove (54) of each fourth thermal insulation block (55) forms a complete fifth convexity circle or fifth groove circle, and the sixth convexity or sixth groove (57) of each fourth thermal insulation block (55) forms a complete sixth groove circle or sixth convexity circle.

5. The device for producing laser crystal blanks according to claim 1, characterized in that: It also comprises a hook (2) and a heat-insulating ring (3), wherein the heat-insulating ring (3) is located on the outside of the upper heat-insulating part, and the hook (2) is located on the upper part of the inside of the shell (10), and the hook (2) is used to adjust the position of the heat-insulating ring (3).

6. The method for using the device for producing laser crystal blanks according to claim 1, characterized in that: During the process of preparing the laser crystal blank (19), the liquid flow center of the molten raw material (21) is kept aligned with the center of the laser crystal blank (19) by adjusting the part.

7. A method for using the device for producing laser crystal blanks as claimed in claim 6, characterized in that The following preparation steps are also included: Step 1, hanging the seed crystal on the fixture (20), and placing the crystal raw material in the crucible (12); Step 2: placing the crucible (12) in the lower heat-insulating part, and aligning the center of the crucible (12) with the center of the seed crystal on the fixture (20), and assembling the device for preparing the laser crystal blank; Step 3, turning on the heater (6) to heat the crystal raw material in the crucible (12); Step 4, waiting for the crystal raw material in the crucible (12) to be completely melted into a melt raw material (21); Step 5, adjusting the adjusting part so that the liquid flow center of the molten raw material (21) is aligned with the center of the seed crystal; Step six, adjusting the height of the fixture (20) so that the seed crystal contacts the surface of the molten raw material (21).