Assembled strong and weak current duct and construction method thereof

Through the design of prefabricated strong and weak current channel, the shortcomings of existing cable laying methods in maintenance, maintenance, safety, economy and aesthetics are solved, and high-quality and rapid construction cable laying is achieved, suitable for bridges and pipes The corridor and other places have good maintenance and maintenance convenience, safety and economy, and are also highly aesthetically pleasing.

CN110518519BActive Publication Date: 2024-11-22JIANGSU YANGJIAN GRP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201910922951.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-27
Publication Date
2024-11-22
Estimated Expiration
2039-09-27

AI Technical Summary

Technical Problem

The existing cable laying methods have shortcomings in maintenance, maintenance, safety, economy and aesthetics, especially direct buried laying is difficult to maintain, pipe laid out requires a large amount of ground construction, wire trough laying is limited, and cable tunnel and trench laying investment is high. , overhead laying is easily affected by the outside world.

Method used

The prefabricated strong and weak current channel is adopted, including spaced conduit support components and cover plates, and mass production components are processed through computer stake and welding to form a rectangular frame structure. The conduit is laid in the channel, and the plug-in joints and compression brackets are used. Fixed, combined with galvanizing treatment to improve corrosion resistance, and reserve work wells during construction to meet earthquake resistance and telescopic requirements.

Benefits of technology

It realizes high-quality laying and rapid construction of cables, significantly improves engineering efficiency, is suitable for bridges and pipe corridors and other places, has good maintenance and maintenance convenience, safety and economy, and is also highly aesthetic.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110518519B_ABST
    Figure CN110518519B_ABST
Patent Text Reader

Abstract

The assembled strong and weak electricity trough and its construction method include a plurality of conduit support assemblies arranged at intervals, each group of conduit support assemblies is composed of a base, a pipe clamp bracket, and a clamp bracket; the semicircular groove positions of the adjacent layers of the pipe clamp brackets correspond to form a circular hole for the conduit to pass through, the top of the base and the bottom of the bottom layer of the pipe clamp bracket form a circular hole for the conduit to pass through, and the bottom of the clamp bracket and the top of the top layer of the pipe clamp bracket form a circular hole for the conduit to pass through. The present invention adopts an assembled trough, and the cable conduit is laid in the trough (circular hole), which meets the requirements of maintenance, inspection, encapsulation, safety, economy, and aesthetics, with high engineering quality, fast construction progress, and significant benefits. With the vigorous construction of infrastructure, the trough of the present invention can be widely used in strong and weak electricity piping and cable laying in bridges, pipe galleries and other places.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a cable laying structure, in particular to an assembled strong and weak current duct and a construction method thereof. Background Art

[0002] There are several ways to lay cables: direct burial, pipe laying, cable trough laying, cable trench laying, cable tunnel laying, overhead laying, etc. Direct burial cable is the most economical and widely used way to lay cables, but it is not conducive to the maintenance and repair of cables; laying multiple cables through pipes requires the construction of cable ducts on the ground and concrete encapsulation; cable trough laying is an economical laying method, but the installation site is limited and cannot ensure safety well; cable tunnel and cable trench laying methods are convenient for cable construction, maintenance and repair, but the initial investment is huge; overhead laying is easily affected by the outside world and is not beautiful enough. Therefore, the choice of cable laying method should be combined with the actual situation, according to the project conditions, environmental characteristics, cable models and quantities and other factors, with a development perspective, and in accordance with the requirements of meeting operational reliability, easy maintenance and technical and economic rationality. Summary of the invention

[0003] The purpose of the present invention is to provide an assembled strong and weak current duct that meets the requirements of maintenance, inspection, enclosure, safety, economy, and aesthetics, with high engineering quality, fast construction progress, and significant benefits.

[0004] The technical solution of the present invention is as follows:

[0005] The assembled strong and weak current duct is characterized in that it includes a plurality of conduit support assemblies arranged at intervals, and each group of conduit support assemblies is composed of a base, a plurality of layers of pipe clamp brackets located in the middle position, and a clamping bracket located at the top position; the bottom and top of the pipe clamp bracket are provided with a plurality of semicircular grooves, and the positions of the semicircular grooves of the adjacent layers of pipe clamp brackets correspond to form circular holes for the conduit to pass through; the top of the base is provided with a plurality of semicircular grooves, which correspond to the positions of the semicircular grooves at the bottom of the bottom layer of pipe clamp brackets, forming a circular hole for the conduit to pass through; the bottom of the clamping bracket is provided with a plurality of semicircular grooves, which correspond to the positions of the semicircular grooves at the top of the top layer of pipe clamp brackets, forming a circular hole for the conduit to pass through.

[0006] Preferably, the catheter support assembly is composed of a base, a plurality of layers of pipe clamp brackets, and a compression bracket to form a rectangular frame structure, and the circular holes formed are arranged in a matrix.

[0007] Preferably, the channel is also provided with a cover plate, a left side plate and a right side plate, wherein the cover plate is installed on the top of the catheter support assembly, and the two ends of each cover plate are respectively connected to the top of the clamping bracket of the two adjacent groups of catheter support assemblies by bolts; each left and right side plate is respectively connected and fixed to the left and right sides of the two adjacent groups of catheter support assemblies, that is, the left and right side walls of the base and the pipe clamp bracket are respectively connected to the left and right side plates at the corresponding positions by bolts.

[0008] Preferably, a threaded column for connecting a cover plate is provided on the top of the clamping bracket.

[0009] The construction method of the above-mentioned assembled strong and weak current duct is characterized in that it comprises the following steps:

[0010] 1) Computer lofting

[0011] Before manufacturing components, computer layout is used to determine the component material specifications, manufacturing dimensions, hole positions and manufacturing quantity according to the actual situation on site and CAD drawings, and component drawings are drawn to provide a basis for purchasing materials and manufacturing components;

[0012] 2) Component production

[0013] The machining center manufactures components according to the requirements of the computer lofted component drawings. The component material is Q235 steel, and all steel parts are connected by welding. After welding, the excess solder is polished flat to eliminate sharp edges and corners. After the components are processed, they are pickled and hot-dip galvanized to remove rust and corrosion to ensure the corrosion resistance of the components.

[0014] 3) Component assembly installation

[0015] First, keep one left side plate or right side plate in an upright state, then take two component bases, install one at the head and tail of the side plate, align the bolt holes with the lower bolt holes of the upright side plate, then insert the bolts and tighten them, then stand the other side plate upright on the other side and install it according to the above method; temporarily install a clamping bracket support at the upper bolt hole position, so that the assembled components have stability; according to the above method, complete the installation of the channel combination in sequence; at the installation position of the channel, use the bottom surface bolt holes of the base to fix the combination;

[0016] 4) Layered laying of conduits and fixed installation of pipe clamp brackets

[0017] After assembling the base and side panels, start laying the cable conduit; due to the narrow space in the trough, it is advisable to use a socket-type joint for laying the cable conduit to facilitate construction in the trough;

[0018] The conduit needs to be laid. First, lay the bottom cable conduit and place it in the semicircular groove of the component base. The semicircular groove of the base keeps the distance between the cable conduits consistent, and the installed conduits are parallel and straight.

[0019] After the bottom cable conduit is installed, install the pipe clamp bracket on the upper part of the conduit to fix the conduit:

[0020] Align the bolt holes of the pipe clamp bracket with the bolt holes of the side plate and insert the bolts and tighten them; then lay other layers of cable casings in sequence according to the above method until the top layer of conduit is laid;

[0021] 5) Fixed installation

[0022] After the top layer of conduit is laid, a clamping bracket is used to fix the conduit. The clamping bracket is installed on the top of the top layer of conduit. The bolt holes of the clamping bracket are aligned with the bolt holes of the side plate, and the bolts are inserted and tightened.

[0023] 6) Cover installation

[0024] Align the bolt holes of the cover plate with the bolts of the clamping bracket, insert them, add flat washers, spring washers, and tighten the nuts;

[0025] 7) Grounding

[0026] After the installation of the trough is completed, the first and last ends are reliably connected to the grounding device.

[0027] Preferably, every 30m, the side panels use working well components with long holes to meet the requirements of earthquake resistance and expansion; every 60m, working well components are combined into a working well to meet the requirements of earthquake resistance, expansion and contraction and the requirements of cable laying, maintenance and inspection; the base, pipe clamp bracket and clamping bracket of the working well components are cut into a semicircle at the conduit to be laid; left and right side panels of special-shaped components are used at the places where the groove changes diameter and direction, and their specific dimensions depend on the change in diameter and direction.

[0028] The present invention adopts an assembled trough, and the cable conduit is laid in the trough (circular hole), which meets the requirements of maintenance, inspection, encapsulation, safety, economy, and beauty. The project quality is high, the construction progress is fast, and the benefits are remarkable. With the vigorous construction of infrastructure, the trough of the present invention can be widely used in bridges, pipe corridors and other places for strong and weak electricity piping and cable laying. The cable conduit trough laying adopted by the present invention is more conducive to maintenance and inspection than direct burial laying; the encapsulation process is simpler than cable ducts; it is safer than cable trough laying; it has a smaller investment and is more economical than the cable tunnel method and cable trench laying method; it is more beautiful and safer than overhead laying; it has great advantages in the selection of strong and weak electricity piping and cable laying methods in bridges, pipe corridors and other places. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a partial structural schematic diagram of the present invention;

[0030] Figure 2 for Figure 1 The main view of

[0031] Figure 3 It is a structural schematic diagram of the base in the present invention;

[0032] Figure 4 It is a structural schematic diagram of the pipe clamp bracket in the present invention;

[0033] Figure 5 It is a structural schematic diagram of the compression bracket in the present invention;

[0034] Figure 6 It is a construction process flow chart of the present invention;

[0035] In the figure: base 1, pipe clamp bracket 2, clamping bracket 3, semicircular groove 4, round hole 5, cover plate 6, left side plate 7, right side plate 8, threaded column 9. DETAILED DESCRIPTION

[0036] As shown in the figure, the assembled strong and weak current duct includes a number of conduit support assemblies arranged at intervals. Each group of conduit support assemblies is a rectangular frame structure consisting of a base 1, a number of layers of pipe clamp brackets 2 located in the middle position, and a clamping bracket 3 located at the top position.

[0037] The bottom and top of the pipe clamp bracket are provided with a plurality of semicircular grooves 4, and the positions of the semicircular grooves of the adjacent layers of the pipe clamp brackets correspond to form circular holes 5 for the conduit to pass through. The top of the base is provided with a plurality of semicircular grooves 4, which correspond to the positions of the semicircular grooves at the bottom of the bottom layer of the pipe clamp bracket, forming circular holes 5 for the conduit to pass through; the bottom of the clamping bracket is provided with a plurality of semicircular grooves 4, which correspond to the positions of the semicircular grooves at the top of the top layer of the pipe clamp bracket, forming circular holes 5 for the conduit to pass through. The circular holes formed in the conduit support assembly for the conduit to be laid through are arranged in a matrix.

[0038] The channel is also provided with a cover plate 6, a left side plate 7, and a right side plate 8. The cover plate is installed on the top of the catheter support assembly. The two ends of each cover plate are respectively connected to the top of the clamping bracket of the two adjacent groups of catheter support assemblies by bolts. The top of the clamping bracket is provided with a threaded column 9 for connecting the cover plate; each left and right side plate is respectively connected and fixed to the left and right sides of the two adjacent groups of catheter support assemblies, that is, the left and right side walls of the base and the pipe clamp bracket are respectively connected to the left and right side plates at the corresponding positions by bolts.

[0039] The assembled channel of the present invention is composed of a plurality of steel components. Computer-generated samples are used to batch-produce conventional components for installation in long segments. Special-shaped components are specially customized for channel diameter and direction changes. After the components are processed, they are galvanized and connected with galvanized bolts to enhance corrosion resistance. The assembled strong and weak current channel is installed on a steel beam or concrete beam. The base and the left and right side panels are combined and connected with bolts. They can be directly assembled at the installation position or assembled on a flat ground into an appropriate length and hoisted to the installation position as a whole. Telescopic devices are reserved every 30m, and cable working wells are reserved every 60m. Long bolt holes are used for component connection to meet earthquake resistance and telescopic requirements. The conduits in the channel are laid in layers, and the conduits are connected with sockets or pipe clamps. After each layer is laid, it is fixed with a pipe clamp bracket. The top layer is fixed with a compression bracket, and the cover plate is finally installed.

[0040] The assembled strong and weak current duct of the present invention is mainly suitable for strong and weak current piping and cable laying in bridges, pipe corridors and other places; or it is suitable for places with small investment, no budget for building pipe corridors and trenches, but high requirements for maintenance, inspection, safety, economy and aesthetics, and cables are not suitable for direct burial, pipe laying, cable trough laying, overhead laying and other methods.

[0041] According to the structural characteristics of the bridge, the assembled channel is designed, which is composed of multiple components and connected with bolts. The strong and weak cable conduits are laid in the channel. The conduits in the channel are fixed with bracket components. The protection strength is far greater than that of the cable trough, which is similar to concrete encapsulation. It solves the requirements of safe protection of cable laying on the bridge, weight limit of bridge load, tight construction period, and aesthetic coordination with the overall effect of the bridge.

[0042] The present invention adopts computer pattern making to determine the size and opening position of each component of the assembled channel, and carries out factory production, batch production of conventional components, and special customization and numbering of special-shaped parts. After processing, galvanizing is carried out to ensure the installation accuracy of the assembled channel, beautiful molding, and strong anti-corrosion performance.

[0043] The assembled strong and weak current troughs are installed on steel beams or concrete beams and fixed with galvanized bolts to enhance corrosion resistance. Wire working wells are reserved at certain intervals, and the components (cover plates and left and right side plates) at the working wells are connected with long bolt holes to meet the requirements of earthquake resistance and expansion and contraction. The assembled trough of the present invention is composed of multiple steel components, and special-shaped components (mainly left and right side plates) are used at the places where the trough changes diameter and direction. The assembled trough is easy to install, meets a wide range of requirements, has high project quality, low risk, fast construction progress, and significant benefits.

[0044] The assembled strong and weak current duct includes standard components: base, pipe clamp bracket, clamp bracket, cover plate, left and right side plates; working well components: base, pipe clamp bracket, clamp bracket, cover plate, left and right side plates; special-shaped components: left and right side plates. Among them, the working well is cut into a semicircle at the conduit to be laid. The arc design of the semicircular groove is determined according to the outer diameter of the cable casing, so that it can be well fixed with each layer of cable casing, reducing gaps and increasing compactness.

[0045] like Figure 6 As shown, the specific construction method of the assembled strong and weak current duct of the present invention is as follows:

[0046] 1. Computer lofting

[0047] The assembled strong and weak current ducts are composed of multiple components, including: standard components 1, 2, 3, 4, 5 (component 1 is the base, component 2 is the side plate, component 3 is the pipe clamp bracket, component 4 is the clamp bracket, and component 5 is the cover plate), working well components 1, 2, 3, 4, 5, and special-shaped components 2, 5. Among them, compared with standard components 1, 3, 4, working well components 1, 3, 4 are the same except for the semicircle cut at the conduit to be laid during the groove welding installation. Before making the components, according to the actual situation on site and CAD drawings, computer lofting is used to determine the component material specifications, production dimensions, opening positions and production quantities, etc., and the component drawings are drawn to provide a basis for purchasing materials and component production. In particular, the arc design of components 1, 3, 4 is determined according to the outer diameter of the cable casing, so that it can be well fixed with each layer of cable casing, reducing gaps and increasing compactness.

[0048] 2. Component production

[0049] The machining center manufactures components according to the requirements of the computer lofted component drawings. Component technical requirements:

[0050] 1) The material is steel Q235, machined, and all steel parts are connected by welding. The welds are full-welded with I-shaped grooves, groove b=2, and fillet welds are full-welded with ⊿5;

[0051] 2) Dimensions without tolerances shall comply with the linear dimension tolerance class B of GB / T19804-2005;

[0052] 3) The uninjected geometric tolerances shall comply with the geometric tolerance grade F of GB / T19804-2005;

[0053] 4) After welding, the excess solder is polished smooth without sharp edges;

[0054] 5) All welded parts are hot-dip galvanized.

[0055] 3. Hot dip galvanizing

[0056] After the components are processed, they are pickled and hot-dip galvanized to remove rust and corrosion to ensure the corrosion resistance of the components.

[0057] 4. Assembly and installation of components 1 and 2 (i.e. base and side panels)

[0058] First, keep a component 2 in an upright position, then take two components 1, install one at the head and tail of component 2, align the bolt holes with the lower bolt holes of the upright component 2, then insert the bolts and tighten them, then stand another component 2 upright on the other side and install it as above, temporarily install component 4 (holding bracket) at the upper bolt hole position for support, so that the assembled components have stability.

[0059] According to the above method, the installation of the trough assembly is completed in sequence. The assembly can be completed at the installation location. If conditions permit, try to assemble as many sections as possible on flat ground and use a crane to lift them to the installation location. At the installation location of the trough, use the bottom bolt holes of component 1 to fix the assembly. Every 30m, component 2 uses a working well component 2 with a long hole to meet the seismic and expansion requirements; every 60m, a working well component is used to combine into a working well to meet the seismic and expansion requirements and the cable laying, maintenance, and overhaul requirements.

[0060] 5. Layered laying of conduits and fixed installation of component 3 (i.e. pipe clamp bracket)

[0061] After assembling components 1 and 2, start laying the cable conduit. Because the space in the trough is small, it is advisable to use a socket joint to facilitate construction in the trough. The conduit needs to be laid. First, lay the bottom cable conduit and place it in the semicircular groove of component 1. The semicircular groove of component 1 keeps the distance between the cable conduits consistent, and the installed conduits are parallel and straight.

[0062] After the bottom layer of cable conduit is installed, install component 3 on the upper part of the conduit to fix the conduit: align the bolt holes of component 3 with the bolt holes of component 2 and insert the bolts and tighten them. Then, lay other layers of cable conduits in sequence according to the above method until the top layer of conduit is laid.

[0063] The installation method of the working shaft components 1, 2, and 3 is similar to the above method except that there is no duct laying.

[0064] The method for combining and installing special-shaped components is similar to the above method.

[0065] 6. Component 4 (i.e., clamping bracket) is fixed and installed

[0066] After the topmost conduit is laid, the conduit is fixed with component 4, and component 4 is installed on the top of the topmost conduit: align the bolt holes of component 4 with the bolt holes of component 2, insert the bolts and tighten them.

[0067] The installation method of the working well component 4 is similar to the above method except that there is no duct laying.

[0068] 7. Installation of component 5 (i.e. cover plate)

[0069] After the assembly of components 1, 2, 3, and 4 is completed and the conduit is laid, component 5 is installed: align the bolt hole of component 5 with the bolt of component 3, insert it, add flat washers, spring washers, and nuts, and tighten them.

[0070] Working shaft component 5 is used in locations where there are requirements for earthquake resistance and expansion.

[0071] The installation method of the special-shaped component 5 is the same as above.

[0072] The working well position component 5 needs to be clearly marked to facilitate finding.

[0073] 8. Grounding

[0074] After the installation of the trough is completed, the first and last ends are reliably connected to the grounding device.

Claims

1. The construction method of assembled strong and weak current trough is characterized by: It comprises a plurality of catheter support assemblies arranged at intervals, and each set of catheter support assemblies is composed of a base, a plurality of layers of pipe clamp brackets located in the middle, and a clamp bracket located at the top; the bottom and top of the pipe clamp bracket are provided with a plurality of semicircular grooves, and the positions of the semicircular grooves of the adjacent layers of the pipe clamp brackets correspond to form a circular hole for the catheter to pass through; the top of the base is provided with a plurality of semicircular grooves, which correspond to the positions of the semicircular grooves at the bottom of the bottom layer of the pipe clamp bracket, forming a circular hole for the catheter to pass through; the bottom of the clamp bracket is provided with a plurality of semicircular grooves, which correspond to the positions of the semicircular grooves at the top of the top layer of the pipe clamp bracket, forming a circular hole for the catheter to pass through; The conduit support assembly is composed of a base, several layers of pipe clamp brackets, and a compression bracket to form a rectangular frame structure, and the circular holes formed are arranged in a matrix; The channel is also provided with a cover plate, a left side plate and a right side plate, wherein the cover plate is installed on the top of the conduit support assembly, and the two ends of each cover plate are respectively connected to the tops of the clamping brackets of the two adjacent groups of conduit support assemblies by bolts; each left and right side plate is respectively connected to and fixed to the left and right sides of the two adjacent groups of conduit support assemblies, that is, the left and right side walls of the base and the pipe clamp bracket are respectively connected to the left and right side plates at the corresponding positions by bolts; The construction method comprises the following steps: 1) Computer lofting Before manufacturing components, computer layout is used to determine the component material specifications, manufacturing dimensions, hole positions and manufacturing quantity according to the actual situation on site and CAD drawings, and component drawings are drawn to provide a basis for purchasing materials and manufacturing components; 2) Component production The machining center manufactures components according to the requirements of the computer lofted component drawings. The component material is Q235 steel, and all steel parts are connected by welding. After welding, the excess solder is polished flat to eliminate sharp edges and corners. After the components are processed, they are pickled and hot-dip galvanized to remove rust and corrosion to ensure the corrosion resistance of the components. 3) Combined installation of bottom plate and side plate First, keep a left or right side plate upright, then take a component base and install it on a side plate, align the base bolt holes with the lower bolt holes of the upright side plate, then insert the bolts and tighten them, then stand the other side plate upright on the other side and install it in the same way as above; 4) Layered laying of conduits and fixed installation of pipe clamp brackets After assembling the base and side panels, start laying the cable conduit; due to the narrow space in the trough, it is advisable to use a socket-type joint for laying the cable conduit to facilitate construction in the trough; The conduit needs to be laid. First, lay the bottom cable conduit and place it in the semicircular groove of the component base. The semicircular groove of the base keeps the distance between the cable conduits consistent, and the installed conduits are parallel and straight. After the bottom cable conduit is installed, install the pipe clamp bracket on the upper part of the conduit to fix the conduit: Align the bolt holes of the pipe clamp bracket with the bolt holes of the side plate and insert the bolts and tighten them; then lay other layers of cable casings in sequence according to the above method until the top layer of conduit is laid; 5) Fixed installation After the top layer of conduit is laid, a clamping bracket is used to fix the conduit. The clamping bracket is installed on the top of the top layer of conduit. The bolt holes of the clamping bracket are aligned with the bolt holes of the side plate, and the bolts are inserted and tightened. 6) Cover installation Align the bolt holes of the cover plate with the bolts inserted into the clamping bracket, add flat washers, spring washers, and nuts to tighten; 7) Grounding After the installation of the trough is completed, the first and last ends are reliably connected to the grounding device.

2. The construction method of the assembled strong and weak current duct according to claim 1 is characterized in that: A threaded column for connecting the cover plate is provided on the top of the clamping bracket.

3. The construction method of the assembled strong and weak current duct according to claim 1 is characterized in that: Every 30m, the side panels use working well components with long holes to meet the requirements of earthquake resistance and expansion; every 60m, working well components are combined into a working well to meet the requirements of earthquake resistance, expansion and contraction and the requirements of cable laying, maintenance and inspection; the base, pipe clamp bracket and clamping bracket of the working well components are cut into semicircles at the conduit to be laid; left and right side panels of special-shaped components are used at the places where the groove changes diameter and direction, and their specific dimensions are determined according to the change in diameter and direction.

Citation Information

Patent Citations

  • Cable retention device

    CN101064421A

  • Fabricated type cable through-wall fixing device and cable through-wall laying construction method

    CN104600643A

  • Sealing device for cables passing through

    CN203387134U

  • Flexible cable wall passing plate

    CN203398675U

  • Assembly type strong and weak electricity channel

    CN210517669U